This is a set of mechanical design drawings for a cast iron fittings replacement project at the Veterans Affairs Medical Center in Tomah, Wisconsin. The project, numbered 676-23-009, involves replacing cast iron steam and condensate fittings throughout multiple buildings on the facility campus.

The drawings, prepared as Final Bid Documents dated October 23, 2023 (with a site date of November 3, 2023), include comprehensive mechanical plans for Buildings 400, 401, 402, 403, 404, 406, 407, 408, 415, 416, 423, 424, 452, and various support structures. The work encompasses new piping installations, crawl space plans, basement plans, first floor plans, attic plans, and mechanical room layouts. The design includes detailed specifications for steam traps, pressure reducing valves, safety valves, pipe hangers, and related mechanical components across multiple floor levels and building sections. Extensive schedules document steam trap specifications, pressure reducing valve requirements, and pressure safety valve installations by building and location. The drawings also show tramway connections between buildings, exterior trench work, manhole details, and valve assembly configurations. All plans are oriented to true north and presented at various scales ranging from 1/8" to 1¼" per foot. The consultant firm is identified as PCG (Pennsylvania-based), with project leadership and mechanical design coordination noted. The scope requires complete coordination and sequencing of all mechanical work across the distributed campus buildings with particular attention to steam system assembly, pressure reducing stations, and condensate service pre-measure, pre-fabrication, and on-site installation protocols.

View the file

Other files

File Type Posted
36C25226B0037 0002.docx DOCX document
S06_SF30 Continuation Page IFB Sol 36C25226B0037 A-0002 CON 676-23-009_09172026.pdf PDF
Copy of S05 - Pre-Bid RFIs Final.xlsx XLSX spreadsheet
36C25226B0037 0001.docx DOCX document
36C25226B0037 0001.docx DOCX document
S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Specifications.pdf PDF
VAAR 852.docx DOCX document
S02 - Wage Det 07242026.txt TXT text file
S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Drawings P1.pdf PDF
S02 - 36C25226B0037.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P

U

E

P

U

E

P

U

E

P

U

E

B U

I L D

I N

G

N

O

BUILDING NO. 404

B U

I L D

I N

G

N

O

B U

I L D

I N

G

N

O

BUILDING

NO. 425

BUILDING NO. 401

BUILDING NO. 424

BUILDING NO. 23

BUILDING NO. 25

BUILDING NO. 423

B U

I L D

I N

G

N

O

B U

I L D

I N

G

N

O

TEPS

B U

I L D

I N

G

N

O

BUILDING NO. 36

BUILDING NO. 40

BUILDING NO. T270

GAZEBO

GAZEBO

GAZEBO

HORSESHOE

W

A

L

L

W

A

L

L

W A

L L

B B Q A R E A

PAVERS

PAVERS

GAZEBO

S T

E P

S

P-UE

P-UE

P-UE

P-UE

P-U E

P-UE

P-U E

P-UE

P

U

E

P

U

E

P

U

E

P

U

E

P

U

E

P

U

E

W

A

L

L

D

E

C

K

GAZEBO

PLANTERS

B

R

I

C

K

W

A

L

L

B R

I C

K

W

A L

L

W A

L L

R A

M P

RAMP

DOCK

WITH

OVER

HANG

STEPS

STEPS

STEPS

STEPS

P O

S S

IB

L E

A B

A N

D O

N E

D G

A S

L

IN

E S

GAZEBO

BUILDING NO. 32

BUILDING NO. 405

STEPS

B U

I L D

I N

G

N

O

PLANTERS

STEPS

STEPS

STEPS

STEPS

W

ALL

W

A

L

L

W A

L L

W A

L L

W

A

L

L

WALL

BUILDING NO. T290

SHED

40A

W

O

O

D

R

M

P

R A

M P

GAZEBO

C O

N C

R E

T E

U R

B

C

O

N

C

R

E

T

E

LANDSCAPING

STEPS

F E

N C

E

WOOD FENCE

WOOD FENCE

CELLAR DOORS

C H

I L L

W

T

E R

S U

P P

L Y

R

E T

U R

N

PITS

P U

E

P U

E

P U

E P

U

E

LANDSCAPE

TIMBERS

BUILDING

NO. 452

WELL HOUSE

GENERATOR

BUILDING

G E

N E

R A

T O

R

B U

I L

D I N

G

BUILDING NO. 455

B

B

B

O X

Y G

E N

O X

Y G

E N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

D E C K

R A

M P

S U N S H A D E

A

M P

RUBBER MAT

S A

N

I T

T U

R F

L A

N D

S C

A P

I N

G

G R

A V

E L

P A

V E

R S

RUBBER MAT

STEPS

OVERHANG

STEPS

FOUNTAIN

UNDERGROUND

FUEL STORAGE

ABANDONED

CATCH BASIN

DRINKING

FOUNTAIN

LIFT STATION

VAPORIZER

FUEL

TAN

K

CONCRETE SLAB

STEPS

WALL

CELLAR DOOR

R A

M P

U N

D E

R G

R O

U N

D

F U

L

S

O

R A

G E

SUN SHADE

STEPS

UNDERGROUND

FUEL STORAGE

CONCRETE

CONCRETE

30,000 GALLON

PROPANE TANK

30,000 GALLON

PROPANE TANK

30,000 GALLON

PROPANE TANK

CHAIN LINK FENCE

C O

N C

R E

R

B

POST

CONCRETE SLAB

CONCRETE

G

V

H

VERHANG

STEPS

W

ALL

W A

LL

W A

L L

W A

L L

CONCRETE

SLABS

STEPS

CHAIN LINK

FENCE

L A

N D

S C

A P

I N

G

LANDSCAPED AREA

S T

E P

S

C H

A

N

K

F

E N

C E

C H

A

N

K

F

E N

C E

POST

OVERHANG

OVERHANG

O V

E R

H A

N G

OVERHANG

OVERHANG

OVERHANG

O

V

E

R

H

A

N

G

O

V

E

R

H

A

N

G

O

V

E

R

H

A

N

G

C O

N C

R E

T E

WATER

VAULT

W

A

L

L

STEPS

OVERHANG

D E C K

OVERHANG

W O

F

N

C E

STEAM MANHOLE

STEAM MANHOLE

STEAM

VAULT

AIR SCRUBBER

ELECTRICAL

ENCLOSURE

V

I

N

Y

N

C

E

V

I

N

Y

N

C

E

CHILLED WATER

SUPPLY/RETURN

CHILLED WATER

SUPPLY/RETURN

CHILLED WATER

SUPPLY/RETURN

C H

A

N

K

F

E N

C E

CELLAR

DOOR

CELLAR DOOR

GAS CONNECTION

ICE TANKS

OVER-

HANG

STEPS

GENERATOR

BUILDING

CONCRETE

CONCRETE

C O

N C

R E

R

B

CONCRETE

DOCK

WITH

OVER-

HANG

P

U

E

P

U

E

P

U

E

P

U

E

P

U

E

GENERATOR

BUILDING

G

A

T

E

LANDSCAPED AREA

WALL

WELL HOUSE

CONCRETE

S I G

N

S I G

N

X

X

X

X

X

X

X

C H

A

N

K

F

E N

C E

X

X

X

C H

A

N

K

F

E N

C E

UNDERGROUND

FUEL STORAGE

MP011

JMD

MECHANICAL

SITE PLAN - WEST

HFB

1/50" = 1'-0"

PARTIAL SITE PLAN - WEST

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

SITE

Date

NOV 3, 2023

X

X

X

AC

AC

AC

AC

AC

AC

BUILDING NO. 400

BUILDING NO. 407

GAZEBO

BASKETBALL COURT

W A L L

W A L L

X

STEPS

WALL

WALL

RAMP

WINDOW

WELL

GENERATOR

BUILDING

GENERATOR

BUILDING

UILDING NO. 455

WALL

W A

L L

X

B I T

U M

I N

O U

S

P

A T

H

B

B

B

B

B

O X

Y G

E N

O X

Y G

E N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

O

X

Y

G

E

N

X

X

X

X

X

X

X

X

XX

X

XXXX

BUILDING NO. 408

MP012

JMD

MECHANICAL

SITE PLAN - EAST

HFB

1/50" = 1'-0"

PARTIAL SITE PLAN - EAST

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

SITE

A B C D E F G H J K L M N P Q R S UT

K.2 K.9

M

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP101

JMDHFB

B400

1/8" = 1'-0"

CRAWL SPACE PLAN

NORTH

MECH. RM.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

2ND FLOOR, 4TH FLOOR, ATTIC

PARTIAL PLANS - NEW WORK

MP102

JMDHFB

1/4" = 1'-0"

ATTIC PARTIAL PLAN

NORTH

B400

1/4" = 1'-0"

FOURTH FLOOR PARTIAL PLAN

NORTH

1/4" = 1'-0"

SECOND FLOOR PARTIAL PLAN

NORTH

KEY PLAN

8.6

3.6

2.6

1.6

G.3 G.9 L.7L.2

J.9 K.1

9.9

9.5

A B C D E F G H J K L M N

P

Q R S T

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP103

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN

NORTH

B401

8.6

3.6

2.6

1.6

G.3 G.9 L.7L.2

J.9 K.1

9.9

9.5

A B C D E F G H J K L M N

P

Q R S T

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP104

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN

NORTH

B402

A B C D E F G H I J K L M N P Q R S

H.4 H.9

L.1 L.8

8.6

8.9

J K

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP105

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN

NORTH

B403

A B C D E

F

G

H I J

K L

M

N

P Q R

S

T

4.8

MECHANICAL

ATTIC PLAN - NEW WORK

MP106

JMDHFB

1/8" = 1'-0"

ATTIC FLOOR PLAN

NORTH

B403

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

AIR COMP

FLASH TANK

MCCMCC

PRV STATION

WH

AIR COMP

FLASH TANK

MCCMCC

PRV STATION

WH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP107

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN

NORTH

B404

ROOF ROOF

B C D E F G H J K L M N P Q R S T U V W

A

MECHANICAL

ATTIC PLAN - NEW WORK

MP108

JMDHFB

1/8" = 1'-0"

ATTIC FLOOR PLAN

NORTH

B404

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

A S H

T A N K

F L A S H

T A N K

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP109

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN NORTH

B406

1615B

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

FIRST FLOOR PLAN -

NEW WORK

MP110

JMDHFB

1/8" = 1'-0"

FIRST FLOOR PLAN NORTH

B406

1/4" = 1'-0"

ENLARGED PLAN NORTH

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

ATTIC PLAN - NEW WORK

MP111

JMDHFB

1/8" = 1'-0"

ATTIC FLOOR PLAN NORTH

B406

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

MP112

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN

NORTH

B407

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

A B C D E F G H J K L M N P Q R S T

1.5

1.6

3.5

3.6

6.8

7.5

E.1

E.5 F.5 G.5 G.9 J K L.2 M.5 N.3L.6

S.8

A B C D E F G H J K L M N P Q R S T

1.5

1.6

3.5

3.6

6.8

7.5

E.1

E.5 F.5 G.5 G.9 J K L.2 M.5 N.3L.6

S.8

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

FIRST FLOOR PLAN -

NEW WORK

MP113

JMDHFB

1/8" = 1'-0"

FIRST FLOOR PLAN

NORTH

B407

1/4" = 1'-0"

ENLARGED PLAN

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

CRAWL SPACE & FIRST FLOOR

PARTIAL PLANS - NEW WORK

MP114

JMDHFB

1/8" = 1'-0"

CRAWL SPACE PLAN NORTH

B408

1/4" = 1'-0"

FIRST FLOOR PARTIAL PLAN

NORTH

G H J K L M N P Q R S TA B C D E F

7.9

10.9

U

7.8

E.5 F.2 F.8 H.8 K.1 L.2 M.6M.2 N.5 N.8 P.3

G H J K L M N P Q R S TA B C D E F

7.9

10.9

U

7.8

E.5 F.2 F.8 H.8 K.1 L.2 M.6M.2 N.5 N.8 P.3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

ATTIC PLAN - NEW WORK

MP115

JMDHFB

1/8" = 1'-0"

ATTIC FLOOR PLAN NORTH

B408

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MP116

JMD

MECHANICAL

FIRST FLOOR AND BASEMENT

PLANS - NEW WORK

HFB

1/4" = 1'-0"

FIRST FLOOR PLAN NORTH

B415

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MP117

JMD

MECHANICAL

MEZZANINE AND UPPER

MEZZANINE DEMOLITION PLANS

HFB

1/4" = 1'-0"

MEZZANINE PLAN NORTH

1/4" = 1'-0"

UPPER MEZZANINE PLAN NORTH

B415

A B C D E F G H

BASEMENT PLAN - NEW WORK

MP118

JMDHFB

B416

1/4" = 1'-0"

BASEMENT FLOOR PLAN

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

NEW WORK FLOOR PLANS -

B023, B025, B032, B260, B425

MP119

JMDHFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/8" = 1'-0"

B032 BASEMENT FLOOR PLAN

NORTH

1/8" = 1'-0"

B025 BASEMENT FLOOR PLAN

NORTH

1/8" = 1'-0"

B425 FIRST FLOOR PLAN

NORTH

1/8" = 1'-0"

B260 FIRST FLOOR PLAN

NORTH

1/8" = 1'-0"

B023 BASEMENT FLOOR PLAN

NORTH

1/8" = 1'-0"

B023 FIRST FLOOR PLAN

NORTH

MECHANICAL NEW WORK

FLOOR PLANS - B040 AND B036

MP120

JMDHFB

1/8" = 1'-0"

B36 FIRST FLOOR PLAN

B036/B040

1/8" = 1'-0"

B40 FIRST FLOOR PLAN

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

NORTH

MP121

JMD

MECHANICAL

FIRST FLOOR PLAN -

NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

B423

1/8" = 1'-0"

FIRST FLOOR PLAN

NORTH

1/4" = 1'-0"

ENLARGED PLAN

NORTH

MP122

MECHANICAL

CRAWL SPACE PLAN -

NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/8" = 1'-0"

B424 CRAWL SPACE PLAN

NORTH

B424

MP123

MECHANICAL

PARTIAL FIRST FLOOR AND

ATTIC PLANS - NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/8" = 1'-0"

B424 PARTIAL FIRST FLOOR PLAN

NORTH

B424

1/4" = 1'-0"

B424 PARTIAL ATTIC PLAN

NORTH

DN

A A

B B

C C

D D

E E

3/4"ø

MP124

JMD

MECHANICAL

FIRST FLOOR NEW WORK

PLAN

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

B452

1/4" = 1'-0"

FIRST FLOOR PLAN

NORTH

MP125

MECHANICAL

TRAMWAY PLANS - NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/16" = 1'-0"

TRAMWAY B407 TO B408

NORTH

1/16" = 1'-0"

TRAMWAY B425 TO B400

1/16" = 1'-0"

TRAMWAY B400 TO B407

1/16" = 1'-0"

TRAMWAY B401 TO B406

1/16" = 1'-0"

TRAMWAY B403 TO B404

1/16" = 1'-0"

TRAMWAY B023 TO INTERSECTION

1/16" = 1'-0"

TRAMWAY B402 TO B401

NORTH

NORTH

NORTH NORTH

NORTH

NORTH

MECHANICAL EXTERIOR

TRENCH AND MANHOLE

ENLARGED NEW WORK PLANS

MP126

JMDHFB

1/8" = 1'-0"

MANHOLE NORTH OF B423

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

NORTH

1/8" = 1'-0"

STEAM VAULT EAST OF B416

NORTH

1/8" = 1'-0"

MANHOLE WEST OF B036

NORTH

MP301

MECHANICAL

ENLARGED PLANS - NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/4" = 1'-0"

B400 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B401 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B402 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B403 BASEMENT PLAN - NEW WORK

NORTH

A S H

T A N K

MP302

JMD

MECHANICAL

ENLARGED PLANS - NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/4" = 1'-0"

B404 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B406 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B407 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B408 BASEMENT PLAN - NEW WORK

NORTH

1/4" = 1'-0"

B424 MECHANICAL ROOM PLAN - NEW WORK

NORTH

G

1/4" = 1'-0"

B407 SECTION

F

1/4" = 1'-0"

B406 SECTION

B

1/4" = 1'-0"

B401 SECTION

E

1/4" = 1'-0"

B404 SECTION

DEMOLITION DEMOLITION

DEMOLITION

DEMOLITION

A

1/4" = 1'-0"

B400 SECTION

C

1/4" = 1'-0"

B402 SECTION

DEMOLITION NEW WORKNEW WORKNEW WORK

D

1/4" = 1'-0"

B403 SECTION

DEMOLITION NEW WORK DEMOLITION NEW WORK

NEW WORKNEW WORK

I

1/4" = 1'-0"

B424 SECTION

DEMOLITION

NEW WORK

H

1/4" = 1'-0"

B408 SECTION

DEMOLITION

NEW WORK

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M301

JMD

MECHANICAL

SECTIONS

HFB

DEMOLITION

1/4" = 1'-0"

B415 SECTION

NEW WORK

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M302

JMD

MECHANICAL

SECTIONS

HFB

B415

NTS

PIPE HANGERS

NTS

PRESSURE REDUCING STATION DETAIL

NTS

INSTALLATION DETAIL

NTS

STEAM TRAP ASSEMBLY

INVERTED BUCKET STEAM SAFETY VALVE

REPLACEMENT FITTING STEAM

NTS

STEAM TRAP ASSEMBLY DETAIL

END OF LINE AND DRIP POCKET

NTS

TRAP ASSEMBLY DETAIL

FLOAT AND THERMOSTATIC

NTS

IN CONCRETE

SECURING HANGER RODS

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M501

JMD

MECHANICAL

DETAILS AND DIAGRAMS

HFB

M601

JMDBAM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

MECHANICAL

SCHEDULES

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M602

EAO

MECHANICAL SCHEDULES

HFB

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M603

EAO

MECHANICAL SCHEDULES

HFB

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M604

EAO

MECHANICAL SCHEDULES

HFB

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-23-009

Office of

Facilities

Management

FINAL BID DOCUMENTS

OCT. 23, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

REPLACE CAST IRON FITTINGS

DESIGN

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

M605

EAO

MECHANICAL SCHEDULES

HFB

Cover
GC101
GC102
GC103
HA101
HA102
HA103
M001
MD011
MD012
MD101-400
MD102-400
MD103-401
MD104-402
MD105-403
MD106-403
MD107-404
MD108-404
MD109-406
MD110-406
MD111-406
MD112-407
MD113-407
MD114-408
MD115-408
MD116-415
MD117-415
MD118-416
MD119-B23-B25-B32-B260-B425
MD120-036-040
MD121-423
MD122-424
MD123-424
MD124-452
MD125-Tramways
MD126 Exterior Enlarged Plans
MD301 Enlarged Plans
MD302 Enlarged Plans
MP011
MP012
MP101-400
MP102-400
MP103-401
MP104-402
MP105-403
MP106-403
MP107-404
MP108-404
MP109-406
MP110-406
MP111-406
MP112-407
MP113-407
MP114-408
MP115-408
MP116-415
MP117-415
MP118-416
MP119-B23-B25-B32-B260-B425
MP120-036-040
MP121-423
MP122-424
MP123-424
MP124-452
MP125-Tramways
MP126 Exterior Enlarged Plans
MP301 Enlarged Plans
MP302 Enlarged Plans
M301
M302
M501
M601
M602
M603
M604
M605

File details come from the government source that posted it. Updated .