S02 561-2-300 Drawings-Updated 1.pdf
PDF 8 MB Posted
- Solicitation number
- 36C24221B0037
About this file
This solicitation package describes a federal construction contract opportunity for project 561-20-300 to convert the 5C ward to an inpatient unit at the VA New Jersey Health Care System campus in East Orange. The project involves demolishing existing structures and furnishing labor and materials to upgrade HVAC, plumbing, electrical, and architectural systems. Specific scopes of work include replacing outdated reheating controls, shower valves, and fixtures; adding hemodialysis hookups; and renovating hallways and patient room doors. The solicitation will be issued on May 3rd via SAM.gov as a Service-Disabled Veteran Owned Small Business set-aside with an estimated cost between $1-2 million. Responses are due in hard copy by the date specified in the solicitation. Work must begin immediately upon notice to proceed and be completed within 180 calendar days while minimizing medical center disruptions. The construction site is in Building 1 on the 5th floor and roof, with oversight from the VA contracting officer representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24221B0037 0001.docx | DOCX document | |
| S06 Amendment 1 Revised Drawings and Specs.pdf | ||
| 36C24221B0037_1.docx | DOCX document | |
| S02 561-20-300 Specifications-Updated 1.pdf | ||
| S02 WD - Copy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-MH-100 HVAC: DUCTWORK FLOOR PLANS
1-GI-001 COVER & INDEX OF DRAWINGS
SHEET #: DRAWING #: DRAWING TITLE
1-MH-001
HVAC: SYMBOLS, ABBREVIATIONS & NOTES
MECHANICAL:
GENERAL:
1-MD-100 HVAC: DUCTWORK DEMOLITION FLOOR PLANS
1-P-001 PLUMBING: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES
PLUMBING:
1-P-100 PLUMBING: FLOOR PLANS
1-MH-101 HVAC: PIPING FLOOR PLANS
1-MD-101 HVAC: PIPING DEMOLITION FLOOR PLANS
1-MH-800
HVAC: DETAILS
1-P-700 PLUMBING: DETAILS
1-MH-700
HVAC: SCHEDULES
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
H
N
D
F E
L
L
E
N
Z
E R
S
T
A
T
E
O
F
NE
W
J
R
S
E
Y
P
R
O
F
E
S
S
I
O
A L
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
1-PH-100 PHASING & ICRA
1-GI-002 GENERAL CONTRACTUAL: SITE SAFETY & PROPOSED STAGING PLAN
1-ES-001 ELECTRICAL: SYMBOLS, ABBREVIATIONS & NOTES
1-ED-100 ELECTRICAL: POWER DEMOLITION FLOOR & ROOF PLANS
ELECTRICAL:
1-ES-100 ELECTRICAL: POWER FLOOR & ROOF PLANS
1-ES-700 ELECTRICAL: DETAILS
HVAC: AIR HANDLER CONTROLS 1-MH-501
1-AS-100 ARCHITECTURAL: FLOOR PLANS
ARCHITECTURAL:
1-AS-701 ARCHITECTURAL: INTERIOR ELEVATIONS
SITE SAFETY & PROPOSED STAGING PLAN
SAFETY NOTES:
LEGEND:
GENERAL NOTES:
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
KEYED NOTES:
5-200
DAYROOM
220 SF
5-199
OFFICE
340 SF
ELECTRICAL: FIFTH FLOOR - FLOOR PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
KEYED NOTES:
VA EAST ORANGE INPATIENT 5C PHASING SUMMARY
Description of Required Infection Control Precautions by Class
During Construction Project Upon Completion of Project
1. Provide active means to prevent airborne dust from dispersing into atmosphere, which may include the use of a control cube.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with masking tape.
4. Block off and seal air vents.
7. Doors and windows within the work zone to remain closed at all times except during ingress/ergress.
8. Place adhesive mat at entrance and exit of work area as necessary.
9. Cover transport receptacles or carts.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
C l a s
I
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transportation in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
C l a
V
C l a
I
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
12. Wet mop and/or vacuum with HEPA filtered vacuum at end of day or end of work shift. Area to be free of dust and/or debris.
11. Use designated removal route/elevators for removal of debris.
10. Contain construction waste before transport in tightly covered containers.
6. Remove or isolate HVAC system in areas where work is being performed.
5. Place adhesive dust mat at entrance and exit of work area.
8. Designate entry and exit traffic pattern, unauthorized personnel are not permitted to enter work zone, traffic control signs placed.
9. The contractor shall maintain the construction zone in a clean manner
· The area will be HEPA-vacuumed or damped mopped daily or more often as necessary to minimize duct, as determined by the VA COR.
· Daily cleanup of debris, material and waste shall be completed.
· Adhesive mats monitored & changed on a regular basis so that they remain effective.
· Any dust or construction debris tracked outside of the work area shall be promptly cleaned.
10. Terminal cleaning will be performed following VA protocol.
11. The terminal cleaning will be inspected by the Owner prior to the authorization for the barrier removal.
12. Air samples may be performed following IC/Safety protocol as deemed necessary by the COR.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins will stay in place until IC or PM authorizes removal.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units. Both will be maintained until project terminal cleaning is completed and IC authorizes removal. Air pressure to be monitored & documented at least daily. Adhesive mats placed at all entrances & exists of work area.
4. Contain construction waste before transport in tightly covered containers.
5. Remove isolation of HVAC system in areas where work is being performed.
4. Wet mop area with disinfectant.
6. Barriers will be removed carefully to minimize spreading of construction dust & debris.
8. Seal all holes, pipes and conduits penetrations in work area.
9. Construct anteroom for staging of equipment & donning of coveralls.
10. Workers will were coveralls in work area. Upon completion of major dust generation activities, coverall requirement is removed
11. Coveralls are removed in work zone before entering anteroom.
12. Any residual dust left on workers shall be removed by vacuum.
13. All renovation, construction, maintenance & tool carts leaving area must be covered & the wheels wiped down with a disinfectant solution.
14. Environmental Management Services (EMS) or a contract cleaner will vacuum or damp mop the area outside the work zone and adjacent areas.
UL U465 (1 HOUR RATED) FIRECODE 'C' OR 'X' GYPSUM BD PANELS
APPLIED VERTICALLY OR HORIZONTALLY. HORIZONTAL JOINTS NEED NOT
BE STAGGERED. FACE LAYER JOINTS TO BE FINISHED. FIRE CAULK ALL
PENETRATIONS.TAPE & SPACKLE OCCUPIED SIDE, LEVEL 4 FINISH.
FRAMING TO DECK
CONTINUOUS BOTTOM
RUNNER TRACK
SEALANT - BOTH SIDES
3 5/8" x 25 GAUGE
MTL STUDS
5/8" FIRECODE 'C'
OR 'X' GYPSUM
WALL BD. (1) LAYER
EACH SIDE
LINE OF RATED FLOOR
STRUCTURE ABOVE
CONTINUOUS TO TOP RUNNER
TRACK. CEILING DECK IS CONCRETE
IN HONEY COMB ASSEMBLY, I.E. IT IS
NOT CONTINUOUS ON ONE PLANE,
THE DECK BOTTOM JOGS UP AND
DOWN. PARTITION MUST FOLLOW
THE CONTOUR OF THE CEILING AND
BE CONTINUOUS FROM FLOOR TO
CEILING DECK.
U.L. LISTED FIRE CAULK
COMPLETE, BOTH SIDES
3" MINERAL WOOL SOUND
ATTENUATION BATT. INSULATION
APPROXIMATE OUTLINE OF PHASE BOUNDARY LINES (PARTITION
LOCATION). COORDINATE WITH PROJECT DRAWING SET EXISTING
WALLS.
LEGEND:
NOTES:
PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
Class IV
Class III / IV
Class IV
Class IV
PATIENT RISK GROUP FOR "TYPE C" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
CLASS II
CLASS III
Class III / IV
Class III / IV
PATIENT RISK GROUP FOR "TYPE B" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
CLASS II
CLASS II
CLASS II
Class III / IV
GENERAL CONSTRUCTION ACTIVITY NOTES:
TEMPORARY CONSTRUCTION PARTITION DETAIL
220 SF
5-200
DAYROOM
220 SF
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
DOOR SCHEDULE
ARCHITECTURAL: FLOOR PLAN
ARCHITECTURAL: DEMOLITION PLAN
NOTES:
NOTE:
DEDUCT ALTERNATES:
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
INTERIOR ELEVATION
TYPICAL CABINETRY SECTIONS
SECTION A SECTION B
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
ARCHITECTURAL: DOOR FRAME DETAILS
ARCHITECTURAL: DOOR ELEVATION
ARCHITECTURAL: DOOR FRAMES
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
GENERAL NOTES:
ABBREVIATIONSDUCTWORK SYMBOLS
GENERAL SYMBOLS
PIPING SYMBOLS
HVAC LINE TYPES
HVAC DEMOLITION NOTES:
VALVE SYMBOLS
MINIMUM PIPE INSULATION - COMMERCIAL
220 SF
5-199
OFFICE
340 SF
HVAC: FIFTH FLOOR - DEMOLITION DUCTWORK PLAN
HVAC: SIXTH FLOOR ROOF - DEMOLITION PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
DEMOLITION KEYED NOTES:
SAFETY NOTES: GENERAL CONSTRUCTION ACTIVITY NOTES:
220 SF
5-199
OFFICE
340 SF
HVAC: FIFTH FLOOR - PIPING DEMOLITION PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
HVAC: LEVEL-C - PIPING DEMOLITION PLAN
GENERAL SCOPE:
REHEAT COIL PIPING
KEYED NOTE:
GENERAL CONSTRUCTION ACTIVITY NOTES:
220 SF
5-199
OFFICE
340 SF
HVAC: FIFTH FLOOR - EXISTING DUCTWORK PLAN
HVAC: SIXTH FLOOR ROOF PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
NEW WORK KEYED NOTE:
GENERAL NOTE:
SAFETY NOTES: GENERAL CONSTRUCTION ACTIVITY NOTES:
220 SF
5-199
OFFICE
340 SF
HVAC: FIFTH FLOOR - PIPING PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
HVAC: LEVEL-C - PIPING PLAN
KEYED NOTES:
NOTES:
NEW REHEAT COIL WITH PIPING (TYP.)
DEDUCT ALTERNATE:
Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
LEGEND
AHU-1 POINTS LIST
ELECTRODE STEAM GENERATOR
100% OUTSIDE AIR HANDLING UNIT AHU-1
BUILDING MANAGEMENT SYSTEM
PART 1 - GENERAL
1.1 SEQUENCE OF OPERATION
A. 100% OUTSIDE AIR UNIT AHU-1
1. THE SINGLE PATH AIR HANDLING UNIT CONSISTS OF AN OUTDOOR AIR DAMPER,
PRE-FILTER, FINAL FILTER, GLYCOL HOT WATER PRE-HEAT COIL, CHILLED WATER
COOLING COIL AND SUPPLY FAN. THE UNIT IS DDC CONTROLLED USING ELECTRIC
ACTUATION FOR THE OUTDOOR AIR DAMPER, FAN, PRE-HEAT COIL, COOLING COIL,
AND HUMIDIFIER.
2. UNIT IS CONTROLLED BY ETHERNET BASED DDC “BUILDING” CONTROLLER WITH
PEER TO PEER COMMUNICATION CAPABILITIES AND WITH 64 MB RAM MINIMUM
PROVIDED BY THE DDC CONTRACTOR. ALL CONTROL INPUT/OUTPUT DEVICES
ARE PROVIDED BY THE DDC CONTRACTOR.
3. THE BUILDING MANAGEMENT SYSTEM SCHEDULES THE AIR HANDLING UNIT TO
OPERATE ON A TIME OF DAY BASIS FOR OCCUPIED AND UNOCCUPIED MODES.
4. OCCUPIED
a. UPON UNIT START, THE ASSOCIATED EXHAUST FANS (AS APPLICABLE) START
AND THE OUTSIDE AIR DAMPER IS OPENED. AFTER THE DAMPER END SWITCH
MAKES, THE SUPPLY FAN STARTS.
b. THE PREHEAT COIL VALVE MODULATES TO MAINTAIN THE PREHEAT COIL
DISCHARGE AIR TEMPERATURE SET POINT OF 55 DEGREES F. WHEN THE
OUTSIDE AIR TEMPERATURE IS BELOW 36 DEGREES F, THE PREHEAT COIL
VALVE IS FULLY OPEN. THE SUPPLY TEMPERATURE SHALL RESET THE
PRE-HEAT COIL DISCHARGE TEMPERATURE.
c. THE PRE-HEAT COIL AND COOLING COIL VALVES MODULATE IN SEQUENCE
WITHOUT OVERLAP TO MAINTAIN THE SUPPLY AIR TEMPERATURE SET POINT OF
55 DEGREES F.
5. UNOCCUPIED
a. THE SUPPLY FAN AND EXHAUST FAN (AS APPLICABLE) STOP. THE ASSOCIATED
DAMPERS ARE FULLY CLOSED. THE COOLING COIL VALVE IS FULLY CLOSED.
THE PREHEAT COIL VALVE MODULATES TO MAINTAIN THE PREHEAT COIL
DISCHARGE AIR TEMPERATURE SET POINT OF 55 DEGREES F. WHEN THE
OUTSIDE AIR TEMPERATURE IS BELOW 36 DEGREES F THE PREHEAT COIL VALVE
IS FULLY OPEN. THE SUPPLY TEMPERATURE SHALL RESET THE PRE-HEAT COIL
DISCHARGE TEMPERATURE.
6. HUMIDITY CONTROL
a. THE STEAM HUMIDIFIER VALVE MODULATES ONLY WHEN THE UNIT IS IN THE
OCCUPIED MODE AND THE SUPPLY FAN IS ON. THE STEAM HUMIDIFIER VALVE IS
CLOSED WHEN THE UNIT IS IN ALL OTHER MODES OF OPERATION OR WHEN THE
SUPPLY FAN IS OFF. THE STEAM HUMIDIFIER VALVE MODULATES TO MAINTAIN
THE SUPPLY AIR HUMIDITY SET POINT (ADJUSTABLE). THE SUPPLY AIR
HUMIDITY SET POINT RANGES FROM 0% RELATIVE HUMIDITY TO 85% RELATIVE
HUMIDITY AS RESET BASED ON THE HUMIDISTAT'S TO MAINTAIN A ROOM
HUMIDITY SET POINT OF 35% RELATIVE HUMIDITY. THE HUMIDIFIER VALVE
RAMPS OPEN SLOWLY TO MINIMIZE OVERSHOOTING.
7. FILTER MONITORING
a. THE BMS MONITORS PRE-FILTER AND FINAL-FILTER WITH INDIVIDUAL
DIFFERENTIAL PRESSURE SWITCHES. UPON INDICATION OF FILTER PRESSURE
DROP ABOVE SET POINT (ADJUSTABLE), THE BMS WILL GENERATE AND ALARM.
8. SAFETIES AND MONITORING
a. THE BMS USES CURRENT SWITCHES TO CONFIRM THAT THE SUPPLY FAN AND
EXHAUST FAN (AS APPLICABLE) ARE IN THE DESIRED STATE. THE BMS WILL
ALARM AT THE WORKSTATION IF THE PUMP FAILS TO PROVE STATUS 30
SECONDS AFTER A COMMAND TO START.
b. A LOW TEMPERATURE DETECTOR LOCATED IN THE DISCHARGE OF THE HEATING
COIL, DE-ENERGIZES (HARD WIRED INTERLOCK) THE SUPPLY AND RETURN FANS
AND INDICATES A LOW TEMPERATURE ALARM IF THE TEMPERATURE DROPS
BELOW 38 DEGREES F (ADJUSTABLE THRU BMS FRONT END P.C.).
c. A SUPPLY FAN SUCTION LOW STATIC PRESSURE CUTOUT OR SMOKE
DETECTORS IN THE SUPPLY AIR DUCT DE-ENERGIZES (HARD WIRED INTERLOCK)
THE SUPPLY FAN AND INDICATES AN ALARM IF ANY ARE ACTIVATED.
d. BMS SHALL GENERATE AN ALARM IF THE MIXED AIR TEMPERATURE DROPS
BELOW 40 DEGREE F (ADJUSTABLE).
9. PROVIDE THE FOLLOWING POINTS:
a. SUPPLY FAN STATUS
b. SUPPLY FAN START/STOP
c. SUPPLY FAN SPEED CONTROL
d. SUPPLY FAN VFD INTEGRATION
e. EXHAUST FAN STATUS (AS APPLICABLE)
f. EXHAUST FAN START/STOP (AS APPLICABLE)
g. PRE-HEAT COIL DISCHARGE AIR TEMPERATURE
h. PRE-HEAT COIL DISCHARGE AIR TEMPERATURE SET POINT
i. SUPPLY FAN DISCHARGE AIR TEMPERATURE
j. SUPPLY FAN DISCHARGE AIR TEMPERATURE SET POINT
k. COOLING COIL VALVE CONTROL
l. PRE-HEAT COIL 1/3RD VALVE CONTROL
m. PRE-HEAT COIL 2/3RD VALVE CONTROL
n. OUTSIDE AIR DAMPER
o. OUTSIDE AIR TEMPERATURE
p. HUMIDIFIER VALVE CONTROL
q. SUPPLY AIR HUMIDITY
r. PRE FILTER STATUS
s. FINAL FILTER STATUS
t. LOW TEMPERATURE ALARM
u. SUPPLY FAN SUCTION LOW STATIC PRESSURE ALARM
v. OUTSIDE AIR DAMPER STATUS w.SUPPLY SMOKE DETECTOR STATUS
x. SUPPLY STATIC PRESSURE
y. SUPPLY AIR FLOW
B. EXHAUST FANS
1. EF-1 AND EF-2 ARE HIGH-PLUME EXHAUST FANS WITH DUCTED IN-LINE HEPA
FILTER BOXES INSTALLED BEFORE THE FANS. THE UNIT SHALL BE DDC
CONTROLLED, TIED INTO THE BMS FOR OPERATION WITH AHU-1.
2. THE BUILDING MANAGEMENT SYSTEM SHALL SCHEDULE THE EXHAUST FANS TO
OPERATE ON A TIME OF DAY BASIS FOR OCCUPIED AND UNOCCUPIED MODES.
3. OCCUPIED
a. EXHAUST FANS SHALL START BEFORE AHU-1
b. THE ISOLATION ROOMS PRESSURE SENSOR SHALL MODULATE THE SPEED OF
THE ASSOCIATED EXHAUST FANS VFD TO MAINTAIN A NEGATIVE SPACE
PRESSURIZATION OF 0.10" W.C. WITH RESPECT OF THE CORRIDOR.
c. PROVIDE DIGITAL PRESSURE READOUTS ON ALL ROOM PRESSURE SENSORS.
ROOF PRESSURIZATIONS SHALL BE LINKED TO BMS WITH HISTORICAL AND
TRENDING DATA TRACKING.
4. UNOCCUPIED
a. ALL EXHAUST FANS SHALL TURN OFF WITH ASSOCIATED AHU-1. WHENEVER
AHU-1 SIGNALS TO TURN ON ASSOCIATED EXHAUST FANS SHALL START FIRST.
5. FILTER MONITORING
a. THE BMS SHALL MONITOR HEPA FILTER BOX WITH INDIVIDUAL PRESSURE
SWITCHES. UPON INDICATION OF FILTERS PRESSURE DROP ABOVE SET POINT
(ADJUSTABLE). THE BMS WILL GENERATE AN ALARM.
EXHAUST FAN POINTS LIST
4.
2. DRIP LEG ON EQUIPMENT CONNECTION. SAME SIZE AS THE
SUPPLY MAIN OR EQUIPMENT CONNECTION. SEE NOTE 1
12" MIN.
FULL SIZE BYPASS
PIPE SIZES SAME AS
CONNECTION ON TRAP
EXTRA STRONG
STEEL PIPE
TO RETURN
MAIN
SEE DWGS.
FOR SIZE
DIELECTRIC FITTING
(WHERE RETURN IS COPPER)
FLOAT & THERMOSTATIC TRAP
NOTES:
ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM
HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG
SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.
NO BYPASS IS REQUIRED IN THE TRAP SET PROVIDED FOR THE DRIPPING OF
LOW PRESSURE SUPPLY MAINS (15 PSIG OR LESS).
NO CHECK VALVE IS REQUIRED FOR LOW PRESSURE STEAM SYSTEM WITH
GRAVITY RETURN.
1.
3.
6" MIN.
P
TFM
1¼" STEAM CONDENSATE
RETURN. SEE H-201a FOR
CONTINUATION
STEAM CONTROL VALVE
LPS
HEAT EXCHANGER
"CIRCUIT-SETTER"
BALANCING VALVE (TYP.)
STRAINER (TYP.)
SAFETY RELIEF
VAVLVE, FACTORY
SUPPLIED (TYP.)
UNION (TYP.)
TEMPERATURE/PRESSURE
GAUGE (TYP.)
FLOW METER STATION
WITH READOUT (TYP.)
HWR FROM
SYSTEM
2½"
BYPASS
B Y P A S S www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
DUCT HANGERS/REINFORCEMENT
PIPING CONNECTIONS (STEAM DISPERSION PANEL)
STEAM HUMIDIFIER -
CUSTOM UNIT (AHU-1) DETAIL
EXTERIOR INSULATED DUCTWORK DETAIL
SUCTION
NOTES:
SPRING VIBRATION
ISOLATORS
FINISHED
FLOOR
BASE MOUNTING
BOLTS. (TYP.)
PIPE SUPPORT MIN. 1" DIA
EXTENDED DRAIN LINE
TO FLOOR DRAIN
SUCTION DIFFUSER
WITH BUILT-IN
STRAINER
FLEXIBLE CONNECTOR
LUG BODY
BUTTERFLY VALVE
PRESSURE GAUGE
(NOTE #2 & 3)
EXTEND & CONNECT TO
BOTTOM OR SIDE OF MAINS
SPRING VIBRATION ISOLATORS (TYPICAL) TYPE
COMBINATION NEOPRENE & SPRING HANGER
FOR 5" DIA. PIPE & LARGER
HANGER ROD SUSPENDED FROM
STRUCTURE ABOVE (TYPICAL)
DISCHARGE
TRIPLE DUTY VALVE
BASE MOUNTED PUMP
DRAIN PAN
1. CONCRETE PAD TO BE PROVIDED UNDER HVAC DIVISION OF SPECIFICATIONS.
2. PROVIDE PRESSURE GAUGE AND MANIFOLD WITH CONNECTIONS TO THE
SUCTION AND DISCHARGE SIDE OF THE PUMP AS SHOWN.
3. CONTRACTOR MAY ALSO USE SEPARATE GAUGES INSTALLED INDIVIDUALLY
AT THE SUCTION AND DISCHARGE SIDE OF THE PUMP.
1/2" REBAR, 12" O.C.
EACH DIRECTION AND
DOWEL INTO SLAB PER
DETAIL #7.
12"
12"
END SUCTION PUMP DETAIL
STEAM TRAP PIPING FOR HEAT EXCHANGERS DETAIL
CHEMICAL FEED SYSTEM PIPING DIAGRAM
HEAT EXCHANGER PIPING SCHEMATIC
DOUBLE WALL ROOFTOP CURB DETAIL
HOT WATER COIL PIPING SCHEMATIC
VEKTOR EXHAUST FAN ELEVATION DETAIL
Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
AIR HANDLING UNIT SCHEDULE
EXHAUST FAN SCHEDULE
STEAM TO WATER HEAT EXCHANGER SCHEDULE
ELECTRODE STEAM GENERATOR
EXPANSION TANK SCHEDULE
NOTES:
AIR SEPARATOR SCHEDULE
NOTES:
Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
GENERAL SYMBOLS
GENERAL PLUMBING NOTES:GENERAL NOTES:
PLUMBING DEMOLITION NOTES:
PLUMBING LINE TYPES
PIPING SYMBOLS VALVE SYMBOLS ABBREVIATIONS
LEGEND AND SCHEDULE OF PLUMBING EQUIPMENT
CATALOG #MANUFACTURERSYMBOL DESCRIPTION
220 SF
5-199
OFFICE
340 SF
5-200
DAYROOM
220 SF
5-199
OFFICE
340 SF
W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
PLUMBING: FIFTH FLOOR - NEW WORK PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
N E
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
GENERAL SCOPE:
PLUMBING: FIFTH FLOOR - DEMOLITION PLAN
GENERAL SCOPE:
KEYED NOTE:
KEYED NOTES:
Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
NOTE:
PLAN
SECTION A
NOTE:
WALL MOUNTED FLUSH VALVE DETAIL
NOTE:
TYPICAL WHEELCHAIR LAVATORY DETAIL
LAVATORY MOUNTING DETAIL
(P-809) DIALYSIS BOX DETAIL
Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
TV
COMMUNICATION SYMBOLS
¾
¾
¾
SP
W
WAP
ABBREVIATIONS
ELECTRICAL DEMOLITION NOTES:
¾
ELECTRICAL GENERAL NOTES:
LIGHTING SYMBOLS
1.
NOTES:
2.
LEGEND AND SCHEDULE OF SAFETY EQUIPMENT
GENERAL SYMBOLS
POWER SYMBOLS
¾
ELECTRICAL LINE TYPES
FIRE ALARM SYMBOLS
FIRE ALARM NOTES:
LEGEND AND SCHEDULE OF FIRE ALARM EQUIPMENT
ELECTRICAL CONTRACTOR SCOPE ITEMS:
220 SF
5-199
OFFICE
340 SF
ELECTRICAL: FIFTH FLOOR - DEMOLITION FLOOR PLAN
ELECTRICAL: SIXTH FLOOR ROOF - DEMOLITION PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
GENERAL NOTE:
DEMO ONE-LINE DIAGRAM
SAFETY NOTES:
220 SF
5-199
OFFICE
340 SF
ELECTRICAL: FIFTH FLOOR - FLOOR PLAN
ELECTRICAL: SIXTH FLOOR ROOF PLAN
www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
EXISTING PP59A ONE-LINE DIAGRAM
KEYED NOTES:
SAFETY NOTES:
5-265
BEDROOM
170 SF
5-265A
BATH
40 SF
5-266
BEDROOM
175 SF
5-270
BEDROOM
145 SF
5-266A
TOILET
15 SF
5-268A
TOILET
15 SF
5-270A
TOILET
15 SF
5-271
BEDROOM
135 SF
5-294C
CORRIDOR
645 SF
CORRIDOR
5-267
BEDROOM
140 SF
5-268
BEDROOM
140 SF
5-269
BEDROOM
135 SF
5-261
ROOM
COMPUTER
160 SF
5-263
BATHING
CENTRAL
90 SF
5-264
DAYROOM
280 SF
5-294C.1
SUB-STATION
NURSE
5-260A
LOUNGE
STAFF
175 SF
5-259
TOILET
STAFF
45 SF
5-260B
LOCKERS
70 SF
5-262
MANAGER
NURSE
120 SF
5-257
CHUTE
LINEN
35 SF5-258
HAC
75 SF
5-200
DAYROOM
220 SF
5-199
OFFICE
340 SF
5-198
OFFICE
190 SF
5-157
ROOM
LINEN
90 SF
5-174A
CORRIDOR
785 SF
5-188A
BATH
35 SF
5-188
BEDROOM
120 SF
5-187
BEDROOM
140 SF
5-187A
BATH
35 SF
5-174B
CORRIDOR
640 SF
5-186
BEDROOM
140 SF
5-185
BEDROOM
140 SF
5-184
BEDROOM
140 SF
5-183
BEDROOM
130 SF
5-185A
TOILET
15 SF
5-183A
TOILET
15 SF
5-181A
TOILET
15 SF
5-182
BEDROOM
130 SF
5-181
BEDROOM
140 SF
5-180
BEDROOM
140 SF
5-179
BEDROOM
140 SF
5-178
BEDROOM
150 SF
5-177
BEDROOM
155 SF
5-179A
TOILET
15 SF
5-177A
TOILET
15 SF
5-176
HAC
35 SF
5-E-108
ELEC
35 SF
SHAFT #8
50 SF
STAIR #5
135 SF
5-174C
CORRIDOR
785 SF
5-197A
LOUNGE
STAFF
200 SF
5-189
STATION
NURSE
275 SF
5-173
BEDROOM
165 SF
5-165A
HC BATH
60 SF
5-166A
HC BATH
60 SF
5-165
HC BEDROOM
200 SF
5-173A
BATH
45 SF
5-172A
BATH
45 SF 5-174C.4
ALCOVE
25 SF
5-191
NOURISH.
60 SF5-190
ROOM
MED
95 SF
5-164
BATHING
CENTRAL
100 SF
5-163
DAYROOM
295 SF
5-174B.1
SUB-STATION
NURSE
5-196
TOILET
STAFF
45 SF
5-193
ROOM
CLEAN
90 SF
5-195
REPORT ROOM
CONFERENCE /
140 SF
5-159
STORAGE
EQUIPMENT
150 SF
5-161
ROOM
COMPUTER
160 SF
5-162
MANAGER
NURSE
115 SF
5-158
ROOM
MECHANICAL
145 SF
5-197B
LOCKERS
100 SF
5-160
OFFICE
RESIDENT'S
130 SF
5-174C.1
SUB-STATION
NURSE
35 SF
5-192
ROOM
SOILED
95 SF
F
W
W
FF
F F
F
F
W
IM
W
F
F
F
F
F
F
F
F
F F
I M
F
W
W
W
W
W www.fellp.com
32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705
ENGINEERING LLP
1 - 5th FLOOR
100% CONSTRUCTION DOCUMENTS
No.J O
F E
L
L
E
N
Z
E R
S
T
A
R
S
E
Y
P
R
O
F
E
S
S
I
O
G
I
N
E
E
R
L
I
C
E N
S
E
D
GE543091
CONDUIT PENETRATION
IN FIRE RATED CONCRETE FLOOR
IN FIRE RATED MASONRY PARTITION
CONDUIT PENETRATION
CONDUIT PENETRATION IN FIRE
RATED GWB OR PLASTER PARTITION
NOTES:
TYPICAL ROOFTOP HVAC EQUIPMENT DETAIL (AHU-1, EF-1, & EF-2)
5TH FLOOR KEY PLAN
| Sheets and Views |
| (1)1-GI-001-(1) G1-001 |
| (2)1-GI-002-GI-002 |
| (3)1-PH-100-1-PH-100 |
| (4) 1-AS-100 & (5) 1-AS-701-1-AS-100 |
| (4) 1-AS-100 & (5) 1-AS-701-1-AS-701 |
| (6) 1-MH-001-1-MH-001 |
| (7)1-MD-100 & (9)1-MH-100-1-MD-100 |
| (7)1-MD-100 & (9)1-MH-100-1-MH-100 |
| (8)1-MD-101 & (10)1-MH-101-1-MD-101 |
| (8)1-MD-101 & (10)1-MH-101-1-MH-101 |
| (11) 1-MH-501-1-MH-501 |
| (12) 1-MH-700-1-MH-700 |
| (13) 1-MH-800-1-MH-800 |
| (14) 1-P-001-1-PL-001 |
| (15)1-P-100-1-PD-100(NU) |
| (15)1-P-100-1-P-100 |
| (16) 1-P-700-1-P-700 |
| (17) 1-ES-001-E-001 |
| (18) 1-ED-100 & (19) ES-100-1-ED-100 |
| (18) 1-ED-100 & (19) ES-100-1-ES-100 |
| (20) ES-700-E-700 |