This solicitation package describes a federal construction contract opportunity for project 561-20-300 to convert the 5C ward to an inpatient unit at the VA New Jersey Health Care System campus in East Orange. The project involves demolishing existing structures and furnishing labor and materials to upgrade HVAC, plumbing, electrical, and architectural systems. Specific scopes of work include replacing outdated reheating controls, shower valves, and fixtures; adding hemodialysis hookups; and renovating hallways and patient room doors. The solicitation will be issued on May 3rd via SAM.gov as a Service-Disabled Veteran Owned Small Business set-aside with an estimated cost between $1-2 million. Responses are due in hard copy by the date specified in the solicitation. Work must begin immediately upon notice to proceed and be completed within 180 calendar days while minimizing medical center disruptions. The construction site is in Building 1 on the 5th floor and roof, with oversight from the VA contracting officer representative.

View the file

Other files

File Type Posted
36C24221B0037 0001.docx DOCX document
S06 Amendment 1 Revised Drawings and Specs.pdf PDF
36C24221B0037_1.docx DOCX document
S02 561-20-300 Specifications-Updated 1.pdf PDF
S02 WD - Copy.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-MH-100 HVAC: DUCTWORK FLOOR PLANS

1-GI-001 COVER & INDEX OF DRAWINGS

SHEET #: DRAWING #: DRAWING TITLE

1-MH-001

HVAC: SYMBOLS, ABBREVIATIONS & NOTES

MECHANICAL:

GENERAL:

1-MD-100 HVAC: DUCTWORK DEMOLITION FLOOR PLANS

1-P-001 PLUMBING: SYMBOLS, SCHEDULES, ABBREVIATIONS & NOTES

PLUMBING:

1-P-100 PLUMBING: FLOOR PLANS

1-MH-101 HVAC: PIPING FLOOR PLANS

1-MD-101 HVAC: PIPING DEMOLITION FLOOR PLANS

1-MH-800

HVAC: DETAILS

1-P-700 PLUMBING: DETAILS

1-MH-700

HVAC: SCHEDULES

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

H

N

D

F E

L

L

E

N

Z

E R

S

T

A

T

E

O

F

NE

W

J

R

S

E

Y

P

R

O

F

E

S

S

I

O

A L

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

1-PH-100 PHASING & ICRA

1-GI-002 GENERAL CONTRACTUAL: SITE SAFETY & PROPOSED STAGING PLAN

1-ES-001 ELECTRICAL: SYMBOLS, ABBREVIATIONS & NOTES

1-ED-100 ELECTRICAL: POWER DEMOLITION FLOOR & ROOF PLANS

ELECTRICAL:

1-ES-100 ELECTRICAL: POWER FLOOR & ROOF PLANS

1-ES-700 ELECTRICAL: DETAILS

HVAC: AIR HANDLER CONTROLS 1-MH-501

1-AS-100 ARCHITECTURAL: FLOOR PLANS

ARCHITECTURAL:

1-AS-701 ARCHITECTURAL: INTERIOR ELEVATIONS

SITE SAFETY & PROPOSED STAGING PLAN

SAFETY NOTES:

LEGEND:

GENERAL NOTES:

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

KEYED NOTES:

5-200

DAYROOM

220 SF

5-199

OFFICE

340 SF

ELECTRICAL: FIFTH FLOOR - FLOOR PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

KEYED NOTES:

VA EAST ORANGE INPATIENT 5C PHASING SUMMARY

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of Project

1. Provide active means to prevent airborne dust from dispersing into atmosphere, which may include the use of a control cube.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with masking tape.

4. Block off and seal air vents.

7. Doors and windows within the work zone to remain closed at all times except during ingress/ergress.

8. Place adhesive mat at entrance and exit of work area as necessary.

9. Cover transport receptacles or carts.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.

C l a s

I

1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transportation in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

C l a

V

C l a

I

1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

12. Wet mop and/or vacuum with HEPA filtered vacuum at end of day or end of work shift. Area to be free of dust and/or debris.

11. Use designated removal route/elevators for removal of debris.

10. Contain construction waste before transport in tightly covered containers.

6. Remove or isolate HVAC system in areas where work is being performed.

5. Place adhesive dust mat at entrance and exit of work area.

8. Designate entry and exit traffic pattern, unauthorized personnel are not permitted to enter work zone, traffic control signs placed.

9. The contractor shall maintain the construction zone in a clean manner

· The area will be HEPA-vacuumed or damped mopped daily or more often as necessary to minimize duct, as determined by the VA COR.

· Daily cleanup of debris, material and waste shall be completed.

· Adhesive mats monitored & changed on a regular basis so that they remain effective.

· Any dust or construction debris tracked outside of the work area shall be promptly cleaned.

10. Terminal cleaning will be performed following VA protocol.

11. The terminal cleaning will be inspected by the Owner prior to the authorization for the barrier removal.

12. Air samples may be performed following IC/Safety protocol as deemed necessary by the COR.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins will stay in place until IC or PM authorizes removal.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units. Both will be maintained until project terminal cleaning is completed and IC authorizes removal. Air pressure to be monitored & documented at least daily. Adhesive mats placed at all entrances & exists of work area.

4. Contain construction waste before transport in tightly covered containers.

5. Remove isolation of HVAC system in areas where work is being performed.

4. Wet mop area with disinfectant.

6. Barriers will be removed carefully to minimize spreading of construction dust & debris.

8. Seal all holes, pipes and conduits penetrations in work area.

9. Construct anteroom for staging of equipment & donning of coveralls.

10. Workers will were coveralls in work area. Upon completion of major dust generation activities, coverall requirement is removed

11. Coveralls are removed in work zone before entering anteroom.

12. Any residual dust left on workers shall be removed by vacuum.

13. All renovation, construction, maintenance & tool carts leaving area must be covered & the wheels wiped down with a disinfectant solution.

14. Environmental Management Services (EMS) or a contract cleaner will vacuum or damp mop the area outside the work zone and adjacent areas.

UL U465 (1 HOUR RATED) FIRECODE 'C' OR 'X' GYPSUM BD PANELS

APPLIED VERTICALLY OR HORIZONTALLY. HORIZONTAL JOINTS NEED NOT

BE STAGGERED. FACE LAYER JOINTS TO BE FINISHED. FIRE CAULK ALL

PENETRATIONS.TAPE & SPACKLE OCCUPIED SIDE, LEVEL 4 FINISH.

FRAMING TO DECK

CONTINUOUS BOTTOM

RUNNER TRACK

SEALANT - BOTH SIDES

3 5/8" x 25 GAUGE

MTL STUDS

5/8" FIRECODE 'C'

OR 'X' GYPSUM

WALL BD. (1) LAYER

EACH SIDE

LINE OF RATED FLOOR

STRUCTURE ABOVE

CONTINUOUS TO TOP RUNNER

TRACK. CEILING DECK IS CONCRETE

IN HONEY COMB ASSEMBLY, I.E. IT IS

NOT CONTINUOUS ON ONE PLANE,

THE DECK BOTTOM JOGS UP AND

DOWN. PARTITION MUST FOLLOW

THE CONTOUR OF THE CEILING AND

BE CONTINUOUS FROM FLOOR TO

CEILING DECK.

U.L. LISTED FIRE CAULK

COMPLETE, BOTH SIDES

3" MINERAL WOOL SOUND

ATTENUATION BATT. INSULATION

APPROXIMATE OUTLINE OF PHASE BOUNDARY LINES (PARTITION

LOCATION). COORDINATE WITH PROJECT DRAWING SET EXISTING

WALLS.

LEGEND:

NOTES:

PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

Class IV

Class III / IV

Class IV

Class IV

PATIENT RISK GROUP FOR "TYPE C" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

CLASS II

CLASS III

Class III / IV

Class III / IV

PATIENT RISK GROUP FOR "TYPE B" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

CLASS II

CLASS II

CLASS II

Class III / IV

GENERAL CONSTRUCTION ACTIVITY NOTES:

TEMPORARY CONSTRUCTION PARTITION DETAIL

220 SF

5-200

DAYROOM

220 SF

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

DOOR SCHEDULE

ARCHITECTURAL: FLOOR PLAN

ARCHITECTURAL: DEMOLITION PLAN

NOTES:

NOTE:

DEDUCT ALTERNATES:

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

INTERIOR ELEVATION

TYPICAL CABINETRY SECTIONS

SECTION A SECTION B

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

ARCHITECTURAL: DOOR FRAME DETAILS

ARCHITECTURAL: DOOR ELEVATION

ARCHITECTURAL: DOOR FRAMES

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

GENERAL NOTES:

ABBREVIATIONSDUCTWORK SYMBOLS

GENERAL SYMBOLS

PIPING SYMBOLS

HVAC LINE TYPES

HVAC DEMOLITION NOTES:

VALVE SYMBOLS

MINIMUM PIPE INSULATION - COMMERCIAL

220 SF

5-199

OFFICE

340 SF

HVAC: FIFTH FLOOR - DEMOLITION DUCTWORK PLAN

HVAC: SIXTH FLOOR ROOF - DEMOLITION PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

DEMOLITION KEYED NOTES:

SAFETY NOTES: GENERAL CONSTRUCTION ACTIVITY NOTES:

220 SF

5-199

OFFICE

340 SF

HVAC: FIFTH FLOOR - PIPING DEMOLITION PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

HVAC: LEVEL-C - PIPING DEMOLITION PLAN

GENERAL SCOPE:

REHEAT COIL PIPING

KEYED NOTE:

GENERAL CONSTRUCTION ACTIVITY NOTES:

220 SF

5-199

OFFICE

340 SF

HVAC: FIFTH FLOOR - EXISTING DUCTWORK PLAN

HVAC: SIXTH FLOOR ROOF PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

NEW WORK KEYED NOTE:

GENERAL NOTE:

SAFETY NOTES: GENERAL CONSTRUCTION ACTIVITY NOTES:

220 SF

5-199

OFFICE

340 SF

HVAC: FIFTH FLOOR - PIPING PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

HVAC: LEVEL-C - PIPING PLAN

KEYED NOTES:

NOTES:

NEW REHEAT COIL WITH PIPING (TYP.)

DEDUCT ALTERNATE:

Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

LEGEND

AHU-1 POINTS LIST

ELECTRODE STEAM GENERATOR

100% OUTSIDE AIR HANDLING UNIT AHU-1

BUILDING MANAGEMENT SYSTEM

PART 1 - GENERAL

1.1 SEQUENCE OF OPERATION

A. 100% OUTSIDE AIR UNIT AHU-1

1. THE SINGLE PATH AIR HANDLING UNIT CONSISTS OF AN OUTDOOR AIR DAMPER,

PRE-FILTER, FINAL FILTER, GLYCOL HOT WATER PRE-HEAT COIL, CHILLED WATER

COOLING COIL AND SUPPLY FAN. THE UNIT IS DDC CONTROLLED USING ELECTRIC

ACTUATION FOR THE OUTDOOR AIR DAMPER, FAN, PRE-HEAT COIL, COOLING COIL,

AND HUMIDIFIER.

2. UNIT IS CONTROLLED BY ETHERNET BASED DDC “BUILDING” CONTROLLER WITH

PEER TO PEER COMMUNICATION CAPABILITIES AND WITH 64 MB RAM MINIMUM

PROVIDED BY THE DDC CONTRACTOR. ALL CONTROL INPUT/OUTPUT DEVICES

ARE PROVIDED BY THE DDC CONTRACTOR.

3. THE BUILDING MANAGEMENT SYSTEM SCHEDULES THE AIR HANDLING UNIT TO

OPERATE ON A TIME OF DAY BASIS FOR OCCUPIED AND UNOCCUPIED MODES.

4. OCCUPIED

a. UPON UNIT START, THE ASSOCIATED EXHAUST FANS (AS APPLICABLE) START

AND THE OUTSIDE AIR DAMPER IS OPENED. AFTER THE DAMPER END SWITCH

MAKES, THE SUPPLY FAN STARTS.

b. THE PREHEAT COIL VALVE MODULATES TO MAINTAIN THE PREHEAT COIL

DISCHARGE AIR TEMPERATURE SET POINT OF 55 DEGREES F. WHEN THE

OUTSIDE AIR TEMPERATURE IS BELOW 36 DEGREES F, THE PREHEAT COIL

VALVE IS FULLY OPEN. THE SUPPLY TEMPERATURE SHALL RESET THE

PRE-HEAT COIL DISCHARGE TEMPERATURE.

c. THE PRE-HEAT COIL AND COOLING COIL VALVES MODULATE IN SEQUENCE

WITHOUT OVERLAP TO MAINTAIN THE SUPPLY AIR TEMPERATURE SET POINT OF

55 DEGREES F.

5. UNOCCUPIED

a. THE SUPPLY FAN AND EXHAUST FAN (AS APPLICABLE) STOP. THE ASSOCIATED

DAMPERS ARE FULLY CLOSED. THE COOLING COIL VALVE IS FULLY CLOSED.

THE PREHEAT COIL VALVE MODULATES TO MAINTAIN THE PREHEAT COIL

DISCHARGE AIR TEMPERATURE SET POINT OF 55 DEGREES F. WHEN THE

OUTSIDE AIR TEMPERATURE IS BELOW 36 DEGREES F THE PREHEAT COIL VALVE

IS FULLY OPEN. THE SUPPLY TEMPERATURE SHALL RESET THE PRE-HEAT COIL

DISCHARGE TEMPERATURE.

6. HUMIDITY CONTROL

a. THE STEAM HUMIDIFIER VALVE MODULATES ONLY WHEN THE UNIT IS IN THE

OCCUPIED MODE AND THE SUPPLY FAN IS ON. THE STEAM HUMIDIFIER VALVE IS

CLOSED WHEN THE UNIT IS IN ALL OTHER MODES OF OPERATION OR WHEN THE

SUPPLY FAN IS OFF. THE STEAM HUMIDIFIER VALVE MODULATES TO MAINTAIN

THE SUPPLY AIR HUMIDITY SET POINT (ADJUSTABLE). THE SUPPLY AIR

HUMIDITY SET POINT RANGES FROM 0% RELATIVE HUMIDITY TO 85% RELATIVE

HUMIDITY AS RESET BASED ON THE HUMIDISTAT'S TO MAINTAIN A ROOM

HUMIDITY SET POINT OF 35% RELATIVE HUMIDITY. THE HUMIDIFIER VALVE

RAMPS OPEN SLOWLY TO MINIMIZE OVERSHOOTING.

7. FILTER MONITORING

a. THE BMS MONITORS PRE-FILTER AND FINAL-FILTER WITH INDIVIDUAL

DIFFERENTIAL PRESSURE SWITCHES. UPON INDICATION OF FILTER PRESSURE

DROP ABOVE SET POINT (ADJUSTABLE), THE BMS WILL GENERATE AND ALARM.

8. SAFETIES AND MONITORING

a. THE BMS USES CURRENT SWITCHES TO CONFIRM THAT THE SUPPLY FAN AND

EXHAUST FAN (AS APPLICABLE) ARE IN THE DESIRED STATE. THE BMS WILL

ALARM AT THE WORKSTATION IF THE PUMP FAILS TO PROVE STATUS 30

SECONDS AFTER A COMMAND TO START.

b. A LOW TEMPERATURE DETECTOR LOCATED IN THE DISCHARGE OF THE HEATING

COIL, DE-ENERGIZES (HARD WIRED INTERLOCK) THE SUPPLY AND RETURN FANS

AND INDICATES A LOW TEMPERATURE ALARM IF THE TEMPERATURE DROPS

BELOW 38 DEGREES F (ADJUSTABLE THRU BMS FRONT END P.C.).

c. A SUPPLY FAN SUCTION LOW STATIC PRESSURE CUTOUT OR SMOKE

DETECTORS IN THE SUPPLY AIR DUCT DE-ENERGIZES (HARD WIRED INTERLOCK)

THE SUPPLY FAN AND INDICATES AN ALARM IF ANY ARE ACTIVATED.

d. BMS SHALL GENERATE AN ALARM IF THE MIXED AIR TEMPERATURE DROPS

BELOW 40 DEGREE F (ADJUSTABLE).

9. PROVIDE THE FOLLOWING POINTS:

a. SUPPLY FAN STATUS

b. SUPPLY FAN START/STOP

c. SUPPLY FAN SPEED CONTROL

d. SUPPLY FAN VFD INTEGRATION

e. EXHAUST FAN STATUS (AS APPLICABLE)

f. EXHAUST FAN START/STOP (AS APPLICABLE)

g. PRE-HEAT COIL DISCHARGE AIR TEMPERATURE

h. PRE-HEAT COIL DISCHARGE AIR TEMPERATURE SET POINT

i. SUPPLY FAN DISCHARGE AIR TEMPERATURE

j. SUPPLY FAN DISCHARGE AIR TEMPERATURE SET POINT

k. COOLING COIL VALVE CONTROL

l. PRE-HEAT COIL 1/3RD VALVE CONTROL

m. PRE-HEAT COIL 2/3RD VALVE CONTROL

n. OUTSIDE AIR DAMPER

o. OUTSIDE AIR TEMPERATURE

p. HUMIDIFIER VALVE CONTROL

q. SUPPLY AIR HUMIDITY

r. PRE FILTER STATUS

s. FINAL FILTER STATUS

t. LOW TEMPERATURE ALARM

u. SUPPLY FAN SUCTION LOW STATIC PRESSURE ALARM

v. OUTSIDE AIR DAMPER STATUS w.SUPPLY SMOKE DETECTOR STATUS

x. SUPPLY STATIC PRESSURE

y. SUPPLY AIR FLOW

B. EXHAUST FANS

1. EF-1 AND EF-2 ARE HIGH-PLUME EXHAUST FANS WITH DUCTED IN-LINE HEPA

FILTER BOXES INSTALLED BEFORE THE FANS. THE UNIT SHALL BE DDC

CONTROLLED, TIED INTO THE BMS FOR OPERATION WITH AHU-1.

2. THE BUILDING MANAGEMENT SYSTEM SHALL SCHEDULE THE EXHAUST FANS TO

OPERATE ON A TIME OF DAY BASIS FOR OCCUPIED AND UNOCCUPIED MODES.

3. OCCUPIED

a. EXHAUST FANS SHALL START BEFORE AHU-1

b. THE ISOLATION ROOMS PRESSURE SENSOR SHALL MODULATE THE SPEED OF

THE ASSOCIATED EXHAUST FANS VFD TO MAINTAIN A NEGATIVE SPACE

PRESSURIZATION OF 0.10" W.C. WITH RESPECT OF THE CORRIDOR.

c. PROVIDE DIGITAL PRESSURE READOUTS ON ALL ROOM PRESSURE SENSORS.

ROOF PRESSURIZATIONS SHALL BE LINKED TO BMS WITH HISTORICAL AND

TRENDING DATA TRACKING.

4. UNOCCUPIED

a. ALL EXHAUST FANS SHALL TURN OFF WITH ASSOCIATED AHU-1. WHENEVER

AHU-1 SIGNALS TO TURN ON ASSOCIATED EXHAUST FANS SHALL START FIRST.

5. FILTER MONITORING

a. THE BMS SHALL MONITOR HEPA FILTER BOX WITH INDIVIDUAL PRESSURE

SWITCHES. UPON INDICATION OF FILTERS PRESSURE DROP ABOVE SET POINT

(ADJUSTABLE). THE BMS WILL GENERATE AN ALARM.

EXHAUST FAN POINTS LIST

4.

2. DRIP LEG ON EQUIPMENT CONNECTION. SAME SIZE AS THE

SUPPLY MAIN OR EQUIPMENT CONNECTION. SEE NOTE 1

12" MIN.

FULL SIZE BYPASS

PIPE SIZES SAME AS

CONNECTION ON TRAP

EXTRA STRONG

STEEL PIPE

TO RETURN

MAIN

SEE DWGS.

FOR SIZE

DIELECTRIC FITTING

(WHERE RETURN IS COPPER)

FLOAT & THERMOSTATIC TRAP

NOTES:

ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM

HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG

SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.

NO BYPASS IS REQUIRED IN THE TRAP SET PROVIDED FOR THE DRIPPING OF

LOW PRESSURE SUPPLY MAINS (15 PSIG OR LESS).

NO CHECK VALVE IS REQUIRED FOR LOW PRESSURE STEAM SYSTEM WITH

GRAVITY RETURN.

1.

3.

6" MIN.

P

TFM

1¼" STEAM CONDENSATE

RETURN. SEE H-201a FOR

CONTINUATION

STEAM CONTROL VALVE

LPS

HEAT EXCHANGER

"CIRCUIT-SETTER"

BALANCING VALVE (TYP.)

STRAINER (TYP.)

SAFETY RELIEF

VAVLVE, FACTORY

SUPPLIED (TYP.)

UNION (TYP.)

TEMPERATURE/PRESSURE

GAUGE (TYP.)

FLOW METER STATION

WITH READOUT (TYP.)

HWR FROM

SYSTEM

2½"

BYPASS

B Y P A S S www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

DUCT HANGERS/REINFORCEMENT

PIPING CONNECTIONS (STEAM DISPERSION PANEL)

STEAM HUMIDIFIER -

CUSTOM UNIT (AHU-1) DETAIL

EXTERIOR INSULATED DUCTWORK DETAIL

SUCTION

NOTES:

SPRING VIBRATION

ISOLATORS

FINISHED

FLOOR

BASE MOUNTING

BOLTS. (TYP.)

PIPE SUPPORT MIN. 1" DIA

EXTENDED DRAIN LINE

TO FLOOR DRAIN

SUCTION DIFFUSER

WITH BUILT-IN

STRAINER

FLEXIBLE CONNECTOR

LUG BODY

BUTTERFLY VALVE

PRESSURE GAUGE

(NOTE #2 & 3)

EXTEND & CONNECT TO

BOTTOM OR SIDE OF MAINS

SPRING VIBRATION ISOLATORS (TYPICAL) TYPE

COMBINATION NEOPRENE & SPRING HANGER

FOR 5" DIA. PIPE & LARGER

HANGER ROD SUSPENDED FROM

STRUCTURE ABOVE (TYPICAL)

DISCHARGE

TRIPLE DUTY VALVE

BASE MOUNTED PUMP

DRAIN PAN

1. CONCRETE PAD TO BE PROVIDED UNDER HVAC DIVISION OF SPECIFICATIONS.

2. PROVIDE PRESSURE GAUGE AND MANIFOLD WITH CONNECTIONS TO THE

SUCTION AND DISCHARGE SIDE OF THE PUMP AS SHOWN.

3. CONTRACTOR MAY ALSO USE SEPARATE GAUGES INSTALLED INDIVIDUALLY

AT THE SUCTION AND DISCHARGE SIDE OF THE PUMP.

1/2" REBAR, 12" O.C.

EACH DIRECTION AND

DOWEL INTO SLAB PER

DETAIL #7.

12"

12"

END SUCTION PUMP DETAIL

STEAM TRAP PIPING FOR HEAT EXCHANGERS DETAIL

CHEMICAL FEED SYSTEM PIPING DIAGRAM

HEAT EXCHANGER PIPING SCHEMATIC

DOUBLE WALL ROOFTOP CURB DETAIL

HOT WATER COIL PIPING SCHEMATIC

VEKTOR EXHAUST FAN ELEVATION DETAIL

Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

AIR HANDLING UNIT SCHEDULE

EXHAUST FAN SCHEDULE

STEAM TO WATER HEAT EXCHANGER SCHEDULE

ELECTRODE STEAM GENERATOR

EXPANSION TANK SCHEDULE

NOTES:

AIR SEPARATOR SCHEDULE

NOTES:

Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

GENERAL SYMBOLS

GENERAL PLUMBING NOTES:GENERAL NOTES:

PLUMBING DEMOLITION NOTES:

PLUMBING LINE TYPES

PIPING SYMBOLS VALVE SYMBOLS ABBREVIATIONS

LEGEND AND SCHEDULE OF PLUMBING EQUIPMENT

CATALOG #MANUFACTURERSYMBOL DESCRIPTION

220 SF

5-199

OFFICE

340 SF

5-200

DAYROOM

220 SF

5-199

OFFICE

340 SF

W

W W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

PLUMBING: FIFTH FLOOR - NEW WORK PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

N E

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

GENERAL SCOPE:

PLUMBING: FIFTH FLOOR - DEMOLITION PLAN

GENERAL SCOPE:

KEYED NOTE:

KEYED NOTES:

Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

NOTE:

PLAN

SECTION A

NOTE:

WALL MOUNTED FLUSH VALVE DETAIL

NOTE:

TYPICAL WHEELCHAIR LAVATORY DETAIL

LAVATORY MOUNTING DETAIL

(P-809) DIALYSIS BOX DETAIL

Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

TV

COMMUNICATION SYMBOLS

¾

¾

¾

SP

W

WAP

ABBREVIATIONS

ELECTRICAL DEMOLITION NOTES:

¾

ELECTRICAL GENERAL NOTES:

LIGHTING SYMBOLS

1.

NOTES:

2.

LEGEND AND SCHEDULE OF SAFETY EQUIPMENT

GENERAL SYMBOLS

POWER SYMBOLS

¾

ELECTRICAL LINE TYPES

FIRE ALARM SYMBOLS

FIRE ALARM NOTES:

LEGEND AND SCHEDULE OF FIRE ALARM EQUIPMENT

ELECTRICAL CONTRACTOR SCOPE ITEMS:

220 SF

5-199

OFFICE

340 SF

ELECTRICAL: FIFTH FLOOR - DEMOLITION FLOOR PLAN

ELECTRICAL: SIXTH FLOOR ROOF - DEMOLITION PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

GENERAL NOTE:

DEMO ONE-LINE DIAGRAM

SAFETY NOTES:

220 SF

5-199

OFFICE

340 SF

ELECTRICAL: FIFTH FLOOR - FLOOR PLAN

ELECTRICAL: SIXTH FLOOR ROOF PLAN

www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

EXISTING PP59A ONE-LINE DIAGRAM

KEYED NOTES:

SAFETY NOTES:

5-265

BEDROOM

170 SF

5-265A

BATH

40 SF

5-266

BEDROOM

175 SF

5-270

BEDROOM

145 SF

5-266A

TOILET

15 SF

5-268A

TOILET

15 SF

5-270A

TOILET

15 SF

5-271

BEDROOM

135 SF

5-294C

CORRIDOR

645 SF

CORRIDOR

5-267

BEDROOM

140 SF

5-268

BEDROOM

140 SF

5-269

BEDROOM

135 SF

5-261

ROOM

COMPUTER

160 SF

5-263

BATHING

CENTRAL

90 SF

5-264

DAYROOM

280 SF

5-294C.1

SUB-STATION

NURSE

5-260A

LOUNGE

STAFF

175 SF

5-259

TOILET

STAFF

45 SF

5-260B

LOCKERS

70 SF

5-262

MANAGER

NURSE

120 SF

5-257

CHUTE

LINEN

35 SF5-258

HAC

75 SF

5-200

DAYROOM

220 SF

5-199

OFFICE

340 SF

5-198

OFFICE

190 SF

5-157

ROOM

LINEN

90 SF

5-174A

CORRIDOR

785 SF

5-188A

BATH

35 SF

5-188

BEDROOM

120 SF

5-187

BEDROOM

140 SF

5-187A

BATH

35 SF

5-174B

CORRIDOR

640 SF

5-186

BEDROOM

140 SF

5-185

BEDROOM

140 SF

5-184

BEDROOM

140 SF

5-183

BEDROOM

130 SF

5-185A

TOILET

15 SF

5-183A

TOILET

15 SF

5-181A

TOILET

15 SF

5-182

BEDROOM

130 SF

5-181

BEDROOM

140 SF

5-180

BEDROOM

140 SF

5-179

BEDROOM

140 SF

5-178

BEDROOM

150 SF

5-177

BEDROOM

155 SF

5-179A

TOILET

15 SF

5-177A

TOILET

15 SF

5-176

HAC

35 SF

5-E-108

ELEC

35 SF

SHAFT #8

50 SF

STAIR #5

135 SF

5-174C

CORRIDOR

785 SF

5-197A

LOUNGE

STAFF

200 SF

5-189

STATION

NURSE

275 SF

5-173

BEDROOM

165 SF

5-165A

HC BATH

60 SF

5-166A

HC BATH

60 SF

5-165

HC BEDROOM

200 SF

5-173A

BATH

45 SF

5-172A

BATH

45 SF 5-174C.4

ALCOVE

25 SF

5-191

NOURISH.

60 SF5-190

ROOM

MED

95 SF

5-164

BATHING

CENTRAL

100 SF

5-163

DAYROOM

295 SF

5-174B.1

SUB-STATION

NURSE

5-196

TOILET

STAFF

45 SF

5-193

ROOM

CLEAN

90 SF

5-195

REPORT ROOM

CONFERENCE /

140 SF

5-159

STORAGE

EQUIPMENT

150 SF

5-161

ROOM

COMPUTER

160 SF

5-162

MANAGER

NURSE

115 SF

5-158

ROOM

MECHANICAL

145 SF

5-197B

LOCKERS

100 SF

5-160

OFFICE

RESIDENT'S

130 SF

5-174C.1

SUB-STATION

NURSE

35 SF

5-192

ROOM

SOILED

95 SF

F

W

W

FF

F F

F

F

W

IM

W

F

F

F

F

F

F

F

F

F F

I M

F

W

W

W

W

W www.fellp.com

32 Front St., Port Jervis, NY 12771 t 845-856-3600 fx 845-856-3734

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

85 Market St., Suite 200, Poughkeepsie, NY 12601 t 845-454-9704 fx 845-454-9705

ENGINEERING LLP

1 - 5th FLOOR

100% CONSTRUCTION DOCUMENTS

No.J O

F E

L

L

E

N

Z

E R

S

T

A

R

S

E

Y

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

L

I

C

E N

S

E

D

GE543091

CONDUIT PENETRATION

IN FIRE RATED CONCRETE FLOOR

IN FIRE RATED MASONRY PARTITION

CONDUIT PENETRATION

CONDUIT PENETRATION IN FIRE

RATED GWB OR PLASTER PARTITION

NOTES:

TYPICAL ROOFTOP HVAC EQUIPMENT DETAIL (AHU-1, EF-1, & EF-2)

5TH FLOOR KEY PLAN

Sheets and Views
(1)1-GI-001-(1) G1-001
(2)1-GI-002-GI-002
(3)1-PH-100-1-PH-100
(4) 1-AS-100 & (5) 1-AS-701-1-AS-100
(4) 1-AS-100 & (5) 1-AS-701-1-AS-701
(6) 1-MH-001-1-MH-001
(7)1-MD-100 & (9)1-MH-100-1-MD-100
(7)1-MD-100 & (9)1-MH-100-1-MH-100
(8)1-MD-101 & (10)1-MH-101-1-MD-101
(8)1-MD-101 & (10)1-MH-101-1-MH-101
(11) 1-MH-501-1-MH-501
(12) 1-MH-700-1-MH-700
(13) 1-MH-800-1-MH-800
(14) 1-P-001-1-PL-001
(15)1-P-100-1-PD-100(NU)
(15)1-P-100-1-P-100
(16) 1-P-700-1-P-700
(17) 1-ES-001-E-001
(18) 1-ED-100 & (19) ES-100-1-ED-100
(18) 1-ED-100 & (19) ES-100-1-ES-100
(20) ES-700-E-700

File details come from the government source that posted it. Updated .