This document outlines maintenance issues and resolutions for various buildings and equipment at a Veterans Affairs medical center. It identifies six humidification systems across multiple buildings and floors that were supplied by low pressure steam from the boiler plant during functional testing, and specifies installing clean steam generators to resolve the issue. It also notes two additional issues - an air handling unit lacking a variable frequency drive, which should be installed along with reprogramming the sequence of operation for airflow control, and chilled water valves open to allow flow to prevent freezing while awaiting bypass valves, with adding the bypass valves listed as the resolution. The related federal contract opportunity is for repairs at the specified Veterans Affairs medical center located in Brockton, Massachusetts, under Solicitation Number 36C24123B0009, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 - Site Visit Sign In Sheet Brockton RCx Repairs.pdf | ||
| S06 - Bid Opening Conference Line 36C24123B0009.docx | DOCX document | |
| S05 - RFI Questions and Answers 523A5-22-003 RCx Repairs Brockton.docx | DOCX document | |
| 36C24123B0009 0003.docx | DOCX document | |
| 36C24123B0009 0002.docx | DOCX document | |
| 1 35 26 SAFETY REQUIREMENTS.pdf | ||
| 36C24123B0009 0001.docx | DOCX document | |
| 523A5-22-003 VISN 1 RCx Repairs BR SOW 230330sm.pdf | ||
| 01 00 00 GENERAL REQUIREMENTS.pdf | ||
| 01 33 23 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf | ||
| WD MA20230001 16 June 2023.pdf | ||
| 36C24123B0009.pdf | ||
| 36C24123B0009.docx | DOCX document | |
| S02 01 33 23 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf | ||
| S02 1 35 26 SAFETY REQUIREMENTS.pdf | ||
| S02 01 00 00 GENERAL REQUIREMENTS.pdf | ||
| S02 WD MA20230001 16 June 2023.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIL
Issue No.
Survey Date
Equipment Name
Equipment Building Location;
Room, Roof, or Wing;
and Area Served
Issue Description Resolution
7 2/1/2021 A1 Bldg 2 PHA‐02 Penthouse A Section
During functional testing the humidifier was supplied by the low‐ pressure steam from the boiler plant.
Install a clean steam generator.
13 2/1/2021 A2 Bldg 2 B‐001A B Section Basement, 1st/2nd Floors
During functional testing the humidifier was supplied by the low‐ pressure steam from the boiler plant.
Install a clean steam generator.
17 2/1/2021 A3 Bldg 2 B‐001 B Section Day Rooms
During functional testing the humidifier was supplied by the low‐ pressure steam from the boiler plant.
Install a clean steam generator.
25 2/1/2021 A4 Bldg 2 PHB‐02 Penthouse B Section 3rd/4th Floors
During functional testing the humidifier was supplied by the low‐ pressure steam from the boiler plant.
Install a clean steam generator.
35 2/1/2021 A5 Bldg 2 C‐001A C Section Basement, 1st/2nd Floors
During functional testing the humidifier was supplied by the low‐ pressure steam from the boiler plant.
Install a clean steam generator.
41 2/1/2021 A6 Bldg 2 C‐001A C Section Day Rooms
During functional testing the humidifier was supplied by the low‐ pressure steam from the boiler plant.
Install a clean steam generator.
MIL
Issue No.
Survey Date
Equipment Name
Equipment Building Location;
Room, Roof, or Wing;
and Area Served
Issue Description Resolution
235 2/4/2021 3 AHUs for Bldg 46
Bldg 46 Outside
During testing the AC Shop indicated that the chilled water valve was set open to allow flow through the pipes to prevent freezing. They indicated that they were waiting on globe valves to put in place as a bypass so chilled water did not need to pass through the cooling coils.
Add a bypass to allow for chilled water flow through the system piping during winter but prevent flow through the coils.
248 2/2/2021 A23 5 ‐ Outpatient Psychiatry Penthouse
PHA‐05
The air handling unit's supply fan is not equipped with a variable frequency drive. (Priority: 3 ‐ Energy Conservation)
Install a variable frequency drive and reprogram the sequence of operation for airflow control. Run the unit through point‐to‐point and functional performance testing.