S02 - 442-24-016_CONSTRUCTION DRAWINGS.pdf
PDF 32 MB Posted
- Solicitation number
- 36C25924R0011
About this file
This document provides details for a federal contract opportunity to repair chilled water cisterns and heat exchangers. The solicitation number is 36C25924R0011 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The contractor will be required to provide construction drawings, repair services for chilled water cisterns and heat exchangers. The response deadline is not specified but the opportunity is listed as a solicitation so bids or proposals would likely be due in the next 1-3 months. The period of performance and award date are also not included but work would likely need to be completed within the next 6-12 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924R0011 0004.docx | DOCX document | |
| S05 - RFIs and Responses.pdf | ||
| S04 - Site Visit Attendance_Repair Chilled Water Cistern _ Heat Exchanger.pdf | ||
| 36C25924R0011 0003.docx | DOCX document | |
| 36C25924R0011 0002.docx | DOCX document | |
| 36C25924R0011 0001.docx | DOCX document | |
| S02 - 442-24-016_SPECIFICATIONS.pdf | ||
| S02 - Past Performance Questionnaire.docx | DOCX document | |
| 36C25924R0011_1.docx | DOCX document | |
| S22- 852.219-75 LOS Certificate - ST.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
M0
MECHANICAL SYMBOLS AND
ABBREVIATIONS
CHEYENNE, WY
BUFFALO
Revisions: Date:
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
GPM GALLONS PER MINUTE
BOB BOTTOM OF BEAM
CC CONTROLS CONTRACTOR
ABBREVIATION DESCRIPTION
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
N
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
TOS TOP OF STEEL
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
NEW
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
CWS CHILLED WATER SUPPLY
CHR CHILLED WATER RETURN
CS CONDENSER WATER SUPPLY
CR CONDENSER WATER RETURN
D DRAIN
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
E
G
F
F
L
G
NTS
SYSTEM PIPING SCHEMATIC
M0
442-24-016BID DOCUMENTS Repair Chilled Water Cistern & Heat Exchanger System
MECHANICAL GENERAL NOTES:
1. THESE NOTES APPLY TO ALL SHEETS. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS
SHALL TAKE PRECEDENCE OVER THE DRAWINGS.
2. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT
LOCATIONS SHOWN ARE
APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR
SHALL VISIT THE SITE
TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW
WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER.
3. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE
SHOWN. THE
CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A
COMPLETE AND FUNCTIONING
SYSTEM. DO NOT SCALE OFF THESE DRAWINGS.
4. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION. REFERENCE THE STATEMENT OF WORK (SOW) FOR PHASING REQUIREMENTS. COORDINATE
SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK.
5. SUPPORT ALL PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR
REMOVAL FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR MAINTENANCE.
6. TEST AND BALANCE P-4 SYSTEM UTILIZING THE BALANCING VALVE AND IMPELLER TRIMMING AS NEEDED TO ACHIEVE THE DESIRED SYSTEM FLOW RATE. RECORD FINAL MEASUREMENTS FOR HYDRONIC EQUIPMENT (HX-2 & P-4) ON PERFORMANCE DATA SHEETS INCLUDING ENTERING AND LEAVING WATER TEMPERATURES. RECORD FINAL VALVE SETTING FOR BALANCING VALVE. PROVIDE FINAL TAB REPORT WITH ALL DATA INCLUDING TAB CONTRACTOR'S
CREDENTIALS AND EQUIPMENT CALIBRATION CERTIFICATIONS.
ELCELC
ROUTE TO FLOOR DRAIN
DRAIN FROM AUTO PURGE
SYSTEM DRAIN BUTTERFLY
VALVE (NC)
ADD BUTTERFLY
VALVE
ADD BUTTERFLY
VALVE
1 1/2"
(BALL VALVE)
(BALL VALVE)
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
M
CHEYENNE, WY
BUFFALO
GENERAL NOTES:
Revisions: Date:
08' 8' 16'
1/8" = 1'-0"
BASEMENT LEVEL NORTH PIPING DEMO PLAN
CHILLER
BL-97AAREA WELL
BL-99
MECH ROOM
BL-97
ELEVATOR LOBBY
BL-100
ELEVATOR
B10-L
ELEVATOR
BL-98
NTS
NTS
ROOF PENETRATION
NTS
NTS
SHOP DRAWING OF EXISTING CISTERN
10101
442-24-016PIPING PLANS AND DETAILS BID DOCUMENTS Repair Chilled Water Cistern & Heat Exchanger System
P-4
HX-2
STEAM
CONTROL
VALVE
ASSEMBLY
REPLACE EXISTING SKID
MOUNTED FILTER/ PUMP
SYSTEM LIKE IN KIND.
PUROFLUX PF-64-020 OR
APPROVED EQUAL WITH
AUTOMATIC PURGE.
110 GPM, 5HP 480V/3PH/60HZ.
RE-FEED FROM EXISTING
ELECTRICAL CIRCUIT FROM
PANEL NBH2DB .
REPLACE (E) STRAINER
AND VIC DRAINAGE PIPING
WITH PIPING PER SPEC.
PANEL NBH2DB
RE-PIPE PER THE SYSTEM
PIPING SCHEMATIC ON M0
SO THAT HWR CONNECTS
TO FILTER RETURN
(FILTERED WATER) WITH A
CHECK VALVE BETWEEN
HWS/R. REPLACE AND ADD
ISOLATION VALVES AS
INDICATED ON SCHEMATIC
AND ADD A DRAIN VALVE
AS SHOWN ON M00.
SKID MOUNTED
FILTER/ PUMP
SYSTEM TO BE
REPLACED.
SEE DETAIL 2.
(E) 14" CWS DN
FROM ROOF
(E) 12" CWS.
BOTTOM OF PIPE
APPROX 2" ABOVE
BOTTOM OF TANK.
(E) 4" CW FILTER
LINE DISCHARGE
PIPE OVER TOP OF
CISTERN.
(E) 4" PVC
OVERFLOW DRAIN,
APPROX. 8" BELOW
TOP OF CISTERN.
(E) 2" SUPPLY/
RETURN LINES
FROM HEAT
EXCHANGER TO
CISTERN.
PRECAST CONCRETE VAULT
PLAN VIEW
ELEVATION
DRAWING SCALE IS 1:55
7'-0" WIDE X 9'-0" LONG X 12'-0" HIGH INSIDE DIMENSIONS
USED FOR CISTERN
SERGENT CONSTRUCTION SERVICES
PIPING & CHILLED WATER, WATER TREATMENT & CHILLER
CHEYENNE VAMC - CHEYENNE, WY
1 REQUIRED
SHEET 1 OF 1
ACTUAL DIMENSIONS OF CONCRETE PRODUCTS MAY VARY SLIGHTLY
c aughn 2671 South Greeley Hwy Cheyenne, WY 82007-3681
Toll Free (877) 827-8255 Toll Free Fax (877) 827-7363
(307) 634-0695 Fax (307) 634-0694 con rete products, inc.
10'-0"
9'-0"
7'-0" 8'-0"
A
L L
O W
F
O R
S
L I G
H T
G
R O
W T
H
A
T
J O
I N
T S
JOINT PRIMED FOR SEALANT;
2 ROWS STANDARD JOINT SEALANT/JOINT OF VAULT
TO ENSURE THAT STRUCTURE IS WATER
TIGHT, THE STRUCTURE MUST BE WATER OR
VACUUM TESTED PRIOR TO BACKFILLING
8"
WEIGHTS:
HEAVIEST PIECE WEIGHS APPX. 18,500 LBS.
LIFTING:
VAULT SECTIONS TO LIFT FROM 4 RECESSED GALVANIZED LIFT
BARS CAST IN THE INSIDE WALLS OF EACH SECTION;
CONTRACTOR TO GROUT SHUT
NOTES:
CONCRETE: 5000 PSI MINIMUM
REINFORCING: GRADE 60 MINIMUM
DESIGNED FOR AASHTO HS-20-44 LOADINGS
FLOOR 8" THICK; WALLS 6" THICK
VAULT NOT SUPPLIED WITH ANY COATINGS
3'-11
3'-11
4'-1"
TOP OF VAULT PROVIDED FLAT & OPEN
PER
CONTRACTOR
PIPING BLOCKOUT FOR CONTRACTOR'S LINK SEAL;
SIZE & LOCATION PER CONTRACTOR
PIPING BLOCKOUT FOR CONTRACTOR'S LINK SEAL;
SIZE & LOCATION PER CONTRACTOR
8" DIAMETER PIPING BLOCKOUT FOR
CONTRACTOR TO GROUT/SEAL IN 4"
OVERFLOW PIPE; LOCATION PER
CONTRACTOR
4 RECESSED GALVANIZED LIFT
BARS IN EACH SECTION
DRAIN CISTERN, REMOVE
SEDIMENT, AND SEAL.
SEE PRE-CAST
CONCRETE VAULT SHOP
DRAWING FOR
ADDITIONAL DETAIL.
HEAT EXCHANGER/ PUMP
SYSTEM TO BE REPLACED.
SEE DETAIL 1 AND SYSTEM
PIPING SCHEMATIC ON M00.
HEAT EXCHANGER/ PUMP PIPING DETAIL
NTS
SEE DETAIL 2 AND
SYSTEM PIPING
SCHEMATIC ON M0
FOR PIPING/ VALVE
WORK IN THIS AREA.
SEAL ALL SEAMS WITH HYDRAULIC
CEMENT. THEN LINE WITH
CHEMICAL/ENVIRONMENTAL
RESISTANT 45 MIL NON-POTABLE
LINER, ONE CLARION #XR-5 8138
45 MIL BLACK ARMOR PRO, OR
APPROVED EQUAL. SEAL AROUND
EXISTING PIPE PENETRATIONS
PER LINER MANUFACTURER'S
RECOMMENDATIONS.
CISTERN ELEVATION
REMOVE EXISTING WOOD ROOF FOR
WORK AS NEEDED AND REINSTALL
AFTER WORK IS COMPLETE TO
RETURN TO PRE-WORK CONDITION.
INSTALL NEW FLASHING TO
BUILDING AND NEW MEMBRANE.
PROVIDE 1/4"/FT SLOPE IN ROOF AND
SEAL AROUND PIPE PENETRATION.
REINSTALL (E) VENTILATION/ ACCESS
LOUVER.
EXISTING CONTROLS/ SENSORS TO
REMAIN. REMOVE AND REINSTALL AS
NEEDED FOR CISTERN SEALING.
CONNECTION
TO 2" RETURN
CONNECTION
TO 2" SUPPLY
CONNECTION
TO 3" MPS
REMOVE (E) SUMP
DISCHARGE PIPING AND
RE-PIPE PER SUMP PIPING
DETAIL.
ELCELC
A. DO NOT SCALE DRAWINGS. ALL DIMENSIONS AND CLEARANCE SHALL BE
VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED
PRIOR TO INSTALLATION.
B. HATCHED AREA IS THE APPROXIMATE EXTENTS OF DEMOLITION. CONTRACTOR
SHALL FIELD VERIFY AND DEMOLISH AND RE-WORK PIPING AS NEEDED FOR
EQUIPMENT REPLACEMENT AND RE-WORK AS NEEDED TO ACCOMPLISH THE
SYSTEM PIPING SCHEMATIC.
DEMOLISH EXISTING HEAT
EXCHANGER/ PUMP AND
ASSOCIATED PIPING/ VALVES.
PROVIDE NEW EQUIPMENT
AND RE-PIPE PER SYSTEM
PIPING SCHEMATIC ON M00.
TRANSITION 2" PVC TO
TO (E) CAST IRON Y
(VERIFY SIZE)
2" D
2" D
2" D
2" SHUTOFF VALVE,
TYP.
2" CHECK VALVE,
TYP.
CONNECT TO (E)
2" PVC AND
EXTEND (N) PVC
DRAIN UP.
(E) SUMP & PUMPS
2% MIN.
CW FILTER & ASSOCIATED PIPING DETAIL SUMP PIPING DETAIL
(E) VENT TO
REMAIN
(N) 2" DRAIN
FROM CW
FILTER
PROVIDE NEW 30A/3P DISCONNECT WITH 10A RK1 FUSES.
PROVIDE PHENOLIC NAMEPLATE INDICATING EQUIPMENT
(P-4), VOLTAGE (208V), PHASE (3 PH) AND CIRCUIT
(ELB-1-19,21,23). EXISTING PUMP IS TIED INTO ELB-1 VIA
15A/3P BREAKER. CONTRACTOR SHALL UTILIZE EXISTING
BREAKER CONDUCTORS AND CONDUIT. PROVIDE NEW
CONDUCTORS/CONDUIT FROM DISCONNECT TO STARTER
AND STARTER TO PUMP, 3/4"C W/ 3#12 & #12G.
PROVIDE NEW STARTER
SIZED FOR 1.5 HP MOTOR
(NEMA 00).
CONNECT TO (E)
2" PVC AND
EXTEND (N) PVC
DRAIN UP.
(N) PVC PIPE
CONFORMING TO
ASTM D2665 W/
SOLVENT WELDED
FITTINGS USING
SOLVENT CEMENT
CONFORMING TO
ASTM D2564.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
M600
CHEYENNE, WY
BUFFALO
Revisions: Date:
STEAM TO WATER HEAT EXCHANGER SCHEDULE
MARK LOCATION SYSTEM TYPE
WATER CONDITIONS STEAM PRESSURE CONTROL VALVE TRAP
FLOW EWT LWT WPD
ENT CONTROL
VALVE
ENT HEAT
EXCHANGER Cv SIZE (IN)
CAPACITY
(LBS/HR) # SIZE (IN) LBS/HR REMARKS
SHELL AND TUBE psi - -
NOTES:
NOTES:
HYDRONIC PUMP SCHEDULE
MARK LOCATION BLDG SERVED SYSTEM TYPE
CIRCULATING FLUID
MIN % EFF
ELECTRICAL MOTOR
REMARKSFLUID FLOW HEAD TEMPERATURE
NOMINAL
POWER (HP) PHASE VOLT R.P.M.
SPEED
CONTROL
IN-LINE, VERTICAL 3
MECHANICAL SCHEDULES
& DETAILS
BID DOCUMENTS Repair Chilled Water Cistern & Heat Exchanger System
442-24-016
HX-2 CHILLER VAULT
SYSTEM
SERVED
CISTERN CONDENSER WATER 50 GPM 35°F 55°F ST-2
P-4 CHILLER VAULT BUFFALO CISTERN CONDENSER WATER WATER 50 GPM 35°F 1.5 -
ELCELC
1. PERFORMANCE IS AT SITE ELEVATION (6100 FT).
2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
3. ALL VALVES AND INSTRUMENTATION PER STANDARD DETAILS AND SYSTEM PIPING SCHEMATIC.
4. MAX. LENGTH OF HEAT EXCHANGER IS 2'-0". 2 PASS UNIT.
5. CONTROL VALVES ARE IN 1/3 & 2/3 SIZE ARRANGEMENT.
6. STEAM TRAP IS F&T TYPE.
1. PERFORMANCE IS AT SITE ELEVATION (6100 FT).
2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
3. ALL VALVES AND INSTRUMENTATION PER STANDARD DETAILS AND SYSTEM PIPING SCHEMATIC.
1, 2, 3, CONTROLS MODIFICATION:
EXISTING BAS CONTROLS/ SEQUENCE FOR HEAT EXCHANGER AND FILTER SYSTEM (PICTURED ABOVE) IS TO REMAIN AS IS WITH THE
FOLLOWING MODIFICATIONS;
1. REPLACE (E) SUMP RETURN TEMP WITH A NEW SENSOR AND RE-USE EXISTING POINT/ PROGRAMING.
2. PROVIDE (N) TEMPERATURE SENSOR ON HWS AFTER HEAT EXCHANGER.
3. MODIFY CONTROLS FOR (N) 1/3 & 2/3 CONTROL VALVES SO THAT THEY MODULATE IN SEQUENCE TO MAINTAIN SET-POINT.
4. THE SAND FILTER UNIT SHOULD RUN CONTINUOUSLY THROUGH ON BOARD CONTROL PANEL. GENERATE AN ALARM IF THE PUMP STATUS GOES TO OFF. GENERATE ANOTHER ALARM IF THERE IS A CALL FOR HEAT ON THE SUMP HX VALVES AND THE SAND FILTER PUMP
STATUS IS OFF.
5. GENERATE AN ALARM IF THE CWS-T FALLS BELOW 33°F (ADJ.) THAT READS "HVAC CHECK CISTERN HEAT EXCHANGER SYSTEM - FREEZE
POTENTIAL!"
30 min. 9 psi 1, 2, 3, 4, 5, 6
1 2
#1
#2
#3
#4
#5
0.5 FT MAX (1) 1/2" & (1) 3/4 530 1,060
42 FT - -
| Sheets |
| CSG0.0 - COVER SHEET |
| M000.0 - MECHANICAL SYMBOLS AND ABBREVIATIONS |
| MP1.01 - BASEMENT LEVEL NORTH PIPING DEMO PLAN |
| MP1.02 - BASEMENT LEVEL SOUTH PIPING DEMO PLAN |
| MP1.11 - LEVEL 1 PIPING NORTH DEMO PLAN |
| MP1.12 - LEVEL 1 PIPING SOUTH DEMO PLAN |
| MP1.21 - LEVEL 2 NORTH PIPING DEMO PLAN |
| MP1.22 - LEVEL 2 SOUTH PIPING DEMO PLAN |
| MP1.31 - PENTHOUSE LEVEL PIPING DEMO PLAN |
| MP2.01 - BASEMENT LEVEL NORTH PIPING NEW PLAN |
| MP2.02 - BASEMENT LEVEL SOUTH PIPING NEW PLAN |
| MP2.11 - LEVEL 1 BUFFALO NORTH PIPING PLAN |
| MP2.12 - LEVEL 1 BUFFALO SOUTH PIPING PLAN |
| MP2.21 - LEVEL 2 BUFFALO NORTH PIPING PLAN |
| MP2.22 - LEVEL 2 BUFFALO SOUTH PIPING PLAN |
| MP2.31 - PENTHOUSE BUFFALO SOUTH PIPING PLAN |
| PP1.01 - BASEMENT LEVEL NORTH PLUMBING DEMO PLAN |
| PP1.02 - BASEMENT LEVEL SOUTH PLUMBING DEMO PLAN |
| PP1.11 - LEVEL 1 NORTH PLUMBING DEMO PLAN |
| PP1.12 - LEVEL 1 SOUTH PLUMBING DEMO PLAN |
| PP1.21 - LEVEL 2 NORTH PLUMBING DEMO PLAN |
| PP1.22 - LEVEL 2 SOUTH PLUMBING DEMO PLAN |
| PP1.31 - PENTHOUSE LEVEL PLUMBING DEMO PLAN |
| PP2.01 - BASEMENT LEVEL NORTH PLUMBING NEW PLAN |
| PP2.02 - BASEMENT LEVEL SOUTH PLUMBING NEW PLAN |
| PP2.11 - LEVEL 1 BUFFALO NORTH PLUMBING PLAN |
| PP2.12 - LEVEL 1 BUFFALO SOUTH PLUMBING PLAN |
| PP2.21 - LEVEL 2 BUFFALO NORTH PLUMBING PLAN |
| PP2.22 - LEVEL 2 BUFFALO SOUTH PLUMBING PLAN |
| PP2.31 - PENTHOUSE BUFFALO SOUTH PLUMBING PLAN |
| PG1.01 - BASEMENT LEVEL NORTH MED GAS DEMO PLAN |
| PG1.02 - BASEMENT LEVEL SOUTH MED GAS DEMO PLAN |
| PG1.03 - BASEMENT LEVEL COWBOY WEST MED GAS DEMO PLAN |
| PG1.04 - BASEMENT LEVEL COWBOY EAST MED GAS DEMO PLAN |
| PG1.06 - BASEMENT LEVEL DOUGLAS FIR MED GAS DEMO PLAN |
| PG1.10 - LEVEL 1 ARROWHEAD MED GAS DEMO PLAN |
| PG1.11 - LEVEL 1 NORTH MED GAS DEMO PLAN |
| PG1.12 - LEVEL 1 SOUTH MED GAS DEMO PLAN |
| PG1.13 - LEVEL 1 COWBOY WEST MED GAS DEMO PLAN |
| PG1.14 - LEVEL 1 COWBOY EAST MED GAS DEMO PLAN |
| PG1.15 - LEVLE 1 COWBOY SOUTH MED GAS DEMO PLAN |
| PG1.16 - LEVEL 1 DOUGLAS FIR MED GAS DEMO PLAN |
| PG1.21 - LEVEL 2 NORTH MED GAS DEMO PLAN |
| PG1.22 - LEVEL 2 SOUTH MED GAS DEMO PLAN |
| PG1.23 - LEVEL 2 COWBOY MED GAS DEMO PLAN |
| PG1.33 - LEVEL 3 COWBOY MED GAS DEMO PLAN |
| PG2.01 - BASEMENT LEVEL NORTH MED GAS PLAN |
| PG2.02 - BASEMENT LEVEL SOUTH MED GAS PLAN |
| PG2.03 - BASEMENT LEVEL COWBOY WEST MED GAS PLAN |
| PG2.04 - BASEMENT LEVEL COWBOY EAST MED GAS PLAN |
| PG2.06 - BASEMENT LEVEL DOUGLAS FIR MED GAS PLAN |
| PG2.10 - LEVEL 1 BUFFALO NORTH MED GAS PLAN |
| PG2.11 - LEVEL 1 BUFFALO SOUTH MED GAS PLAN |
| PG2.12 - LEVEL 1 ARROWHEAD MED GAS PLAN |
| PG2.13 - LEVEL 1 COWBOY WEST MED GAS PLAN |
| PG2.14 - LEVEL 1 COWBOY EAST MED GAS PLAN |
| PG2.15 - LEVLE 1 COWBOY SOUTH MED GAS PLAN |
| PG2.16 - LEVEL 1 DOUGLAS FIR MED GAS PLAN |
| PG2.21 - LEVEL 2 BUFFALO NORTH MED GAS PLAN |
| PG2.22 - LEVEL 2 BUFFALO SOUTH MED GAS PLAN |
| PG2.23 - LEVEL 2 COWBOY MED GAS PLAN |
| PG2.33 - LEVEL 3 COWBOY MED GAS PLAN |
| M600 - MECHANICAL SCHEDULES |
MP1.01 - BASEMENT LEVEL NORTH PIPING DEMO PLAN
File details come from the government source that posted it. Updated .