S02 - 442-24-016_CONSTRUCTION DRAWINGS.pdf

PDF 32 MB Posted

Attached to
Z2DA--442-24-016 Repair Chilled Water Cistern & Heat Exchanger
Solicitation number
36C25924R0011
Issued by

About this file

This document provides details for a federal contract opportunity to repair chilled water cisterns and heat exchangers. The solicitation number is 36C25924R0011 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The contractor will be required to provide construction drawings, repair services for chilled water cisterns and heat exchangers. The response deadline is not specified but the opportunity is listed as a solicitation so bids or proposals would likely be due in the next 1-3 months. The period of performance and award date are also not included but work would likely need to be completed within the next 6-12 months.

View the file

Other files

File Type Posted
36C25924R0011 0004.docx DOCX document
S05 - RFIs and Responses.pdf PDF
S04 - Site Visit Attendance_Repair Chilled Water Cistern _ Heat Exchanger.pdf PDF
36C25924R0011 0003.docx DOCX document
36C25924R0011 0002.docx DOCX document
36C25924R0011 0001.docx DOCX document
S02 - 442-24-016_SPECIFICATIONS.pdf PDF
S02 - Past Performance Questionnaire.docx DOCX document
36C25924R0011_1.docx DOCX document
S22- 852.219-75 LOS Certificate - ST.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

M0

MECHANICAL SYMBOLS AND

ABBREVIATIONS

CHEYENNE, WY

BUFFALO

Revisions: Date:

ABBREVIATION

GENERAL ABBREVIATIONS

DESCRIPTION

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

AD ACCESS DOOR/PANEL

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

DIA DIAMETER

DN DOWN

E EXISTING

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

GC GENERAL CONTRACTOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

L LENGTH

GPM GALLONS PER MINUTE

BOB BOTTOM OF BEAM

CC CONTROLS CONTRACTOR

ABBREVIATION DESCRIPTION

LF LINEAR FEET

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MFR MANUFACTURER

MIN MINIMUM

N

NTS NOT TO SCALE

PC PLUMBING CONTRACTOR

PSIG POUNDS PER SQUARE INCH GAUGE

RPM REVOLUTIONS PER MINUTE

SHT SHEET

TOB TOP OF BEAM

TOS TOP OF STEEL

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

NEW

HWS HEATING WATER SUPPLY

HWR HEATING WATER RETURN

CWS CHILLED WATER SUPPLY

CHR CHILLED WATER RETURN

CS CONDENSER WATER SUPPLY

CR CONDENSER WATER RETURN

D DRAIN

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

E

G

F

F

L

G

NTS

SYSTEM PIPING SCHEMATIC

M0

442-24-016BID DOCUMENTS Repair Chilled Water Cistern & Heat Exchanger System

MECHANICAL GENERAL NOTES:

1. THESE NOTES APPLY TO ALL SHEETS. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS

SHALL TAKE PRECEDENCE OVER THE DRAWINGS.

2. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT

LOCATIONS SHOWN ARE

APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR

SHALL VISIT THE SITE

TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW

WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER.

3. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE

SHOWN. THE

CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A

COMPLETE AND FUNCTIONING

SYSTEM. DO NOT SCALE OFF THESE DRAWINGS.

4. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION. REFERENCE THE STATEMENT OF WORK (SOW) FOR PHASING REQUIREMENTS. COORDINATE

SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK.

5. SUPPORT ALL PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR

REMOVAL FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR MAINTENANCE.

6. TEST AND BALANCE P-4 SYSTEM UTILIZING THE BALANCING VALVE AND IMPELLER TRIMMING AS NEEDED TO ACHIEVE THE DESIRED SYSTEM FLOW RATE. RECORD FINAL MEASUREMENTS FOR HYDRONIC EQUIPMENT (HX-2 & P-4) ON PERFORMANCE DATA SHEETS INCLUDING ENTERING AND LEAVING WATER TEMPERATURES. RECORD FINAL VALVE SETTING FOR BALANCING VALVE. PROVIDE FINAL TAB REPORT WITH ALL DATA INCLUDING TAB CONTRACTOR'S

CREDENTIALS AND EQUIPMENT CALIBRATION CERTIFICATIONS.

ELCELC

ROUTE TO FLOOR DRAIN

DRAIN FROM AUTO PURGE

SYSTEM DRAIN BUTTERFLY

VALVE (NC)

ADD BUTTERFLY

VALVE

ADD BUTTERFLY

VALVE

1 1/2"

(BALL VALVE)

(BALL VALVE)

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

M

CHEYENNE, WY

BUFFALO

GENERAL NOTES:

Revisions: Date:

08' 8' 16'

1/8" = 1'-0"

BASEMENT LEVEL NORTH PIPING DEMO PLAN

CHILLER

BL-97AAREA WELL

BL-99

MECH ROOM

BL-97

ELEVATOR LOBBY

BL-100

ELEVATOR

B10-L

ELEVATOR

BL-98

NTS

NTS

ROOF PENETRATION

NTS

NTS

SHOP DRAWING OF EXISTING CISTERN

10101

442-24-016PIPING PLANS AND DETAILS BID DOCUMENTS Repair Chilled Water Cistern & Heat Exchanger System

P-4

HX-2

STEAM

CONTROL

VALVE

ASSEMBLY

REPLACE EXISTING SKID

MOUNTED FILTER/ PUMP

SYSTEM LIKE IN KIND.

PUROFLUX PF-64-020 OR

APPROVED EQUAL WITH

AUTOMATIC PURGE.

110 GPM, 5HP 480V/3PH/60HZ.

RE-FEED FROM EXISTING

ELECTRICAL CIRCUIT FROM

PANEL NBH2DB .

REPLACE (E) STRAINER

AND VIC DRAINAGE PIPING

WITH PIPING PER SPEC.

PANEL NBH2DB

RE-PIPE PER THE SYSTEM

PIPING SCHEMATIC ON M0

SO THAT HWR CONNECTS

TO FILTER RETURN

(FILTERED WATER) WITH A

CHECK VALVE BETWEEN

HWS/R. REPLACE AND ADD

ISOLATION VALVES AS

INDICATED ON SCHEMATIC

AND ADD A DRAIN VALVE

AS SHOWN ON M00.

SKID MOUNTED

FILTER/ PUMP

SYSTEM TO BE

REPLACED.

SEE DETAIL 2.

(E) 14" CWS DN

FROM ROOF

(E) 12" CWS.

BOTTOM OF PIPE

APPROX 2" ABOVE

BOTTOM OF TANK.

(E) 4" CW FILTER

LINE DISCHARGE

PIPE OVER TOP OF

CISTERN.

(E) 4" PVC

OVERFLOW DRAIN,

APPROX. 8" BELOW

TOP OF CISTERN.

(E) 2" SUPPLY/

RETURN LINES

FROM HEAT

EXCHANGER TO

CISTERN.

PRECAST CONCRETE VAULT

PLAN VIEW

ELEVATION

DRAWING SCALE IS 1:55

7'-0" WIDE X 9'-0" LONG X 12'-0" HIGH INSIDE DIMENSIONS

USED FOR CISTERN

SERGENT CONSTRUCTION SERVICES

PIPING & CHILLED WATER, WATER TREATMENT & CHILLER

CHEYENNE VAMC - CHEYENNE, WY

1 REQUIRED

SHEET 1 OF 1

ACTUAL DIMENSIONS OF CONCRETE PRODUCTS MAY VARY SLIGHTLY

c aughn 2671 South Greeley Hwy Cheyenne, WY 82007-3681

Toll Free (877) 827-8255 Toll Free Fax (877) 827-7363

(307) 634-0695 Fax (307) 634-0694 con rete products, inc.

10'-0"

9'-0"

7'-0" 8'-0"

A

L L

O W

F

O R

S

L I G

H T

G

R O

W T

H

A

T

J O

I N

T S

JOINT PRIMED FOR SEALANT;

2 ROWS STANDARD JOINT SEALANT/JOINT OF VAULT

TO ENSURE THAT STRUCTURE IS WATER

TIGHT, THE STRUCTURE MUST BE WATER OR

VACUUM TESTED PRIOR TO BACKFILLING

8"

WEIGHTS:

HEAVIEST PIECE WEIGHS APPX. 18,500 LBS.

LIFTING:

VAULT SECTIONS TO LIFT FROM 4 RECESSED GALVANIZED LIFT

BARS CAST IN THE INSIDE WALLS OF EACH SECTION;

CONTRACTOR TO GROUT SHUT

NOTES:

CONCRETE: 5000 PSI MINIMUM

REINFORCING: GRADE 60 MINIMUM

DESIGNED FOR AASHTO HS-20-44 LOADINGS

FLOOR 8" THICK; WALLS 6" THICK

VAULT NOT SUPPLIED WITH ANY COATINGS

3'-11

3'-11

4'-1"

TOP OF VAULT PROVIDED FLAT & OPEN

PER

CONTRACTOR

PIPING BLOCKOUT FOR CONTRACTOR'S LINK SEAL;

SIZE & LOCATION PER CONTRACTOR

PIPING BLOCKOUT FOR CONTRACTOR'S LINK SEAL;

SIZE & LOCATION PER CONTRACTOR

8" DIAMETER PIPING BLOCKOUT FOR

CONTRACTOR TO GROUT/SEAL IN 4"

OVERFLOW PIPE; LOCATION PER

CONTRACTOR

4 RECESSED GALVANIZED LIFT

BARS IN EACH SECTION

DRAIN CISTERN, REMOVE

SEDIMENT, AND SEAL.

SEE PRE-CAST

CONCRETE VAULT SHOP

DRAWING FOR

ADDITIONAL DETAIL.

HEAT EXCHANGER/ PUMP

SYSTEM TO BE REPLACED.

SEE DETAIL 1 AND SYSTEM

PIPING SCHEMATIC ON M00.

HEAT EXCHANGER/ PUMP PIPING DETAIL

NTS

SEE DETAIL 2 AND

SYSTEM PIPING

SCHEMATIC ON M0

FOR PIPING/ VALVE

WORK IN THIS AREA.

SEAL ALL SEAMS WITH HYDRAULIC

CEMENT. THEN LINE WITH

CHEMICAL/ENVIRONMENTAL

RESISTANT 45 MIL NON-POTABLE

LINER, ONE CLARION #XR-5 8138

45 MIL BLACK ARMOR PRO, OR

APPROVED EQUAL. SEAL AROUND

EXISTING PIPE PENETRATIONS

PER LINER MANUFACTURER'S

RECOMMENDATIONS.

CISTERN ELEVATION

REMOVE EXISTING WOOD ROOF FOR

WORK AS NEEDED AND REINSTALL

AFTER WORK IS COMPLETE TO

RETURN TO PRE-WORK CONDITION.

INSTALL NEW FLASHING TO

BUILDING AND NEW MEMBRANE.

PROVIDE 1/4"/FT SLOPE IN ROOF AND

SEAL AROUND PIPE PENETRATION.

REINSTALL (E) VENTILATION/ ACCESS

LOUVER.

EXISTING CONTROLS/ SENSORS TO

REMAIN. REMOVE AND REINSTALL AS

NEEDED FOR CISTERN SEALING.

CONNECTION

TO 2" RETURN

CONNECTION

TO 2" SUPPLY

CONNECTION

TO 3" MPS

REMOVE (E) SUMP

DISCHARGE PIPING AND

RE-PIPE PER SUMP PIPING

DETAIL.

ELCELC

A. DO NOT SCALE DRAWINGS. ALL DIMENSIONS AND CLEARANCE SHALL BE

VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED

PRIOR TO INSTALLATION.

B. HATCHED AREA IS THE APPROXIMATE EXTENTS OF DEMOLITION. CONTRACTOR

SHALL FIELD VERIFY AND DEMOLISH AND RE-WORK PIPING AS NEEDED FOR

EQUIPMENT REPLACEMENT AND RE-WORK AS NEEDED TO ACCOMPLISH THE

SYSTEM PIPING SCHEMATIC.

DEMOLISH EXISTING HEAT

EXCHANGER/ PUMP AND

ASSOCIATED PIPING/ VALVES.

PROVIDE NEW EQUIPMENT

AND RE-PIPE PER SYSTEM

PIPING SCHEMATIC ON M00.

TRANSITION 2" PVC TO

TO (E) CAST IRON Y

(VERIFY SIZE)

2" D

2" D

2" D

2" SHUTOFF VALVE,

TYP.

2" CHECK VALVE,

TYP.

CONNECT TO (E)

2" PVC AND

EXTEND (N) PVC

DRAIN UP.

(E) SUMP & PUMPS

2% MIN.

CW FILTER & ASSOCIATED PIPING DETAIL SUMP PIPING DETAIL

(E) VENT TO

REMAIN

(N) 2" DRAIN

FROM CW

FILTER

PROVIDE NEW 30A/3P DISCONNECT WITH 10A RK1 FUSES.

PROVIDE PHENOLIC NAMEPLATE INDICATING EQUIPMENT

(P-4), VOLTAGE (208V), PHASE (3 PH) AND CIRCUIT

(ELB-1-19,21,23). EXISTING PUMP IS TIED INTO ELB-1 VIA

15A/3P BREAKER. CONTRACTOR SHALL UTILIZE EXISTING

BREAKER CONDUCTORS AND CONDUIT. PROVIDE NEW

CONDUCTORS/CONDUIT FROM DISCONNECT TO STARTER

AND STARTER TO PUMP, 3/4"C W/ 3#12 & #12G.

PROVIDE NEW STARTER

SIZED FOR 1.5 HP MOTOR

(NEMA 00).

CONNECT TO (E)

2" PVC AND

EXTEND (N) PVC

DRAIN UP.

(N) PVC PIPE

CONFORMING TO

ASTM D2665 W/

SOLVENT WELDED

FITTINGS USING

SOLVENT CEMENT

CONFORMING TO

ASTM D2564.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

M600

CHEYENNE, WY

BUFFALO

Revisions: Date:

STEAM TO WATER HEAT EXCHANGER SCHEDULE

MARK LOCATION SYSTEM TYPE

WATER CONDITIONS STEAM PRESSURE CONTROL VALVE TRAP

FLOW EWT LWT WPD

ENT CONTROL

VALVE

ENT HEAT

EXCHANGER Cv SIZE (IN)

CAPACITY

(LBS/HR) # SIZE (IN) LBS/HR REMARKS

SHELL AND TUBE psi - -

NOTES:

NOTES:

HYDRONIC PUMP SCHEDULE

MARK LOCATION BLDG SERVED SYSTEM TYPE

CIRCULATING FLUID

MIN % EFF

ELECTRICAL MOTOR

REMARKSFLUID FLOW HEAD TEMPERATURE

NOMINAL

POWER (HP) PHASE VOLT R.P.M.

SPEED

CONTROL

IN-LINE, VERTICAL 3

MECHANICAL SCHEDULES

& DETAILS

BID DOCUMENTS Repair Chilled Water Cistern & Heat Exchanger System

442-24-016

HX-2 CHILLER VAULT

SYSTEM

SERVED

CISTERN CONDENSER WATER 50 GPM 35°F 55°F ST-2

P-4 CHILLER VAULT BUFFALO CISTERN CONDENSER WATER WATER 50 GPM 35°F 1.5 -

ELCELC

1. PERFORMANCE IS AT SITE ELEVATION (6100 FT).

2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

3. ALL VALVES AND INSTRUMENTATION PER STANDARD DETAILS AND SYSTEM PIPING SCHEMATIC.

4. MAX. LENGTH OF HEAT EXCHANGER IS 2'-0". 2 PASS UNIT.

5. CONTROL VALVES ARE IN 1/3 & 2/3 SIZE ARRANGEMENT.

6. STEAM TRAP IS F&T TYPE.

1. PERFORMANCE IS AT SITE ELEVATION (6100 FT).

2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

3. ALL VALVES AND INSTRUMENTATION PER STANDARD DETAILS AND SYSTEM PIPING SCHEMATIC.

1, 2, 3, CONTROLS MODIFICATION:

EXISTING BAS CONTROLS/ SEQUENCE FOR HEAT EXCHANGER AND FILTER SYSTEM (PICTURED ABOVE) IS TO REMAIN AS IS WITH THE

FOLLOWING MODIFICATIONS;

1. REPLACE (E) SUMP RETURN TEMP WITH A NEW SENSOR AND RE-USE EXISTING POINT/ PROGRAMING.

2. PROVIDE (N) TEMPERATURE SENSOR ON HWS AFTER HEAT EXCHANGER.

3. MODIFY CONTROLS FOR (N) 1/3 & 2/3 CONTROL VALVES SO THAT THEY MODULATE IN SEQUENCE TO MAINTAIN SET-POINT.

4. THE SAND FILTER UNIT SHOULD RUN CONTINUOUSLY THROUGH ON BOARD CONTROL PANEL. GENERATE AN ALARM IF THE PUMP STATUS GOES TO OFF. GENERATE ANOTHER ALARM IF THERE IS A CALL FOR HEAT ON THE SUMP HX VALVES AND THE SAND FILTER PUMP

STATUS IS OFF.

5. GENERATE AN ALARM IF THE CWS-T FALLS BELOW 33°F (ADJ.) THAT READS "HVAC CHECK CISTERN HEAT EXCHANGER SYSTEM - FREEZE

POTENTIAL!"

30 min. 9 psi 1, 2, 3, 4, 5, 6

1 2

#1

#2

#3

#4

#5

0.5 FT MAX (1) 1/2" & (1) 3/4 530 1,060

42 FT - -

Sheets
CSG0.0 - COVER SHEET
M000.0 - MECHANICAL SYMBOLS AND ABBREVIATIONS
MP1.01 - BASEMENT LEVEL NORTH PIPING DEMO PLAN
MP1.02 - BASEMENT LEVEL SOUTH PIPING DEMO PLAN
MP1.11 - LEVEL 1 PIPING NORTH DEMO PLAN
MP1.12 - LEVEL 1 PIPING SOUTH DEMO PLAN
MP1.21 - LEVEL 2 NORTH PIPING DEMO PLAN
MP1.22 - LEVEL 2 SOUTH PIPING DEMO PLAN
MP1.31 - PENTHOUSE LEVEL PIPING DEMO PLAN
MP2.01 - BASEMENT LEVEL NORTH PIPING NEW PLAN
MP2.02 - BASEMENT LEVEL SOUTH PIPING NEW PLAN
MP2.11 - LEVEL 1 BUFFALO NORTH PIPING PLAN
MP2.12 - LEVEL 1 BUFFALO SOUTH PIPING PLAN
MP2.21 - LEVEL 2 BUFFALO NORTH PIPING PLAN
MP2.22 - LEVEL 2 BUFFALO SOUTH PIPING PLAN
MP2.31 - PENTHOUSE BUFFALO SOUTH PIPING PLAN
PP1.01 - BASEMENT LEVEL NORTH PLUMBING DEMO PLAN
PP1.02 - BASEMENT LEVEL SOUTH PLUMBING DEMO PLAN
PP1.11 - LEVEL 1 NORTH PLUMBING DEMO PLAN
PP1.12 - LEVEL 1 SOUTH PLUMBING DEMO PLAN
PP1.21 - LEVEL 2 NORTH PLUMBING DEMO PLAN
PP1.22 - LEVEL 2 SOUTH PLUMBING DEMO PLAN
PP1.31 - PENTHOUSE LEVEL PLUMBING DEMO PLAN
PP2.01 - BASEMENT LEVEL NORTH PLUMBING NEW PLAN
PP2.02 - BASEMENT LEVEL SOUTH PLUMBING NEW PLAN
PP2.11 - LEVEL 1 BUFFALO NORTH PLUMBING PLAN
PP2.12 - LEVEL 1 BUFFALO SOUTH PLUMBING PLAN
PP2.21 - LEVEL 2 BUFFALO NORTH PLUMBING PLAN
PP2.22 - LEVEL 2 BUFFALO SOUTH PLUMBING PLAN
PP2.31 - PENTHOUSE BUFFALO SOUTH PLUMBING PLAN
PG1.01 - BASEMENT LEVEL NORTH MED GAS DEMO PLAN
PG1.02 - BASEMENT LEVEL SOUTH MED GAS DEMO PLAN
PG1.03 - BASEMENT LEVEL COWBOY WEST MED GAS DEMO PLAN
PG1.04 - BASEMENT LEVEL COWBOY EAST MED GAS DEMO PLAN
PG1.06 - BASEMENT LEVEL DOUGLAS FIR MED GAS DEMO PLAN
PG1.10 - LEVEL 1 ARROWHEAD MED GAS DEMO PLAN
PG1.11 - LEVEL 1 NORTH MED GAS DEMO PLAN
PG1.12 - LEVEL 1 SOUTH MED GAS DEMO PLAN
PG1.13 - LEVEL 1 COWBOY WEST MED GAS DEMO PLAN
PG1.14 - LEVEL 1 COWBOY EAST MED GAS DEMO PLAN
PG1.15 - LEVLE 1 COWBOY SOUTH MED GAS DEMO PLAN
PG1.16 - LEVEL 1 DOUGLAS FIR MED GAS DEMO PLAN
PG1.21 - LEVEL 2 NORTH MED GAS DEMO PLAN
PG1.22 - LEVEL 2 SOUTH MED GAS DEMO PLAN
PG1.23 - LEVEL 2 COWBOY MED GAS DEMO PLAN
PG1.33 - LEVEL 3 COWBOY MED GAS DEMO PLAN
PG2.01 - BASEMENT LEVEL NORTH MED GAS PLAN
PG2.02 - BASEMENT LEVEL SOUTH MED GAS PLAN
PG2.03 - BASEMENT LEVEL COWBOY WEST MED GAS PLAN
PG2.04 - BASEMENT LEVEL COWBOY EAST MED GAS PLAN
PG2.06 - BASEMENT LEVEL DOUGLAS FIR MED GAS PLAN
PG2.10 - LEVEL 1 BUFFALO NORTH MED GAS PLAN
PG2.11 - LEVEL 1 BUFFALO SOUTH MED GAS PLAN
PG2.12 - LEVEL 1 ARROWHEAD MED GAS PLAN
PG2.13 - LEVEL 1 COWBOY WEST MED GAS PLAN
PG2.14 - LEVEL 1 COWBOY EAST MED GAS PLAN
PG2.15 - LEVLE 1 COWBOY SOUTH MED GAS PLAN
PG2.16 - LEVEL 1 DOUGLAS FIR MED GAS PLAN
PG2.21 - LEVEL 2 BUFFALO NORTH MED GAS PLAN
PG2.22 - LEVEL 2 BUFFALO SOUTH MED GAS PLAN
PG2.23 - LEVEL 2 COWBOY MED GAS PLAN
PG2.33 - LEVEL 3 COWBOY MED GAS PLAN
M600 - MECHANICAL SCHEDULES

MP1.01 - BASEMENT LEVEL NORTH PIPING DEMO PLAN