AMENDMENT 3 Patient Ceiling Lift and Installation Federal contract opportunity
Solicitation number
36C26026Q0337_0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is Amendment 3 to Solicitation 36C26026Q0337, issued by the Department of Veterans Affairs Network Contracting Office in Vancouver, Washington on March 3, 2026. The amendment extends the deadline for receipt of offers to March 9, 2026 at 10:00 AM PDT and provides responses to ten industry questions regarding the installation of patient ceiling lift systems across multiple clinical areas at a VA facility.

The solicitation addresses ceiling lift installation in three main areas: a Clinic (CLC), Intensive Care Unit (ICU), and a new clinic space. Key clarifications provided through this amendment confirm that the General Contractor is responsible for installing the lift systems and removing existing ICU and CLC lifts. The facility clarified that ICU and CLC work areas will not be active during construction, eliminating infectious control and isolation area (ICRA) concerns. Specific ceiling configurations were identified: all CLC rooms have hard ceilings, while ICU contains six drop ceiling rooms and four hard ceiling rooms. The contractor is responsible for minor patching, painting, and repairs in hard lid ceiling rooms. Building plans, reflected ceiling plans, floor plans, and structural plans are attached to the amendment to support the bidders' proposal development. The amendment notes that the Statement of Work has been amended to incorporate these clarifications and contractor requirements.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

03-03-2026

36C260 Department of Veterans Affairs Network Contracting Office 20 1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26026Q0337

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-09-2026 10:00 AM PDT See CONTINUATION Page

The purpose of this amendment is to answer industry questions, and extend the closing date.

See the Continuation pages for questions and Government responses.

All other terms and conditions remain the same.

CONTINUATION PAGE

1) Please provide Building Plans for all areas in this solicitation (CLC, ICU, new clinic) to include Reflected ceiling plans, floor plans, and structural plans.

Please see the available building plans attached to this amendment.

2) SOW 1.1.2 states the General Contractor will install the lift systems. Is this an accurate statement? Will installation be procured under a different contract?

The General Contractor is responsible for installation of the lift systems under this contract.

3) ICU and CLC are active care areas. Who will be responsible for ICRA in these areas, and what level of ICRA is required?

The areas being worked on will not be active during that period of time.

4) The CLC room viewed during the site visit was hard lid ceiling. Are all of the other CLC rooms also hard lid ceiling?

All CLC rooms are hard ceiling.

5) ICU and CLC hard lid ceiling rooms – are there access panels in all of these rooms? Is there working space above the ceiling in these rooms?

Building plans are attached and site access was available during the site visit.

6) CLC – what is the approximate distance from the bottom of structure to the finished ceiling?

Building plans are attached and site access was available for measuring during the site visit. The facility is uncertain what “bottom of the structure" means.

7) ICU – what is the approximate distance from the bottom of structure to the finished ceiling?

Building plans are attached and site access was available for measuring during the site visit. The facility is uncertain what “bottom of the structure" means.

8) 2 rooms were viewed during the site visit in ICU. One was hard lid and one was ACT ceiling. Please provide the ceiling type in the other rooms.

ICU is 6 drop ceiling and 4 hard ceiling.

9) In hard lid ceiling rooms, both ICU and CLC, who will be responsible for minor patch, paint, and repair?

The Contractor.

10) The SOW calls for removal of the current ICU lifts. Will the facility be removing the existing CLC lifts or should CLC removal be included in the SOW?

The Contractor will also remove the existing CLC lifts.

11) Are reflective ceiling plans of the existing spaces available?

Yes. See attached plans.

*Note – The Statement of Work is amended to include the above referenced Contractor requirements.

See attached document: pg 28 531-325 - Drawings-V1_09192024.

See attached document: pg 30 531-325 - Drawings-V1_09192024 2.

See attached document: 3rd floor reflected ceiling 531-317_ICU Ceiling Lifts.

See attached document: refelcted ceiling 531-325 - Drawings-V1_09192024 2.

See attached document: floor 531-325 - Drawings-V1_09192024 2.

See attached document: pg 29 531-325 - Drawings-V1_09192024 2.

See attached document: pg 71 womens health 531-325 - Drawings-V1_09192024 2.

See attached document: refected ceiling 531-319_AA90.

See attached document: ceiling 531-325 - Drawings-V1_09192024 2.