ceiling 531-325 - Drawings-V1_09192024 2.pdf

PDF 438 KB Posted

Attached to
AMENDMENT 3 Patient Ceiling Lift and Installation Federal contract opportunity
Solicitation number
36C26026Q0337_0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is an architectural drawing showing a reflected ceiling plan for Level 1 of a medical facility construction project. The document is prepared by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, for the VA Puget Sound Health Care System in Seattle, Washington. The drawing is part of Phase 1 Architect-Engineer design services led by Spees Design Build with Stave Architects as the president and approved by the Chief Facility Management Service and Medical Center Director.

The ceiling plan illustrates the layout of lighting fixtures, mechanical equipment, and structural elements across the first level of the primary care/mental health building (Building AC101). The plan includes detailed notations for covelighting, recessed downlights, recessed troffer fixtures, hanging troffers, pendant fixtures, surface mount lineals, surface mount rounds, surface mount strips, and other lighting and mechanical components. General notes reference specifications for materials, lighting layout details, and construction requirements. The drawing incorporates a legend identifying various fixture types and includes coordination notes regarding mechanical equipment placement visible from below. This technical document serves as a construction guidance document for the implementation of ceiling systems and lighting infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 3 Patient Ceiling Lift and Installation, newest first.
File Type Posted
refected ceiling 531-319_AA90.pdf PDF
pg 29 531-325 - Drawings-V1_09192024 2.pdf PDF
pg 28 531-325 - Drawings-V1_09192024.pdf PDF
floor 531-325 - Drawings-V1_09192024 2.pdf PDF
3rd floor reflected ceiling 531-317_ICU Ceiling Lifts.pdf PDF
pg 30 531-325 - Drawings-V1_09192024 2.pdf PDF
refelcted ceiling 531-325 - Drawings-V1_09192024 2.pdf PDF
pg 71 womens health 531-325 - Drawings-V1_09192024 2.pdf PDF
S02 36C26026Q0337 0003 Amendment 3.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .