S02_36C10B25R0010_1825_Final.pdf
PDF 1 MB Posted
- Solicitation number
- 36C10B25R0010
About this file
This is a Request for Proposal (RFP) for Real Time Location System (RTLS) Asset Tracking sustainment services at Veterans Integrated Services Network (VISN) 16 facilities, issued by the VA Technology Acquisition Center. The RFP requires the contractor to provide project management, CenTrak battery management, CenTrak maintenance support, Infor LBI maintenance support, server maintenance/administration, and Juniper/Mist Wi-Fi integration services across 10 VA medical facilities in Louisiana, Mississippi, Arkansas, Texas, and Florida.
The solicitation is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with NAICS code 541512 and a $34 million size standard. The period of performance includes a 12-month base period and four 12-month option periods. Key requirements include maintaining battery levels below 2% for infrastructure devices and asset tags, providing Level 3 technical support, performing software updates/upgrades, and re-establishing Juniper/Mist Wi-Fi connectivity at all sites except Houston during the base period. Proposals are due January 13, 2025 at 10:00 AM ET, with the contract scheduled to begin in early 2025. The contract will be awarded on a firm-fixed-price basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_RTLS FINALRedacted.pdf | ||
| AttachmentA_RTLS_ServerList.xlsx | XLSX spreadsheet | |
| 36C10B25R0010_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TBD
TBD TBD
36C10B25R0010 01-08-2025
Angela Key, Contract Specialist 848-377-5202 01-13-2025
10am ET
36C10B
Department of Veterans Affairs
Technology Acquisition Center
Procurement Service J
23 Christopher Way
Eatontown NJ 07724
X 100
X
541512
$34 Million
N/A
N/A
See Schedule of Supplies/Services
36C10B
Department of Veterans Affairs
Technology Acquisition Center
Procurement Service J
Department of Veterans Affairs
Technology Acquisition Center
Financial Services Center
PO Box 149971
Austin TX 78714-8971
See website at: http://www.fsc.va.gov/einvoice.asp
See CONTINUATION Page
TITLE: South Central VA Health Network Veterans Integrated
Services Network (VISN) 16 Real Time Location System (RTLS)
Asset Tracking (AT) Sustainment Services
Contract Specialist: Angela Key, angela.key@va.gov
Contracting Officer: John Vardouniotis, ioannis.vardouniotis@va.gov
See Continuation Page
See CONTINUATION Page
X X
John Vardouniotis
Contracting Officer
36C10B25R0010
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 GOVERNING LAW
B.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT
B.4 SCHEDULE OF SUPPLIES/SERVICES
B.5 PERFORMANCE WORK STATEMENT
SECTION C - CONTRACT CLAUSES
C.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.2 FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (NOV 2021)
C.3 FAR 52.212-5 CONTRACT TERMS AND CONDITIONSREQUIRED TO
IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (NOV 2024)
C.4 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
C.5 FAR 52.227-19 COMMERCIAL COMPUTER SOFTWARE LICENSE (DEC 2007) . 83
C.6 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY
(FEB 2023)
C.7 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-
DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023 DEVIATION)
C.8 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023
DEVIATION)
C.9 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY
ACCESSIBILITY (FEB 2023)
SECTION D – CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
E.2 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
(NOV 2021)
E.3 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018)
E.4 FAR 52.212-3 OFFEROR REPS AND CERTS- COMMERCIAL ITEMS (MAY 2024)
E.5 FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
E.6 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.7 BASIS OF AWARD
E.8 EVALUATION APPROACH
E.9 PROPOSAL SUBMISSION INSTRUCTIONS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C10B Department of Veterans Affairs Technology Acquisition Center
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly
b. Semi-Annually
c. Other [IAW Section B.4 Price Schedule and acceptance of deliverables]
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic
Submission of Payment Requests.
See website at: http://www.fsc.va.gov/einvoice.asp
5. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto, as permitted by FAR 12.212. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. § 3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this clause shall prevail. The Contractor shall deliver to the Government all data first produced under this Contract/Order with unlimited rights as defined by FAR 52.227-14. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S.
Department of Justice (DOJ) in accordance with 28 U.S.C. § 516; at the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by modification (Standard Form 30) and shall only be made by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT
(1) Definitions.
(a) Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”
(b) Licensor. The term “licensor” shall mean the contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “contractor” is the party identified in Block 17a on the SF1449. If the contractor is a reseller and not the Licensor, the contractor remains responsible for performance under this order.
(c) Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.
(d) Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.
(e) Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.
(f) Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.
(g) Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version
5.4 to 6).
(2) Software License
(a) Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software
(b) The Government may use the software in a networked environment.
(c) Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).
(d) All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description.
(3) Software Maintenance and Technical Support
(a) If the Government desires to continue software maintenance and support beyond the period of performance identified in this contract or order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received the contractor is neither authorized nor permitted to renew any of the previously furnished services.
(b) The contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims.
(c) Any telephone support provided by contractor shall be at no additional cost.
(d) The contractor shall provide all maintenance services in a timely manner in accordance with the contractor’s customary practice or as defined in the Performance Work Statement/Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the contractor (e.g., www.ppirs.gov).
(e) If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.
(4) Disabling Software Code. The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive ke, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government.
Inability of the contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
(5) Manuals and Publications. Upon Government request, the contractor shall furnish the most current version of the user manual and publications for all products/services provided under this contract or order at no cost.
B.4 SCHEDULE OF SUPPLIES/SERVICES
Offerors are instructed to complete Section B.4 and submit with their proposal.
Offerors are cautioned that alterations to the line items as specified below may render proposals unacceptable. Software licenses shall include all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS. All questions shall be directed to the Contract Specialist, Angela Key, angela.key@va.gov, and Contracting Officer, John Vardouniotis, ioannis.vardouniotis@va.gov, prior to the closing date and time specified in the Request for Proposal (RFP).
Inspection/Acceptance: Destination
BASE PERIOD
Period of Performance (PoP): 12 months
Product Service Code (PSC): DA01 for all Contract Line Item Numbers (CLIN) unless otherwise noted.
CLIN Description Qty Unit Unit Price Total Price 0001 Project Management
In accordance with (IAW) Performance Work Statement (PWS) Paragraph 5.1 including all its subparagraphs.
Firm Fixed Price (FFP)
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.1 inclusive of all subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
The price of this CLIN shall be included in priced CLINs 0002 through 0006.
12 MONTH
(MO)
Not Separately
Priced
(NSP)
NSP
0001AA Contractor Project Management Plan
IAW PWS 5.1.1
Due 30 days after the beginning of the PoP and updated throughout as specified in the contract.
1 LOT
(LT)
NSP NSP
mailto:angela.key@va.gov
Electronic submission to: VA PM, COR, CO
0001AB Monthly Progress Report
IAW PWS 5.1.2
Due on the fifth day of each month
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
0001AC Kickoff Meeting Final Presentation
IAW PWS 5.1.3
Due within three calendar days after kickoff meeting.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
0001AD Contractor Staff Roster
IAW PWS 6.2.2
Due within three business days after award, and updated as needed.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
0002 Battery Management IAW PWS 5.2 including all its subparagraphs
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.2
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
0002AA Battery Management Report
IAW PWS 5.2
Due on last day after each onsite visit at each location.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
0003 Centrak Maintenance Support 12 MO $ $
IAW PWS 5.3
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.3.
The PoP shall be 12 months from the beginning of the PoP as specified in the TO.
0004 INFOR LBI Maintenance Support
IAW PWS 5.4
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.4.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
0005 Server Maintenance and Administration
IAW PWS 5.5
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraph 5.5 including all of its subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
0006 Juniper Mist Integration and Sustainment for Alexandria, Biloxi, Fayetteville, Jackson, Little Rock, North Little Rock, New Orleans, Shreveport, and Pensacola. IAW PWS 5.6.
12 MO $ $
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion of this task.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
BASE PERIOD TOTAL $
OPTION PERIOD ONE
This option may be exercised in accordance with FAR 52.217-9, Option to Extend the Term of the Contract. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of the Base Period.
Period of Performance: 12 months
PSC: DA01 for all CLINs unless otherwise noted.
CLIN Description Qty Unit Unit Price Total Price 1001 Project Management
IAW PWS Paragraph 5.1 including all its subparagraphs.
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.1 inclusive of all subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
The price of this CLIN shall be included in priced CLINs 1002 through 1006.
12 MO NSP NSP
1001AA Contractor Project Management Plan
IAW PWS 5.1.1
Due 30 days after the beginning of the PoP as specified in the contract.
Electronic submission to: VA PM, COR, CO
1001AB Monthly Progress Report
IAW PWS 5.1.2
Due on the fifth day of each month
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
1001AC Intentionally Left Blank
1001AD Contractor Staff Roster
IAW PWS 6.2.2
Due within three business days after award, and updated as needed.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
1002 Battery Management IAW PWS 5.2 including all its subparagraphs
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.2
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
1002AA Battery Management Report
IAW PWS 5.2
Due on last day after each onsite visit at each location.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
1003 Centrak Maintenance Support
IAW PWS 5.3
material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.3.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
1004 INFOR LBI Maintenance Support
IAW PWS 5.4
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.4.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
1005 Server Maintenance and Administration
IAW PWS 5.5
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraph 5.5 including all of its subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
1006 Juniper Mist Integration and Sustainment for Alexandria, Biloxi, Fayetteville, Jackson, Little Rock, North Little Rock, New Orleans, Shreveport, Pensacola, and Houston. IAW PWS 5.6 material, supplies, travel, reinstatement fees, and any other costs required for successful completion of this task.
The PoP shall be 12 months from the beginning of the PoP as
OPTION PERIOD ONE TOTAL $
OPTION PERIOD TWO
the Term of the Contract. Work shall not commence until, and unless, a formal commence immediately after expiration of Option Period One.
2001 Project Management
IAW PWS Paragraph 5.1 including all its subparagraphs.
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.1 inclusive of all subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
The price of this CLIN shall be included in priced CLINs 2002 through 2006.
12 MO NSP NSP
2001AA Contractor Project Management Plan
IAW PWS 5.1.1
Due 30 days after the beginning of the PoP as specified in the contract.
COR, CO
2001AB Monthly Progress Report
IAW PWS 5.1.2
Due on the fifth day of each month
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
2001AC Intentionally Left Blank
2001AD Contractor Staff Roster
IAW PWS 6.2.2
Due within three business days after award, and updated as needed.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
2002 Battery Management IAW PWS 5.2 including all its subparagraphs
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.2
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
2002AA Battery Management Report
IAW PWS 5.2
Due on last day after each onsite visit at each location.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
2003 Centrak Maintenance Support
IAW PWS 5.3
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.3.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
2004 INFOR LBI Maintenance Support
IAW PWS 5.4
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.4.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
2005 Server Maintenance and Administration
IAW PWS 5.5
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraph 5.5 including all of its subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
2006 Juniper Mist Integration and Sustainment for Alexandria, Biloxi, Fayetteville, Jackson, Little Rock, North Little Rock, New Orleans, Shreveport, Pensacola, and Houston. IAW PWS 5.6.
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion of this task.
The PoP shall be 12 months from the beginning of the PoP as
OPTION PERIOD TWO TOTAL $
OPTION PERIOD THREE
the Term of the Contract. Work shall not commence until, and unless, a formal commence immediately after expiration of Option Period Two.
3001 Project Management
IAW PWS Paragraph 5.1 including all its subparagraphs.
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.1 inclusive of all subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
The price of this CLIN shall be included in priced CLINs 3002 through 3006.
12 MO NSP NSP
3001AA Contractor Project Management Plan
IAW PWS 5.1.1
Due 30 days after the beginning of the PoP as specified in the contract.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
3001AB Monthly Progress Report
IAW PWS 5.1.2
1 LO NSP NSP
Due on the fifth day of each month
Electronic submission to: VA PM, COR, CO
3001AC Intentionally Left Blank
3001AD Contractor Staff Roster
IAW PWS 6.2.2
Due within three business days after award, and updated as needed.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
3002 Battery Management IAW PWS 5.2 including all its subparagraphs
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.2
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
3002AA Battery Management Report
IAW PWS 5.2
Due on last day after each onsite visit at each location.
Electronic submission to: VA PM, COR, CO
1 LO NSP NSP
3003 Centrak Maintenance Support
IAW PWS 5.3
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.3.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
3004 INFOR LBI Maintenance Support
IAW PWS 5.4
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.4.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
3005 Server Maintenance and Administration
IAW PWS 5.5
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraph 5.5 including all of its subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
3006 Juniper Mist Integration and Sustainment for Alexandria, Biloxi, Fayetteville, Jackson, Little Rock, North Little Rock, New Orleans, Shreveport, Pensacola, and Houston. IAW PWS 5.6
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion of this task.
The PoP shall be 12 months from the beginning of the PoP as
OPTION PERIOD THREE TOTAL $
OPTION PERIOD FOUR
the Term of the Contract. Work shall not commence until, and unless, a formal commence immediately after expiration of Option Period Three.
4001 Project Management
IAW PWS Paragraph 5.1 including all its subparagraphs.
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.1 inclusive of all subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
The price of this CLIN shall be included in priced CLINs 4002 through 4006.
12 MO NSP NSP
4001AA Contractor Project Management Plan
IAW PWS 5.1.1
Due 30 days after the beginning of the PoP as specified in the contract.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
4001AB Monthly Progress Report
IAW PWS 5.1.2
Due on the fifth day of each month
1 LO NSP NSP
COR, CO
4001AC Intentionally Left Blank
4001AD Contractor Staff Roster
IAW PWS 6.2.2
Due within three business days after award, and updated as needed.
Electronic submission to: VA PM, COR, CO
1 LT NSP NSP
4002 Battery Management IAW PWS 5.2 including all its subparagraphs
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.2
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
4002AA Battery Management Report
IAW PWS 5.2
Due on last day after each onsite visit at each location.
Electronic submission to: VA PM, COR, CO
1 LO NSP NSP
4003 Centrak Maintenance Support
IAW PWS 5.3
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.3.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
4004 INFOR LBI Maintenance Support
IAW PWS 5.4
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraphs 5.4.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
4005 Server Maintenance and Administration
IAW PWS 5.5
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion for the services detailed in PWS paragraph 5.5 including all of its subparagraphs.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
12 MO $ $
4006 Juniper Mist Integration and Sustainment for Alexandria, Biloxi, Fayetteville, Jackson, Little Rock, North Little Rock, New Orleans, Shreveport, Pensacola, and Houston. IAW PWS 5.6.
FFP
This CLIN includes all labor, material, supplies, travel, reinstatement fees, and any other costs required for successful completion of this task.
The PoP shall be 12 months from the beginning of the PoP as specified in the contract.
OPTION PERIOD FOUR TOTAL $
Summary:
TOTAL BASE PERIOD: $
TOTAL OPTION PERIOD ONE: $
TOTAL OPTION PERIOD TWO: $
TOTAL OPTION PERIOD THREE: $
TOTAL OPTION PERIOD FOUR: $
TOTAL CONTRACT PRICE: $
B.5 PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
South Central VA Health Care Network Veterans Integrated Services Network
(VISN) 16
Real Time Location System (RTLS) Asset Tracking (AT) Sustainment
Date: December 19, 2024
VA-25-00016405
PWS Version Number: 1.2
1.0 BACKGROUND
Real Time Location System (RTLS) Asset Tracking (AT) capability is currently provided by CenTrak RTLS Technology and Infor Location Based Intelligence (LBI) middleware in the VA Medical Centers. Both are supplemented via the Infor LBI Asset Management Business Intelligent Solution. RTLS technology combines a variety of signaling and wireless communication methods to determine the location of tagged assets. Knowing the location of tagged assets can be used to speed up annual inventory, locate equipment, reduce theft/loss, track patients and track staff to improve workflow.
Active RTLS technology uses tags that transmit a Radio Frequency ID (RFID) through Wi-Fi at a regular interval. The same tags may also listen for, and report the receipt of, other signaling technologies like infrared or low frequency emitters. These technologies are designed for room level accuracy. Veterans Integrated Services Network (VISN) 16’s AT solution uses Active Tags only. AT is one of three RTLS business use cases deployed by VA, and one of eight that VA has identified. VISN 16 facilities are currently operating AT and AT data is collected and transferred from the CenTrak system to the Infor LBI. Infor LBI, is a RTLS specific Business Intelligent platform that leverages location-based data to provide users with the following information:
• A real-time Graphical User Interface display of location status for individual assets
• A set of statistically based reports and dashboards that present the state of the RTLS inventory, as well as the employment of individual assets.
RTLS users may access and use individual application functionality directly from CenTrak or from Infor LBI. The Infor LBI implementation is interfaced to IBM’s Maximo Asset Management solution. IBM Maximo Asset Management is an asset management life cycle and workflow management application. Currently, MuleSoft Enterprise Service Bus (ESB) is deployed as part of the interface solution to Maximo.
See PWS Section 4.2 for the list of specific VISN 16 sites that are in scope for this PWS requirement. Southeast Louisiana Veterans Health Care System in New Orleans is still under warranty during the base year, therefore not included in the base year, however this site location will be included in the option years.
Additionally, the Office of Information & Technology (OIT) replaced the Wi-Fi system through a national NextGen Wi-Fi project using Juniper/Mist technology. The new Wi-Fi system affected the connectivity to the RTLS system. The connectivity needs to be re-established to restore functionality to all stations except for Michael E. DeBakey VA Medical Center located in Houston. Michael E. DeBakey VA Medical Center was the Beta site for the integration therefore it will not need re-establishment connectivity for the base period, however the Houston location will need sustainment services for the option years.
2.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”
2. “Federal Information Security Modernization Act of 2014”
3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”
4. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004
5. FIPS Pub 200, “Minimum Security Requirements for Federal Information and
Information Systems,” March 2006
6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and
Contractors,” August 2013
7. 10 U.S.C. § 2224, "Defense Information Assurance Program"
8. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
9. Public Law 109-461, Veterans Benefits, Health Care, and Information
Technology Act of 2006, Title IX, Information Security Matters
10. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
11. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
12. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
13. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5,
14. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017
15. Office of Management and Budget (OMB) Circular A-130, “Managing Federal
Information as a Strategic Resource,” July 28, 2016
16. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed
Services (CHAMPUS)”
17. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” October 2008
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021
21. VA Handbook 6500, “Risk Management Framework for VA Information
Systems VA Information Security Program,” February 24, 2021
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive
Personal Information (SPI),” March 12, 2019
23. VA Handbook 6500.5, “Incorporating Security and Privacy into the System
Development Lifecycle,” March 22, 2010
24. VA Handbook 6500.6, “Contract Security,” March 12, 2010
25. VA Handbook 6500.8, “Information System Contingency Planning,” April 6,
26. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
27. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
28. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference
Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp https://www.va.gov/vapubs/index.cfm https://www.va.gov/vapubs/index.cfm http://www.va.gov/vapubs http://www.va.gov/vapubs https://www.va.gov/process/ https://www.va.gov/process/maps.asp https://www.va.gov/process/artifacts.asp
29. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
30. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014
31. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015
32. VA Handbook 6510, “VA Identity and Access Management,” January 15,
33. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017
34. VA Directive 6300, “Records and Information Management,” September 21,
35. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010
36. NIST SP 800-37 Rev 2, “Risk Management Framework for Information
Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018
37. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
38. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
39. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-
12) Program,” March 24, 2014
40. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005
41. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019
42. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
43. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with an updated Architecture (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)
44. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018
45. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
46. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
47. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile
Devices (Draft),” October 2012
48. Draft National Institute of Standards and Technology Interagency Report
(NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014
49. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland
Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514) https://www.va.gov/trm/TRMHomePage.aspx https://arch.idmanagement.gov/#what-is-the-ficam-architecture https://arch.idmanagement.gov/#what-is-the-ficam-architecture https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514
50. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
51. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
52. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
53. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019
54. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008
55. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007
56. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
57. Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018
58. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August
2, 2001
59. VA Directive 0058, “VA Green Purchasing Program,” July 19, 2013
60. VA Handbook 0058, “VA Green Purchasing Program,” July 19, 2013
61. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote
Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
62. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
63. “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
64. VA Memorandum “Proper Use of Email and Other Messaging Services,”
January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
65. “DevSecOps Product Line Management Playbook” version 2.0, May 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
66. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
67. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol
Version 6 (IPv6),” November 19, 2020
68. Social Security Number (SSN) Fraud Prevention Act of 2017
69. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23,
70. “National RTLS Requirements Specification Document (RSD) v4.1 Final”, June 2015
71. “RTLS System Design Document (SDD) v7.2”, February 2018
72. “RTLS National Enterprise Data Architecture FINAL”, August 2017
73. RTLS Enterprise Data Architecture (EDA) Standards Workbook v2.0 Final
Spreadsheet. (this replaces Data Standards 1.94.1?)
74. RTLS National Requirement Traceability Matrix 20180215_v1.2
Spreadsheet, February 2018
75. RTLS Asset Tracking - Application Usage Document v4.0, September 2017
76. Maximo – Intelligent Infor LBI RTLS ICD, Version 3.0 November 16th 2017 https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896 https://www.cisa.gov/publication/tic-30-core-guidance-documents https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
77. VA Directive 6300, Records and Information Management, February 26,
78. VA Memorandum, VAIQ # 7011145, VA Identity Management Policy, June 28, 2010
3.0 SCOPE OF WORK
The Contractor shall provide project management, CenTrak battery management, CenTrak maintenance support, Infor LBI maintenance support, and RTLS server support for VISN 16. The Contractor shall provide RTLS software updates, upgrades, and administration along with software license installation, corrective maintenance, and helpdesk support. The Contractor shall also provide offline tag mitigation and a CenTrak system health assessment to include an onsite assessment of CenTrak infrastructure coverage. The Contractor shall provide re-establishment of Juniper/Mist Wi-Fi connectivity during the base period for all sites except for Michael E. DeBakey VA Medical Center located in Houston. The Contractor shall provide sustainment of Juniper/Mist Wi-Fi system for all sites for the option periods.
4.0 PERFORMANCE DETAILS
4.1 PERFORMANCE PERIOD
The PoP shall be one, 12-month base period from the date of award with four, 12-month option periods, if exercised by the Government.
Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO). If required, the CO may designate the Contractor to work during holidays and weekends.
There are eleven Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, four are set by date:
New Year's Day January 1 Juneteenth June 19 Independence Day July 4 Veterans Day November 11 Christmas Day December 25
If any of the above falls on a Saturday, then Friday shall be observed as a holiday.
Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
Martin Luther King's Birthday Third Monday in January Washington's Birthday Third Monday in February Memorial Day Last Monday in May Labor Day First Monday in September
Columbus Day Second Monday in October Thanksgiving Fourth Thursday in November
4.2 PLACE OF PERFORMANCE
Tasks under this PWS shall be performed in VA facilities as noted in the Table 1 below as well as at Contractor facilities. Work may be performed at remote locations with prior concurrence from the Contracting Officer’s Representative (COR). Tasks under this PWS shall be performed at Contractor facilities. The Contractor shall identify the Contractor’s place of performance in their proposal submission.
Table 1. VISN Facilities Deploying the RTLS Asset Tracking Solution
Facility ID Facility Name
502 Alexandria VA Health Care System
2495 Shreveport Hwy 71 Pineville, LA 71360
520 Gulf Coast Veterans Health Care System VA Gulf Coast Veterans Health Care System 400 Veterans Ave.
Biloxi, MS 39531
520BZ Gulf Coast Veterans Health Care System-Joint Ambulatory Care Center
790 Veterans Way Pensacola, FL 32507
564 Veterans Health Care System of the Ozarks
1100 North College Ave.
Fayetteville, AR 72703
580 Michael E. DeBakey VA Medical Center
2002 Holcombe Blvd.
Houston, TX 77030
586 G. V. (Sonny) Montgomery VA Medical Center
1500 E. Woodrow Wilson Dr.
Jackson, MS 39216
598 Central Arkansas Veterans Healthcare System John L. McClellan Memorial Veterans Hospital 4300 West 7th St.
Little Rock, AR 72205
598AO Central Arkansas Veterans Healthcare System
Eugene J. Towbin Healthcare Center
2200 Fort Roots Drive North Little Rock, AR 72114
629 Southeast Louisiana Veterans Health Care System 2400 Canal Street New Orleans, LA 70119-6535
667 Overton Brooks VA Medical Center 510 East Stoner Ave.
Shreveport, LA 71101
4.3 TRAVEL
The Government anticipates travel under this effort to perform the tasks associated with the effort, as well as to attend program-related meetings or conferences throughout the PoP. Include all estimated travel costs in your firm-fixed price line items. These costs will not be directly reimbursed by the Government.
The total estimated number of trips in support of the battery management program for this effort is outlined in the Table 2 below. Anticipated locations include the following, with estimated days and number of travelers per each trip:
Table 2
Site Days Trips Base Period Travelers
Option Periods One through Four
Travelers per Option Period
Alexandria, LA 5 6 2 2
Biloxi, MS 5 6 2 2
Fayetteville, AR 5 6 2 2
Houston, TX 5 7 2 2
Jackson, MS 5 6 2 2
Little Rock, AR 5 6 2 2
North Little Rock, AR 5 7 2 2
New Orleans 5 7 0 2
Shreveport, LA 5 7 2 2
Pensacola, FL 5 7 2 2
5.0 SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the following:
5.1 PROJECT MANAGEMENT
5.1.1 CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline, and tools to be used in execution of the contract. Due 30 days after the beginning of the PoP and updated throughout as specified in the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP.
Deliverable:
A. Contractor Project Management Plan
5.1.2 REPORTING REQUIREMENTS
The Contractor shall provide the COR with Monthly Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding Month.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor performance against the CPMP and report any deviations.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .