S02 000110 Table of Contents.pdf
PDF 234 KB Posted
- Solicitation number
- 36C24926R0074
About this file
This document is a Table of Contents for the Department of Veterans Affairs (VA) VHA Master Specifications, effective July 1, 2026. It provides a comprehensive index of technical specification sections organized by the MasterFormat 2004 division structure used for federal construction projects.
The specifications cover all major construction trades and systems, including general requirements (scheduling, quality control, safety, commissioning), site work and demolition, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, and electrical power generation. Each specification section is identified by its CSI MasterFormat number and section title, with dates ranging from 2010 to 2026 indicating when specifications were last updated or created. Notable recent updates include sections on PVC roofing (04-2026), asbestos abatement (06-2026), communications systems and infrastructure (07-2026), and various HVAC, plumbing, and electrical components (03-2026). The document serves as a master reference guide for VA construction projects, directing practitioners to applicable technical requirements for all construction work and systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 010000 General Requirements.pdf | ||
| S02 DBA Wage Determination KY20260093 5-18-2026.pdf | ||
| S02 Floorplan 603-26-107.pdf | ||
| S02 Solicitation Attachment-Price Schedule.xlsx | XLSX spreadsheet | |
| S02 Past Performance Questionaire.pdf | ||
| S02 SCA Wage Determination 2015-4717.pdf | ||
| 36C24926R0074_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07-01-2026
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-2020
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 06-2026 01 32 16.01 Architectural and Engineering CPM Schedules 03-2020 01 32 16.13 Network Analysis Schedules – Major Construction
Project Design-Bid-Build 05-2022
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 12-2025 01 32 16.16 Network Analysis Schedules (Design-Build Only) 05-2022 01 32 16.17 Network Analysis Schedules – Major Design/Build
Projects 06-2019
01 33 23 Shop Drawings, Product Data, and Samples 03-2026 01 35 26 Safety Requirements for Major Projects 05-2024 01 42 19 Reference Standards 11-2020 01 45 00 Quality Control 02-2021 01 45 29 Testing Laboratory Services 11-2018 01 45 35 Special Inspections 06-2021 01 57 19 Temporary Environmental Controls 01-2021 01 58 16 Temporary Interior Signage 07-2015 01 74 19 Construction Waste Management 04-2022 01 81 13 Sustainable Construction Requirements 10-2017 01 81 13.02 Sustainability Certification Requirements – LEED V4
BD+C: New Construction and Major Renovation 04-2023
01 81 13.03 Sustainability Certification Requirements – LEED V4 BD+C: Healthcare
04-2023
01 81 13.12 Sustainability Certification Requirements – LEED V4.1 BD+C: New Construction and Major Renovation
04-2023
01 81 13.13 Sustainability Certification Requirements – LEED V4.1: Healthcare
04-2023
01 81 13.14 Sustainability Certification Requirements – LEED V4.1 BD+C: Data Centers
04-2023
01 81 13.15 Sustainability Certification Requirements – LEED V4.1 BD+C: Warehouses and Distribution Centers
04-2023
01 81 13.21 Sustainability Certification Requirements – GREEN
GLOBES
01-2021
01 91 00 General Commissioning Requirements 04-2022 01 91 00.01 DVA/USACE Projects General Commissioning Requirements 08-2019
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-2023 02 41 00 Demolition 08-2017
00 01 10-2
SECTION NO DIVISION AND SECTION TITLES DATE
02 65 00 Underground Storage Tank Removal 01-2021 02 82 11 Traditional Asbestos Abatement 01-2021 02 82 13.13 Glovebag Asbestos Abatement 06-2026 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 06-2026 02 82 13.21 Asbestos Roofing Abatement 01-2021 02 82 13.31 Asbestos Transite Abatement 01-2021 02 82 13.41 Asbestos Abatement for Total Demolition Project 01-2021 02 83 33.13 Lead-Based Paint Removal and Disposal 01-2021
DIVISION 03 – CONCRETE
03 23 00 Stressing Tendons 01-2021 03 30 00 Cast-in-Place Concrete 01-2021 03 30 53 (Short-Form) Cast-in-Place Concrete 01-2021 03 37 13 Shotcrete 01-2021 03 41 13 Precast Concrete Hollow Core Planks 01-2021 03 41 33 Precast Structural Pretensioned Concrete 01-2021 03 45 00 Precast Architectural Concrete 01-2021 03 51 13 Cementitious Wood Fiber Decks 01-2021 03 51 16 Gypsum Concrete Roof Decks 01-2021 03 52 00 Lightweight Concrete Roof Insulation 01-2021 03 55 11 Gypsum Concrete Floor Decks 01-2021
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-2021 04 05 13 Masonry Mortaring 10-2017 04 05 16 Masonry Grouting 01-2021 04 20 00 Unit Masonry 08-2017 04 72 00 Cast Stone Masonry 01-2021
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-2018 05 21 00 Steel Joist Framing 11-2018 05 31 00 Steel Decking 01-2021 05 36 00 Composite Metal Decking 01-2021 05 40 00 Cold-Formed Metal Framing 01-2021 05 50 00 Metal Fabrications 08-2018 05 51 00 Metal Stairs 01-2021
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-2017 06 16 63 Cementitious Sheathing 01-2021 06 20 00 Finish Carpentry 01-2021
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-2021 07 08 00 Facility Exterior Closure Commissioning 01-2021
00 01 10-3
SECTION NO DIVISION AND SECTION TITLES DATE
07 08 00.01 DVA/USACE Projects Facility Exterior Closure Commissioning
08-2019
07 11 13 Bituminous Dampproofing 01-2021 07 12 00 Built-Up Bituminous Waterproofing 01-2021 07 13 00 Sheet Waterproofing 01-2021 07 13 52 Modified Bituminous Sheet Waterproofing 01-2021 07 14 21 Latex Mastic Deck Covering 01-2021 07 18 13 Pedestrian Traffic Coatings 01-2021 07 21 13 Thermal Insulation 01-2021 07 21 23 Loose-Fill Insulation 01-2021 07 22 00 Roof and Deck Insulation 01-2021 07 24 00 Exterior Insulation and Finish Systems 01-2021 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-2021 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-2021 07 31 13 Asphalt Shingles 02-2021 07 31 26 Slate Shingles 01-2021 07 31 29.13 Wood Shingles 01-2021 07 32 13 Clay Roof Tiles 01-2021 07 40 00 Roofing and Siding Panels 03-2026 07 51 00 Built-Up Bituminous Roofing 12-2021 07 51 13.11 Hot-Applied Built-Up Asphalt Roofing 12-2021 07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 12-2021 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing 12-2021
07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
12-2021
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-2021 07 54 16 Ethylene Interpolymer (KEE) Roofing 01-2021 07 54 19 Polyvinyl-Chloride (PVC) Roofing 04-2026 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 11-2025 07 56 00 Fluid-Applied Roofing 01-2021 07 57 13 Sprayed Polyurethane Foam Roofing 12-2021 07 60 00 Flashing and Sheet Metal 01-2021 07 61 16 Batten Seam Copper Roofing 01-2021 07 71 00 Roof Specialties 01-2021 07 72 00 Roof Accessories 01-2021 07 81 00 Applied Fireproofing 07-2023 07 84 00 Firestopping 01-2021 07 92 00 Joint Sealants 04-2022 07 95 13 Expansion Joint Cover Assemblies 01-2021
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-2021 08 11 73 Sliding Metal Fire Doors 01-2021 08 14 00 Interior Wood Doors 01-2021 08 17 10 Integrated Door Assemblies 01-2021 08 31 13 Access Doors and Frames 06-2025 08 32 13 ICU Sliding Glass Doors 01-2021 08 33 00 Coiling Doors and Grilles 01-2021 08 33 13 Coiling Counter Doors 01-2021
00 01 10-4
SECTION NO DIVISION AND SECTION TITLES DATE
08 34 53 Security Doors and Frames 01-2021 08 34 59 Vault Doors and Day Gates 01-2021 08 35 13.13 Accordion Folding Doors 01-2021 08 36 13 Sectional Doors 01-2021 08 38 16 Flexible Traffic Doors 01-2021 08 41 13 Aluminum-Framed Entrances and Storefronts 01-2021 08 42 33 Revolving Door Entrances 01-2021 08 44 13 Glazed Aluminum Curtain Walls 04-2020 08 51 13 Aluminum Windows 01-2021 08 51 13.11 Side-Hinged Aluminum Windows 01-2021 08 51 23 Steel Windows 01-2021 08 51 69.11 Aluminum Storm Windows 01-2021 08 56 19 Pass Windows 01-2021 08 56 53 Blast Resistant Windows 01-2021 08 56 59 Service and Teller Window Units 01-2021 08 56 66 Detention Window Screens 01-2021 08 63 00 Metal-Framed Skylights 01-2021 08 71 00 Door Hardware 03-2024 08 71 13 Automatic Door Operators 01-2021 08 71 13.11 Low Energy Power Assist Door Operators 01-2021 08 80 00 Glazing 01-2021 08 90 00 Louvers and Vents 01-2021
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-2026 09 06 00 Schedule for Finishes 01-2021 09 22 16 Non-Structural Metal Framing 06-2018 09 23 00 Gypsum Plastering 01-2021 09 24 00 Portland Cement Plastering 01-2021 09 26 00 Veneer Plastering 01-2021 09 29 00 Gypsum Board 04-2020 09 30 13 Ceramic/Porcelain Tiling 11-2025 09 51 00 Acoustical Ceilings 12-2018 09 54 23 Linear Metal Ceilings 01-2021 09 63 13 Brick Flooring 01-2021 09 63 40 Stone Flooring 01-2021 09 65 13 Resilient Base and Accessories 01-2021 09 65 16 Resilient Sheet Flooring 06-2022 09 65 19 Resilient Tile Flooring 05-2018 09 66 13 Portland Cement Terrazzo Flooring 01-2021 09 66 16 Terrazzo Floor Tile 10-2025 09 67 23 High Performance Resinous Flooring for Pharmacies 04-2026 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 12-2021 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring
(RES-3)
05-2024
09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 01-2021 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 01-2021 09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B) 01-2021
09 68 00 Carpeting 01-2021
00 01 10-5
SECTION NO DIVISION AND SECTION TITLES DATE
09 68 21 Athletic Carpeting 01-2021 09 69 00 Access Flooring (Telecommunications) 04-2026 09 69 13 Rigid-Grid Access Flooring (Telecommunications) 06-2026 09 72 16 Vinyl-Coated Fabric Wall Covering 01-2021 09 72 31 Polypropylene Fabric Wall Covering 01-2021 09 78 23 Phenolic Interior Wall Paneling 01-2021 09 84 33 Sound-Absorbing Wall Units 01-2021 09 91 00 Painting 01-2021 09 94 19 Multicolor Interior Finishing 01-2021 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 01-2021
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 01-2021 10 11 23 Tackboards 01-2021 10 11 33 Glassboards (Magnetic & Non-Magnetic) 01-2021 10 13 00 Directories 01-2021 10 14 00 Signage 01-2021 10 21 13 Toilet Compartments 01-2021 10 21 16 Shower and Dressing Compartments 01-2021 10 21 23 Cubicle Curtain Tracks 01-2021 10 22 13 Wire Mesh Partitions 01-2021 10 22 19 Demountable Partitions 01-2021 10 22 26.13 Accordion Folding Partitions 01-2021 10 25 13 Patient Bed Service Walls 05-2023 10 26 00 Wall and Door Protection 01-2021 10 28 00 Toilet, Bath, and Laundry Accessories 01-2021 10 44 13 Fire Extinguisher Cabinets 08-2018 10 75 00 Flagpoles 01-2021
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 01-2021 11 12 00 Parking Control Equipment 01-2021 11 17 36 Package Transfer Units 08-2025 11 26 00 Unit Kitchens 01-2021 11 40 11 Custom Fabricated Food Service Equipment 01-2021 11 40 21 Food Service Equipment-Utility Distribution System 01-2021 11 41 00 Food Storage Equipment 01-2021 11 41 21 Walk-In Coolers and Freezers 01-2021 11 44 00 Food Cooking Equipment 01-2021 11 48 00 Cleaning and Disposal Equipment 01-2021 11 53 13 Laboratory Fume Hoods 01-2021 11 53 23 Laboratory Refrigerators 01-2021 11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-2021 11 53 61 Custom Fabricated Laboratory Equipment 01-2021 11 53 71 Solution Warming Cabinets 01-2021 11 71 01 Medical Washing and Sterilizing Equipment 01-2021 11 71 02 Laboratory Washing and Sterilizing Equipment 01-2021 11 73 00 Ceiling Mounted Patient Lift System 06-2025
00 01 10-6
SECTION NO DIVISION AND SECTION TITLES DATE
11 78 00 Mortuary Equipment 01-2021 11 78 13 Mortuary Refrigerators 01-2021 11 79 13 Hydrotherapy Equipment 01-2021 11 82 19 Packaged Incinerators 01-2021
DIVISION 12 – FURNISHINGS
12 22 16 Drapery Track and Accessories 01-2021 12 24 00 Window Shades 08-2017 12 24 21 Lightproof Shades 01-2021 12 31 00 Manufactured Metal Casework 01-2021 12 32 00 Manufactured Wood Casework 01-2021 12 34 00 Manufactured Plastic Casework 01-2021 12 35 70.21 Medication Cabinet 01-2021 12 36 00 Countertops 12-2023 12 56 70.11 Suspended Table 01-2021
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-2021
13 05 41.10 Seismic Restraint Requirements for Non-Structural Components (Telecommunications)
06-2026
13 17 23 Therapeutic Pools 01-2021 13 17 23.11 Therapeutic Pool Accessories 01-2021 13 19 13 Kennel Enclosures and Gates 01-2021 13 21 29 Constant Temperature Rooms 01-2021 13 21 49 Audiology Booth 01-2021 13 34 19 Metal Building Systems 01-2021 13 49 00 Radiation Protection 01-2021
DIVISION 14– CONVEYING EQUIPEMENT
14 12 11 Traction and Winding Drum Dumbwaiter 04-2024 14 21 00 Traction Elevator – New 04-2024 14 21 10 Traction Elevator – Modernization 04-2024 14 21 11 Traction Cartlift 04-2024 14 24 00 Hydraulic Elevator – New 04-2024 14 24 10 Hydraulic Elevator – Modernization 04-2024 14 24 11 Hydraulic Cartlift 04-2024 14 91 33 Gravity Soiled Linen Chutes 09-2023 14 91 82 Gravity Trash Chutes 09-2023 14 92 00 Pneumatic Tube System 09-2023
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-2016 21 08 00.01 DVA/USACE Projects Commissioning of Fire Suppression
Systems 08-2019
21 12 00 Manual Dry Standpipe Systems 06-2015
00 01 10-7
SECTION NO DIVISION AND SECTION TITLES DATE
21 13 13 Wet-Pipe Sprinkler Systems 06-2015 21 13 16 Dry-Pipe Sprinkler Systems 01-2015 21-22-00 Clean Agent Fire Suppression Systems 05-2015 21-30-13 Electric-Driven, Fire Pumps 05-2015 21-30-16 Diesel-Driven, Fire Pumps 05-2015
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-2023 22 05 12 General Motor Requirements for Plumbing Equipment 09-2020 22 05 19 Meters and Gages for Plumbing Piping 09-2020 22 05 23 General-Duty Valves for Plumbing Piping 09-2020 22 05 33 Heat Tracing for Plumbing Piping 09-2020 22 07 11 Plumbing Insulation 09-2019 22 08 00 Commissioning of Plumbing Systems 11-2016 22 08 00.01 DVA/USACE Projects Commissioning of Plumbing Systems 08-2019 22 11 00 Facility Water Distribution 03-2026 22 11 23 Domestic Water Pumps 09-2015 22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-2015 22 13 00 Facility Sanitary and Vent Piping 09-2020 22 13 23 Sanitary Waste Interceptors 09-2020 22 13 29 Sanitary Sewerage Pumps 09-2020 22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-2020 22 13 33 Packaged, Submersible Sewerage Pump Units 09-2020 22 14 00 Facility Storm Drainage 09-2015 22 14 29 Sump Pumps 09-2015 22 14 33 Packaged, Pedestal Drainage Pump Units 09-2015 22 14 36 Packaged, Submersible, Drainage Pump Units 09-2015 22 15 00 General Service Compressed-Air Systems 03-2026 22 31 11 Water Softeners 09-2015 22 33 00 Electric Domestic Water Heaters 09-2020 22 34 00 Fuel-Fired Domestic Water Heaters 09-2020 22 35 00 Domestic Water Heat Exchangers 09-2020 22 40 00 Plumbing Fixtures 05-2024 22 42 26 Commercial Disposers 09-2015 22 61 13.74 Dental Compressed-Air Piping 05-2023 22 61 19.74 Dental Compressed-Air Equipment 09-2020 22 62 00 Vacuum Systems for Laboratory and Healthcare
Facilities 05-2023
22 62 19.74 Dental Vacuum and Evacuation Equipment 09-2015 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 05-2023 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities 09-2020
22 67 19.16 Reverse-Osmosis Water Equipment 03-2026 22 67 21 Water Dealkalizing System 09-2015
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation 06-2024
00 01 10-8
SECTION NO DIVISION AND SECTION TITLES DATE
23 05 11 Common Work Results for HVAC 03-2023 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 03-2023
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
03-2023
23 05 51 Noise and Vibration Control for Boiler Plant 03-2022 23 05 93 Testing, Adjusting, and Balancing for HVAC 03-2023 23 05 93.01 DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC 11-2021
23 07 11 HVAC and Boiler Plant Insulation 02-2020 23 08 00 Commissioning of HVAC Systems 03-2023 23 08 00.01 DVA/USACE Projects Commissioning of HVAC Systems 08-2019 23 08 11 Demonstrations and Tests for Boiler Plant 04-2020 23 09 11 Instrumentation and Control for Boiler Plant 04-2024 23 09 23 Direct-Digital Control System for HVAC 03-2023 23 10 00 Facility Fuel Systems 04-2020 23 11 23 Facility Natural-Gas Piping 04-2020 23 21 11 Boiler Plant Piping Systems 12-2025 23 21 13 Hydronic Piping 06-2025 23 21 23 Hydronic Pumps 03-2023 23 22 13 Steam and Condensate Heating Piping 12-2025 23 22 23 Steam Condensate Pumps 04-2020 23 23 00 Refrigerant Piping 03-2024 23 25 00 HVAC Water Treatment 03-2023 23 31 00 HVAC Ducts and Casings 03-2023 23 34 00 HVAC Fans 03-2023 23 36 00 Air Terminal Units 03-2023 23 37 00 Air Outlets and Inlets 03-2023 23 38 13 Commercial-Kitchen Hoods 03-2023 23 40 00 HVAC Air Cleaning Devices 03-2023 23 50 11 Boiler Plant Mechanical Equipment 12-2025 23 51 00 Breechings, Chimneys, and Stacks 04-2020 23 52 25 Low-Pressure Water Heating Boilers 12-2025 23 52 28 Low-Pressure Steam Boilers 12-2025 23 52 33 Water Tube Boilers 06-2025 23 52 39 Fire Tube Boilers 01-2026 23 56 00 Solar Energy Heating System 03-2023 23 57 33 Geothermal Energy – Direct Use 03-2023 23 64 00 Packaged Water Chillers 03-2024 23 65 00 Cooling Towers 03-2023 23 72 00 Air-to-Air Energy Recovery Equipment 03-2024 23 73 00 Indoor Central-Station Air-Handling Units 03-2023 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-2023 23 81 00 Decentralized Unitary HVAC Equipment 03-2024 23 81 23 Computer-Room Air-Conditioners 03-2024 23 81 43 Air-Source Unitary Heat Pumps 03-2023 23 81 46 Water-Source Unitary Heat Pumps 03-2023 23 81 49 Ground-Source Heat Pump 03-2023 23 82 00 Convection Heating and Cooling Units 03-2023 23 82 16 Air Coils 03-2024 23 84 00 Humidity Control Equipment 03-2024
00 01 10-9
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-2010
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-2022 26 05 13 Medium-Voltage Cables 06-2025 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-2022 26 05 26 Grounding and Bonding for Electrical Systems 11-2022 26 05 33 Raceway and Boxes for Electrical Systems 11-2022 26 05 36 Wireways for Radiology Equipment 11-2022 26 05 39 Underfloor Raceways for Electrical Systems 11-2022 26 05 41 Underground Electrical Construction 01-2026 26 05 73 Overcurrent Protective Device Coordination Study 11-2022 26 08 00 Commissioning of Electrical Systems 11-2022 26 08 00.01 DVA/USACE Projects Commissioning of Electrical
Systems 08-2019
26 09 23 Lighting Controls 11-2022 26 11 16 Secondary Unit Substations 11-2022 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage
Transformers 11-2025
26 13 13 Medium-Voltage Circuit Breaker Switchgear 06-2025 26 13 16 Medium-Voltage Fusible Interrupter Switches 11-2022 26 20 11 Isolated Power Systems 11-2022 26 22 00 Low-Voltage Transformers 11-2022 26 23 00 Low-Voltage Switchgear 11-2022 26 23 13 Generator Paralleling Controls 11-2022 26 24 13 Distribution Switchboards 11-2022 26 24 16 Panelboards 11-2022 26 24 19 Motor Control Centers 11-2022 26 25 11 Busways 11-2022 26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems 11-2022
26 25 13 Low-Voltage Busways (Telecommunications) 05-2026 26 27 26 Wiring Devices 11-2022 26 29 11 Motor Controllers 11-2022 26 27 33 Power Distribution Units (Telecommunications) 05-2026 26 29 21 Enclosed Switches and Circuit Breakers 11-2022 26 32 13 Engine Generators 11-2022 26 33 13 Batteries (Telecommunications) 05-2026 26 33 46 Battery Monitoring (Telecommunications) 05-2026 26 33 53 Static Uninterruptible Power Supply 11-2022 26 33 53.10 Static UPS for Telecommunications Spaces 07-2026 26 35 26 Harmonic Filters 11-2022 26 36 23 Automatic Transfer Switches 11-2022 26 41 00 Facility Lightning Protection 11-2022 26 42 00 Cathodic Protection 11-2022 26 43 13 Surge Protective Devices 11-2022 26 51 00 Interior Lighting 03-2024
00 01 10-10
SECTION NO DIVISION AND SECTION TITLES DATE
26 55 71 Medical and Surgical Lighting Fixtures 11-2022 26 56 00 Exterior Lighting 11-2022
DIVISION 27 – COMMUNICATIONS
27 05 00 Common Work Results for Communications 04-2026 27 05 26 Grounding and Bonding for Communications Systems 04-2026 27 05 33 Raceways and Boxes for Communications Systems 04-2026 27 05 36 Cable Trays for Communications Systems 07-2026 27 05 53 Identification for Communications Systems 07-2026 27 05 61 Leased Space, Communication Equipment and Systems 06-2015 27 08 00 Commissioning of Communications Systems 11-2016 27 08 00.01 DVA/USACE Projects Commissioning of Communications
Systems 08-2019
27 10 00 Control, Communication and Signal Wiring 04-2016 27 11 16 Communications Cabinets, Racks, Frames, and
Enclosures 06-2026
27 11 19 Communications Termination Blocks and Patch Panels 06-2026 27 11 26 Communications Rack Mounted Power Protection and
Power Strips 07-2026
27 13 13 Communications Copper Backbone Cabling 07-2026 27 13 13.13 Communications Copper Cable Splicing and Terminations 07-2026 27 13 23 Communications Optical Fiber Backbone Cabling 07-2026 27 13 23.13 Communications Optical Fiber Cable Splicing and
Terminations 07-2026
27 15 13 Communications Copper Horizontal Cabling 07-2026 27 16 19 Communications Patch Cords, Station Cords, and Cross
Connect Wire 07-2026
27 31 00 Voice Communications Switching and Routing Equipment 06-2015 27 31 31 Voice Communications Switching and Routing Equipment
- Extension 06-2015
27 32 41 Two-Way Radio Equipment and Systems 10-2018 27 41 31 Master Antenna Television Equipment and Systems 06-2015 27 51 16 Public Address and Mass Notification Systems 11-2022 27 51 23 Intercommunications and Program Systems 06-2015 27 52 23 Nurse Call and Code Blue Systems 10-2018 27 52 41 Miscellaneous Medical Systems 06-2015 27 53 19 Distributed Radio Antenna (Within Building) Equipment and System 10-2018
27 78 00 Closeout Submittals for Communications 05-2026
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and
Security 04-2018
28 05 13 Conductors and Cables for Electronic Safety and Security
10-2018
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-2011
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-2011
00 01 10-11
SECTION NO DIVISION AND SECTION TITLES DATE
28 08 00 Commissioning of Electronic Safety and Security Systems
11-2016
28 08 00.01 DVA/USACE Projects Commissioning of Electronic Safety and Security Systems
08-2019
28 13 00 Physical Access Control System 10-2011 28 13 16 Physical Access Control System and Database
Management 09-2011
28 13 53 Security Access Detection 09-2011 28 16 00 Intrusion Detection System 10-2011 28 23 00 Video Surveillance 09-2011 28 26 00 Electronic Personal Protection System 09-2011 28 31 00 Fire Detection and Alarm 10-2011 28 52 31 Emergency Call System 06-2015
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 08-2023 31 20 11 Earthwork (Short Form) 10-2012 31 23 19 Dewatering 10-2012 31 23 23.33 Flowable Fill 10-2012 31 32 23 Pressure Grouting Soil Stabilization 10-2012 31 62 00 Driven Piles 10-2012 31 63 16 Auger Cast Grout Piles 10-2012 31 63 26 Drilled Caissons 10-2012
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-2016 32 12 16 Asphalt Paving 09-2015 32 14 16 Brick Unit Paving 08-2016 32 17 23 Pavement Markings 08-2016 32 31 13 Chain Link Fences and Gates 06-2018 32 31 40 High Security Fences and Gates 08-2016 32 84 00 Planting Irrigation 08-2016 32 90 00 Planting 08-2016
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 11-2016 33 08 00.01 DVA/USACE Projects Commissioning of Site Utility
Systems 08-2019
33 10 00 Water Utilities 03-2017 33 30 00 Sanitary Sewer Utilities 06-2013 33 40 00 Storm Sewer Utilities 12-2017 33 46 13 Foundation Drainage 10-2011 33 51 00 Natural-Gas Distribution 10-2011 33 63 00 Steam Energy Distribution 02-2024
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 04-2018
00 01 10-12
SECTION NO DIVISION AND SECTION TITLES DATE
34 75 13.13 Active Vehicle Barriers 08-2016
DIVISION 48 – Electrical Power Generation
48 14 00 Solar Energy Electrical Power Generation System 07-2023 48 15 00 Wind Energy Electrical Power Generation System 07-2023
File details come from the government source that posted it. Updated .