S01_Statement of Work_Tool Body_Ram 3500 Dually Chassis.pdf
PDF 308 KB Posted
- Attached to
- Truck Body and Install (NRCS Soils)
- Solicitation number
- 12FPC425Q0076
About this file
This Statement of Work (SOW) is for the United States Department of Agriculture's (USDA) Natural Resources Conservation Service (NRCS) Special Projects Office, requesting the purchase and installation of a contractor tool body for a 2024 Ram 3500 Tradesman Crew Cab 4x4 dually diesel chassis with a 60" cab-to-axle (CA) measurement. The tool body must include specific features such as a headboard, tie-down options, weatherproof toolboxes, a full-length pipe rack, a Class V receiver hitch, 7-wire RV trailer plug, powder coating to match the truck, tread plate, backup camera wiring, fold-down gates, and a rear bumper with lights.
The SOW specifies a 90-day delivery from the time of award, with invoicing to be submitted electronically through the Invoice Processing Platform (IPP) system upon completion of work. The mission of the Special Projects Office is to gather and disseminate soils information in coastal and urban areas, supporting decision-making for U.S. taxpayers and the NRCS's broader mission of helping people help the land. The tool body is intended to safely and securely store tools while enabling the transportation of various loads including pipe, boats, trailers, and generators.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S01 12FPC425Q0074 RFQ-Combo_FE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Contractor Tool Body for 3500 Ram Dually with 60” Cab-to-Axel (CA) measurement
Revision 0
7/15/2025
Table of Contents
1 INTRODUCTION
1.1 Mission
1.2 Background
1.3 Scope
2 GENERAL REQUIREMENTS
2.1 Non-Personal Services
2.2 Contractor Personnel Qualifications
2.6 Invoicing
1 INTRODUCTION
The United States Department of Agriculture (USDA) – Natural Resources Conservation Service (NRCS)
– Special Projects Office (SPO) requires a tool body for a Ram 3500 Dually diesel chassis with 60” CA that supports the safe and secure transport and storage of equipment and supplies.
1.1 Mission
The mission of the Special Projects Office is to gather and disseminate soils information in coastal and urban areas that provides a foundation for decision-making and planning to the US taxpayer. This work directly supports the NRCS’s mission of helping people help the land while also supporting the Soil Survey Program’s mandate to keep soil survey relevant to an expanding customer base.
1.2 Background
Produce and install a tool body on an existing 2024 Ram 3500 Tradesman Crew Cab 4x4 dually diesel chassis that can safely and securely store tools while hauling and towing various loads including pipe, boats, trailers, and generators.
1.3 Scope
• Purchase and installation of contractor tool body that allows for secure storage of tools, various hauling configurations, and towing of large boats and trailers. the following specifications must be met:
o Headboard to protect cab and vehicle occupants o Include tie down options o Weatherproof toolboxes mounted on and under the body to maximize space and utility o Pipe or materials rack extending the full length of the truck for hauling pipe o Class V receiver hitch with 2 ½” and 2 5/16” balls o 7 wire RV trailer plug o Powder coated to match truck o Tread plate to improve grip and protect tool body o Wiring of existing backup camera o Side and rear fold down gates o Rear bumper with lights o Installation on 2024 Dodge Ram 3500 diesel dually crew cab with 60” cab-to-axle (CA) measurement o All other common accessories to accommodate need and to provide a body ready for service o 90-day delivery from time of award
Figure 1- Example of requested truck body
2 GENERAL REQUIREMENTS
This section describes the general requirements for this effort.
2.1 Non-Personal Services
The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees, except for the site lead. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor’s responsibility to notify the Contracting Officer, in writing, immediately.
2.2 Contractor Personnel Qualifications
Those commonly needed to meet the specifications associated with the purchase and installation of a tool body on an existing truck chassis
2.6 Invoicing
Net due at completion of work
Invoices must be submitted electronically through the Invoice Processing Platform (IPP) system and in accordance with the payment clause(s) in the contract.
| 1 INTRODUCTION |
| 1.1 Mission |
| 1.2 Background |
| 1.3 Scope |
| 2 GENERAL REQUIREMENTS |
| 2.1 Non-Personal Services |
| 2.2 Contractor Personnel Qualifications |
| 2.6 Invoicing |
File details come from the government source that posted it. Updated .