S01_Attachment C - Drill Hole Locations.pdf
PDF 149 KB Posted
- Attached to
- Geological Investigations at Upper Clear Boggy Creek Site No. 26 Pontotoc County, Oklahoma.
- Solicitation number
- 12FPC322Q0062
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1:UCB 26 Drill Hole Locations & Estimated Depth State Plane ‐ NAD 83
Id Northing Easting
Approx.
Elevation
Est.
Depth
Est. # of Shlby
Tube Samples Dam Centerline 225 465192.934 2368842.585 1038.2 35.0 3 226 465073.111 2368739.100 1037.9 40.0 3 227 464914.050 2368597.054 1037.9 50.0 3
Auxiliary/Principal Spillway 220A 1013.6 15.0 0 220 465131.884 2368996.552 1013.6 15.0 1 221 464969.188 2368854.818 1001.7 15.0 1 222 464805.694 2368712.642 1004.2 20.0 1 223A 1006.8 20.0 0 223 465093.500 2368904.730 1006.8 20.0 1 224 464890.615 2368749.633 1003.8 25.0 2
Proposed Borrow Area 110 465745.204 2368502.169 1026.7 10.0 0 111 465874.863 2368229.279 1025.1 10.0 0 112 465966.853 2368000.039 1026.3 10.0 0 113 10.0 0 114 10.0 0 115 10.0 0 116 10.0 0
Total Feet 285.0 Total 15 Samples
Note:
Holes 113‐116 locations will be directed by the NRCS Geologist at the time of investigation
The tentative locations are shown on the GI sheets included Holes 220A and 223A will serve as companion holes for 220 and 223 respectively
File details come from the government source that posted it. Updated .