- 1 -
Statement of Work (SOW) For
GEOLOGIC INVESTIGATION
Upper Clear Boggy Creek Site 26
The Contractor shall furnish the personnel, equipment, labor, materials, transportation, and facilities required to perform the services described herein:
I. INTRODUCTION
Upper Clear Boggy Creek Site No. 26 is a Flood Water Retarding Structure located in Pontotoc County, Oklahoma. The dam was constructed in 1980 as a low hazard class (A) structure, but due to development downstream and changes in dam safety criteria the structure has been reclassified as a high hazard structure. The local project sponsors have chosen to rehabilitate the dam to maintain the flood control benefits and meet safety criteria. A Geologic Investigation Report was completed November 13, 2019. Since the completion of the report the design for the rehabilitation of the structure has been amended and now includes the following modifications to the structure: raise the top of dam, modify the principal spillway and construction of a RCC stepped auxiliary spillway.
The Natural Resources Conservation Service, Oklahoma State Office (Oklahoma NRCS) is requesting the A&E provide support in the effort to gather the appropriate level of geologic data for Upper Clear Boggy Creek 26 to support the proposed modifications. The objective of this statement of work (SOW) is to provide drilling and field service to support a supplemental geologic investigation (GI). The resultant supplemental report produced by NRCS and the 2019 Geologic Report will be used to support the proposed modifications to the dam and associated appurtenances to bring the dam into compliance with current NRCS safety criteria and performance standards for high hazard dams, and to extend the service life of the dam to 100 years while providing the required flood protection.
II. AVAILABLE INFORMATION
The following information will be supplied to the selected Architect & Engineer firm (A&E):
Upper Clear Boggy Creek Site 26
1. All Survey Shots matched to OPUS
2. Civil 3D CADD Drawings-Survey Plan, GI Layout, GIS Data, LiDAR Surface
3. GI Report dated November 13, 2019
4. GI Layout without image
5. GI Layout with image
6. Field Investigation Plan
The Government will provide all the above information to the selected firm in electronic format.
Any other existing specific project information or existing materials that may be available from NRCS deemed, by the selected A&E, as necessary for completing the Task Order shall be requested in writing from the Contracting Officer (CO) after final award to the successful firm.
- 2 -
III. SUPERVISION
The A&E shall designate a qualified person or persons to oversee the tasks of this GI SOW.
The assigned supervisor shall be fully cognizant of contract requirements for the performance of the work and requirements of meeting the performance schedule.
IV. PERSONNEL
All work under this GI SOW shall be performed by professional and technical level personnel who collectively possess the capability equal to that needed to perform the work.
The A&E shall submit a list of names and qualifications of proposed personnel to be assigned work under this GI SOW to the assigned Oklahoma NRCS Contracting Officer (CO) for approval. The approved personnel shall serve in these capacities throughout the completion of this GI SOW. If an assigned person must be replaced by the A&E, the replacement candidate must have qualifications equal to that needed to perform the portion of the work for which they are assigned. The A&E shall submit documents supporting the qualifications, and the Oklahoma NRCS CO will review, evaluate, and approve or disapprove, in writing, the replacement candidate.
An individual licensed in Oklahoma by the Oklahoma Water Resource Board (OWRB) to drill geotechnical test holes, and to conduct supporting activities requiring licensure by the OWRB, shall be on site at all times.
V. EQUIPMENT
The A&E shall provide a list of all equipment that will likely be used to complete the field investigation. Site preparation equipment shall be included. Appropriate field testing equipment shall be included.
The drill rig proposed shall be able to traverse unpaved, relatively level to uneven/rough land surfaces. It shall have the ability to auger and/or core soils and bedrock material to depths necessary to obtain the required information, and be capable of driving continuous samplers, Shelby tubes, split spoon samplers, and performing standard penetration tests (SPT). A rig capable of drilling at 45 degree angles shall be available if deemed necessary. Drill rigs used in the investigations shall comply with all applicable licensing requirements. Excavating equipment, should it be proposed, shall be capable of reaching depths necessary to obtain the required information. Determination of site clearing and preparation must be made by the A&E firm for the borehole locations.
VI. SCHEDULE
A timeline to complete the tasks herein shall be generated by the A&E for approval by the Oklahoma NRCS CO prior to initiation of work. The timeline shall be separated by part and the tasks within each part as prescribed in Section VIII TASKS AND DELIVERABLES.
VII. SCOPE OF WORK
This scope of work involves field operations of the Geologic Investigation for the future Soil Mechanics testing to obtain site characteristics for the dam site and its associated appurtenances. The NRCS will stake boring locations in the field and conduct ground truthing to validate the locations shown on the Boring Layout map prior to the beginning of field operations.
- 3 -
The contracting firm shall perform all drilling activities, sample collection, water level readings, site preparations, and backfilling operations. The contracting firm shall provide appropriate equipment and materials for drilling, testing, and sampling. Upon completion of drilling activities, the contracting firm shall return site to original conditions or as directed by the CO. The contracting firm will be responsible for locating all underground utilities and contacting Oklahoma One Call before drilling operations begin. Some of the boreholes may not be easily accessible, it is the responsibility of the contracting firm to prepare site conditions to for drilling operations.
The data to be collected is based on five areas of focus; centerline of the dam, downstream (embankment) toe/foundation, proposed combined principal and auxiliary spillway, and borrow areas. Specific characteristics are spelled out below. These shall not be construed as the limit of the investigation and testing, but as a guide. It should be noted that some of the boreholes are listed in multiple locations below.
A. Centerline of Dam All test holes penetrating the existing embankment shall follow guidance outlined in the U.S.
Army Corps of Engineers ER 1110-1-1807, Procedures for Drilling in Earth Embankments (dated March 2006).
Three (3) boreholes shall be located along the centerline of the existing embankment and the proposed alignment of the RCC Spillway. These borings will provide data to help define engineering characteristics of the embankment.
Boreholes along the centerline shall advance to a depth of one (1) times the embankment height (where drilled). The approximate depths are depicted in Table 1 of the Field Investigation Plan (FIP); depths may vary once borehole locations are surveyed and drilled.
Drilling typically advances at 5 feet intervals; the Oklahoma NRCS Geologist shall determine the method and appropriate level of sampling as drilling advances. When sampling with splitspoon, standard penetration tests (SPT) shall be performed at each interval sampled.
Samples collected shall represent each interval drilled in uniform materials or each differing material should a change occur before reaching the next sampling interval. Continuous sampling may be used if deemed necessary by the Oklahoma NRCS Geologist to gain a more detailed representation of the materials encountered between planned intervals. Depth to ground water, if reached, shall be recorded and monitored over a 24-hour period.
B. Downstream Toe / Foundation
Seven (7) boreholes are located along the existing embankment toe and to extents representing the planned expansion, for purposes of investigating foundation conditions.
The approximate depths are depicted in Table 1 of the FIP; depths may vary once borehole locations are surveyed and drilled. Due to lack of pre-existing geologic information two (2) of the holes, referenced as 220A and 223A in the FIP, will serve as companion holes for 220 and 223 to determine Shelby Tube sampling intervals.
These boreholes shall advance to the same depths prescribed for the centerline. Drilling shall advance at 2.5 feet intervals or tighter (drilling adjusted) with SPT analysis performed at each interval. Where soil conditions allow, undisturbed samples will be considered so that
- 4 -an appropriate number are available for compressive/shear strength analyses. Continuous sampling shall be conducted between SPT and/or undisturbed sampling intervals to allow for detailed logging, and sample separation if material changes occur. Drilling/sampling intervals may change to 5 feet intervals, and continuous sampling may be discontinued based on materials encountered and/or with depth; this will be determined by conditions found in the field and the Oklahoma NRCS Geologist. Depth to ground water, if reached, shall be recorded and monitored over a 24-hour period.
C. Principal and Auxiliary Spillway
A detailed description of the strata underlying the proposed combined principal and auxiliary spillway alignment is required to evaluate the conditions that could impact the installation of the inlet tower, the conduit, stepped RCC spillway and the impact basin.
Eight (8) boreholes are located within the footprint of the proposed spillway. The new location of the proposed combined spillway is located within the existing dam/embankment.
The approximate depths are depicted in Table 1 of the FIP; depths may vary once borehole locations are surveyed and drilled. Some of the boreholes may not be easily accessible. The A&E shall determine how best to access these locations. All test holes penetrating the existing embankment shall follow guidance outlined in the U.S. Army Corps of Engineers ER 1110-1-1807, Procedures for Drilling in Earth Embankments (dated March 2006).
Drilling typically advances at 5 feet intervals; field operations shall determine the appropriate interval, method, and level of sampling as drilling advances. Where drilling advances through the existing embankment (including embankment materials encountered at either toe), it is important to record where distinct changes in materials occur (color inclusive), and depths water was encountered (if any). Accurate recording of water levels along this alignment is critical to evaluating the conditions that may influence the method of construction (cut and cover, boring and jacking, or other).
D. Borrow Area Approximately seven (7) boreholes will be placed in the proposed borrow areas to identify and classify the materials according to their availability and suitability for their intended use.
Drilling with helical flight augers and collecting large bag/buckets samples is the proposed method, but field conditions will dictate the how sample collection is achieved. The approximate depths are depicted in Table 1 of the FIP; depths may vary once borehole locations are surveyed and drilled. Additional sampling may be required and boring depths may vary based on field conditions encountered while drilling.
Investigations shall extend at least 2 feet below the expected depth of material excavation unless consolidated material, not suitable for borrow, is encountered. Additional areas may be investigated in the field based on varying subsurface conditions; as determined by the Oklahoma NRCS geologist.
Samples representing each defined material required for use shall be collected for laboratory testing. The quantities and location of desirable materials, and the areas in which it may be most conveniently developed shall be determined. A preferred method of excavation shall be determined. Depth to ground water, if reached, shall be recorded and monitored over a 24 hour period.
- 5 -
VIII. TASKS AND DELIVERABLES
The tasks of this Field Geologic Investigation SOW are described in Part I – Geologic Investigation. Part I has two primary tasks: the A&E’s plan of operations (Task 1) and field investigation (Task 2), Any resulting proposal shall be broken down per this part and per the individual tasks. Further refinement of the tasks can be made within the proposal if deemed necessary by the Oklahoma NRCS Geologist.
A. Part I – Geologic Investigation
A geologic investigation (GI) shall be conducted as prescribed by NRCS Title 210 – National Engineering Manual (NEM), Part 531 - Geology, Subpart A - Geologic Investigations. The criteria established in National Engineering Handbook (NEH) Part 631 – Geology, Chapter 2 Engineering Geology Investigations, and associated Chapters 3, 4, 5 and 12, as well as Technical Release (TR) document TR-60 shall be used as guidance. All referenced American Standard Testing & Materials (ASTM) standards shall apply. The A&E shall use acceptable industry standards where clear guidance is not provided, or where alternatives methods are more suited. The work may include, but is not limited to, drilling, disturbed and undisturbed soil sampling, rock core drilling, in-situ soil and rock testing, and excavation.
The A&E shall provide appropriate equipment and materials for drilling, testing, and sampling. Upon completion of drilling activities, the A&E shall return site to original conditions or as directed by the CO.
1. TASK 1: Plan of Operations Upon review of the FIP prepared by the Oklahoma NRCS and the existing data provided, the A&E shall prepare and submit for approval a plan of operations to execute the field investigation. The plan shall provide further details regarding the personnel/subcontractors assigned to take part in the investigation, safety, days and hours of operation, ingress and egress routes, site preparation requirements including sediment control measures, anticipated mobilization and demobilization dates, equipment to be used, drilling procedures, sample procedures, storage locations, field testing methods, water level measurement procedures, and a schedule of days and hours of operation (including holidays and inclement weather days) to complete the field work for the site.
a). Safety
The A&E shall fully comply with 29 CFR 1926 as prescribed by the U.S. Department of Labor, Occupational Safety and Health Administration, during the field investigation.
The A&E’s field operations shall be performed by methods that will prevent entrance, or accidental spillage, of solid matter, contaminants, debris, or other pollutants or wastes into streams, flowing or dry watercourses, lakes, wetlands, reservoirs, or underground water sources.
b). Days and Hours of Operation The days of the week and hours of operation should take into consideration any potential to impact surrounding residences, and allow for work to be conducted safely.
c). Ingress and Egress
All work will be performed on private lands and coordinated through the NRCS CO. The Oklahoma NRCS will work with the A&E to establish ingress and egress routes prior to
- 6 -mobilization of equipment onto the site. All permissions to access the properties to be investigated will be obtained by the Oklahoma NRCS CO. All determinations of site preparation is the responsibility of the A&E firm for the borehole locations.
Upon completion of the field investigations, the site shall be reclaimed to pre-ingress conditions to the extent practicably possible. All tracks or ruts created by the drill rig and other vehicles shall be filled, raked smooth, and reseeded, as necessary. Any remaining drill cuttings shall be spread on the ground surface and graded smooth. All stakes, flagging, and waste materials shall be removed from the site upon completion of work and disposed of in a State approved landfill by the A&E.
d). Site Preparation
The A&E shall determine the appropriate level of site preparation required to mobilize equipment and to complete the field investigation. Disturbance of the property should be kept to a minimum, with limits being established prior to disturbance. Care shall be taken to avoid causing any undue erosion, and to prevent sediment from impacting streams and tributaries. The A&E shall provide any necessary sediment control measures and materials.
Cleared debris, unless directed otherwise by the Oklahoma NRCS CO, shall be hauled off site and disposed of at a State approved landfill by the A&E.
Where site preparation has improved site conditions, negotiations can be requested to allow such improvements to remain.
e). Mobilization and Demobilization Mobilization and demobilization shall consist of the delivery, set up, staging and storing, and removal of all equipment, material, supplies, personnel, and incidentals required to accomplish the work under this part of the GI SOW. Delivery of additional equipment to the site required to perform the work in conformance with the specifications and assembling thereof as the work progresses, shall be considered a part of the original mobilization whether or not such equipment has been specified as required.
f). Drilling Permits, Licenses, and Permission to Drill The A&E shall be responsible for all costs associated in obtaining any and all state and local permits and licenses which may be required by Federal or State law to perform the work defined in this GI SOW. The drilling company, or persons performing site preparation work if differing from the drilling company, shall be responsible for obtaining utility clearance a minimum of 48 hours before field work commences. Oklahoma One- Call System, Inc.’s Call-Okie provides this service to excavators at no cost. Submit a request on-line at http://okticketentry.korterraweb.com/ , by telephone at 1-800-522- 6543, or by dialing 811.
2. TASK 2: Field Investigation The A&E shall conduct the field investigation approved under Task I, Plan of Operations.
Drilling/excavating, sampling, and field testing shall conform to NRCS NEH Part 631, Chapter 5 Engineering Geology Logging, Sampling, and Testing, as well as the prescribed criteria below unless prior approval to deviate is obtained from the Oklahoma NRCS CO. NRCS will be responsible for logging, packaging and transportation of sample materials Test holes penetrating the existing embankment shall follow guidance http://okticketentry.korterraweb.com/
- 7 -outlined in the U.S. Army Corps of Engineers ER 1110-1-1807, Procedures for Drilling in Earth Embankments (dated March 2006) as well as the prescribed criteria below unless directed to deviate by the Oklahoma NRCS Geologist.
a). Drilling / Excavating
1). Augering
Hollow-stem auger drilling, capable of pushing a minimum 3 inch diameter Shelby tube, drilling with continuous sampling, and driving split-spoon/split-barrel samplers, shall be the primary method considered. It shall be accomplished as prescribed by ASTM D6151-08, Standard Practice for Using Hollow-Stem Augers for Geotechnical Exploration and Soil Sampling, or comparable method.
Continuous helical flight augers may be used where competent soils allow; however, sampling cannot be compromised by cuttings or materials that slough into the hole during the sampling process.
2). Rock Coring
No rock coring intervals were proposed in the FIP. Rock coring may be proposed where deemed necessary, to obtain the material characteristics discussed above.
Oklahoma NRCS CO approval shall be obtained prior to proceeding. If approved, rock coring shall be accomplished as prescribed by ASTM D2113-08, Standard Practice for Rock Core Drilling and Sampling of Rock for Site Investigation, or comparable method. The barrel shall be a double tube core barrel, NX size or larger, and equipped with a split inner barrel (preferred). The maximum length of the coring "run" shall be limited to 10 feet; 5 feet is typical. Caution should be taken to ensure that core recovered is not altered or damaged by drilling or recovery to the extent the core does not represent the rock material or feature being sampled.
The rock core samples shall be placed in properly marked waxed cardboard or wooden core boxes, furnished by the A&E or drilling contractor. The depth of each sample run shall be clearly marked for proper identification and photographing. Rock cores shall be photo-documented according to ASTM D5079-08, Standard Practices for Preserving and Transporting Rock Core Samples.
Rock cores shall be preserved and transported as prescribed in ASTM D5079-08.
Rock cores shall be retained and stored until acceptance of the final design. The Oklahoma NRCS CO shall work with the A&E to establish a suitable storage location, and disposition options. The Oklahoma NRCS CO shall also determine whether any or all core samples shall be retained for further evaluation and/or testing beyond acceptance of the final design.
All sampling materials, rock coring, and/or data materials to be tested for the Soils Mechanics Report will be delivered to the following location by the NRCS:
Lincoln, Nebraska
Soils Mechanics Center 512 South 7th Street Lincoln, NE 68508 Phone (402) 437-5337
Steve Reinsch, Co-Director
- 8 -
3). Test Pits No test pits were proposed in the FIP. Test pits, trenches, or other excavations, may be proposed within the borrow areas, or elsewhere as deemed necessary, to obtain the material characteristics discussed above. Oklahoma NRCS CO approval shall be obtained prior to proceeding. Observations of the excavation process may be used to assess the excavation characteristics of the materials that might be encountered during construction.
4). Monitoring/Observation Wells and Piezometers No monitoring/observation wells or piezometers were proposed in the FIP. The A&E may elect to install monitoring/observation wells or piezometers to aid in determining the phreatic and/or piezometric surfaces and to monitor seepage, should field conditions warrant. NRCS CO approval shall be obtained prior to proceeding. All wells/piezometers, if approved, shall be constructed and abandoned according to OWRB rules and regulations.
Pipe temporarily placed in a drill hole to keep it open for obtaining a static water level shall not be considered a monitoring/observation well, or piezometer, as such pipe will be required to be removed upon obtaining the water level measurement(s). The depth at which a drill hole collapses or becomes restricted shall be recorded in the water level measurements.
5). Drill Hole Plugging and Test Pit Backfilling In the event water is encountered, drill holes and test pits shall remain open at least 24 hours, or until a change of less than 0.1 foot in water elevation is observed within 24 hours, so that a static groundwater level can be recorded. Drill holes which cannot be maintained open unaided, shall be lined with PVC casing or equivalent until static groundwater level is confirmed. Test pits that cannot remain open unaided, or where safety is an issue, shall be backfilled as soon as a practicably possible; a water level shall be recorded prior to backfilling.
All drill holes shall be plugged in accordance with OWRB rules and regulations.
ASTM D6151-08 may be used as a reference.
Test pits shall be backfilled to 6 inches above natural ground surface with excavated material and all ridges smoothed prior to leaving the pit area. Pits shall be checked a minimum of 24 hours after backfilling, and prior to mobilizing off site, in order to evaluate for settlement, and to correct if it has occurred.
Wash borings shall only be considered adequate for determining rough bedrock profiles or for reaching a depth to be sampled by other means and must be approved by the Oklahoma NRCS Geologist prior to utilization. The bit shall be fitted with deflectors to prevent soil disturbance below the depth drilled.
Geophysical soundings or probing shall not be used in lieu of drilling, however, where liquefaction may be of concern, cone penetration tests can be proposed to supplement the drilling/SPT data obtained. Prior approval from the Oklahoma NRCS CO shall be obtained.
- 9 -b). Sampling At a minimum, soil samples shall be collected every 5 feet or where material changes occur. In foundation materials, a tighter sampling interval may be required to further evaluate the underlying conditions and to support seismic evaluations. Sampling should reflect that approved in the FIP, unless field conditions warrant otherwise.
1). Shelby Tube Sampling
Shelby tubes shall be no less than 3 inches in diameter, and no less than 24 inches in length.
For triaxial compressive / shear testing, undisturbed samples shall be collected using the appropriate diameter and length of Shelby tube specified by the testing laboratory. Undisturbed sampling shall be performed according to ASTM D1587- 08(2012)e1, Standard Practice for Thin-Walled Tube Geotechnical Sampling of Soils.
Expandable plugs and end caps shall be used to seal the samples prior to transporting to the lab. The Shelby tubes, expandable plugs, and end caps will be provided by the contractor. Melted wax for sealing tubes is not allowed.
Undisturbed sample tubes shall be clearly labeled with waterproof materials showing, at a minimum, the top end of sample, the project name, test hole and sample number, sampled interval, length of sample recovered, name of collector, and date sample collected. Undisturbed sample tubes shall be handled, transported, and stored in an upright position to minimize disturbance after preservation and marking.
Care shall be taken to place samples in areas shielded from direct sunlight and/or exposure to extreme heat or freezing temperatures.
2). Split Spoon Sampling / Standard Penetration Test (SPT)
The minimum length of the sampler shall be 24 inches. The cutting shoe shall be of hardened steel and shall be replaced when it becomes dented, distorted, or in any way damaged. Core retainers, sand traps, or other devices shall be available at the worksite should the standard spoon not retain a sample. A ball check valve in the sampler head is required so fluid can escape through the top of the sampler.
Split spoon sampling shall be conducted in conjunction with standard penetration tests. In low density/loose sands, where there is a potential for liquefaction, ASTM D6066-11 Standard Practice for Determining the Normalized Penetration Resistance of Sands for Evaluation of Liquefaction Potential, shall be used.
ASTM D1586-11, Standard Test Method for Standard Penetration Test (SPT) and Split-Barrel Sampling of Soils, may be used as a reference.
The Oklahoma NRCS geologist shall prepare a sample list itemizing all samples collected using form SCS-ENG-534 – Soil Sample List or a comparable form approved by the Oklahoma NRCS CO prior to use.
The size of the sample shall be sufficient to perform the intended tests; the testing laboratory should be consulted as to volume requirements. Minimum sample size requirements are provided in NEH Part 631, Chapter 5.
Samples shall be handled, transported, and stored as prescribed in NEM 531, Subpart 531.14. Storage times need to reflect the testing protocol proposed. The
- 10 -laboratory should be consulted on containers, proper handling, and any special transport requirements.
c). Field Testing
The following shall be conducted where materials warrant:
1). Standard Penetration Testing This shall be performed in conjunction with split spoon sampling. This test shall be used to provide an indication of the relative density of tight consolidated deposits, unconsolidated deposits, and weak rock. It shall be performed per the requirements of ASTM D6066-11 for this investigation.
The usefulness of SPT results depends on the soil type, with fine-grained sands giving the most useful results, coarser sands and silty sands giving reasonably useful results, and clays and gravelly soils yielding results which may not be representative of the true soil conditions. SPT results in dry materials shall be noted, as the relative density and cohesiveness of the soils may change if wetted.
Results shall be evaluated and used to help determine seismic influences on the foundation and the potential for liquefaction of any underlying strata tested.
2). Acid Tests A 1.0 M HCl (1.0 molar) solution shall be prepared, and intervals suspect of having calcareous or carbonate components shall be tested. Reaction levels (none, weak, strong, or violent) shall be recorded on the log at the depths analyzed.
3). Field Dispersion Tests Where materials are suspect for dispersion, the NRCS Geologist shall perform field crumb tests to determine which samples will require further laboratory analysis confirmation. Photos of the test results at each time allotment shall be taken, and the results cited in the report.
4). Pocket Penetrometer Testing
Where determined pertinent to the design process, pocket penetrometer tests can be recorded on the ends of Shelby tube samples, within continuous sample intervals, or on other suitable samples.
IX. REFERENCES
The A&E shall be responsible for obtaining all reference materials referenced within this GI SOW. Most NRCS and some non-NRCS reference materials, standards, and forms referenced above can be obtained online at http://policy.nrcs.usda.gov/, http://www.ok.nrcs.usda.gov/technical/ (Oklahoma Field Office Technical Guide - FOTG), and other associated links. American Society for Testing and Materials (ASTM) technical standards can be obtained online, and where updates may conflict with one cited above, the current shall apply.
The A&E is responsible for any costs incurred by the A&E in obtaining reference materials. The GR/COR will provide NRCS reference materials, forms, and templates that cannot be obtained http://policy.nrcs.usda.gov/ http://www.ok.nrcs.usda.gov/technical/
- 11 -online, upon written request. Alternate forms, having the same criteria, and available in electronic format, may be used with prior approval by the COR/CO.
X. PAYMENT
Payment will be made in accordance with the applicable Task Order. Payment will be made in accordance with the applicable contract clauses for payment.
If the Contractor fails to deliver the supplies or perform the services within the time and dates specified in this Task Order, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $100 per calendar day of delay of the Geologic Investigation.
XI. GOVERNMENT POINTS OF CONTACT
For this GI SOW, the primary designated Contracting Officer’s Representative (COR) is Valerie G. Glasgow. All deliverables and technical matters regarding the work involved in the tasks shall be directed to the COR at the following address:
Valerie G. Glasgow, Design Engineer USDA Natural Resources Conservation Service Oklahoma State Office 100 USDA, Suite 206 Stillwater, OK 74074-2655 Phone: 405-742-1112 Email: valerie.glasgow@usda.gov
The on-site Government Representative for the tasks detailed in this GI SOW is Jessica A.
Nichols.
Jessica A. Nichols, Geologist USDA Natural Resources Conservation Service Oklahoma State Office 100 USDA, Suite 206 Stillwater, OK 74074-2655 Phone: 405-742-1258 Email: jessica.nichols@usda.gov
Only the Oklahoma NRCS CO may authorize changes to this GI SOW after issuance of the Notice to Proceed (NTP).
mailto:valerie.glasgow@usda.gov mailto:jessica.nichols@usda.gov
| VII. SCOPE OF WORK |
| A. Part I – Geologic Investigation |
| f). Drilling Permits, Licenses, and Permission to Drill |
| Rock cores shall be preserved and transported as prescribed in ASTM D5079-08. Rock cores shall be retained and stored until acceptance of the final design. The Oklahoma NRCS CO shall work with the A&E to establish a suitable storage location, and disp... |
| All sampling materials, rock coring, and/or data materials to be tested for the Soils Mechanics Report will be delivered to the following location by the NRCS: |