Construction of Rawson Hill Dam Rehabilitation Project - Worcester County, Massachusetts
Solicitation number
12FPC321R0016
Issued by

About this file

This solicitation requests proposals for the construction of the Rawson Hill Dam Rehabilitation Project located in Worcester County, Massachusetts. The major items of work include clearing and grubbing, structure removal, seeding and mulching, construction and maintenance of access roads, surveys, mobilization and demobilization, dewatering, diverting surface water, excavation, earthfill, drainage works including fine drainfill, coarse drainfill and perforated and non-perforated drain pipes, riprap, quality control, and precast concrete manholes. Interested contractors must be registered in SAM and complete annual representations and certifications to be eligible. A firm fixed price construction contract will be awarded using FAR Part 15 procedures. Bids require a 20% bid guarantee and performance and payment bonds of 100% within 10 days of award. The period of performance is 153 calendar days from notice to proceed. The estimated contract value is between $1,000,000 and $5,000,000. The solicitation is a total small business set-aside.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 545

0+00 ASW

1+00 ASW

2+00 ASW

3+00 ASW

4+00 ASW

5+

A

SW

6+

A

SW

7+

A

SW

8+

A

SW

0+00 D 1+00 D 2+00 D 3+00 D 4+00 D 5+00 D 6+00 D 7+00 D

545545

0 560

LIMIT OF

VEHICULAR ACCESS

SEE NOTE 2

PR

O

PO

SE

D P

LA

N

O F

D

AM

A N

D A

U

XI

LI

AR

Y

SP

IL

LW

AY

NOTES:

1. SEE SHEET 3 FOR GENERAL NOTES AND LEGEND.

2. VEHICULAR ACCESS WITHIN 20 FEET OF THE SHEETPILE WALL SHALL BE

LIMITED TO THE AREA DESIGNATED ON THE PLAN UNTIL RCC HAS BEEN

PLACED TO EL. 542.5. REFER TO SHEET 31 FOR SEQUENCE OF OPERATIONS.

3. THE SPOIL AREA LOCATED WITHIN THE EXISTING AUXILIARY SPILLWAY

CHANNEL MAY BE MODIFIED TO ACHIEVE CUT-FILL BALANCE UPON

APPROVAL OF THE COR.

4. CLEAR 20' BEYOND LIMIT OF DAM CREST.

5. BVW MITIGATION AREA SHRUB PLANTING SCHEDULE:

a. SHRUBS SHALL BE PLANTED IN THE MITIGATION AREA AT AN

APPROXIMATE 8-FOOT ON CENTER SPACING.

b. SHRUBS SHALL BE GREATER THAN 2 FEET.

c. SHRUB PLANTING SHALL BE DONE BY HAND AND ANY EXCESS SOIL FROM

PLANTING WILL BE REMOVED FROM THE MITIGATION AREA.

6. TREE PLANTING SCHEDULE:

a. TREES SHALL BE PLANTED IN THE DESIGNATED TREE PLANTING AREA AN

APPROXIMATE 10-FOOT ON CENTER SPACING.

b. TREES SHALL BE GREATER THAN 3 FEET TALL.

D at e

C he ck ed

Ap pr ov ed

D ra w n

D es ig ne d

Sheet of

File No.

Drawing No.

Ap pr ov ed

C :\U se rs

\e fro m he rz \D es kt op \C

AD

D

\C

AD

D \D es ig n Se t\P ro po se d Pl an o f D am a nd

A ux ilia ry

S pi llw ay

.d w g Pl ot te d By

: F ro m he rz , E ric E

Pl ot D at e:

1/

/2

7:

P M

R

AW

SO

N

H

IL

L D

AM

FL

O O

D W

AT

ER

R

ET

AR

D

IN

G

D

AM

R

AW

SO

N

H

IL

L D

AM

R

EH

AB

IL

IT

AT

IO

N P

R O

JE

C

T W

O R

C

ES

TE

R

C O

U N

TY

, M

AS

SA

C H

U

SE

TT

S

6 37

W C

H

AU

G

EE

F

AU

G

G

LR

AU

G

AU

G

PG

S

XX

X

XX

X

SCALE IN FEET

-0- 3030 60

DAM

LIMIT OF DETAILED

FIELD SURVEY

EXISTING

STONE WALL

EXISTING AUXILIARY

SPILLWAY DRAIN TO

BE REMOVED

SEE SHEET 9

EXISTING CONCRETE RISER STRUCTURE

EXISTING 30" DIA PRINCIPAL SPILLWAY CONDUIT

INLET INV. EL. 533.02

OUTLET INV. EL. 531.4

EXISTING MONUMENT STRUCTURE

AUXILIARY SPILLWAY

EXISTING

CIP DRAIN PIPE

12" INLET INV. EL. 530.17

8" OUTLET INV. EL. 529.69

EXISTING

GRAVEL ACCESS ROAD

FL

O

W

190' AUXILIARY SPILLWAY CREST

SEE SHEET 11

RIPRAP

SHEET PILE CUTOFF

WALL AND SILL

WARP SLOPE TO MATCH

EXISTING GRADE IN THIS AREA

3H :1

V

3H :1

V

544.5

548.0 548.0

533.5 536.5

530.5

LIMIT OF WORK

9H :1

V

9H :1

V

10' WIDE RAMP

536.5

10' WIDE RAMP

10H:1V

WARP SLOPE TO MATCH

EXISTING GRADE, 9H±:1V

544.5

EL. 547.0

SLO

PE

TO

D

R

AIN

LIMIT OF CLEARING

AND GRUBBING

SEE SHEET 9

A

B

A

B

SPOIL AREA

WARP SLOPE

TO TIE INTO LIMIT

OF EXCAVATION

PROSPECT DRIVE

TO DAM

EXISTING GRAVEL ACCESS ROAD

LIMIT OF WORK

PARTIAL PLAN VIEW OF ACCESS ROAD INTERSECTION WITH PROSPECT DRIVE

WETLAND EXTENDS

BEYOND STUDY AREA

EXISTING

BORDERING

VEGETATED

WETLAND

WETLAND EXTENDS

BEYOND STUDY AREA

WETLAND EXTENDS

BEYOND STUDY AREA

EXISTING

BORDERING

VEGETATED

WETLAND

EXISTING WETLAND

7.34'

20.0' DAM CREST

SEE NOTE 4

100' BUFFER ZONE

BORDERING LAND SUBJECT

TO FLOODING

BVW MITIGATION AREA

1,350 SF

SEE NOTE 5

COMMON NAME SCIENTIFIC NAME NUMBER

SPECKLED ALDER ALNUS INCANA 14

WINTERBERRY ILEX VERTICILLATA 7

COMMON NAME SCIENTIFIC NAME NUMBER

RED OAK QUERCUS RUBRA 8

BLACK CHERRY PRUNUS SEROTINA 7

TREE PLANTING AREA

SEE NOTE 6