S000000461 Official Bid Price Sheet - locked~1.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Tandem Axle Day Cab Trucks State and local contract opportunity
- Solicitation number
- S000000461
- Issued by
- Drew County, Arkansas
About this file
This document is an Official Bid Price Sheet for solicitation S000000461 related to Tandem Axle Day Cab Trucks. The procurement involves the potential acquisition of six total trucks, specifically three standard Tandem Axle Day Cab trucks and three Tandem Axle Day Cab trucks equipped with a Fifth Wheel Hitch. The bid sheet provides a structured template for prospective contractors to submit their pricing, with specific instructions for completing the pricing table.
The pricing document requires contractors to enter their proposed cost per truck in the designated fields, with the total cost calculated automatically based on the unit pricing and quantity. The bid sheet emphasizes that failure to provide pricing for both line items will result in bid rejection. No specific pricing, funding sources, or current contract values are populated in the provided document, indicating this is a blank template awaiting contractor submission. The instructions suggest this is part of a competitive bidding process for procuring specialized truck equipment, with a focus on precise pricing documentation and compliance with bid requirements.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| S000000461 IFB Tandem Axle Day Cab Trucks~1.pdf | ||
| Standard Commodities Contract Sample-s461.pdf | ||
| Contract and Grant Disclosure -S461.pdf | ||
| S000000461 IFB Bid Response Packet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing
| Official Bid Price Sheet |
| S000000461 Tandem Axle Day Cab Trucks |
| Prospective Contractor Name: |
| Instructions: |
| 1. The Prospective Contractor shall enter their name in the blue shaded field provided above. |
| 2. Pricing must include all requirements of the IFB. |
| 3. The Prospective Contractor shall enter the cost per Truck in Table 1; the Total Cost will automatically calculate. |
| 5. Failure to provide pricing for both line items will cause the Prospective Contractor's bid to be rejected. |
| TABLE 1: (to be used in low cost determination) | |||
| Description | Cost Per Truck | Quantity | Cost of Trucks |
| Tandem Axle Day Cab | 3 | $ - 0 | |
| Tandem Axle Day Cab with Fifth Wheel Hitch | 3 | $ - 0 | |
| Total Cost | $ - 0 |
File details come from the government source that posted it. Updated .