This document contains questions and answers related to a state and local contract opportunity for the provision of dark fiber, trenching, boring, and conduit installation services for the Arkansas Division of Parks, Heritage, and Tourism (ADPHT) and the Division of Information Systems (DIS). The project requires the contractor to provide single-mode fiber pairs, 1-1/4" or 2" PVC conduit, and tracer wire. The contract has an initial term of 1 year, with the potential for extension, and the project must be completed by the end of the current fiscal year on June 30, 2024. The contractor is responsible for fiber installation, splicing, and the placement of pull boxes every 1500 feet or as needed. Armored fiber may be used in place of buried conduit and tracer wire. There is no priority list for the completion of each state park, and the contractor is expected to coordinate with park superintendents on utility locations. The contractor can place fiber in the most cost-effective manner, whether through home runs or daisy-chained connections, between the specified end points.
The pricing for the project is based on the "from" and "to" end points, and the contractor is expected to determine the most cost-effective fiber routing and quantity. This contract opportunity is not subject to Davis-Bacon wage requirements, as it is not federally funded. The state will provide the necessary fiber jumpers for connecting the visitor centers to the termination points.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Short Description Question Number Question Subject Question Text Answer
Dark Fiber for ADPHT/DIS 1.00 product What product is the bid for?
2.1.A - The Contractor shall provide single mode fiber pairs (SM), trenching, boring (any paved streets should be bored not cut), 1-1/4” or 2” PVC conduit, and tracer wire.
Dark Fiber for ADPHT/DIS 2.00 Competition Date
While on the site walk it was mentioned June 30th as a completion date. And the contract solicitation states the initial term for the contract is for 1 year. Please advise the project completion date
Parks, Heritage, and Tourism has money in their budget that they need to spend by the end this current fiscal year (6/30/24). They do have funds to continue into the next fiscal year and expect to have funding for this project in additional years if the awarded Contractor agrees to extend the contract.
Dark Fiber for ADPHT/DIS 3.00 Fiber Jumpers
Will LC to LC SM fiber jumpers need to be provided in the bid price? Or is this item to be provided by DIS for the overall connection of the fiber from each visitor center to the station end?
The State of Arkansas will provide the fiber jumpers.
Dark Fiber for ADPHT/DIS 4.00 Handhole Distance Is there a Maximum distance between hand holes that is to be followed for this fiber installation?
Revised Solicitation 1 - 2.3.A.- "The Contractor shall install, and splice pull boxes every 1500 feet or as needed. For large handholes or manholes leave 50 feet of slack for future growth."
Dark Fiber for ADPHT/DIS 5.00 Tracer Wire
2.1 SERVICE TECHNICAL REQUIREMENTS
"The Contractor shall provide single mode fiber pairs (SM), trenching, boring (any paved streets should be bored not cut), 1-1/4" or 2" PVC conduit, and tracer wire." Question: is tracer wire needing to be installed if underground armored fiber is provided and bonding connectors are installed on the fiber for locating/tracing purposes?
Underground armored fiber can be provided in place of buried conduit with a tracer wire if the armored fiber is bonded on both ends.
Dark Fiber for ADPHT/DIS 6.00 Wage Rate Does Davis Bacon Wage rate apply to this project? Please provide a wage determination sheet if applicable.
The Davis Bacon Wage rate only applies to federally funded projects. These parks projects are not federally funded so this does not apply.
Dark Fiber for ADPHT/DIS 7.00 List of State Party Priority Is there a Priority list for the completion of each state park?
There is no priority list. Generally the highest priority of project completion will be to improve public access in the parks.
Dark Fiber for ADPHT/DIS 8.00 Hanhole Size Is there a specific/minimum size handhole that needs to be installed that will also accommodate future growth?
No, there is no specifc/minimum size handhole.
Dark Fiber for ADPHT/DIS 9.00 Unmarked Utilities Will the State parks be responsible for locating any unmarked existing utilities not marked by one call?
The Contractor is expected to use "One Call" where possible. Also the Contractor is asked to coordinate with each Park Superintendent for in-park utility locations.
Dark Fiber for ADPHT/DIS 10.00 Cabin Please verify if the cabins are to get (1) 6 strand SM fiber or
(1) 2 strand SM fiber cable.Are the cabins to be daisy chained or Home runs.
2.2.B - "The red dashed lines on the Connectivity Planning Maps are just conceptual for fiber placement and are not meant to specify fiber routing. Exact routes are to be determined by the Contractor and approved by DIS and Parks prior to construction."
Also the Pricing Sheets specify "from" and "to" end point pricing where the Contractor is expected to place the quantity of fiber strands between the end points specified in the most cost effective manner. This could be Home runs, or the fiber sheath can be daisy chained through or near fiber strand termination points specified.
Division of Information Systems
Written Questions and Answers
Dark Fiber for Parks S000000302