About this file

This document contains questions and answers related to a state and local contract opportunity for the provision of dark fiber, trenching, boring, and conduit installation services for the Arkansas Division of Parks, Heritage, and Tourism (ADPHT) and the Division of Information Systems (DIS). The project requires the contractor to provide single-mode fiber pairs, 1-1/4" or 2" PVC conduit, and tracer wire. The contract has an initial term of 1 year, with the potential for extension, and the project must be completed by the end of the current fiscal year on June 30, 2024. The contractor is responsible for fiber installation, splicing, and the placement of pull boxes every 1500 feet or as needed. Armored fiber may be used in place of buried conduit and tracer wire. There is no priority list for the completion of each state park, and the contractor is expected to coordinate with park superintendents on utility locations. The contractor can place fiber in the most cost-effective manner, whether through home runs or daisy-chained connections, between the specified end points.

The pricing for the project is based on the "from" and "to" end points, and the contractor is expected to determine the most cost-effective fiber routing and quantity. This contract opportunity is not subject to Davis-Bacon wage requirements, as it is not federally funded. The state will provide the necessary fiber jumpers for connecting the visitor centers to the termination points.

View the file

Other files

File Type Posted
Attachment (C3)- Devils Den Pt 3.pdf PDF
Attachment (D)- Lake Chicot State Park.pdf PDF
Attachment (E1)- Lake Fort Smith State Park Pt1- 2nd Revision.pdf PDF
Attachment (J)- Mount Nebo State Park.pdf PDF
Attachment (L)- Queen Wilhelmina State Park.pdf PDF
Attachment (S2)- Mississippi River State Park Pt2.pdf PDF
S000000302 Dark Fiber for ADPHT Solicitation- Revised~1.pdf PDF
S000000302 Sample Services Contract.pdf PDF
S000000302 Site Visit Verification Form.pdf PDF
S000000302 Vendor Meet Schedule- Revised.pdf PDF
Attachment (A)-Bull Shoals State Park- 1st Revision.pdf PDF
Attachment (B1)-Lake Catherine State Park Pt1- 1st Revision.pdf PDF
Attachment (E2)- Lake Fort Smith State Park Pt2- 2nd Revision.pdf PDF
Attachment (F)- Lake Ouachita State Park.pdf PDF
Attachment (I1)- Mount Magazine State Park Pt1.pdf PDF
Attachment (K2)- Petit Jean State Park Pt 2.pdf PDF
Attachment (M2)- Village Creek State Park Pt2.pdf PDF
Attachment (N)- White Oak Lake State Park.pdf PDF
Attachment (R)- Cane Creek State Park.pdf PDF
S000000302 Price Sheet-2nd Revision.xlsx XLSX spreadsheet
Attachment (C1)- Devils Den Pt1.pdf PDF
Attachment (C2)- Devils Den Pt2.pdf PDF
Attachment (H)- Millwood State Park.pdf PDF
Attachment (I2)- Mount Magazine State Park Pt2.pdf PDF
Attachment (I3)- Mount Magazine State Park Pt3.pdf PDF
Attachment (O)- Withrow Springs State Park.pdf PDF
Attachment (P)- Woolly Hollow State Park.pdf PDF
Attachment (S3)- Mississippi River State Park Pt3.pdf PDF
Attachment (S4)- Mississippi River State Park Pt4.pdf PDF
S000000302 Contract and Grant Disclosure Form.pdf PDF
S000000302 Response Packet.docx DOCX document
Attachment (B2)- Lake Catherine State Park Pt2.pdf PDF
Attachment (K1)- Petit Jean State Park Pt 1.pdf PDF
Attachment (M1)- Village Creek State Park Pt1.pdf PDF
Attachment (Q)- Moro Bay State Park.pdf PDF
Attachment (S1)- Mississippi River State Park Pt1.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Short Description Question Number Question Subject Question Text Answer

Dark Fiber for ADPHT/DIS 1.00 product What product is the bid for?

2.1.A - The Contractor shall provide single mode fiber pairs (SM), trenching, boring (any paved streets should be bored not cut), 1-1/4” or 2” PVC conduit, and tracer wire.

Dark Fiber for ADPHT/DIS 2.00 Competition Date

While on the site walk it was mentioned June 30th as a completion date. And the contract solicitation states the initial term for the contract is for 1 year. Please advise the project completion date

Parks, Heritage, and Tourism has money in their budget that they need to spend by the end this current fiscal year (6/30/24). They do have funds to continue into the next fiscal year and expect to have funding for this project in additional years if the awarded Contractor agrees to extend the contract.

Dark Fiber for ADPHT/DIS 3.00 Fiber Jumpers

Will LC to LC SM fiber jumpers need to be provided in the bid price? Or is this item to be provided by DIS for the overall connection of the fiber from each visitor center to the station end?

The State of Arkansas will provide the fiber jumpers.

Dark Fiber for ADPHT/DIS 4.00 Handhole Distance Is there a Maximum distance between hand holes that is to be followed for this fiber installation?

Revised Solicitation 1 - 2.3.A.- "The Contractor shall install, and splice pull boxes every 1500 feet or as needed. For large handholes or manholes leave 50 feet of slack for future growth."

Dark Fiber for ADPHT/DIS 5.00 Tracer Wire

2.1 SERVICE TECHNICAL REQUIREMENTS

"The Contractor shall provide single mode fiber pairs (SM), trenching, boring (any paved streets should be bored not cut), 1-1/4" or 2" PVC conduit, and tracer wire." Question: is tracer wire needing to be installed if underground armored fiber is provided and bonding connectors are installed on the fiber for locating/tracing purposes?

Underground armored fiber can be provided in place of buried conduit with a tracer wire if the armored fiber is bonded on both ends.

Dark Fiber for ADPHT/DIS 6.00 Wage Rate Does Davis Bacon Wage rate apply to this project? Please provide a wage determination sheet if applicable.

The Davis Bacon Wage rate only applies to federally funded projects. These parks projects are not federally funded so this does not apply.

Dark Fiber for ADPHT/DIS 7.00 List of State Party Priority Is there a Priority list for the completion of each state park?

There is no priority list. Generally the highest priority of project completion will be to improve public access in the parks.

Dark Fiber for ADPHT/DIS 8.00 Hanhole Size Is there a specific/minimum size handhole that needs to be installed that will also accommodate future growth?

No, there is no specifc/minimum size handhole.

Dark Fiber for ADPHT/DIS 9.00 Unmarked Utilities Will the State parks be responsible for locating any unmarked existing utilities not marked by one call?

The Contractor is expected to use "One Call" where possible. Also the Contractor is asked to coordinate with each Park Superintendent for in-park utility locations.

Dark Fiber for ADPHT/DIS 10.00 Cabin Please verify if the cabins are to get (1) 6 strand SM fiber or

(1) 2 strand SM fiber cable.Are the cabins to be daisy chained or Home runs.

2.2.B - "The red dashed lines on the Connectivity Planning Maps are just conceptual for fiber placement and are not meant to specify fiber routing. Exact routes are to be determined by the Contractor and approved by DIS and Parks prior to construction."

Also the Pricing Sheets specify "from" and "to" end point pricing where the Contractor is expected to place the quantity of fiber strands between the end points specified in the most cost effective manner. This could be Home runs, or the fiber sheath can be daisy chained through or near fiber strand termination points specified.

Division of Information Systems

Written Questions and Answers

Dark Fiber for Parks S000000302