S000000273 ASP IFB Bid Response Packet - Final.docx
DOCX document 41 KB Posted
- Attached to
- Push Bumpers, Pit Bars, Wings and Light Channel
- Solicitation number
- S000000273
- Issued by
- Pulaski County, Arkansas
About this file
This document is a Bid Response Packet for Solicitation S000000273 issued by the State of Arkansas. The solicitation is for Push Bumpers, Pit Bars, Wings and Light Channel, which will be provided to Pulaski County and the City of Little Rock. Prospective contractors must submit a completed Bid Signature Page, Proposed Subcontractors Form, Equal Opportunity Policy, and Bid Price Sheet. Contractors may also include an EO 98-04: Contract and Grant Disclosure Form and a Voluntary Product Accessibility Template, if applicable, with their bid. The contract term is not specified.
The bid response packet outlines pricing and certification requirements. Contractors must certify that they do not employ illegal immigrants, boycott Israel, or boycott the Energy, Fossil Fuel, Firearms, or Ammunition Industry. Contractors must also provide contact information and indicate if a redacted copy of their submission is enclosed. Subcontractor information, if used, must be provided on the Proposed Subcontractors Form. No other details regarding the specific products, quantities, or funding sources are included in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID RESPONSE PACKET
S000000273
BID SIGNATURE PAGE
PROSPECTIVE CONTRACTOR’S INFORMATION
Company:
Address:
City:
State:
Zip Code:
Minority or Women-Owned Designation See the Minority and Women-Owned Business section of the Solicitation.
| ☐ Not Applicable |
| AR Certification #: ________________ |
PROSPECTIVE CONTRACTOR CONTACT INFORMATION
Provide contact information to be used for Solicitation related matters.
Contact Person:
Title:
Phone:
Alternate Phone:
Email:
CONFIRMATION OF REDACTED COPY
☐ YES, a redacted copy of submission documents is enclosed.
☐ NO, a redacted copy of submission documents is not enclosed. I understand a full copy of non-redacted submission documents will be released if requested.
If a redacted copy of the submission documents is not provided with Prospective Contractor’s response packet, and neither box is checked, a copy of the non-redacted documents, except for financial data (other than pricing), will be released in response to any request made under the Arkansas Freedom of Information Act (FOIA). See the Proprietary Information section of the Solicitation.
REQUIRED CERTIFICATIONS
By signing and submitting a response to this Solicitation, Prospective Contractor agrees and certifies that they:
☐ Do not and shall not employ or contract with illegal immigrants during the term of a contract awarded as a result of this Solicitation.
☐ Do not and shall not boycott Israel during the term of a contract awarded as a result of this Solicitation.
☐ Do not and shall not boycott an Energy, Fossil Fuel, Firearms, or Ammunition Industry during the term of a contract awarded as a result of this Solicitation.
An official authorized to bind the Prospective Contractor to a resultant contract shall sign below. The signature below signifies agreement that any exception that conflicts with a Requirement of this Solicitation may cause the Prospective Contractor’s bid to be rejected.
Authorized Signature: Title:
Printed/Typed Name: Date:
submission requirements checklist The following items must be submitted with the Prospective Contractor’s bid:
· Bid Signature Page
· Proposed Subcontractors Form
· Copy of Prospective Contractor’s Equal Opportunity Policy
· Official Bid Price Sheet
The following items, which must be submitted prior to a contract award to the Prospective Contractor, may also be included with the Prospective Contractor’s bid:
· EO 98-04: Contract and Grant Disclosure Form
· Voluntary Product Accessibility Template (VPAT), if applicable (itic.org, use the VPAT 2.4 Rev 508 version)
PROPOSED SUBCONTRACTORS FORM
Prospective Contractors shall complete the form for all subcontractors the Prospective Contractor proposes to use under a resulting contract (Standard Commodities Contract Template, section 14). If the Prospective Contractor does not intend to use subcontractor(s), Prospective Contractor should indicate so by checking the appropriate box.
Prospective Contractors should not include additional information relating to subcontractors on this form or as an attachment to this form.
Prospective Contractor proposes to use the following subcontractor(s) under a resulting contract:
| SUBCONTRACTOR’S COMPANY NAME |
| STREET ADDRESS |
| CITY, STATE, ZIP |
☐ Prospective Contractor does not propose to use subcontractors under a resulting contract.
08/2023
File details come from the government source that posted it. Updated .