S000000161 Bidders Conference PPT.pdf
PDF 118 KB Posted
- Attached to
- Pharmacy Benefit Manager
- Solicitation number
- S000000161
- Issued by
- Pulaski County, Arkansas
About this file
This document is a Bidders Conference presentation for a Request for Proposal (RFP) by the Arkansas Department of Transformation and Shared Services Office of State Procurement for a Pharmacy Benefits Manager (PBM) contract. The RFP was released on October 28, 2022, with a Bidders Conference on November 1, 2022 and a proposal due date of November 30, 2022. The State is seeking a PBM that will provide the most advantageous formulary and lower net costs, with a focus on excluding high-cost, low-value drugs. The RFP process includes an initial evaluation, interviews, final evaluation, discussions, and contract award, which is expected by February 20, 2023.
The proposal should outline the best approach to achieve the State's objectives, using demonstrable metrics to support the solution. Prospective Contractors will be evaluated on factors such as experience, proposed solution, risk mitigation, and interview performance. Proposals must not identify the Contractor, and technical proposals are limited to 35 pages. Contractors whose proposals do not receive a minimum technical score of 100 will be eliminated from further consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C - Retail Network Disruption Report~1.xlsx | XLSX spreadsheet | |
| Attachment G Arkansas Independents Network.xlsx | XLSX spreadsheet | |
| Contract and Grant Disclosure~17.pdf | ||
| Attachment A - Non-Disclosure Agreement~1.docx | DOCX document | |
| Attachment E - Financial and Formulary Scoring Examples~1.xlsx | XLSX spreadsheet | |
| Attachment F - Specialty Pharmacy Listing- Revised.xlsx | XLSX spreadsheet | |
| S000000161 - Drug Pricing Product Exclusions.xlsx | XLSX spreadsheet | |
| Attachment B - List of Exclusions~1.xlsx | XLSX spreadsheet | |
| S000000161 Cost Workbook.xlsx | XLSX spreadsheet | |
| S000000161 Pharmacy Benefits Manager.pdf | ||
| S000000161 Technical Proposal Packet.docx | DOCX document | |
| Attachment D - Formulary Disruption Reporting~1.xlsx | XLSX spreadsheet | |
| S000000161 Q and A.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S000000161
PHARMACY BENEFITS MANAGER
BIDDERS CONFERENCE
DEPARTMENT OF TRANSFORMATION AND SHARED SERVICES OFFICE OF STATE PROCUREMENT
TSS OSP CONTACT INFORMATION
Tanya Freeman Statewide Procurement Manager Email: tanya.freeman@Arkansas.gov Office: 501-590-9284
RFP GOALS AND OBJECTIVES
EBD is seeking a PBM that will provide the most advantageous formulary.
EBD is seeking a PBM with a similar lowest net-cost focused formulary with drug exclusions that allows prior authorization for medical necessity and does not cover high-cost and low value drugs.
RFP SCHEDULE
Activity Date RFP Release to Prospective Contractors October 28, 2022 Bidders Conference November 1, 2022, 1:00 pm Deadline for Questions November 9, 2022, 4:00 pm Answers to Questions November 16, 2022 Proposal Due Date November 30, 2022, 2:00 pm Initial Proposal Evaluation* December 1, 2022 Interviews* December 12-13, 2022 Final Proposal Evaluation* December 13, 2022 Discussions Kick Off Meeting* January 5, 2023 Finalize Discussions* January 19, 2023 Post Anticipation to Award* January 20, 2023 Award Contract* February 20, 2023
MOST ADVANTAGEOUS PROPOSAL OVERVIEW
The State seeks the most advantageous proposal (the “MAP”) to reach its objectives. The State is relying on the expertise of the Prospective Contractors to put together the MAP, which needs to:
Clearly outline the best way to achieve the State’s objectives, considering cost and the evaluation factors identified in the RFP
Use demonstrable and observable metrics to make its business case Identify known and anticipated risks, along with how to manage, mitigate, or avoid those risks
The proposal should be easy for a non-technical person to read and understand.
The State expects to discuss the finer details and technical points of the project or service delivery with the Prospective Contractor who provides the MAP.
PHASES OF THE RFP PROCESS
Preparation
• Develop and release RFP
• Bidders conference
Selection
• Cost check
• Initial evaluation
• Interviews
• Final evaluation
Discussions
• Kick off meeting
• Final meeting
Execution
• Award
• Implementation
• Progress reporting
PHASE II OF THE RFP PROCESS - SELECTION
The TSS OSP will conduct the following tasks:
Review technical proposal packets for submission requirements
Perform initial cost check to review the competitive range of cost proposals submitted
The average cost submitted will be used as the baseline for the competitive range, and Prospective Contractors whose proposed costs fall outside of the competitive range (see RFP) may be asked to justify their cost.
Evaluators will conduct the following tasks:
Review and score technical proposal packets and interview Prospective Contractors who meet RFP submission requirements
Review cost proposals to determine if highest ranked proposal is the MAP for the State
Recommend Prospective Contractor submitting the MAP to move into the discussion phase with the State
PHASE II OF THE RFP PROCESS – SELECTION
Prospective Contractors provide the following information in their technical proposal packets:
Experience
Solution
Risk
Cost Proposal Should not include cost to cover risk contingences or recommended option items
Total evaluation criteria submittal must be no more than 35 pages total.
Technical proposals should focus on the merits of the proposed approach and not the identity or reputation of the Prospective Contractor.
The Prospective Contractor must not be identified in the technical proposal.
Proposals should be simple, non-technical, project specific, and supported by metrics.
Metrics should objectively demonstrate the soundness of the approach (high likelihood of success and little to no risk of failure).
Metrics should show the capability of the Prospective Contractor and minimize the room for uncertainty and subjectivity in the evaluation process.
INFORMATION FOR EVALUATION
SUB-SECTIONS
MAXIMUM RAW
POINTS POSSIBLE
SUB-SECTION’S
WEIGHTED
PERCENTAGE
* MAXIMUM
WEIGHTED SCORE
POSSIBLE
Experience: A 20 12.6% 60
Experience: B 10 4.2% 20
Solution: A 55 34.7% 165
Solution: B 35 14.7% 70
Solution: C 25 5.3% 25
Risk 5 7.4% 35
Recommended Options 0 0.0% 0
Interview 5 21.1% 100
Total Technical Score 155 100% 475
Response and Scoring Breakdown:
Experience and Solution
High-level overview of the Prospective Contractor’s proposed solution
Should be non-technical and should include the Prospective Contractor’s best solution for meeting the requirements of the RFP
Additional service options and recommendations above and beyond the required scope of services should be included in the Recommended Options Form
Examples of demonstrable and verifiable risk mitigation metrics:
Risk Description State personnel do not attend training sessions regarding the use of the solution
Solution Contractor will assign full-time personnel to continually reach out to State personnel regarding training sessions. Contractor will also have a 24/7 toll free number to assist personnel.
Documented performance Contractor has implemented this strategy on the last 4 projects, and client complaints and issues have decreased by 30%. Client satisfaction on this mitigation strategy is 10/10
Interviews Prospective Contractors meeting the RFP submission requirements will be invited to attend an interview.
The primary project manager or key person for the project will generally be the only individual attending the interview.
If the prospective contractor thinks additional personnel are needed during the interview, the Prospective Contractor can submit the reason and request approval from the State to bring additional personnel.
Each Prospective Contractor will be provided a list of questions that will be asked during the interview.
Follow up questions may be asked during the interview.
Evaluators will follow the rating system below:
Quality Rating
Quality of Response
Description Confidence in Proposed Approach
5 Excellent When considered in relation to the RFP evaluation factor, the proposal squarely meets the requirement and exhibits outstanding knowledge, creativity, ability, or other exceptional characteristics. Extremely good.
Very High
4 Good When considered in relation to the RFP evaluation factor, the proposal squarely meets the requirement and is better than merely acceptable.
High
3 Acceptable When considered in relation to the RFP evaluation factor, the proposal is of acceptable quality.
Moderate
2 Marginal When considered in relation to the RFP evaluation factor, the proposal’s acceptability is doubtful
Low
1 Poor When considered in relation to the RFP evaluation factor, the proposal is inferior
Very Low
0 Unacceptable When considered in relation to the RFP evaluation factor, the proposal clearly does not meet the requirement, either because it was left blank or because the proposal is unresponsive.
No Confidence
Consensus Technical and cost scores will be added together to determine the Grand Total Score for each proposal to determine the top ranked proposal.
Proposals that do not receive a minimum Total Technical Score of 100 will not be subject to further consideration in the solicitation process; pricing for those proposals will not be scored.
Evaluators will determine if the top ranked proposal is the MAP for the State and submit their recommendation to TSS OSP.
PHASE III OF THE RFP PROCESS – DISCUSSIONS
TSS OSP will begin the discussions phase with the responsive and responsible Prospective Contractor submitting the MAP recommended by the Evaluators.
Prospective Contractor will be invited to participate in the discussion phase.
No work should be done during this phase, but all planning should be completed.
Discussions check points
Kickoff meeting
Refinement
Finalization
Kickoff meeting
Prospective Contractor prepares the following documents:
Detailed scope of work, including milestone schedule and performance standards
Risk management plan
Financial summary including a proposed payment schedule and recommended options
Proposed project management and reporting templates
Prospective Contractor presents the documents during to all applicable State personnel
Refinement Prospective Contractor adjusts proposed scope, schedule, and plan (where needed) based on State feedback
Prospective Contractor collaborates with the State to finalize documents
Finalization Prospective Contractor prepares final documents for State review during final meeting with stakeholders
S000000161
PHARMACY BENEFITS MANAGER
BIDDERS CONFERENCE
DEPARTMENT OF TRANSFORMATION AND SHARED SERVICES OFFICE OF
STATE PROCUREMENT
| S000000161�Pharmacy Benefits Manager�Bidders conference |
| TSS OSP contact information |
| RFP goals and objectives |
| RFP schedule |
| �most advantageous Proposal overview |
| Phases of the rfp process |
| Phase II of the RFP Process - selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase II of the RFP Process – selection |
| Phase III of the RFP Process – discussions |
| Phase III of the RFP Process – discussions |
| Phase III of the RFP Process – discussions |
| Phase III of the RFP Process – discussions |
| S000000161�Pharmacy benefits manager�Bidders conference |
File details come from the government source that posted it. Updated .