S000000064 Official Soliciation Price Sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- S000000064
- Issued by
- Pulaski County, Arkansas
About this file
This document is an Official Solicitation Price Sheet for a state and local contract opportunity for the Turnkey Low-Income Household Water Assistance Program (LIHWAP) in the state of Arkansas. The price sheet instructs prospective contractors to provide their company name and to identify the total cost for the initial two-year term of the contract, which must include all costs associated with the required activities and tasks outlined in the RFP. The price sheet also includes tables for contractors to provide detailed cost information for each activity or task, both for the initial two-year term and for optional renewal years 3-7, although the renewal year costs will not be used for the low-cost determination. The total cost from the detailed activity/task table must match the total two-year cost provided in the summary table.
Pricing must be inclusive of all applicable expenses, and prospective contractors may be required to provide further breakdown of costs during the discussion phase. Cost points will be awarded based on the total two-year cost provided in the summary table, and in the event of a discrepancy, the summary table will govern.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAP RFP-S000000064 Final RFP--v1--2022-01-25-155217--sp(.docx | DOCX document | |
| contgrantform~9.pdf | ||
| MAP RFP Response Packet-S000000064.docx | DOCX document | |
| S000000064 Q&A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| S000000064 LIHWAP |
| ADEE |
| Official Solicitation Price Sheet |
| Prospective Contractor Name |
| Instructions |
| 1. Insert your company's name on this tab in the yellow highlighted cell. |
| Table 1: |
| 1. Identify the total cost for the initial two (2) year term of the Contract. This cost must include all costs associated with the activities/tasks that meet the requirements of this RFP and any additional activities/tasks identified in the Prospective Contractors proposal. |
| Table 2: |
| 1. Include information and cost related to successfully complete each activity/task. |
| Activities/tasks may either be the ones identified in the RFP or an alternative approach proposed by the Prospective Contractor. |
| 2. Include the activity/task name, the unit of measure, and the rate. |
| 3. Calculate the total for each line. Enter the total cost in the light-green shaded cells at the end of each line. |
| 4. Add lines as necessary. |
| 5. The total cost from Table 2 must match the total two (3) year cost provided in Table 1. |
| 6. Cost Points will be awarded based on the total two (2) year cost provided in Table 1. |
| 7. In the event of a discrepancy, Table 1 shall govern. |
| 8. Pricing must be inclusive of all applicabe expenses such as travel, etc. |
| 9. Prospective Contractors shall provide any further breakdown of identified cost during the Discussion Phase. The cost must not exceed what is identified in Table 1. |
| Table 3: |
| 1. Include information and cost related to optional renewal years 3-7. |
| 2. Include the activity/task name, the unit of measure, and the rate. |
| 3. Calculate the total for each line. Enter the total cost in the light-green shaded cells at the end of each line. |
| 4. Add lines as necessary. |
| 5. Table 3 will not be used for low-cost determination. |
Pricing
| S000000064 LIHWAP | ||||
| ADEE | ||||
| Official Solicitation Price Sheet | ||||
| Prospective Contractor Name | 0 | |||
| Table 1 - Total Seven (7)-Year Cost | ||||
| Total Cost | $ - 0 | |||
| Table 2 - Cost Per Activity/Task (evaluated for low-cost determination) | ||||
| Activity/Task/Project Role | Description | Per (indicate one-time, annual, monthly, hourly) | Rate | Total Cost |
| Testing | hourly | hourly | $ 10.00 |
Table 3
| S000000064 LIHWAP | ||||
| ADEE | ||||
| Official Solicitation Price Sheet | ||||
| Prospective Contractor Name | 0 | |||
| Table 3 - Cost Per Activity/Task Optional Years 3-7 (not used for low-cost determination) | ||||
| Activity/Task/Project Role | Description | Per (indicate one-time, annual, monthly, hourly) | Rate | Total Cost |
| Testing | hourly | hourly | $ 10.00 |
File details come from the government source that posted it. Updated .