S-3-27_PLANS.pdf

PDF 55 MB Posted

Attached to
Van Buren Ave - Street Curb and Gutter Improvements
Solicitation number
S-3-27
Issued by
Natrona County, Wyoming

About this file

Summary of S-3-27_PLANS.pdf

This is a project plans document for the Van Buren Avenue Street Curb and Gutter Improvements project in Wyoming. The project encompasses the installation of a new 12-inch water main complete with associated valves, fittings, and fire hydrants, along with comprehensive storm drainage improvements. The scope of work includes asphalt and fencing removal, excavation and backfill operations, implementation of traffic and erosion control measures, and restoration of affected areas utilizing asphalt, concrete, curb and gutter installation, landscaping, riprap placement, and signage. The plans document provides the technical specifications and design details necessary for contractors to understand the full scope and requirements of the infrastructure improvements along Van Buren Avenue.

The document serves as the engineering and design reference material for bidders preparing proposals for this street improvement project. Contractors must review these plans in conjunction with the project specifications and bid documents to develop accurate cost estimates and project schedules. The plans establish the technical baseline for all work to be performed, including utility coordination, material specifications, and restoration standards that must be met upon project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .