S-21-26_SPECS.pdf
PDF 217 KB Posted
- Solicitation number
- S-21-26
- Issued by
- Niobrara County, Wyoming
About this file
This is a specifications document for construction work on the Cheyenne Transit Facility project in Wyoming, issued by the City of Cheyenne and the Board of Public Utilities. The specifications establish standard construction requirements, materials, and payment methods for exterior and interior renovations of the approximately 9,378 gross square foot facility located at 1800 Westland Road. Key work items outlined include mobilization and demobilization, clearing and grubbing with tree removal restrictions outside migratory bird season and requiring permits from the City Forester, storm drain and culvert installation with mandatory CCTV inspection before service release, landscape improvements including bus shelter, picnic tables, and bicycle rack installation, light pole and base installation, pavement markings, and water system isolation modifications. The project is divided into multiple bid schedules with a mandatory pre-bid meeting scheduled for March 20, 2026 at 2:00 p.m., questions due by March 27, 2026 at 5:00 p.m., addendum responses due by April 1, 2026 at 5:00 p.m., and electronic bid proposals due April 14, 2026 at 2:00 p.m. through the City's eProcurement Portal with public bid opening via Zoom immediately following. City Council approval is scheduled for April 27, 2026 (first reading) and May 11, 2026 (final approval), with an estimated Notice to Proceed on May 18, 2026.
Pricing is structured through multiple payment methods including lump sum contracts for mobilization, pavement markings, and site work at individual locations, unit pricing for light poles and bases, and force account provisions for unexpected construction costs requiring written change order authorization from both the contractor and Board of Public Utilities. Force account work compensation includes labor at payroll wages plus 66 percent overhead, actual material costs plus 15 percent, and equipment rental at rates from the Rental Rate Blue Book adjusted for Wyoming and equipment age, with invoicing only permitted for specialized fabrication or services unavailable within the contractor's organization. Mobilization payments are authorized at 50 percent with the first pay request, proportionally through 90 percent with monthly progress payments, and 100 percent following substantial completion. All work must conform to 2022 City of Cheyenne Standard Specifications, approved construction documents, and federal, state, and local laws and regulations. The contractor is responsible for all construction surveying, staking, measurement calculations, utility locates, right-of-way permits, traffic control, and storm water management, with required coordination with the Board of Public Utilities inspector for any water main system modifications.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPDATES AND ADDITIONS TO THE STANDARD SPECIFICATIONS
All work shall conform to the requirements of the 2022 City of Cheyenne Standard Specifications, supplemental specifications, approved construction documents, easement or use of property agreement or conditions, and federal, state, and local laws and regulations. In the case of conflict, the more stringent requirements shall be adhered to.
SECTION 01030 – MOBILIZATION
PART 1 GENERAL
1.01 SUMMARY
A. Movement of personnel, equipment, supplies and incidentals to the project site(s).
B. Establishment of temporary offices, buildings, and other facilities.
C. Other work and operations which must be performed prior to beginning work on the various items on the project.
D. Other costs incurred prior to beginning work on the various items for the project.
E. Demobilization.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
PART 4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT
4.01 METHOD OF MEASUREMENT
A. Based upon the contract lump sum price for “Mobilization”.
4.02 BASIS OF PAYMENT
A. Partial payments will be allowed as follows:
1. With first pay request, 50%.
2. Paid proportionally to the with completion of work through monthly progress payments to 90%.
3. Following substantial completion, 100%.
Pay Item Pay Unit
Mobilization Lump Sum
END OF SECTION 01030
SECTION 01035 – FORCE ACCOUNT
A. This section describes the use of the force account line item to provide compensation for unexpected or unforeseen construction costs that result in a change order.
1.02 SUBMITTALS
A. Change order costs will only be expensed by a change order authorized in writing by the CONTRACTOR and BOPU. BOPU shall provide the size and scope of additional services required to be completed by the CONTRACTOR in writing, and the CONTRACTOR shall produce a written response in no less than five business days with a cost to complete the work per Part 4.01.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
PART 4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT
4.01 METHOD OF MEASUREMENT
A. The ENGINEER may direct the CONTRACTOR to perform work that was unexpected under force account. The payment to the CONTRACTOR for such work is compensation in-full and will be determined as follows:
1. Labor: For the time that workers and their immediate working foremen are engaged specifically and solely in force account work, BOPU will pay the cost of those employees’ wages at the rates shown on payroll plus 66 percent to cover any overhead. Hours shall be measured to the nearest recorded one-half hour each day.
2. Materials: BOPU will pay for the actual cost of materials approved for use by the
ENGINEER and incorporated into the work, including transportation charges
(exclusive of equipment rentals), plus 15 percent. BOPU will not issue payment without receipt of invoices substantiating the material and transportation costs.
If materials are taken from the CONTRACTOR’S stock, provide a statement certifying that the materials were taken from stock, that the quantity claimed was used, and that the price and transportation claimed represent actual costs.
3. Equipment: BOPU will pay for the rental of equipment approved by the
ENGINEER. The ENGINEER requires fully operational equipment of a size and capacity to perform the work. The ENGINEER may approve the use of equipment not meeting this requirement if furnished by the CONTRACTOR at reduced prices that are mutually agreed upon. The CONTRACTOR and the
ENGINEER will agree on whether to use equipment already available on the project or to lease equipment. BOPU will pay for equipment based on actual hours of use, recorded to the nearest one-half hour each day. If the total period of operation within a day is less than one hour, the department will consider the time as one full hour. In determining payment rates, BOPU will pay for rental of the CONTRACTOR’S own equipment at rates given in the Rental Rate Blue Book for Construction Equipment, volumes 1-4, published by Equipment Watch, adjusted both regionally for Wyoming and for equipment age.
4. Invoicing: If the ENGINEER and the CONTRACTOR agree that an item of work requires a specialist, the administrative work may be paid for based on a
CONTRACTOR or subcontractor invoice. Specialist work includes an item of work or service requiring skills, tools, or equipment unavailable within the
CONTRACTOR’S or authorized subcontractors’ organizations. If a CONTRACTOR is required to perform specialized fabrication or machining in a shop facility away from the project, BOPU may accept the charges for that portion of the
CONTRACTOR’S work as an invoice billing to which 5 percent has been added.
BOPU will base its payment for specialty work or service on current market price. In all other instances, BOPU will not pay for invoicing or related administrative tasks.
5. BOPU will not pay additionally for items or services already covered by or inherent to the contracted scope of work (such as general superintendence, use of small hand tools, or the provision of storage facilities).
4.02 BASIS OF PAYMENT
A. Payment for any force account work will be made in whole following completion and acceptance of the work.
Force Account Force Account
END OF SECTION 01035
SECTION 01054 – CONTROL OF WORK
Insert the additions into the specification:
1.05 SUMMARY
D. The Contractor shall be responsible for all construction surveying, staking, measurement, and calculations (including measurement and calculation of quantities for contract pay items measured or paid for by area or volume and survey staking of paint marking layout) essential to completing the project and properly control the entire work.
END OF SECTION 01054
SECTION 02100 – CLEARING AND GRUBBING
Remove the current specification section referenced below and replace with the following:
PART 3 EXECUTION
3.01 CONSTRUCTION
E. Prior to planting, pruning, removing or structurally altering any tree or shrub within the public street, alley, or sidewalk right-of-way, or other public place within the CITY, a written permit must be obtained from the CITY Forester. Additionally, any removal or structural alteration of trees must occur outside of migratory bird season in accordance with recommendations provided by the Wyoming Game & Fish Department.
END OF SECTION 02100
SECTION 02725 – STORM DRAINS AND CULVERTS
Remove the current specification section referenced below and replace with the following:
3.04 TESTING
C. CAMERA INSPECTION
1. All storm sewer mains are to be inspected using a television camera before release for service.
2. Prior to CCTV inspection, water shall be introduced for identification of bellies and sags. Jetting may be required for removal of debris prior to camera inspection.
3. The ENGINEER and CITY shall be present during any CCTV testing and shall receive a digital copy of video data following inspection.
4. Any deficiencies identified by the ENGINEER and CITY shall be replaced at the expense of the CONTRACTOR. Additional video inspection required to verify correction of deficiencies may be required. The CONTRACTOR shall bear all costs incurred for video inspection materials, equipment, labor, and downtime.
SECTION 02900 – LANDSCAPING
Insert the additions into the specification:
1.05 SUMMARY
B. Warranty irrigation equipment, bicycle rack, picnic table, and bus shelter for a period of one (1) year after final acceptance, except for defects resulting from Owner’s neglect or abuse by others outside of normal wear and tear.
PART 2 PRODUCTS
2.01 MATERIALS
I. Bus Shelter – Tolar Model # SFSS-01 Bus Shelter or approved equal.
J. Picnic Table – Belson Model #238-ev6 Picnic Table or approved equal.
K. Bicycle Rack – Belson model # CBBR-9UR-BK Bicycle rack or approved equal.
3.01 INSTALLATION
F. Installation of the bus shelter, picnic table, and bike rack shall be in accordance with manufacturer's recommendations.
END OF SECTION 02900
SECTION 04000 – LIGHT POLE AND BASE
A. This section consists of the standard requirements, materials, and dimensions of light poles and bases.
PART 2 PRODUCTS
2.01 MATERIALS
A. Materials shall be in accordance with the applicable detail within the approved
Construction Drawings.
PART 3 EXECUTION
NOT USED
PART 4 METHOD OF PAYMENT
4.01 METHOD OF MEASUREMENT
A. Light pole and bases shall be measured by the unit each completed and in place.
Payment will be full compensation for excavation, light pole, light fixture, concrete, reinforcement, anchorage, grounding, internal pole wiring, and furnishment of all tools, equipment, labor, and incidentals required to complete the work.
4.02 BASIS OF PAYMENT
A. Basis of payment shall be made at the contract unit bid price multiplied by the number of units installed.
B. Payment shall be made under:
Light Pole & Base EA
END OF SECTION 04000
SECTION 04010 – PAVEMENT MARKINGS
A. This section consists of the requirements for pavement markings.
PART 2 PRODUCTS
2.01 PAINT
A. Based on specified ingredients, provide, and use paint that is a homogeneous blend of its constituent components, stable in storage, free from grit and coarse particles, with no rosin or rosin derivatives unless specifically allowed.
B. Ensure that paint is shipped in sealed containers constructed and packed to withstand rough handling and plainly marked with contents, batch number, date of manufacture, and the manufacturer’s name and address. The ENGINEER will reject containers received in a damaged condition.
C. Provide paints in accordance with Federal Color Standard 595, Paint Color
Standards, ± 2 delta E units.
PART 3 EXECUTION
A. Ensure that the application surfaces for pavement markings are free of foreign matter, which would interfere with adhesion. Apply pavement markings in accordance with the manufacturer’s recommendations.
B. Ensure that paint and beads are placed within 24 hours of a day’s operation.
C. Parking space delineation striping shall be white solid (federal no. 27925). Parking spaces reserved for handicapped parking may be marked with the handicapped pavement marking symbol shown in Appendix A of the WYDOT Traffic Program
Pavement Marking Manual.
PART 4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT
4.01 METHOD OF MEASUREMENT
A. Based upon the contract lump sum price for “Pavement Markings”.
4.02 BASIS OF PAYMENT
A. Payment shall be made at the lump sump quote for this item in the “Bid
Schedule” and shall be for the removal of existing markings and complete application of all proposed markings.
Pavement Striping Lump Sum
END OF SECTION 04010
SECTION 04020 – SYSTEM ISOLATION MODIFICATIONS
A. This section consists of the modification to the existing water system associated with Bid
Schedules E and F. Generally, this includes locating each isolation site (site), excavation, piping modifications, and surface restoration.
1.02 RELATED WORK
SECTION 01041 – PROJECT COORDINATION
SECTION 01050 – TRAFFIC CONTROL
SECTION 02051 – ABANDON PIPE SYSTEMS
SECTION 02075 – DEMOLITION OF ASPHALT AND PORTLAND CEMENT CONCRETE
SECTION 02150 – SHORING AND UNDERPINNING
SECTION 02210 – EXCAVATION, EMBANKMENT, AND COMPACTION
SECTION 02225 – TRENCH BACKFILL
SECTION 02226 – BACKFILLING FOR APPURTENANCES
SECTION 02515 – ASPHALT PATCHING
SECTION 02665 – WATER DISTRIBUTION AND TRANSMISSION SYSTEMS
SECTION 03310 – CONCRETE WORK
SECTION 03340 – CONCRETE SIDEWALKS, DRIVEWAY APPROACHES, CURB TURN FILLETS,
VALLEY GUTTERS & MISCELLANEOUS NEW CONCRETE CONSTRUCTION
1.03 QUALITY ASSURANCE
A. The CONTRACTOR shall provide BOPU with a complete set of submittals for all materials incorporated into the work. No materials shall be incorporated into the work until BOPU or its designee has provided written approval.
B. The CONTRACTOR shall not modify BOPU’s watermain system without a BOPU inspector present.
PART 2 PRODUCTS
Unless otherwise stated in the approved construction drawings, all products and materials shall meet the requirements of the latest version of the City of Cheyenne Standard Specifications.
3.01 CONSTRUCTION
A. The CONTRACTOR shall keep and maintain a schedule that details the date that work at each site is to begin. This date shall be communicated to BOPU and the ENGINEER at least one week in advance. The CONTRACTOR shall call in utility locates at this time.
Should the CONTRACTOR have any special waterline locate requirements to complete the work, they shall convey them to BOPU at this time. CONTRACTOR shall obtain a right-of-way permit(s) as required by the City of Cheyenne.
B. The CONTRACTOR shall have all required traffic control devices in place prior to demolition of the street grade. This includes placement of “No Parking” signs in advance of the work to ensure no vehicle obstructs the work area.
C. The BOPU shall, at the date and time provided by the CONTRACTOR, isolate the main to be modified and verify the absence of pressurized flows by opening the nearest adjacent fire hydrant (if applicable).
D. The CONTRACTOR shall make the modifications detailed in the approved construction drawings. The CONTRACTOR shall have the components required for modification on-site prior to excavation. Should the field conditions not match the plans, the
CONTRACTOR shall notify the ENGINEER immediately.
E. The CONTRACTOR shall minimize stormwater runoff into the excavation at each site.
Failure to do so will result in over excavation and re-compaction of the base and subgrade as directed by the ENGINEER.
F. The CONTRACTOR shall maintain traffic control and BMPs at each site until final paving is complete, at which time traffic control facilities and BMPs shall be removed from the site in their entirety.
G. Backfilling activities at each site shall be in accordance with SECTION 02225 – TRENCH
BACKFILL and SECTION 02226 BACKFILLING FOR APPURTENANCES. Surface restoration at each site shall be in accordance with SECTION 02515 – ASPHALT PATCHING and/or
SECTION 02900 – LANDSCAPING and/or SECTION 03340 – CONCRETE SIDEWALKS, DRIVEWAY APPROACHES, CURB TURN FILLETS, VALLEY GUTTERS & MISCELLANEOUS
NEW CONCRETE CONSTRUCTION.
PART 4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT
4.01 METHOD OF MEASUREMENT
A. The work at each site for Bid Schedules E and F will be measured on an individualized lump-sum basis. Measurement of isolation sites shall be the number of each site individually identified in the “Bid Schedule” complete in place and accepted. No measurement of individual items shall be required.
4.02 BASIS OF PAYMENT
A. Payment shall be considered as full compensation for furnishing all labor, materials, tools, equipment and other incidentals necessary for mobilization, traffic control, storm water management, site safety, equipment, materials, backfilling, temporary surfacing, paving, landscape, surface restoration, labor, and all other incidentals required to complete the work detailed in the approved construction drawings.
Site work Lump Sum
END OF SECTION 04020