S-10900-00015977 ATTACHMENT D - PLANS AND DRAWINGS.pdf
PDF 13 MB Posted
- Solicitation number
- S-10900-00015977
- Issued by
- Jackson County, Cheshire CDP, Oregon
About this file
This is a comprehensive set of construction plans and drawings for the Oregon Department of Aviation's Chiloquin State Airport Runway, Taxiway, and Apron Surface Seal Project, prepared by Century West Engineering. The project encompasses pavement rehabilitation work including crack repair, asphalt patching, surface seal application, and pavement marking installation across Runway 17-35, associated taxiways, and apron areas. The work is organized into three phases: Phase 1 involves crack sealing and asphalt concrete patching over approximately 10 calendar days; Phase 2 covers surface seal application requiring 1 calendar day; and Phase 3 addresses pavement markings requiring 1 calendar day, with a second marking application permitted 30 days after rehabilitation completion. Specific quantities identified include 4,002 linear feet of crack sealing, 2,728 linear feet of asphalt patching for wide cracks, 49 square feet of standard asphalt patching, 31,562 square yards of surface seal coat, and 7,556 square feet of pavement markings (1,556 square feet yellow and 6,000 square feet white). The anticipated project start date is July 2026 with completion targeted for August 2026. All work must be completed within 12 continuous calendar days from the Notice to Proceed, with the contractor required to request runway closures 14 days in advance and coordinate with airport operations.
The project documents establish comprehensive safety and operational requirements including runway closure procedures, temporary traffic control measures using low-level barricades, Foreign Object Debris (FOD) removal protocols, and weather condition monitoring for both surface seal and pavement marking applications. The contractor is restricted to designated haul routes and staging areas, with all equipment required to remain on pavement to the extent feasible. Equipment height is limited to 12 feet unless approved by the engineer, and stockpiles must not exceed 12 feet in height while maintaining minimum distances of 125 feet from runway centerlines and 44.5 feet from taxiway centerlines. The contractor bears full responsibility for locating existing utilities and preventing damage, and must conduct friction testing on sealed surfaces using approved Continuous Friction Measuring Equipment before runway reopening. Pavement markings require two applications: a first coat at 30 percent of the specified rate without glass beads, followed by a final coat at 100 percent with glass beads applied in accordance with FAA standards and specifications. Additional project requirements include erosion control measures, hydro-seeding of disturbed surfaces, ditch inlet protection, and compliance with FAA operational safety standards during construction including maintaining airport radio capability on 122.90 MHz CTAF/UNICOM frequency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
FOR
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL PROJECT
ATTACHMENT D – RUNWAY, TAXIWAY, AND APRON SURFACE
SEAL PROJECT PLANS AND DRAWINGS
OWNER:
Oregon Department of Aviation
3040 25th St. SE Salem, OR 97302
ENGINEER:
Century West Engineering
5500 Meadows Rd., Suite 250
Lake Oswego, OR 97035
Phone: 503.419.2130
FEBRUARY 2026
This Page Left Intentionally Blank
OREGON DEPARTMENT OF
AVIATION
CHILOQUIN STATE AIRPORT
RUNWAY, TAXIWAY, AND APRON
SURFACE SEAL
A.I.P NO. 3-41-0012-011-2025
FEBRUARY 2026
SITE MAP
NO SCALE
VICINITY MAP
NO SCALE
G-01
COVER SHEET
PROJECT LOCATION
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
O
VE
R S
H
EE
T.
dw g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
SHEET INDEX
SHEET NO DWG NO SHEET TITLE
1 G-01 COVER SHEET
2 G-02 SITE & SURVEY CONTROL
3 G-03 CONSTRUCTION SITE & SAFETY PHASING PLAN
4 G-04 SITE & SAFETY NOTES & DETAILS
5 EC-01 EROSION CONTROL PLAN
6 C-01 DEMOLITION PLAN
7 C-02 CRACK SEAL AND PAVEMENT REPAIR PLAN
8 C-03 SURFACE SEAL PLAN
9 C-04 CRACK SEAL, AC PATCHING, AND SURFACE SEAL DETAILS
10 C-05 PAVEMENT MARKING OVERALL PLAN
11 C-06 PAVEMENT MARKING PLAN
12 C-07 PAVEMENT MARKING PLAN
13 C-08 PAVEMENT MARKING PLAN
14 C-10 PAVEMENT MARKING PLAN
15 C-09 PAVEMENT MARKING PLAN
16 C-11 PAVEMENT MARKING DETAILS
17 C-12 PAVEMENT MARKING DETAILS
AutoCAD SHX Text N
AutoCAD SHX Text N
MULTICORELINK:SITE & SURVEY CONTROL-C-02
MULTICORELINK:SITE & SURVEY CONTROL-C-02
MULTICORELINK:CONSTRUCTION SITE & SAFETY PHASING PLAN-C-03
MULTICORELINK:CONSTRUCTION SITE & SAFETY PHASING PLAN-C-03
MULTICORELINK:SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:EROSION CONTROL PLAN-EC-01
MULTICORELINK:EROSION CONTROL PLAN-EC-01
MULTICORELINK:DEMOLITION PLAN-C-01
MULTICORELINK:DEMOLITION PLAN-C-01
MULTICORELINK:CRACK REPAIR-C-02
MULTICORELINK:CRACK REPAIR-C-02
MULTICORELINK:SURFACE SEAL-C-03
MULTICORELINK:SURFACE SEAL-C-03
MULTICORELINK:DETAILS-C-12
MULTICORELINK:DETAILS-C-12
MULTICORELINK:PAVEMENT MARKING PLAN-C-04
MULTICORELINK:PAVEMENT MARKING PLAN-C-04
MULTICORELINK:PAVEMENT MARKING PLAN-C-05
MULTICORELINK:PAVEMENT MARKING PLAN-C-05
MULTICORELINK:PAVEMENT MARKING PLAN-C-06
MULTICORELINK:PAVEMENT MARKING PLAN-C-06
MULTICORELINK:PAVEMENT MARKING PLAN-C-07
MULTICORELINK:PAVEMENT MARKING PLAN-C-07
MULTICORELINK:PAVEMENT MARKING PLAN-C-09
MULTICORELINK:PAVEMENT MARKING PLAN-C-09
MULTICORELINK:PAVEMENT MARKING PLAN-C-08
MULTICORELINK:PAVEMENT MARKING PLAN-C-08
MULTICORELINK:DETAILS-C-10
MULTICORELINK:DETAILS-C-10
MULTICORELINK:DETAILS-C-11
10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 47+53
G-02
SITE & SURVEY CONTROL
G-02
SITE & SURVEY CONTROL
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \S
IT
E
SU
R
VE
Y C
O N
TR
O
L.
dw g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBSTACLE FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
SURVEY NOTES:
1. TOPOGRAPHIC SURVEY IS PROVIDED FROM CRAWFORD, DRUMMOND, & ASSOCIATES, INC, DATED
SEPTEMBER 2025.
2. THE COORDINATES SHOWN ARE BASED ON THE OREGON STATE PLAN SOUTH ZONE (3601).
VERTICAL DATUM: NAVD88
3. IF SHOWN, THE LOCATION OF EXISTING UNDERGROUND UTILITIES THROUGHOUT THIS SET OF DRAWINGS ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE.
THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTORS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
0'
0'
240' 200'
RUNWAY 17-35
NORTH TAXIWAY
REFUGE
SOUTH TAXIWAY
REFUGE
WEST APRON
TAXIWAY B
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
SECURITY GATE
SURVEY CONTROL TABLE
NAVD 83 (2011)
POINT # NORTHING EASTING ELEVATION DESCRIPTION
1 334377.05 4549789.70 4193.62 CNT 5/8 IR
2 335351.35 4549910.90 4200.73 CNT 5/8 IR
3 336326.66 4550027.91 4209.03 CNT 5/8 IR
4 337419.14 4550211.67 4219.23 CNT MAG
5 336267.60 4549621.44 4208.22 CNT MAG
6 333807.93 4549647.98 4191.60 FD 5/8 IR CL MONUMENT
7 337534.14 4550098.64 4220.23 FD 5/8 IR CL MONUMENT
CP#1 CP#2 CP#3
CP#4
CP#5
TAXIWAY B1
TAXIWAY A1
EXISTING WINDCONE
RUNWAY OFA/OFZ
FOUND MONUMENT #6
FOUND MONUMENT #7
TAXIWAY A
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text N
G-03
CONSTRUCTION SITE & SAFETY PHASING PLAN
G-03
CONSTRUCTION SAFETY AND PHASING PLAN
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
O N
ST
R
U C
TI
O
N S
IT
E
SA
FE
TY
P H
AS
IN
G P
LA
N
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
CONTRACTOR
HAUL/ACCESS ROADS
CONTRACTOR STAGING
AREA
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBJECT FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
WORK AREA BOUNDARY
LOW LEVEL BARRICADES
WORK SCOPE:
CRACK SEAL (PHASE 1):
1. SET UP RUNWAY CLOSURE "X" AND NAVAID (MIRLS) TURNED OFF
2. INSTALL TEMPORARY TRAFFIC CONTROL (INCLUDING BARRICADES)
3. PAVEMENT MARKING REMOVAL
4. CRACK PREPARATION, WIDE CRACK REPAIR, ASPHALT PATCHING
5. CRACK FILL
6. SURFACE SWEEPING
SURFACE SEAL (PHASE 2):
7. SURFACE SEAL
PAVEMENT MARKING (PHASE 3):
8. PAVEMENT MARKING
9. FOREIGN OBJECT DEBRIS (FOD) CHECK/REMOVAL
GENERAL PHASING NOTES:
1. THE CONTRACTOR SHALL REQUEST RUNWAY CLOSURES FOR CONSTRUCTION 14 DAYS IN ADVANCE.
2. CONTRACTOR TO SUBMIT THE CONSTRUCTION SCHEDULE FOR OWNER REVIEW. COORDINATE CLOSURES WITH THE ENGINEER AND MAINTAIN AIRPORT OPERATION TO THE GREATEST EXTENT POSSIBLE.
3. ALL RUNWAY LIGHTING AND TAXIWAY LIGHTING SHALL BE SHUT DOWN/OFFLINE DURING RUNWAY CLOSURE.
ALL GUIDANCE SIGNS SHALL BE SHUT DOWN/OFFLINE (IF LIGHTED) AND COVERED DURING RUNWAY
CLOSURE.
4. TEMPORARY TRAFFIC CONTROL LOW LEVEL BARRICADES TO BE INSTALLED ON TAXIWAY A CONNECTOR
FOR THE DURATION OF THE PROJECT.
5. RUNWAY AND TAXIWAY MARKINGS SHALL BE IN PLACE ANY TIME RUNWAY OR TAXIWAYS ARE OPEN TO AIR
TRAFFIC.
6. REMOVAL OF EXISTING PAVEMENT MARKINGS SHALL PRECEDE CRACK SEAL WORK AND SEAL COAT WORK.
7. THE TERM "DAY" SHALL BE TAKEN TO MEAN A CALENDAR DAY OF 24 HOURS, BEGINNING AT 12:00 MIDNIGHT, SATURDAYS, SUNDAYS, AND HOLIDAYS SHALL BE INCLUDED.
8. REFER TO CSPP FOR FULL SAFETY AND PHASING REQUIREMENTS.
9. CONTRACTOR SHALL IMPLEMENT APPROVED SPCD IN ACCORDANCE WITH SECTION 01300 OF THE
SPECIFICATIONS.
10. CONTRACTOR TO COORDINATE WITH THE ENGINEER AND OWNER FOR COMPLETION AND SUBMITTAL OF
FAA FORM 7460-1.
0'
0'
NORTH APRONSOUTH APRON
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
RUNWAY 17-35
NORTH TAXIWAY
REFUGE
SOUTH TAXIWAY
REFUGE
SECURITY GATE
STAGING AREA
LOW-LEVEL
BARRICADES
G-04
EXISTING WINDCONE
RUNWAY OFA/OFZ
RUNWAY
CLOSURE X
RUNWAY
CLOSURE X
G-04
G-04
WEST APRON
TAXIWAY B
TAXIWAY B1
TAXIWAY A1TAXIWAY A
WORK SCOPE DURATION RUNWAY CLOSURE
CRACK SEAL, AC PATCHING -
MAJOR WIDE CRACK, AC PATCHING
(PHASE 1)
10 DAYS 10 DAYS
SURFACE SEAL (PHASE 2) 1 DAY 1 DAY
PAVEMENT MARKING (PHASE 3) 1 DAY 1 DAY
TOTAL 12 DAYS 12 DAYS
THE SCOPE OF THIS PROJECT HAS BEEN
COORDINATED WITH THE 2026 ODAV PMP CYCLE TO
AVOID DUPLICATION OF TREATMENTS.
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text N
MULTICORELINK:SITE & SAFETY NOTES & DETAILS-G-04
MULTICORELINK:SITE & SAFETY NOTES & DETAILS-G-04
G-04
SITE & SAFETY NOTES & DETAILS
GENERAL WORK AREA NOTES:
1. THE CONTRACTOR SHALL BE RESTRICTED TO USE THE ENTRANCE AND HAULING
ROUTES SHOWN ON THE DRAWINGS. FOLLOW AIRPORT AND FAA SAFETY
PROCEDURES WHEN MOVING EQUIPMENT OR PERSONNEL. NO PERSONAL
VEHICLES SHALL BE ALLOWED OUTSIDE OF THE STAGING AREA. THE AIRPORT
MAY IMMEDIATELY REMOVE ANY PERSONNEL AND EQUIPMENT FROM THE SITE
IN VIOLATION OF AIRPORT SAFETY AND SECURITY PROCEDURES.
2. ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL REMAIN ON PAVEMENT
TO THE FURTHEST EXTENT POSSIBLE. ANY DAMAGE TO LIGHTS OR OTHER
AIRPORT NAVIGATIONAL AIDS SHALL BE REPORTED IMMEDIATELY.
3. LIMIT EQUIPMENT HEIGHT TO 12 FEET UNLESS OTHERWISE APPROVED BY THE
ENGINEER.
4. LIMITS STOCKPILES TO 12 FEET IN HEIGHT AND AT LEAST 125 FEET FROM THE
RUNWAY CENTERLINE AND 44.5 FEET FROM TAXIWAY CENTERLINE.
5. IN THE EVENT OF AN EMERGENCY, MOVE ALL EQUIPMENT AND PERSONNEL TO
THE CONTRACTOR'S STAGING AREA UNLESS OTHERWISE DIRECTED BY THE
ENGINEER.
6. ACCESS TO ANY WORK AREA MUST BE AUTHORIZED BY THE ENGINEER PRIOR
TO WORK IN THAT AREA. NOTIFY THE ENGINEER A MINIMUM OF 72 HOURS
PRIOR TO BEGINNING WORK IN ANY AREA.
7. SEE SECTION 01300 OF THE TECHNICAL SPECIFICATIONS. ANY WORK WITHIN 60
FEET OF THE RUNWAY 17-35 CENTERLINE OR WITHIN 240 FEET OF THE RUNWAY
END WILL REQUIRE A RUNWAY CLOSURE.
8. PLACE LOW LEVEL BARRICADES AS SHOWN AND AS DESCRIBED IN SECTION
01300 OF THE TECHNICAL SPECIFICATIONS.
9. IN THE EVENT OF NIGHTTIME CONSTRUCTION, LIGHTING EQUIPMENT MUST
ADEQUATELY ILLUMINATE THE WORK AREA PER AC 150/5370-2G OPERATIONAL
SAFETY ON AIRPORTS DURING CONSTRUCTION.
10. FOR ADDITIONAL REQUIREMENTS, REFER TO SECTION 01300, AIRPORT SAFETY,
IN THE TECHNICAL SPECIFICATIONS.
11. WHILE WORKING IN ANY AREA, THE CONTRACTOR SHALL HAVE AN AIRPORT
RADIO CAPABLE OF MONITORING THE AIRPORT UNICOM FREQUENCY:
CTAF/UNICOM: 122.90 MHz
RADIO TRAINING IS REQUIRED FOR STAFF ASSIGNED TO MONITOR THE RADIO.
12. CONTRACTOR SHALL MOVE ALL EQUIPMENT TO THE STAGING AREA AT THE
COMPLETION OF EACH WORK SHIFT.
13. PLACE CLOSURE CROSSES (X's) OFF THE ENDS OF THE RUNWAY DURING
RUNWAY CLOSURES AS DIRECTED BY THE ENGINEER.
14. DISENGAGE LIGHTING CIRCUITS, DARKEN LIGHT FIXTURES, AND COVER
GUIDANCE SIGNS AS DIRECTED BY THE AIRPORT TO PREVENT AIRCRAFT FROM
TAXIING TOWARDS CLOSED WORK AREAS. ALL AIRPORT LIGHTING SHALL BE
DISENGAGED DURING A RUNWAY CLOSURE.
15. RUNWAY CLOSURES WILL REQUIRE THE SHUTDOWN OF AIRPORT NAVAIDS.
AIRPORT SPONSOR TO SUBMIT RUNWAY CLOSURE STRATEGIC EVENT
SUBMISSION (SEC) FORM A MINIMUM OF 45 DAYS PRIOR TO THE ANTICIPATED
CONSTRUCTION START DATE.
16. PAPI SHUTDOWN WILL BE MADE PUBLIC TO AIRFIELD USERS VIA NOTAM.
17. CONTRACTOR SHALL PREVENT WILDLIFE ATTRACTANTS PER FAA AC
150/5200-33C HAZARDOUS WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS.
18. SPECIFIC WEATHER CONDITIONS MUST BE MET FOR SURFACE SEAL
APPLICATION. CONTRACTOR TO COORDINATE WITH ENGINEER TO DETERMINE IF
SURFACE SEAL APPLICATION IS FEASIBLE A MINIMUM OF 12 HOURS BEFORE
PLANNED APPLICATION. IF UNPREDICTED WEATHER OCCURS, THE ENGINEER
MAY POSTPONE APPLICATION. SEE WEATHER LIMITATION SPECIFICATIONS
P-608-4.2 IN THE TECHNICAL SPECIFICATIONS.
19. SPECIFIC WEATHER CONDITIONS MUST BE MET FOR PAVEMENT MARKING
APPLICATION. CONTRACTOR TO COORDINATE WITH ENGINEER TO DETERMINE IF
PAVEMENT MARKING APPLICATION IS FEASIBLE A MINIMUM OF 12 HOURS
BEFORE PLANNED APPLICATION. IF UNPREDICTED WEATHER OCCURS, THE
ENGINEER MAY POSTPONE APPLICATION. SEE WEATHER LIMITATIONS SECTION
P-620-3.1 IN THE TECHNICAL SPECIFICATIONS.
20. ENGINEERING CONSULTANT POINT-OF-CONTACT:
RYAN HALVORSON, PE
503-419-2130
WORK IN SAFETY AREAS AND OBJECT FREE AREAS:
1. RUNWAY SAFETY AREA (RSA) AND TAXIWAY SAFETY AREA (TSA) AREAS ARE
DEFINED AS AREAS THAT SHALL BE CLEARED AND GRADED AND HAVE NO
POTENTIALLY HAZARDOUS RUTS, HUMPS, DEPRESSIONS, OR OTHER SURFACE
VARIATIONS. THE MAXIMUM SLOPE ANYWHERE WITHIN A RUNWAY OR TAXIWAY
SAFETY AREA SHALL BE 5%. IN TRANSITIONS FROM PAVED TO UNPAVED AREAS, A
3 INCH MAXIMUM VERTICAL DROP IS ALLOWED. THE RUNWAY AND TAXIWAY SAFETY
AREAS SHALL BE MAINTAINED AT ALL TIMES WHEN THE RUNWAY AND TAXIWAY IS
OPEN TO AIR TRAFFIC. PERSONNEL, EQUIPMENT, OR MATERIAL WITHIN A RUNWAY
SAFETY AREA AT ANY TIME REQUIRES A CLOSURE. SAFETY AREAS THAT ARE
CLOSED FOR CONSTRUCTION MUST MEET THESE CRITERIA PRIOR TO REOPENING.
2. THE CONTRACTOR SHALL ANTICIPATE THE CONSTRUCTION OF TEMPORARY FILLS,
COMPACTION, AND GRADING TO MEET THE REQUIREMENTS OF "WORK IN SAFETY
AREAS AND OBJECT FREE AREAS" PRIOR TO REOPENING RUNWAYS AND TAXIWAYS.
THIS WORK IS CONSIDERED INCIDENTAL TO VARIOUS WORK ITEMS AND SEPARATE
PAYMENT WILL NOT BE MADE.
3. CONTRACTOR SHALL NOT ENTER ANY ACTIVE RSA OR TSA WITHOUT
AUTHORIZATION FROM THE AIRPORT. ALL EQUIPMENT, TOOLS, AND MATERIALS
SHALL BE MOVED TO STAGING AREAS PRIOR TO REOPENING A RUNWAY OR
TAXIWAY.
4. SAFETY AREA LIMITS:
RUNWAY 17-35 - 60 FEET FROM ; 240 FEET FROM RUNWAY ENDS/THRESHOLD
TAXIWAYS - 24.5 FEET FROM
5. RUNWAY AND TAXIWAY OBJECT FREE AREAS ARE DEFINED AS AREAS THAT SHALL
BE CLEAR OF FIXED OR MOVABLE OBJECTS. EQUIPMENT NOT IN USE, AND MATERIAL
STOCKPILES AND STORAGE SHALL BE PLACED AT LEAST 125 FEET FROM ANY
RUNWAY CENTERLINE. NO WORK MAY OCCUR IN TAXIWAY OBJECT FREE AREAS
UNLESS THE TAXIWAY IS CLOSED TO AIRCRAFT TRAFFIC. NO STORAGE OF
EQUIPMENT, MATERIALS OR STOCKPILES IS ALLOWED WITHIN TAXIWAY OBJECT
FREE AREAS.
C L C L
C L C L
YELLOW
RUNWAY
LC
(TYP)
(TYP)
NOTES:
1. RUNWAY CLOSURE CROSSES SHALL BE
PROVIDED, INSTALLED, MAINTAINED,
AND REMOVED BY THE CONTRACTOR.
2. PLACE CLOSING "X" DIRECTLY OUTSIDE
OF BOTH ENDS OF THE RUNWAY, AS
CLOSE TO THE EDGE OF PAVEMENT AS
IS REASONABLE TO COMPLETE RUNWAY
WORK.
3. THE CROSSES SHALL BE SECURED
WITH WEIGHTED MATERIALS LESS THAN
3 INCHES IN HEIGHT. SANDBAGS OR
EQUIVALENT ARE NOT ALLOWED.
4. SEE FIGURE 2-3 OF FAA AC 150-5370-2G
OPERATIONAL SAFETY ON AIRPORTS
DURING CONSTRUCTION FOR
MARKINGS OF A TEMPORARY RUNWAY
CLOSURE.
SCALE: N.T.S.
G-04
RUNWAY CLOSURE "X"
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \S
IT
E
SA
FE
TY
N O
TE
S
D
ET
AI
LS
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
ORANGE / WHITE STRIPE
HIGH REFLECTIVE SHEETING
INSTALL BATTERY OR SOLAR POWERED
RED LENS STANDARD BARRICADE LIGHT
8'-0"
10"
ELEVATION
FILL WITH WATER
OR SAND
ORANGE BODY
SELF-CONNECTING
PINS
NOTES:
1. BARRICADES SHALL MEET THE REQUIREMENTS OF AC 150/5370-2G OPERATIONAL SAFETY ON
AIRPORTS DURING CONSTRUCTION.
2. PLACE BARRICADE PER THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. BARRICADES SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING, FILLING, EMPTYING, MOVING, MAINTAINING AND PROTECTING
BARRICADES THROUGHOUT THE DURATION OF THE PROJECT.
4. LIGHTS ARE TO BE NO FARTHER APART THAN 10' WHEN PLACED.
5. BARRICADES SHALL BE NO FURTHER THAN 10' APART.
6. BARRICADES SHALL BE COVERED WITH REFLECTIVE SHEETING OR OTHER MATERIAL APPROVED BY
THE ENGINEER.
7. BARRICADES SHALL BE APPROPRIATELY WEIGHTED DOWN TO RESTRICT MOVEMENT FROM HIGH
WINDS OR PROP WASH.
SCALE: N.T.S.
G-04
LOW LEVEL BARRICADE DETAIL
VARIES 6'-0"
RUNWAY/TAXIWAY/APRON RE-OPENING CHECKLIST:
1. BACKFILL ANY OPEN TRENCHES WITHIN THE RSA AND/OR TSA, OR COVER THE
EXCAVATIONS APPROPRIATELY TO ALLOW FOR THE SAFE OPERATION OF THE
HEAVIEST AIRCRAFT OPERATING ON THE AFFECTED RUNWAY OR TAXIWAY
SUCH THAT THE AIRCRAFT WILL NOT BE DAMAGED.
2. ENSURE THERE ARE NOT POTENTIALLY HAZARDOUS RUTS, HUMPS,
DEPRESSIONS, OR OTHER SURFACE VARIATIONS WITHIN THE RSA AND/OR TSA.
THE RSA AND TSA MUST BE CAPABLE OF SUPPORTING OCCASIONAL PASSAGE
OF AIRCRAFT DURING DRY CONDITIONS WITHOUT CAUSING STRUCTURAL
DAMAGE TO THE AIRCRAFT.
3. ENSURE THAT IMPACTED PAVEMENT EDGES DO NOT EXCEED 3 INCHES
VERTICALLY.
4. IF RE-OPENING A RUNWAY AFTER STANDARD SEAL (P-608) APPLICATION,
ENSURE THAT FRICTION TESTING HAS BEEN COMPLETED AND ACCEPTED IN
ACCORDANCE WITH ITEM P-608 IN THE TECHNICAL SPECIFICATIONS. USE
APPROVED CONTINUOUS FRICTION MEASURING EQUIPMENT (CFME) AND
DETERMINE IF RESULTS ARE PASSING OR FAILING BASED ON THE APPLICATION
MAINTENANCE PLANNING FRICTION LEVELS SHOWN IN TABLE 3-2 OF FAA AC
150/5320-12C MEASUREMENT, CONSTRUCTION, AND MAINTENANCE OF
SKID-RESISTANT AIRPORT PAVEMENT SURFACES. THE RPR SHALL BE PRESENT
FOR FRICTION TESTING, AND THE CONTRACTOR SHALL PROVIDE THE RPR
WITH A WRITTEN REPORT OF PASSING TEST RESULTS FOR ACCEPTANCE
PRIOR TO RE-OPENING THE RUNWAY.
5. REMOVE ALL CONSTRUCTION DEBRIS, TRASH, AND ALL FOD FROM THE
PAVEMENT.
6. REMOVE BARRICADES AND CLOSURE MARKERS.
WORK SCHEDULE AND PHASING NOTES:
1. ALL WORK SHALL BE COMPLETED WITHIN 12 CONTINUOUS CALENDAR DAYS OF
CONTRACT NOTICE TO PROCEED.
2. NOTICE TO PROCEED FOR CONSTRUCTION IS ANTICIPATED JULY 2026, AT THE
CONVENIENCE OF THE OWNER.
3. WORK EXEMPT FROM THE 12 CALENDAR DAY CONTRACT PERIOD INCLUDES
THE SECOND APPLICATION OF PAVEMENT MARKINGS. A CONTINUOUS 1
CALENDAR DAY (24 HOUR) CLOSURE FOR THE SECOND APPLICATION OF
PAVEMENT MARKINGS WILL BE PERMITTED, A MINIMUM OF 30 DAYS AFTER
PAVEMENT REHABILITATION HAS BEEN COMPLETED.
4. COORDINATE WORK AREA CLOSURES WITH THE AIRPORT TO ENSURE ACCESS
AS NEEDED TO MAINTAIN AIRPORT OPERATIONS TO THE FURTHEST EXTENT
POSSIBLE.
6. OBJECT FREE AREA LIMITS
RUNWAY 17-35 - 125 FEET FROM
TAXIWAYS - 44.5 FEET FROM
7. RUNWAY AND TAXIWAY SAFETY AREA AND RUNWAY AND TAXIWAY OBJECT FREE
AREA CRITERIA MUST BOTH BE MET PRIOR TO OPENING AN IMPACTED RUNWAY
OR TAXIWAY.
8. WORK WITHIN 125 FEET OF RUNWAY CENTERLINE OR WITHIN 240 FEET OF
RUNWAY END REQUIRES A RUNWAY CLOSURE.
EC-01
EROSION CONTROL PLAN
EC-01
EROSION CONTROL PLAN
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \E
R O
SI
O
N C
O N
TR
O
L
PL
AN
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBJECT FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
WORK AREA BOUNDARY
DITCH INLET PROTECTION
PER
CONTRACTOR STAGING
AREA
LOW LEVEL BARRICADES
CONTRACTOR
HAUL/ACCESS ROADS
NOTES:
1. PLACE SEDIMENT BARRIER AROUND SOIL STOCK PILES AS NEEDED.
2. HYDROSEED ANY DISTURBED SURFACES, AT NO COST TO THE OWNER. HYDROSEEDING SHALL NOT OCCUR ON
GRAVEL SHOULDERS. THIS WORK SHALL BE INCIDENTAL TO OTHER WORK ITEMS.
3. CONSTRUCTION STAGING AREA TO CONTAIN STOCKPILE, PORTABLE TOILET, CONSTRUCTION FUEL, AND
MATERIALS.
EC-01
ANTICIPATED PROJECT SCHEDULE:
1. ANTICIPATED START DATE FOR WORK IS JULY 2026. WORK INCLUDES PAVEMENT REHABILITATION CONSISTING OF
CRACK REPAIR, ASPHALT PATCHING, SURFACE SEAL, AND PAVEMENT MARKINGS.
2. ANTICIPATED END DATE FOR WORK IS AUGUST 2026; NO TEMPORARY STOP DATES ARE ANTICIPATED.
DITCH INLET
PROTECTION
EC-01
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
NORTH TAXIWAY
REFUGE
SOUTH TAXIWAY
REFUGE
SECURITY GATE
0'
0'
RUNWAY 17-35
DITCH INLET
PROTECTION
EC-01
EXISTING WINDCONE
RUNWAY OFA/OFZ
EC-01
DITCH PROTECTION
BIO-FILTER BAG
NO SCALE
NOTES:
1. STACKING OF BAGS REQUIRED USING (2)
1"X2" WOOD STAKES OR APPROVED
EQUAL PER BAG.
2. SURFACE MUST BE SMOOTH BEFORE
APPLICATION
3. CHECK DAMS CAN BE CONSTRUCTED
USING STRAW WATTLES OR OTHER
MATERIALS AS APPROVED BY THE
ENGINEER
LOW-LEVEL
BARRICADES
G-04
STAGING AREA
WEST APRON
TAXIWAY B
TAXIWAY B1
TAXIWAY A1TAXIWAY A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text N
C-01
DEMOLITION PLAN
C-01
PAVEMENT MARKING REMOVAL PLAN
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
RUNWAY 17-35
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \D
EM
O
LI
TI
O N
P
LA
N .d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBJECT FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
WORK AREA BOUNDARY
RUNWAY NUMERAL
REMOVAL
RUNWAY CENTERLINE
MARKING REMOVAL
TAXIWAY CENTERLINE
MARKING REMOVAL
HOLD BAR MARKING
REMOVAL
AIRCRAFT TIE DOWN
MARKING REMOVAL
DEMOLITION NOTES:
1. PROTECT EXISTING STRUCTURES, UTILITIES AND
FEATURES TO REMAIN.
2. PROTECT ALL EXISTING PAVEMENT MARKINGS UNLESS OTHERWISE NOTED.
ANY DAMAGED PAVEMENT MARKINGS NOT IDENTIFIED FOR REMOVAL SHALL
BE RESTORED AT NO COST TO THE OWNER.
3. ASPHALT DEMOLITION EXTENTS FOR ASPHALT PATCH WILL BE INDICATED BY
THE ENGINEER. CONTRACTOR WILL BE PROVIDED WITH MEASURED ASPHALT
DEMOLITION QUANTITY INFORMATION.
4. PAVEMENT MARKING REMOVAL AMOUNT SHALL BE:
· 50% REMOVAL FOR PAVEMENT AREAS TO RECEIVE STANDARD SEAL COAT
WHEN MARKINGS ARE NOT RELOCATED.
· 100% REMOVAL FOR AREAS TO RECEIVE STANDARD SEAL COAT WHEN
MARKINGS ARE TO BE RELOCATED, AS SHOWN ON THE PLAN. SEE ITEM P-620
IN THE TECHNICAL SPECIFICATIONS.
5. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON FIELD SURVEY
AND/OR GIS DATA UTILIZED AT THE TIME OF DESIGN AND WILL BE
FIELD-VERIFIED. DEVIATIONS ARE EXPECTED DUE TO RELOCATIONS OF
EXISTING MARKINGS AND CONDITION CHANGES.
HOLD BAR MARKING
REMOVAL (TYP)
RUNWAY CLOSURE
"X"
RUNWAY CLOSURE
"X"
G-03
HOLD BAR MARKING
REMOVAL, 100% (TYP)
HOLD BAR MARKING
REMOVAL (TYP)
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
NORTH TAXIWAY
REFUGE
SOUTH TAXIWAY
REFUGE
0'
0'
EXISTING WINDCONE
RUNWAY OFA/OFZ
G-03
RUNWAY AND TAXIWAYS PAVEMENT MARKINGS
SHALL BE INSTALLED PRIOR TO OPENING
PAVEMENT MARKINGS REMOVAL
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 1,473 5,999
TOTALS 1,473 5,999
PROJECT TOTAL
(WHITE & YELLOW) 7,472
WEST APRON
TAXIWAY B
TAXIWAY B1
TAXIWAY A1TAXIWAY A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text N
MULTICORELINK:CONSTRUCTION SITE & SAFETY PHASING PLAN-C-03
MULTICORELINK:CONSTRUCTION SITE & SAFETY PHASING PLAN-C-03
C-02
CRACK SEAL AND PAVEMENT REPAIR PLAN
C-02
CRACK SEAL AND PAVEMENT REPAIR PLAN
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \C
R
AC
K R
EP
AI
R .d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBJECT FREE ZONE
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
CRACK SEAL WORK AREA
CRACK REPAIR NOTES:
1. PRIOR TO CRACK REPAIR, CRACK LOCATIONS WILL
BE INDICATED WITH TEMPORARY MARKS BY THE
ENGINEER. CONTRACTOR WILL BE PROVIDED WITH
MEASURED CRACK QUANTITY INFORMATION.
2. PERFORM EXISTING PAVEMENT MARKING
REMOVAL BEFORE CRACK SEALING AND
STANDARD SEAL COAT. REMOVED PAVEMENT
MARKINGS SHALL BE REPLACED PRIOR TO
OPENING RUNWAY OR TAXIWAY TO AIR TRAFFIC.
3. CONTRACTOR SHALL IMMEDIATELY NOTIFY
ENGINEER IF ANY DISCREPANCY IN CRACK LENGTH
IS OBSERVED.
4. CONTRACTOR SHALL NOTIFY ENGINEER 72 HOURS
MINIMUM PRIOR TO CRACK REPAIR WORK.
5. PERFORM CRACK REPAIR PRIOR TO SURFACE
SEAL APPLICATION.
6. FOR CRACK SEALING DETAIL, REFER TO
7. FOR AC PATCHING - WIDE CRACK REPAIR DETAIL,
REFER TO
8. FOR AC PATCHING DETAIL, REFER TO
GENERAL NOTES:
1. AIRPORT USES UNICOM RADIO FREQUENCY OF 122.9.
PERFORM RADIO CHECK PRIOR TO ENTERING
AIRPORT.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO USE
CAUTION AROUND RUNWAY LIGHTS, TAXIWAY
LIGHTS, TAXIWAY REFLECTORS, AND CONNECTOR
SIGNS.
3. CONTRACTOR CHANGES TO PHASING PLAN
REQUIRES APPROVAL FROM THE ENGINEER.
C-04
CRACK SEALING
KEY NOTE # CRACK REPAIR (LF)
1 101 2 130 3 100 4 2,984 5 38
6 79
7 120
8 66
9 384
SUBTOTAL 4,002
AC PATCHING - WIDE CRACK REPAIR
KEY NOTE # CRACK REPAIR (LF)
1 40
2 76
3 183
4 2,110
5 31
6 15
7 50
8 34
9 189
TOTAL 2,728
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
0'
0'
RUNWAY 17-35
C-04
NORTH TAXIWAY
REFUGE
SOUTH TAXIWAY
REFUGE
EXISTING WINDCONE
RUNWAY OFA/OFZ
AC PATCHING
KEY NOTE # LENGTH (FT) WIDTH (FT) AREA (SF)
1 7 7 49
TOTAL 49
C-04
WEST APRON
TAXIWAY B
TAXIWAY B1
TAXIWAY A1TAXIWAY A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text N
MULTICORELINK:DETAILS-C-12
MULTICORELINK:DETAILS-C-12
C-03
SURFACE SEAL PLAN
C-03
SURFACE SEAL PLAN
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \S
U R
FA
C
E
SE
AL
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBJECT FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE
AREA
STANDARD SURFACE
SEAL AREA
NOTES:
1. AIRPORT USES UNICOM RADIO FREQUENCY OF 122.9. PERFORM RADIO CHECK PRIOR TO ENTERING AIRPORT.
2. REMOVE EXISTING PAVEMENT MARKINGS PRIOR TO CRACK SEALING AS SHOWN ON DEMOLITION PLAN AND AS DESCRIBED IN THE SPECIFICATIONS. PERFORM ALL PAVEMENT REPAIR PRIOR TO SURFACE SEAL APPLICATION.
3. PROVIDE SURFACE PREPARATION FOR ALL AREAS TO RECEIVE STANDARD
SURFACE SEAL. SEE DETAIL FOR PAVEMENT EDGE CLEANING.
4. ALL PAVEMENT MARKINGS WITHIN WORK AREAS TO BE REMARKED AFTER SURFACE SEAL, REFER TO PAVEMENT MARKING
PLANS
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO USE CAUTION AROUND RUNWAY LIGHTS, TAXIWAY LIGHTS, TAXIWAY
REFLECTORS, CONNECTOR SIGNS, AND OTHER STRUCTURES.
6. COORDINATE SURFACE SEAL LIMITS WITH THE ENGINEER IN THE FIELD PRIOR TO BEGINNING CONSTRUCTION.
7. OIL AND FUEL RESIDUE MAY BE PRESENT FROM AIRCRAFT OPERATIONS. CONTRACTOR SHALL TAKE ADDED CARE TO PERFORM SURFACE PREPARATION PRIOR TO SURFACE SEAL APPLICATION. SEE ITEM P-101 IN THE SPECIFICATIONS.
8. PRESERVE AND PROTECT ALL PAVEMENT MARKINGS OUTSIDE OF WORK AREAS. DAMAGE TO MARKINGS OUTSIDE OF
WORK AREAS WILL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
9. THE CONTRACTOR MAY BEGIN TESTING THE SKID RESISTANCE OF THE APPLIED STANDARD SEAL (P-608) AFTER IT HAS FULLY CURED, GENERALLY 8 TO 36 HOURS AFTER APPLICATION. THE RUNWAY MUST HAVE PASSING FRICTION TEST
RESULTS PRIOR TO OPENING TO TRAFFIC. SEE ITEM P-608 IN THE SPECIFICATIONS.
STANDARD SEAL COAT
KEY NOTE # STANDARD SEAL COAT (SY)
WORK AREA #1
1 546
2 1,112
3 4,421
4 20,657
5 1,106
6 550
7 486
1,865
TOTAL 31,562
C-04
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
0'
0'
RUNWAY 17-35
NORTH TAXIWAY
REFUGE
SOUTH TAXIWAY
REFUGE
WEST APRON
TAXIWAY B
TAXIWAY B1
TAXIWAY A1
EXISTING WINDCONE
RUNWAY OFA/OFZ
TAXIWAY A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
C-04
CRACK SEAL, AC PATCHING, AND SURFACE SEAL DETAILS
C-04
CRACK SEALING DETAIL
SCALE: NTS
NOTES:
1. VERIFY CRACK LOCATIONS AND QUANTITIES FOR CLEANING AND FILLING
WITH ENGINEER PRIOR TO WORK.
2. FOR UNSEALED CRACKS, ROUTE AND CLEAN CRACKS OF ALL DEBRIS AND
VEGETATION, THEN FILL WITH RUBBERIZED ASPHALT CRACK SEALANT.
SQUEEGEE USE IS NOT ALLOWED FOR UNSEALED CRACKS.
3. FOR PREVIOUSLY SEALED CRACKS, CLEAN CRACKS WITH HEAT LANCE
AND FILL WITH RUBBERIZED ASPHALT CRACK SEALANT. SQUEEGEE USE
IS ALLOWED FOR PREVIOUSLY SEALED CRACKS.
4. MORE THAN ONE LIFT OF SEALANT MAY BE NECESSARY TO MEET THE
REQUIREMENTS OF SPECIFICATION ITEMS P-101 AND P-605.
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \D
ET
AI
LS
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
PAVEMENT EDGE CLEANING DETAIL
NO SCALE
2'
1.5" EDGE EXPOSURE
REMOVE OVERGROWN
SOD, MOSS, SOIL, VEGETATION
AND THOROUGHLY CLEAN
PRIOR TO SEAL COAT
EXISTING
PAVEMENT
SECTION
FINISH GRADE
MATCH EXISTING
GRADE
C-04
EXISTING
BASE
ROTOMILL OR
SAWCUT
SEAL EDGE OF FINISHED PATCH
WITH CRACK SEAL MATERIAL (TYP.)
HMAC PAVEMENT
NOM. THKN. - 3" MIN OR MATCH EXISTING
THICKNESS, (3" MAX. LIFT), WHICHEVER IS
GREATER. 92% COMPACTION PER ODOT
00744 CONSTRUCTION STANDARDS.
3/4" - 0" DENSE GRADED ODOT
AGGREGATE BASE COURSE, 2" MIN.
THICKNESS. COMPACT TO 100% ASTM
D-698 PER ODOT 00641
CONSTRUCTION STANDARDS.
SCALE: N.T.S.
AC PATCHING-WIDE CRACK REPAIR DETAIL 3
C-04
NOTES:
1. EXACT LENGTH WILL BE IDENTIFIED IN THE FIELD BY THE
ENGINEER PRIOR TO CONSTRUCTION.
2. TACK ASPHALT FACES OF SAWCUTS. TACK COAT AND
RUBBERIZED ASPHALT CRACK SEALANT SHALL BE
INCIDENTAL TO OTHER APPLICABLE BID ITEMS. NO SEPARATE
MEASUREMENT OR PAYMENT WILL BE MADE.
3. RECOMPACT EXISTING BASE ROCK TO 100% OF ASTM D-698
PRIOR TO CONSTRUCTING NEW AGGREGATE BASE.
4. AGGREGATE BASE COMPACTION TO BE TESTED PER ODOT
SPECIFICATION 00641.44; ASPHALT CONCRETE COMPACTION
TO BE TESTED PER ODOT SPECIFICATION 00744.49.
PLAN
SECTION
REPAIR LIMITS
(SAWCUT LINE OR
ROTOMILLED EDGE)
PAVEMENT CRACKS WITH
WIDTH GREATER THAN 1 1/2"
24" WIDE
APPLY TACK (P-603) TO FACE
OF SAWCUT OR MILLED EDGE
(TYP.)
VARIES
24"
SCALE: N.T.S.
AC PATCHING DETAIL
EXISTING SUBGRADE
SAWCUT (TYP.) EXISTING PAVEMENT SECTION. DEPTHS OF
EXISTING A.C. AND BASE ROCK
AS NOTED ON THE PLANS.
SEAL EDGE OF FINISHED PATCH
WITH CRACK SEAL MATERIAL (TYP.)
HMAC PAVEMENT NOM. THKN. = 3" MIN OR MATCH
EXISTING (WHICHEVER IS GREATER)
COMPACTION = 92% MIN PER ODOT 00744
CONSTRUCTION STANDARDS.
4"-0 DENSE GRADED ODOT AGG. BASE NOM. THKN. = 4"
MIN OR MATCH EXISTING (WHICHEVER IS GREATER)
COMPACTION = 100% OF ASTM D-698 PER ODOT 00641
CONSTRUCTION STANDARDS.
PLAN
SECTION
REPAIR LIMITS
(SAWCUT LINE)
APPLY TACK (P-603) TO FACE
OF SAWCUT EDGE (TYP.)
DISTANCE VARIES
LO
C
AT
IO
N A
S
SH
O W
N O
N P
LA
N
SPAVEMENT PATCH
LIMITS
LO
C
AT
IO
N A
S
SH
O W
N O
N P
LA
N
S
C-04
REMOVE EXISTING GEOTEXTILE FABRIC OR GEOGRID IF
WITHIN REPAIR LIMITS. PLACE NEW GEOTEXTILE FABRIC
OR GEOGRID ON TOP ON COMPACTED SUBGRADE.
FOR UNSEALED CRACKS:
ROUTE, CLEAN, AND SEAL
FOR PREVIOUSLY SEALED
CRACKS: HEAT, CLEAN, AND SEAL
AREA OF CRACKED/
DISTRESSED PAVEMENT
6" BENCH OF EXISTING
AGGREGATE
EXISTING
AGGREGATE BASE
6" BENCH OF EXISTING
AGGREGATE BASE
6" 6"
C-05
PAVEMENT MARKING OVERALL PLAN
C-05
PAVEMENT MARKING OVERALL PLAN
SCALE: 1"=150'
150 150 300
SCALE OF FEET
SCALE: 1"=150'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBSTACLE FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
WORK AREA BOUNDARY
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
NOTES:
1. PROPOSED WORK AREA BOUNDARY ON THIS SHEET REFERS TO
PROPOSED CRACK SEAL AREAS AND STANDARD SEAL COAT AREAS.
SEE PLANS FOR DETAILS.
2. THE CONTRACTOR SHALL SURVEY PAVEMENT MARKING LOCATIONS.
3. APPLY FIRST COAT OF PAVEMENT MARKINGS AFTER STANDARD SEAL
COAT AND BEFORE OPENING AREAS TO TRAFFIC.
4. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS PER
SPECIFICATIONS.
5. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF PAINT
WITH THE FOLLOWING COVERAGE:
· FIRST COAT: 30% OF SPECIFIED APPLICATION RATE WITHOUT GLASS
BEADS.
· SECOND/FINAL COAT: 100% OF SPECIFIED APPLICATION RATE WITH
GLASS BEADS.
SEE ITEM P-620 IN THE TECHNICAL SPECIFICATIONS.
6. SEE FAA FORM 7460-1 FOR TALL CONSTRUCTION EQUIPMENT.
7. CONTRACTOR TO MEET MARKING STANDARDS PER FAA AC
150/5340-1M STANDARDS FOR AIRPORT MARKINGS.
8. PROPOSED PAVEMENT MARKING QUANTITIES ARE BASED ON FIELD
SURVEY AND/OR GIS DATA UTILIZED AT THE TIME OF DESIGN AND WILL
BE FIELD-VERIFIED. DEVIATIONS ARE EXPECTED DUE TO
RELOCATIONS OF EXISTING MARKINGS AND CONDITION CHANGES.
SEE
SHEET
C-06
SEE
SHEET
C-07
SEE
SHEET
C-08
SEE
SHEET
C-10
SEE
SHEET
C-09
THE DALLES-CALIFORNIA HWY (HWY 97)
CHILOQUIN BLVD
RUNWAY 17-35
PAVEMENT MARKINGS
WORK AREA YELLOW MARKINGS (SF) WHITE MARKINGS (SF)
1 1,556 6,000
TOTALS 1,556 6,000
PROJECT TOTAL
(WHITE & YELLOW) 7,556
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text N
MULTICORELINK:PAVEMENT MARKING PLAN-C-05
MULTICORELINK:PAVEMENT MARKING PLAN-C-05
MULTICORELINK:PAVEMENT MARKING PLAN-C-06
MULTICORELINK:PAVEMENT MARKING PLAN-C-06
MULTICORELINK:PAVEMENT MARKING PLAN-C-07
MULTICORELINK:PAVEMENT MARKING PLAN-C-07
MULTICORELINK:PAVEMENT MARKING PLAN-C-09
MULTICORELINK:PAVEMENT MARKING PLAN-C-09
MULTICORELINK:PAVEMENT MARKING PLAN-C-08
MULTICORELINK:PAVEMENT MARKING PLAN-C-08
120.0'
80.0'
120.0'
80.0' 80.0'
120.0' 120.0'
80.0'40.0'
.3
20.0' 10+00 15+00
.9
'100.0'
C-06
PAVEMENT MARKING PLAN
C-06
PAVEMENT MARKING PLAN
SCALE: 1"=40' 40 40 80
SCALE OF FEET
SCALE: 1"=40'
RUNWAY 17-35
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
FEBRUARY 2026
OREGON DEPARTMENT OF AVIATION
CHILOQUIN STATE AIRPORT (2S7)
RUNWAY, TAXIWAY, AND APRON SURFACE SEAL
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
O re go n
D ep ar tm en t o f A vi at io n\
- C hi lo qu in S ta te
R un w ay
, T ax iw ay
, a nd
A pr on S ur fa ce S ea l -
P ha se I
- D es ig n\
C
AD
W
O R
KI
N
G \P
AV
EM
EN
T
M
AR
KI
N
G P
LA
N
.d w g
AS NOTED40097.137.01
CENTURY
WEST
E N G I N E E R I N G
PORTLAND OFFICE
5500 MEADOWS ROAD
SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
JAK
TDC
RHH
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
A.I.P. NO. 3-41-0012-011-2025
BID SET
78906PE
OREGON
EXPIRES: 6/30/27
SEPT 11 , 2012
RYAN HA J IME HA LVORSO
N
ENGINEER
RE
GIS
TERED PROFESSIONAL
DIGITALLY SIGNED
ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C -0
ALL PAVEMENT MARKINGS FOR RUNWAY AND
TAXIWAYS SHALL BE INSTALLED PRIOR TO OPENING
RUNWAY 35 PAVEMENT
MARKINGS PER
RUNWAY CENTERLINE
PER
HOLD BAR MARKINGS
PER
C-11
C-12
C-11
RUNWAY OFA/OFZ
SOUTH TAXIWAY
REFUGE
LEGEND:
RUNWAY SAFETY AREA
OBJECT FREE AREA
OBSTACLE FREE ZONE
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
WORK AREA BOUNDARY
WHITE PAVEMENT MARKING
YELLOW PAVEMENT MARKING
NOTES:
1. PROPOSED WORK AREA BOUNDARY ON THIS SHEET REFERS TO PROPOSED CRACK SEAL AREAS AND STANDARD
SEAL COAT AREAS. SEE PLANS FOR DETAILS.
2. THE CONTRACTOR SHALL SURVEY PAVEMENT MARKING LOCATIONS.
3. APPLY FIRST COAT OF PAVEMENT MARKINGS AFTER STANDARD SEAL COAT AND BEFORE OPENING AREAS TO
TRAFFIC.
4. SECOND COAT OF MARKINGS TO BE APPLIED AFTER 30-DAYS PER SPECIFICATIONS.
5. ALL PAVEMENT MARKINGS REQUIRE TWO APPLICATIONS OF PAINT WITH…
This is the start of the file's text. The full file is on GovTribe.