S-10000-00014646 Pre-Proposal Conference Recording.mp4
MP4 file 200 MB Posted
- Attached to
- OWEN SUMMERS SECURITY GATE ENHANCEMENTS
- Solicitation number
- S-24800-00014645
- Issued by
- Marion County, Oregon
About this file
This is a pre-proposal conference recording for Request for Quote 250054C001, issued by the Oregon Military Department (OMD) for security gate enhancements at the Owen Summers Readiness Center in Salem, Oregon. The project involves installing a new Doorking 1601 Barrier Arm Gate system with a 10-foot aluminum arm, down loop detector, photo eye, and 3-button control station, along with replacement of existing gate motors, controllers, and actuators. The scope includes gate maintenance, updated gate control system installation, safety compliance, and access control mechanisms integration with the existing Lenel network system. A mandatory pre-bid conference was scheduled for September 8, 2025, at 9:00 am, with quotes due by September 18, 2025, at 10:00 am. The project requires substantial completion within 120 calendar days and final completion within 150 calendar days from the Notice to Proceed. Contractors must be registered with the Oregon Construction Contractors Board and provide operational verification and owner training upon completion.
Bidders must submit 10% bid security and carry comprehensive insurance coverage including workers' compensation, commercial general liability, and automobile liability. If the bid exceeds $50,000, Oregon prevailing wage rates will apply. The project is potentially federally funded and subject to Build America, Buy America Act requirements, which may restrict material sourcing. The OMD has allocated a $7,500 contingency budget for owner discretion. The existing infrastructure consists of an outdated gate control system from approximately 2002 using Byan Systems G2M controllers with hydraulic arms that have been removed. Bidders must comply with non-discrimination regulations; no specific set-aside designations for disadvantaged enterprises are explicitly mentioned. The comprehensive technical requirements and multiple system components indicate a significant security infrastructure modernization investment.
Other files
| File | Type | Posted |
|---|---|---|
| 250054C001 Final Bid results.pdf | ||
| RFQ 250054C001 final for posting.pdf | ||
| Doorking_1601_PS-8 11 25~2.pdf | ||
| OS_Gate_SOW_Assessment.pdf | ||
| RFQ 250054C001 PreBid sign in sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .