RUS 6C1 WITHOUT SPECS.pdf

PDF 611 KB Posted

Attached to
USS RUSHMORE 6C1 SRA Sources Sought
Solicitation number
6C1
Issued by

About this file

This document is a Business Sensitive maintenance requirements list for a naval vessel, detailing numerous repair and preservation tasks across multiple ship systems and compartments scheduled for completion between January 2027 and April 2027. The comprehensive list includes over 100 specific maintenance items covering areas such as air conditioning plant shells, flight deck tiedowns, ballast tanks, ventilation systems, machinery rooms, electrical systems, and deck coverings.

Key maintenance requirements include intrusive inspections of AC plant shells, replacing degraded flight deck and vehicle lashing socket components, overhauling main propulsion diesel engine components, preserving various tank and void spaces, repairing corroded deck and bulkhead areas, and addressing equipment functionality issues in critical ship systems. Most tasks are designated for outside repair activities or regional maintenance centers, with specific instructions for base metal buildup, corrosion control, cleaning, gas-free certification, and adherence to naval maintenance standards. The document indicates a systematic approach to maintaining the vessel's operational readiness through comprehensive scheduled maintenance.

View the file

Other files

File Type Posted
LSD47 6C1 Tanks.pdf PDF
6C1 job list WITH DETAIL SPECS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Business Sensitive

09/06/2023 07:51:37 AM

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9358302 DA01-5260 CIWS MT 2 J-BAR DAVIT; LOADTEST 08-55-0-WEA 4/8/2027 DURING PMS IT WAS DISCORVERED THAT THE 05

LEVEL AFT MK749 MISSLE CONTAINER HANDLING

REQUEST REPAIR ACTIVITY TO LOAD TEST

PORTABLE DAVIT AND SOCKET IN

38E9358303 DA01-ZAT6 WEIGHT TEST BOAT DAVIT 01-69-4-WEA 4/8/2027 *HSC 58311121 *PRIDSLAD MRN-

GCMAAUXILMA0037UNNAMAINTENANCE

WEIGHT TEST BOAT DAVIT IN ACCORDANCE

WITH MRC A5H7. REPORT CONDITIONS

38E9366201 DB01-5108 VEHICLE LASHING SOCKET IN WELL

DECK; REPLACE

4-35-0-Q 4/8/2027 DURING PMS CHECK (18M-1) INSPECT " TOP PLATE

FLUSH-TYPE CLOVERLEAF TIE-DOWN DECK FITTINGS

IN THE WELL DECK, 20 PADEYES WERE FOUND TO BE

DEGRADED. THEY PASS THE GO-NO GAUGE TEST.

BUT ARE A FEW MONTHS AWAY FROM FAILING.

REQUEST OUTSIDE REPAIR ACTIVITY TO

REPLACE THE UNSAT PADEYESS AND TO

PERFORM THE NECESSARY LOAD TEST.

XXXPEJF 2023 SEP05 RESCREEN TO 4J1 XXX

38E9313901 DB01-5390 FLIGHT DECK TIEDOWNS; REPLACE 01-92-0-WEA 3/24/2027 DURING THE SHIP'S INSPECTION, WHILE

CONDUCTING PMS CHECK FOR MIP SERIES 5882/010,

REQUEST DEPOT LEVEL ACTIVITIES TO

REMOVE THE DEFECTIVE CROSSBAR TYPE

38E9313901 DB01-ZA90 FLIGHT DECK TIEDOWNS; REPLACE 01-92-0-WEA 3/24/2027 *HSC 13900NK10A *PRIDFLIGHT DECK MRN-

GCMACORROSA0027RL4LMAINTENANCE STANDARD:

REMOVE AND REPLACE THE FLIGHT DECK

TIEDOWNS IAW LSD 41 CSWT 130-012.

38E9312326 EA02-ZA72 JP-5 SERVICE TANK 6-98-5-J; REPAIR

AND PRESERVE

6-98-5-J 3/2/2027 *HSC 12312N31001 *PRID6-98-5-J MRN-

GCMACORROSA0027RNAVMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR IAW

SURFMEPP CORROSION TRD 220-100-016.

38E9312326 EA02-ZA73 JP-5 SERVICE TANK 6-98-5-J;ASSESS 6-98-5-J 10/29/2026 *HSC 12312N31001 *PRID6-98-5-J MRN-

GCMACORROSA0017RNAVMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312326 EA02-ZA74 JP-5 SERVICE TANK 6-98-5-J; REPAIR

AND PRESERVE

6-98-5-J 10/29/2026 *HSC 12312N31001 *PRID6-98-5-J MRN-

GCMACORROSA0037RNAVMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9351406 EA05-4896 NO 3 A/C PLANT SHELL; INSPECTION

AND REPAIR

3-74-1-E 10/29/2026 PER NAVAL ADVISORY S/F REQUEST FOR REGIONAL

MAINTENANCE CENTER (RMC) OR OTHER QUALIFIED

REPAIR ACTIVITIES TO CONDUCT AN INTRUSIVE

INSPECTION AND REPAIR OF AC PLANT SHELL

PRESSURE BOUNDARY SURFACES REFRIGERANT AND

OIL DRAIN PIPING SHELL PENETRATIONS AND

INSULATION.

S/F REQUEST AN INTRUSIVE INSPECTION AND

REPAIR OF AC PLANT SHELL PRESSURE

BOUNDARY SURFACES, REFRIGERANT AND OIL

DRAIN PIPING SHELL PENETRATIONS AND

INSULATION. S/F WILL SUBMIT REPORT AND

ROUTE TO TYCOM AS DIRECTED.

XXXPEJV- SHIPS FORCE HAS TUBES ON HAND

WHICH WILL LIKELY BE REQUIRED AFTER THE

INSTRUSIVE INSPECTIONXXX

38E9351407 EA05-4898 NO 2 A/C PLANT SHELL; INSPECTION

AND REPAIR

3-29-0-E 10/29/2026 PER NAVAL ADVISORY S/F REQUEST FOR REGIONAL

MAINTENANCE CENTER (RMC) OR OTHER QUALIFIED

REPAIR ACTIVITIES TO CONDUCT AN INTRUSIVE

INSPECTION AND REPAIR OF AC PLANT SHELL

PRESSURE BOUNDARY SURFACES REFRIGERANT AND

OIL DRAIN PIPING SHELL PENETRATIONS AND

INSULATION.

S/F REQUEST FOR REGIONAL MAINTENANCE

CENTER (RMC) OR OTHER QUALIFIED REPAIR

ACTIVITIES TO CONDUCT AN INTRUSIVE

INSPECTION AND REPAIR OF AC PLANT SHELL

PRESSURE BOUNDARY SURFACES,

REFRIGERANT AND OIL DRAIN PIPING SHELL

PENETRATIONS AND INSULATION. S/F WILL

SUBMIT REPORT AND ROUTE TO TYCOM, AS

DIRECTED.

XXXPEJV- SHIPS FORCE HAS TUBES ON HAND

WHICH WILL LIKELY BE REQUIRED AFTER THE

Page 1 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9351408 EA05-4899 NO 1 A/C PLANT SHELL; INSPECTION

AND REPAIR

3-29-0-E 10/29/2026 PER NAVAL ADVISORY S/F REQUEST FOR REGIONAL

MAINTENANCE CENTER (RMC) OR OTHER QUALIFIED

REPAIR ACTIVITIES TO CONDUCT AN INTRUSIVE

INSPECTION AND REPAIR OF AC PLANT SHELL

PRESSURE BOUNDARY SURFACES, REFRIGERANT AND

OIL DRAIN PIPING SHELL PENETRATIONS AND

INSULATION.

S/F REQUEST FOR REGIONAL MAINTENANCE

CENTER (RMC) OR OTHER QUALIFIED REPAIR

ACTIVITIES TO CONDUCT AN INTRUSIVE

INSPECTION AND REPAIR OF AC PLANT SHELL

PRESSURE BOUNDARY SURFACES,

REFRIGERANT AND OIL DRAIN PIPING SHELL

PENETRATIONS AND INSULATION. S/F WILL

SUBMIT REPORT AND ROUTE TO TYCOM, AS

DIRECTED.

XXXPEJV- SHIPS FORCE HAS TUBES ON HAND

WHICH WILL LIKELY BE REQUIRED AFTER THE

38E9351602 EA05-4905 NR2 REEFER FOUNDATION; REPAIR AND

PRESERVE

3-29-0-E 3/2/2027 NR2 REEFER FOUNDATION SEVERELY DEGRADED

REQUIRING EXTENSIVE OVERHAUL AND

PRESERVATION.

S/F TO REQUEST OUTSIDE ACTIVITY TO

OVERHAUL FOUNDATION TO INCLUDE

PRIMING AND PAINTING.

38E9351409 EA05-4906 NR1 A/C FOUNDATION; REPAIR AND

PRESERVE

3-29-0-E 3/2/2027 NR1 A/C FOUNDATION SEVERELY DEGRADED

REQUIRING EXTENSIVE PRESERVATION AND

OVERHAUL.

S/F TO REQUEST OUTSIDE ACTIVITY TO

OVERHAUL A/C FOUNDATION TO INCLUDE

PRIMING AND PAINTING.

38E9351601 EA05-4907 NR1 REEFER FOUNDATION; REPAIR AND

PRESERVE

3-29-0-E 3/2/2027 NR1 REEFER FOUNDATION SEVERELY DEGRADED

REQUIRING EXTENSIVE OVERHAUL AND

PRESERVATION.

S/F TO RECOMMEND OUTSIDE ACTIVITY TO

OVERHAUL NR1 REEFER FOUNDATION TO

INCLUDE PRIMING AND PAINTING.

XXXPECOMMENT - SRA.XXX

38E9351412 EA05-4908 NR4 A/C FOUNDATION; REPAIR AND

PRESERVE

3-74-1-E 3/2/2027 NR4 A/C FOUNDATION SEVERELY DEGRADED

REQUIRING OVERHAUL AND EXTENSIVE

PRESERVATION.

S/F TO REQUEST OUTSIDE ACTIVITY TO

OVERHAUL NR4 A/C FOUNDATION TO

INCLUDE PRIMING AND PAINTING

38E9351410 EA05-4909 NR2 A/C FOUNDATION; REPAIR AND

PRESERVE

3-29-0-E 3/2/2027 NR2 A/C FOUNDATION SEVERELY DEGRADED

REQUIRING EXTENSIVE OVERHAUL AND

PRESERVATION.

S/F TO REQUEST OUTSIDE ACTIVITY TO

OVERHAUL AND PRESERVATION INCLUDING

PRIMING AND PAINTING.

38E9351411 EA05-4910 NR3 A/C FOUNDATION; REPAIR AND

PRESERVE

3-74-1-E 3/2/2027 NR3 A/C FOUNDATION IS SEVERELY DEGRADED

REQUIRING EXTENSIVE OVERHAUL AND

PRESERVATION.

S/F TO REQUEST OUTSIDE ACTIVITY TO

OVERHAUL A/C FOUNDATION TO INCLUDE

PRIMING AND PAINTING.

JRMC Page 2 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9367201 EA05-5062 BRACKETS FOR LADDER IN A/C

MACHINERY ROOM; FABRICATE AND

INSTALL

3-59-2-E 3/2/2027 DURING MOB-E M-1, S/F DISCOVERED THAT THE

LADDER WELL TO AFT A/C ROOM BASE WAS

DEGRADED. THE PORT SIDE STRUCTURAL SUPPORTS

ON THE DECK, WHERE THE LADDER SAFETY PINS

WOULD ATTACH, WAS MISSING AND THE STARBOARD

SIDE WAS SEVERELY CORRODED. S/F WAS UNABLE TO

SECURE THE LADDER AT THE BASE, IN ITS CURRENT

CONDITION. THE COMPARTMENT IS ABOVE A FUEL

TANK AND S/F IN UNABLE TO WELD TO THE DECK.

S/F REQUEST OUTSIDE ACTIVITY TO EMPTY,

CLEAN, AND INSPECT FUEL OVERFLOW TANK 6-

74-3-F. ONCE COMPLETE S/F REQUEST

OUTSIDE ACTIVITY TO FABRICATE AND INSTALL

BRACKETS ON THE DECK TO SECURE LADDER.

XXXPEJV - TANK TO BE GAS FREED IN ORDER

TO PERFORM WELDING TO BRACKETS ON

TANK TOP. S/F LEADERSHIP PUSHES BACK ON

THIS BEING S/F CAPABLE DUE TO SAFETY

CONCERNS WITH WELDING ON A TANK TOP.

DEPOT-LEVEL REQUESTED. XXX

38E9366101 EB14-2115 DECK COVERING IN 2-99-2-Q; REPLACE 2-99-2-Q 3/2/2027 PRC DECKING IN COMPARTMENT 2-99-2-Q IS 13 FEET

BY 12 FEET.COMPARTMENT 2-99-2-Q PRC DECKING

SERVERLY DEGRADED. HOLE IN PRC DECKING IN

S/F CONTRACTS OUTSIDE ACTIVITY TO

REPLACE PRC DECKING IN COMPARTMENT 2-

99-2-Q.38E9312343 EB14-ZGZ9 G1N5 ASSESSMENT FOR LO-TK 6-65-2-W 6-65-2-W 10/29/2026 *HSC 12317N41022 *PRID6-65-2-W MRN-

GCMACORROSA0017QP0CMAINTENANCE STANDARD:

G1N5 LAST COMPLETED

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

REPORT TO LOCAL NSA AND INPUT SURVEY 38E9312345 EB14-ZH00 G1N5 ASSESSMENT FOR LO-TK 6-81-2-F 6-81-2-F 10/29/2026 *HSC 12317N41028 *PRID6-81-2-F MRN-

GCMACORROSA0017RNDFMAINTENANCE STANDARD:

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312341 EB14-ZH01 G1N5 ASSESSMENT FOR LO-TK 6-59-1-F 6-59-1-F 10/29/2026 *HSC 12317N41018 *PRID6-59-1-F MRN-

GCMACORROSA0017RNDBMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312342 EB14-ZH02 G1N5 ASSESSMENT FOR LO-TK 6-59-2-F 6-59-2-F 10/29/2026 *HSC 12317N41019 *PRID6-59-2-F MRN-

GCMACORROSA0017QNZWMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312344 EB14-ZH03 G1N5 ASSESSMENT FOR LO-TK 6-81-1-F 6-81-1-F 10/29/2026 *HSC 12317N41027 *PRID6-81-1-F MRN-

GCMACORROSA0017QNZXMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312346 EB14-ZH04 G1N5 ASSESSMENT FOR

CONTAMINATED OIL TANK 6-86-3-W

6-86-3-W 10/29/2026 *HSC 12317N41030 *PRID6-86-3-W MRN-

GCMACORROSA0017RNDJMAINTENANCE STANDARD:

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312347 EB14-ZH05 G1N5 ASSESSMENT FOR

CONTAMINATED OIL TANK 6-93-2-W

6-93-2-W 10/29/2026 *HSC 12317N41037 *PRID6-93-2-W MRN-

GCMACORROSA0017QNXVMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312341 EB14-ZH27 CONTAMINATED OIL TANK 6-59-1-F;

REPAIR

6-59-1-F 3/2/2027 *HSC 12317N41018 *PRID6-59-1-F MRN-

GCMACORROSA0027RNDBMAINTENANCE

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

38E9312341 EB14-ZH28 CONTAMINATED OIL TANK 6-59-1-F;

REPAIR

6-59-1-F 10/29/2026 *HSC 12317N41018 *PRID6-59-1-F MRN-

GCMACORROSA0037RNDBMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9312342 EB14-ZH29 CONTAMINATED OIL TANK 6-59-2-F;

REPAIR

6-59-2-F 3/2/2027 *HSC 12317N41019 *PRID6-59-2-F MRN-

GCMACORROSA0027QNZWMAINTENANCE

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

38E9312342 EB14-ZH30 CONTAMINATED OIL TANK 6-59-2-F;

REPAIR

6-59-2-F 10/29/2026 *HSC 12317N41019 *PRID6-59-2-F MRN-

GCMACORROSA0037QNZWMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9312343 EB14-ZH33 CONTAMINATED OIL TANK 6-65-2-

W;REPAIR

6-65-2-W 3/2/2027 *HSC 12317N41022 *PRID6-65-2-W MRN-

GCMACORROSA0027QP0CMAINTENANCE STANDARD:

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

38E9312343 EB14-ZH34 CONTAMINATED OIL TANK 6-65-2-

W;REPAIR

6-65-2-W 10/29/2026 *HSC 12317N41022 *PRID6-65-2-W MRN-

GCMACORROSA0037QP0CMAINTENANCE STANDARD:

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9312344 EB14-ZH35 CONTAMINATED OIL TANK 6-81-1-F;

REPAIR

6-81-1-F 3/2/2027 *HSC 12317N41027 *PRID6-81-1-F MRN-

GCMACORROSA0027QNZXMAINTENANCE

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

JRMC Page 3 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312344 EB14-ZH36 CONTAMINATED OIL TANK 6-81-1-F;

REPAIR

6-81-1-F 10/29/2026 *HSC 12317N41027 *PRID6-81-1-F MRN-

GCMACORROSA0037QNZXMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9312345 EB14-ZH37 CONTAMINATED OIL TANK 6-81-2-F;

REPAIR

6-81-2-F 3/2/2027 *HSC 12317N41028 *PRID6-81-2-F MRN-

GCMACORROSA0027RNDFMAINTENANCE STANDARD:

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

38E9312345 EB14-ZH38 CONTAMINATED OIL TANK 6-81-2-F;

REPAIR

6-81-2-F 10/29/2026 *HSC 12317N41028 *PRID6-81-2-F MRN-

GCMACORROSA0037RNDFMAINTENANCE STANDARD:

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9312346 EB14-ZH39 CONTAMINATED OIL TANK 6-86-3-W;

REPAIR

6-86-3-W 3/2/2027 *HSC 12317N41030 *PRID6-86-3-W MRN-

GCMACORROSA0027RNDJMAINTENANCE STANDARD:

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

38E9312346 EB14-ZH40 CONTAMINATED OIL TANK 6-86-3-W;

REPAIR

6-86-3-W 10/29/2026 *HSC 12317N41030 *PRID6-86-3-W MRN-

GCMACORROSA0037RNDJMAINTENANCE STANDARD:

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9312347 EB14-ZH41 CONTAMINATED OIL TANK 6-93-2-W;

REPAIR

6-93-2-W 3/2/2027 *HSC 12317N41037 *PRID6-93-2-W MRN-

GCMACORROSA0027QNXVMAINTENANCE

CONDUCT ONLY BASE METAL BUILDUP REPAIR

IAW LSD 41 CSWT 123-063; CONTAMINATED

38E9312347 EB14-ZH42 CONTAMINATED OIL TANK 6-93-2-W;

REPAIR

6-93-2-W 10/29/2026 *HSC 12317N41037 *PRID6-93-2-W MRN-

GCMACORROSA0037QNXVMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW LSD 41 CSWT 123-068. CERTIFY AND

38E9365101 EE02-7666 40GAL STEAM KETTLE; REPLACE 03-37-0-Q 2/1/2027 DURING NORMAL OPERATION S/F DISCOVERED THAT

THE 40GAL STEAM INTERNALLY EXPLODED, DUE TO

S/F PROCURE MATERIAL AND PROVIDE TO

OUTSIDE ACTIVITY FOR INSTALLATION

38E9365101 EE02-7667 40GAL STEAM KETTLE; REPLACE 03-37-0-Q 2/1/2027 DURING NORMAL OPERATION S/F DISCOVERED THAT

THE 40GAL STEAM INTERNALLY EXPLODED, DUE TO

S/F REQUESTING OUTSIDE ACTIVITY TO

UNINSTALL, RIG OUT, AND DISPOSE OF OLD

38E9312315 EM01-6720 DECK PLATING ON MMR NO. ONE

UPPER LEVEL; REPAIR

5-52-0-E 3/2/2027 MMR1 UPPER LEVEL HAS CORROSION TO THE POINT

THAT HOLES ARE APPEARING IN THE DECK. WITH

REQUEST OUTSIDE ACTIVITY CONDUCT

CORROSION CONTROL ON THE UPPER LEVEL

38E9323327 EM01-U303 1B MPDE LEFT AND RIGHT BANK

EXHAUST MANIFOLD GASKETS; REPLACE

5-52-0-E 3/2/2027 ISEA REP TYLER BACKMAN (TBACKMAN@LCE.COM)

IDENTIFIED DURING MATERIAL ASSESSMENT REVIEW

REPLACE THE LEFT AND RIGHT BANK EXHAUST

HEADER GASKETS AND SOFTWARE FROM THE

38E9323301 EM01-ZE81 1B MPDE; REPAIR 5-52-0-E 3/2/2027 *HSC 233121 *PRID1B MPDE MRN-

GCMAPROPULA002A7567MAINTENANCE STANDARD:

REPAIR MPDE SHUTDOWN AIR CONTROL

VALVE ASSEMBLY (START/STOP RELAY VALVE,

38E9323301 EM01-ZE92 1B MPDE; REPAIR 5-52-0-E 3/2/2027 *HSC 233121 *PRID1B MPDE MRN-

GCMAPROPULA002A7567MAINTENANCE STANDARD:

OVERHAUL AND ALIGN THE FUEL CONTROL

CROSS SHAFT OF THE MAIN PROPULSION

38E9323309 EM01-ZE95 1A MPDE CRANKCASE VACUUM

SYSTEM: CLEAN

5-52-0-E 3/2/2027 *HSC 233111B1 *PRIDNO. 1A MRN-

GCMAPROPULA002A7557MAINTENANCE STANDARD:

CLEAN MAIN PROPULSION DIESEL ENGINE

CRANKCASE VACUUM FAN, SEPARATOR AND

38E9323316 EM01-ZE96 1B MPDE CRANKCASE VACUUM

SYSTEM: CLEAN

5-52-0-E 3/2/2027 *HSC 233121B1 *PRIDNO. 1B MRN-

GCMAPROPULA0027M0KBMAINTENANCE

CLEAN MAIN PROPULSION DIESEL ENGINE

CRANKCASE VACUUM FAN, SEPARATOR AND

38E9323310 EM01-ZE97 1B MPDE ENG INJE THERMOSTATIC

CONTROL VALVES; OVERHAUL

5-52-0-E 3/2/2027 *HSC 233121474 *PRID1B MPDE MRN-

GCMAPROPULA002A7594MAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323311 EM01-ZE98 1A MPDE THERMOSTATIC CONTROL

VALVES; OVERHAUL

5-52-0-E 3/2/2027 *HSC 233111474 *PRID1A MPDE MRN-

GCMAPROPULA002A7593MAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323312 EM01-ZE99 1B MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-52-0-E 3/2/2027 *HSC 23312154 *PRID1B MPDE FO CLR MRN-

GCMAPROPULA002A7538MAINTENANCE STANDARD:

S9233-DM-HBK-010 LAST COMPLETED

02/01/2021 (Q-23310-A7R)MPDE

COOLERS REQUIRE CLEANING AND REPAIR.

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

INJECTION WATER COOLER OF THE MAIN

PROPULSION DIESEL ENGINE IN ACCORDANCE

NAVSEA MAINTENANCE STANDARD MS S9233-

DM-HBK-010. REPAIRS SHALL INCLUDE

MACHINING OF MATTING SURFACES.

CONDUCT OPERATIONL TEST AT 100 PERCENT

LOAD AS DESIGNATED BY THE SUPERVISOR.

JRMC Page 4 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9323317 EM01-ZEA0 1A MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-52-0-E 3/2/2027 *HSC 23311155 *PRID1A MPDE LO CLR MRN-

GCMAPROPULA002A7533MAINTENANCE STANDARD:

S9233-DM-HBK-010 LAST COMPLETED

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

INJECTION WATER COOLER OF THE MAIN 38E9323318 EM01-ZEA1 1A MPDE AIR INTERCOOLER; REPAIR 5-52-0-E 3/2/2027 *HSC 233111E1 *PRIDMPDE 1A CLR1 MRN-

GCMAPROPULA0027TWNGMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323318 EM01-ZEA2 1A MPDE AIR INTERCOOLER; REPAIR 5-52-0-E 3/2/2027 *HSC 233111E2 *PRIDMPDE 1A CLR2 MRN-

GCMAPROPULA0027TWKLMAINTENANCE STANDARD:

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323313 EM01-ZEA3 1B MPDE AIR INTERCOOLER; REPAIR 5-52-0-E 3/2/2027 *HSC 233121E1 *PRIDMPDE 1B CLR1 MRN-

GCMAPROPULA0027TWKNMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323313 EM01-ZEA4 1B MPDE AIR INTERCOOLER; REPAIR 5-52-0-E 3/2/2027 *HSC 233121E2 *PRIDMPDE 1B CLR2 MRN-

GCMAPROPULA0027TWKQMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323319 EM01-ZEA5 1A MPDE SW TEMPERATURE

REGULATING VALVE; OVERHAUL

5-52-0-E 3/2/2027 *HSC 23311166 *PRID1A MPDE MRN-

GCMAPROPULA002A7589MAINTENANCE STANDARD:

MS2331-PC-003 LAST COMPLETED

02/01/2021 (Q-23310-A48)MAIN

PROPULSION DIESEL ENGINE 3-WAY SEAWATER

TEMPERATURE REGULATING VALVE REQUIRES

OVERHAUL.

OVERHAUL MAIN PROPULSION DIESEL ENGINE

3-WAY SEAWATER TEMPERATURE

REGULATING VALVE, TO INCLUDE THE

ACTUATOR ASSEMBLY, VOLUME BOOSTER

AND PILOT CONTROLS, IN ACCORDANCE WITH

TECH MAN. S9233-A8-MMO-A10.

38E9323320 EM01-ZEA6 1B MPDE SW TEMPERATURE

REGULATING VALVE; OVERHAUL

5-52-0-E 3/2/2027 *HSC 23312166 *PRID1B MPDE MRN-

GCMAPROPULA0027M0HWMAINTENANCE

STANDARD: MS2331-PC-003 LAST

COMPLETED 02/01/2021 (Q-23310-

A48)MAIN PROPULSION DIESEL ENGINE 3-WAY

SEAWATER TEMPERATURE REGULATING VALVE

REQUIRES OVERHAUL.

OVERHAUL MAIN PROPULSION DIESEL ENGINE

3-WAY SEAWATER TEMPERATURE

REGULATING VALVE, TO INCLUDE THE

ACTUATOR ASSEMBLY, VOLUME BOOSTER

AND PILOT CONTROLS, IN ACCORDANCE WITH

TECH MAN. S9233-A8-MMO-A10.

38E9312318 EM01-ZEB9 WASTE STORAGE TANK 6-61-2-W;

ASSESS

6-61-2-W 3/2/2027 *HSC 12319N91002 *PRID6-61-2-W MRN-

GCMACORROSA0017RNDCMAINTENANCE

STANDARD: G1N5 LAST COMPLETED

09/01/2014 (I-12319-A0C)CONDUCT

VOID/TANK AS ARRIVED SURVEY IN ACCORDANCE

WITH MRC G1N5.

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

REPORT TO LOCAL NSA AND INPUT SURVEY

DATA PER CORROSION CONTROL ASSESSMENT

AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

PROVIDE "AS-FOUND MATERIAL CONDITION"

CODE IN THE SECOND POSITION OF THE

"FINAL ACTION TAKEN" FIELD (2-KILO, BLOCK

64) IAW NAVSEAINST 4790.8 SERIES.

JRMC Page 5 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312318 EM01-ZEC1 WASTE STORAGE TANK 6-61-2-W;

ASSESS

6-61-2-W 10/29/2026 *HSC 12319N91002 *PRID6-61-2-W MRN-

GCMACORROSA0037RNDCMAINTENANCE

STANDARD: TRD 220-100-013 LAST

COMPLETED 10/16/2010 (Q-12319-

A09)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312318 EM01-ZEC2 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

6-61-2-W 3/2/2027 *HSC 12319N91002 *PRID6-61-2-W MRN-

GCMACORROSA0027RNDCMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9323310 EM01-ZEC3 1B MPDE ENG INJE THERMOSTATIC

CONTROL VALVES; OVERHAUL

5-52-0-E 3/2/2027 *HSC 23312166 *PRID1B MPDE MRN-

GCMAPROPULA0027M0HWMAINTENANCE

STANDARD: S9233-DM-HBK-010 LAST

COMPLETED 02/01/2021 (Q-23310-

A87)THERMOSTATIC CONTROL VALVES REQUIRE

OVERHAUL.

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

THERMOSTATIC CONTROL VALVES IN

ACCORDANCE WITH NAVSEA MAINTENANCE

STANDARD MS S9233-DM-HBK-010 AND CSWT

233-023. INSTALL NEW ALUMINIZED SPRAY

CLOTH. CONDUCT OPERATIONAL TEST AT 100

PERCENT LOAD AS AS DESEIGNATED BY THE

38E9323311 EM01-ZEC4 1A MPDE THERMOSTATIC CONTROL

VALVES; OVERHAUL

5-52-0-E 3/2/2027 *HSC 23311166 *PRID1A MPDE MRN-

GCMAPROPULA002A7589MAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323311 EM01-ZEC5 1A MPDE THERMOSTATIC CONTROL

VALVES; OVERHAUL

5-52-0-E 3/2/2027 *HSC 26211211W1 *PRID1A MPDE MRN-

GCMAPROPULA002B3763MAINTENANCE STANDARD:

S9233-DM-HBK-010 LAST COMPLETED

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

THERMOSTATIC CONTROL VALVES IN 38E9323310 EM01-ZEC6 1B MPDE ENG INJE THERMOSTATIC

CONTROL VALVES; OVERHAUL

5-52-0-E 3/2/2027 *HSC 26211221W1 *PRID1B MPDE MRN-

GCMAPROPULA0027PRSPMAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323328 EM01-ZEC8 1A MPDE FUEL OIL INJECTION PUMP:

OVERHAUL

5-52-0-E 3/2/2027 *HSC 233111 *PRID1A MPDE MRN-

GCMAPROPULA002B3253MAINTENANCE STANDARD:

OVERHAUL THE FUEL OIL INJECTION PUMP

AND INJECTION PUMP DRIVES OF THE MAIN

38E9323329 EM01-ZEC9 1B MPDE FUEL OIL INJECTION PUMP:

OVERHAUL

5-52-0-E 3/2/2027 *HSC 233121 *PRID1B MPDE MRN-

GCMAPROPULA002A7567MAINTENANCE STANDARD:

S9233-DM-HBK-010 LAST COMPLETED

09/01/2020 (Q-23310-A7Z)FUEL

INJECTION PUMPS AND PUMP DRIVE REQUIRES

OVERHAUL

OVERHAUL THE FUEL OIL INJECTION PUMP

AND INJECTION PUMP DRIVES OF THE MAIN

PROPULSION DIESEL ENGINE IN ACCORDANCE

WITH NAVSEA MAINTENANCE STANDARD MS

S9233-DM-HBK-010 AND CSWT 233-024,

CONDUCT OPERATIONAL TEST AND MAKE

FINAL TIMING ADJUSTMENTS AT 80 PERCENT

AND 100 PERCENT LOAD AS DESIGNATED BY

THE SUPERVISOR

38E9323312 EM01-ZED3 1B MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-52-0-E 3/2/2027 *HSC 23312162 *PRID1B MPDE JW CLR MRN-

GCMAPROPULA002A7536MAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323312 EM01-ZED4 1B MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-52-0-E 3/2/2027 *HSC 23312155 *PRID1B MPDE LO CLR MRN-

GCMAPROPULA0027P1RMMAINTENANCE

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323317 EM01-ZED5 1A MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-52-0-E 3/2/2027 *HSC 23311154 *PRID1A MPDE FO CLR MRN-

GCMAPROPULA002A7537MAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

JRMC Page 6 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9323317 EM01-ZED6 1A MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-52-0-E 3/2/2027 *HSC 23311162 *PRID1A MPDE JW CLR MRN-

GCMAPROPULA002A7535MAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323304 EM02-7533 2A MPDE SW TEMP REG VLV DEGRAD 5-74-0-E 3/2/2027 UPON NORMAL OPERATION S/F DISCOVERED 2A

MPDE SW/JW TEMP REGULATING VALVE WAS

REQUESTING OUTSIDE ACTIVITY OVERHAUL 2A

MPDE SW/JW TEMP REGULATING VALVE.

38E9323337 EM02-U300 2A MPDE ENGINE ROCKER ARM ASSY;

REPAIR

5-74-0-E 3/2/2027 ISEA REP TYLER BACKMAN (TBACKMAN@LCE.COM)

IDENTIFIED DURING MATERIAL ASSESSMENT REVIEW

THE FOLLOWING MAINTENANCE IS REQUIRED: 2A

REPAIR, ALIGN, AND ADJUST MAIN

PROPULSION DIESEL ENGINE ROCKER ARM

ASSEMBLIES IN ACCORDANCE WITH NAVSEA

38E9323330 EM02-U301 2A MPDE LEFT AND RIGHT BANK

EXHAUST MANIFOLD GASKETS; REPLACE

5-74-0-E 3/2/2027 ISEA REP TYLER BACKMAN (TBACKMAN@LCE.COM)

IDENTIFIED DURING MATERIAL ASSESSMENT REVIEW

REPLACE THE LEFT AND RIGHT BANK EXHAUST

HEADER GASKETS AND SOFTWARE FROM THE

38E9323339 EM02-U302 2B MPDE ENGINE ROCKER ARM ASSY;

REPAIR

5-74-0-E 3/2/2027 ISEA REP TYLER BACKMAN (TBACKMAN@LCE.COM)

IDENTIFIED DURING MATERIAL ASSESSMENT REVIEW

REPAIR, ALIGN, AND ADJUST MAIN

PROPULSION DIESEL ENGINE ROCKER ARM

38E9323304 EM02-ZDX0 2A MPDE SW TEMPERATURE

REGULATING VALVE; OVERHAUL

5-74-0-E 3/2/2027 *HSC 23313166 *PRID2A MPDE MRN-

GCMAPROPULA002A7590MAINTENANCE STANDARD:

OVERHAUL MAIN PROPULSION DIESEL ENGINE

3-WAY SEAWATER TEMPERATURE

38E9323314 EM02-ZDX6 2B MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-74-0-E 3/2/2027 *HSC 23314155 *PRID2B MPDE LO CLR MRN-

GCMAPROPULA0027P1RLMAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323302 EM02-ZDX7 2A MPDE ; REPAIR 5-74-0-E 3/2/2027 *HSC 233131 *PRID2A MPDE MRN-

GCMAPROPULA002A7566MAINTENANCE STANDARD:

REPAIR MPDE SHUTDOWN AIR CONTROL

VALVE ASSEMBLY (START/STOP RELAY VALVE,

38E9323303 EM02-ZDX8 2B MPDE; REPAIR 5-74-0-E 3/2/2027 *HSC 233141 *PRID2B MPDE MRN-

GCMAPROPULA002A7565MAINTENANCE STANDARD:

REPAIR MPDE SHUTDOWN AIR CONTROL

VALVE ASSEMBLY (START/STOP RELAY VALVE,

38E9323305 EM02-ZDX9 2A MPDE LO PUMP; OVERHAUL 5-74-0-E 3/2/2027 *HSC 233131C1 *PRID2A MPDE MRN-

GCMAPROPULA0027SH2EMAINTENANCE STANDARD:

OVERHAUL THE ATTACHED LUBE LUBE OIL

PUMP AND RELIEF VALVE ASSEMBLY OF THE

38E9323306 EM02-ZDY0 2B MPDE THERMOSTATIC CONTROL

VALVES; OVERHAUL

5-74-0-E 3/2/2027 *HSC 23314166 *PRID2B MPDE MRN-

GCMAPROPULA0027M0RXMAINTENANCE

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323302 EM02-ZDY9 2A MPDE ; REPAIR 5-74-0-E 3/2/2027 *HSC 233131 *PRID2A MPDE MRN-

GCMAPROPULA002A7566MAINTENANCE STANDARD:

OVERHAUL AND ALIGN THE FUEL CONTROL

CROSS SHAFT OF THE MAIN PROPULSION

38E9323303 EM02-ZDZ0 2B MPDE; REPAIR 5-74-0-E 3/2/2027 *HSC 233141 *PRID2B MPDE MRN-

GCMAPROPULA002A7565MAINTENANCE STANDARD:

OVERHAUL AND ALIGN THE FUEL CONTROL

CROSS SHAFT OF THE MAIN PROPULSION

38E9323307 EM02-ZDZ1 2B MPDE CRANKCASE VACUUM

SYSTEM: CLEAN

5-74-0-E 3/2/2027 *HSC 233141B1 *PRIDNO. 2B MRN-

GCMAPROPULA0027M0TBMAINTENANCE

CLEAN MAIN PROPULSION DIESEL ENGINE

CRANKCASE VACUUM FAN, SEPARATOR AND

38E9323306 EM02-ZDZ3 2B MPDE THERMOSTATIC CONTROL

VALVES; OVERHAUL

5-74-0-E 3/2/2027 *HSC 233141474 *PRID2B MPDE MRN-

GCMAPROPULA002A7596MAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323315 EM02-ZDZ5 2A MPDE FUEL INJECTOR COOLER;

REPAIR

5-74-0-E 3/2/2027 *HSC 23313154 *PRID2A MPDE FO CLR MRN-

GCMAPROPULA002A7539MAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323308 EM02-ZDZ6 2B MPDE AIR INTERCOOLER; REPAIR 5-74-0-E 3/2/2027 *HSC 233141E2 *PRIDMPDE 2B CLR2 MRN-

GCMAPROPULA0027TWKUMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323308 EM02-ZDZ8 2B MPDE AIR INTERCOOLER; REPAIR 5-74-0-E 3/2/2027 *HSC 233141E1 *PRIDMPDE 2B CLR1 MRN-

GCMAPROPULA0027TWKWMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323325 EM02-ZE00 2B MPDE SW TEMPERATURE

REGULATING VALVE; OVERHAUL

5-74-0-E 3/2/2027 *HSC 23314166 *PRID2B MPDE MRN-

GCMAPROPULA0027M0RXMAINTENANCE

OVERHAUL MAIN PROPULSION DIESEL ENGINE

3-WAY SEAWATER TEMPERATURE

38E9323306 EM02-ZE09 2B MPDE THERMOSTATIC CONTROL

VALVES; OVERHAUL

5-74-0-E 3/2/2027 *HSC 26212221W1 *PRID2B MPDE MRN-

GCMAPROPULA0027PQ7PMAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323331 EM02-ZE12 2A MPDE AIR START DISTRIBUTOR AND

MAIN AIR START CONTROL VALVE;

5-74-0-E 3/2/2027 *HSC 233131 *PRID2A MPDE MRN-

GCMAPROPULA002A7566MAINTENANCE STANDARD:

OVERHAUL THE AIR START DISTRIBUTOR AND

MAIN AIR START CONTROL VALVE OF THE

JRMC Page 7 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9323332 EM02-ZE13 2B MPDE FUEL OIL INJECTION PUMP

AND INJECTION PUMP DRIVES;

5-74-0-E 3/2/2027 *HSC 233141 *PRID2B MPDE MRN-

GCMAPROPULA002A7565MAINTENANCE STANDARD:

OVERHAUL THE FUEL OIL INJECTION PUMP

AND INJECTION PUMP DRIVES OF THE MAIN

38E9323333 EM02-ZE14 2A MPDE FUEL OIL INJECTION PUMP

AND INJECTION PUMP DRIVES;

5-74-0-E 3/2/2027 *HSC 233131 *PRID2A MPDE MRN-

GCMAPROPULA002A7566MAINTENANCE STANDARD:

OVERHAUL THE FUEL OIL INJECTION PUMP

AND INJECTION PUMP DRIVES OF THE MAIN

38E9323315 EM02-ZE17 2A MPDE FUEL INJECTOR COOLER;

REPAIR

5-74-0-E 3/2/2027 *HSC 23313155 *PRID2A MPDE LO CLR MRN-

GCMAPROPULA002A7534MAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323314 EM02-ZE18 2B MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-74-0-E 3/2/2027 *HSC 23314162 *PRID2B MPDE JW CLR MRN-

GCMAPROPULA0027M0SBMAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323314 EM02-ZE19 2B MPDE FUEL INJECTOR FL COOLER;

OVERHAUL

5-74-0-E 3/2/2027 *HSC 23314154 *PRID2B MPDE FO CLR MRN-

GCMAPROPULA002A7540MAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9323315 EM02-ZE20 2A MPDE FUEL INJECTOR COOLER;

REPAIR

5-74-0-E 3/2/2027 *HSC 23313162 *PRID2A MPDE JW CLR MRN-

GCMAPROPULA0027NPKLMAINTENANCE STANDARD:

CLEAN, REPAIR AND HYDROSTATICALLY TEST

EACH LUBE OIL, JACKET WATER, AND

38E9366204 EM03-3934 AUX MACHINERY ROOM INTAKE

VENTILATION; REPAIR

5-43-0-E 3/2/2027 IT WAS NOTED THAT THE VENTILATION INTAKES

LEADING TO AUX ONE THAT GOES THROUGH

REQUEST OUTSIDE ACTIVITY CONDUCT

CORROSION REPAIRS TO INTAKE VENTILATION.

38E9331102 EM03-ZBF3 NO.1 SSDG LO AND JW/SW CLG PUMPS,

OVERHAUL

5-43-0-E 3/2/2027 *HSC 31121114 *PRIDNO. 1 JW PMP MRN-

GCMAPROPULA0027M2HDMAINTENANCE

OVERHAUL THE ATTACHED JACKET WATER

AND SEAWATER COOLING PUMPS OF THE SHIP

38E9331102 EM03-ZBF5 NO.1 SSDG LO AND JW/SW CLG PUMPS,

OVERHAUL

5-43-0-E 3/2/2027 *HSC 31121116 *PRIDNO. 1 SW PMP MRN-

GCMAPROPULA002B5841MAINTENANCE STANDARD:

OVERHAUL THE ATTACHED JACKET WATER

AND SEAWATER COOLING PUMPS OF THE SHIP

38E9331105 EM03-ZBG2 NO.1 SSDG COOLING SYSTEM

COMPONENTS; REPAIR

5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

CLEAN AND REPAIR THE SHIP SERVICE DIESEL

GENERATOR COOLING SYSTEM COMPONENTS

38E9331101 EM03-ZBG4 NO.1 SSDG; OVERHAUL 5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL THE AIR START CHECK VALVESAND

REPLACE CYLINDER LINER ADAPTERS OF THE

38E9331104 EM03-ZBH5 NO.2 SSDG START AIR SYSTEM

COMPONENTS; OVERHAUL

5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL THE START AIR SYSTEM

COMPONENTS (AIR START DISTRIBUTOR, AIR

38E9331101 EM03-ZBI3 NO.1 SSDG GVRNR; CALIBRATE 5-43-0-E 3/2/2027 *HSC 311211181 *PRIDNO. 1 MRN-

GCMAPROPULA0027SNNHMAINTENANCE

REMOVE AND DELIVER TO AUTHORIZED OEM

FACILITY THE ELECTROHYDRAULIC GOVERNOR

38E9331101 EM03-ZBI4 NO.1 SSDG; OVERHAUL 5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL THE UPPER AND LOWER

TORSIONAL DAMPENERS OF THE SHIP SERVICE

38E9331102 EM03-ZBI8 NO.1 SSDG LO AND JW/SW CLG PUMPS,

OVERHAUL

5-43-0-E 3/2/2027 *HSC 31121111 *PRIDNO. 1 MRN-

GCMAPROPULA0027MY9QMAINTENANCE

OVERHAUL THE ATTACHED LUBE OIL PUMP OF

THE SHIP SERVICE DIESEL GENERATOR IN

38E9331101 EM03-ZBJ0 NO.1 SSDG; OVERHAUL 5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL THE FLEX DRIVE AND GOVERNOR

DRIVE ASSEMBLIES OF THE SHIP SERVICE

38E9355102 EM04-7517 PLATFORM UNDER NR 3 LPAC; REPAIR 5-89-01-E 3/2/2027 DURING DAILY WALKTHROUGH, S/F DISCOVERED

UPPER LEVEL PLATFORM IN AMR 2 (5-89-01-E) UNDER

S/F REQUEST OUTSIDE ACTIVITY TO CONDUCT

REPAIRS IAW STRUCTUREAL REQUIREMENTS

38E9365405 EM04-7529 VENT DUCTING FOR SUPPLY FAN 1-87-

1:REPLACE

2-87-3-L 3/2/2027 0 0

38E9365405 EM04-7535 VENT DUCTING FOR SUPPLY FAN 1-87-

1:REPLACE

2-87-3-L 3/2/2027 0 0

38E9312350 ER01-5976 FWD WASTE AND SOIL DRAINS; CLEAN 5-33-1-Q 2/1/2027 S/F DISCOVERED THAT THE FWD WASTE / SOIL DRAIN

PIPING LEADING TO MAIN CHT TANK 5-31-2-W HAS

S/F REQUESTS OUTSIDE ACTIVITY TO ACID

CLEAN ALL WASTE/ SOIL DRAINS 06 AND

38E9312309 ER01-ZJK8 CHT TANK 5-31-2-W; ASSESS 5-31-2-W 10/29/2026 *HSC 12319N91005 *PRID5-31-2-W MRN-

GCMACORROSA0017RN6PMAINTENANCE STANDARD:

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312303 ER01-ZJK9 REV-01(IH)~ SEWAGE EJECTION TANK IN

3-108-1-W; ASSESS

3-108-1-W 10/29/2026 *HSC 12319N91003 *PRID3-108-1-W MRN-

GCMACORROSA0017RN4SMAINTENANCE STANDARD:

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

JRMC Page 8 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312320 ER01-ZJL0 ACCESSIBLE VOID 1-28-1-V; ASESS 1-28-1-V 10/29/2026 *HSC 12322N11001 *PRID1-28-1-V MRN-

GCMACORROSA0017QP4GMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312303 ER01-ZJL1 SEWAGE EJECTION TANK 3-108-1-W;

REPAIR

3-108-1-W 10/29/2026 *HSC 12319N91003 *PRID3-108-1-W MRN-

GCMACORROSA0037RN4SMAINTENANCE STANDARD:

TRD 220-100-013 LAST COMPLETED

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE 38E9312327 ER01-ZJL2 WASTE STORAGE 6-83-1-W; REPAIR

AND PRESERVE

6-83-1-W 10/29/2026 *HSC 12319N91038 *PRID6-83-1-W MRN-

GCMACORROSA0037RNDGMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312339 ER01-ZJL3 G1N5 ASSESSMENT FOR ACCESSIBLE

VOID 6-48-1-V

6-48-1-V 10/29/2026 *HSC 12322N1101 *PRID6-48-1-V MRN-

GCMACORROSA0017TSMTMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 PER CORROSION CONTROL

38E9312305 ER01-ZJL5 REV-01(IH)~VOID (6-56-3-V); ASSESS 6-56-3-V 10/29/2026 *HSC 12322N1103 *PRID6-56-3-V MRN-

GCMACORROSA0017TSMVMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 PER CORROSION CONTROL

38E9312340 ER01-ZJL7 G1N5 ASSESSMENT FOR ACCESSIBLE

VOID 6-52-3-Q

6-52-3-Q 10/29/2026 *HSC 12322N11053 *PRID6-52-3-Q MRN-

GCMACORROSA0017RNDQMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 PER CORROSION CONTROL

38E9312338 ER01-ZJL8 G1N5 ASSESSMENT FOR ACCESSIBLE

VOID 5-41-0-Q

5-41-0-Q 10/29/2026 *HSC 12322N11027 *PRID5-41-0-Q MRN-

GCMACORROSA0017RN6RMAINTENANCE STANDARD:

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 PER CORROSION CONTROL

38E9312337 ER01-ZJL9 G1N5 ASSESSMENT FOR ACCESSIBLE

VOID 2-30-2-V

2-30-2-V 10/29/2026 *HSC 12322N11002 *PRID2-30-2-V MRN-

GCMACORROSA0017RNDMMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 PER CORROSION CONTROL

38E9312327 ER01-ZJM0 WASTE STORAGE TANK 6-83-1-W;

ASSESS

6-83-1-W 10/29/2026 *HSC 12319N91038 *PRID6-83-1-W MRN-

GCMACORROSA0017RNDGMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5. PROVIDE CONDITION FOUND

38E9312307 ER01-ZJM1 BALLAST TANK 5-129-0-W; REPAIR AND

PRESERVE

5-129-0-W 10/29/2026 *HSC 12316N11030 *PRID5-129-0-W MRN-

GCMACORROSA0037QNVXMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312334 ER01-ZJM2 BALLAST TANK 6-85-1-W; REPAIR AND

PRESERVE

6-85-1-W 10/29/2026 *HSC 12316N11096 *PRID6-85-1-W MRN-

GCMACORROSA0037QNXPMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312308 ER01-ZJM3 BALLAST TANK 5-121-1-W; REPAIR AND

PRESERVE

5-121-1-W 10/29/2026 *HSC 12316N11025 *PRID5-121-1-W MRN-

GCMACORROSA0037QNVSMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312310 ER01-ZJM4 BALLAST TANK 6-56-1-W; REPAIR AND

PRESERVE

6-56-1-W 10/29/2026 *HSC 12316N11071 *PRID6-56-1-W MRN-

GCMACORROSA0037QNWYMAINTENANCE

STANDARD: TRD 220-100-013 LAST

COMPLETED 02/01/2021 (Q-12316-

A05)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312328 ER01-ZJM5 BALLAST TANK 6-81-3-W; REPAIR AND

PRESERVE

6-81-3-W 10/29/2026 *HSC 12316N11093 *PRID6-81-3-W MRN-

GCMACORROSA0037QNXKMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312332 ER01-ZJM6 BALLAST TANK 6-35-0-W; REPAIR AND

PRESERVE

6-35-0-W 10/29/2026 *HSC 12316N11059 *PRID6-35-0-W MRN-

GCMACORROSA0037QNWQMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312311 ER01-ZJM7 BALLAST TANK 6-29-0-W; REPAIR AND

PRESERVE

6-29-0-W 10/29/2026 *HSC 12316N11058 *PRID6-29-0-W MRN-

GCMACORROSA0037QNWPMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

JRMC Page 9 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312331 ER01-ZJM8 BALLAST TANK 6-83-0-W; REPAIR AND

PRESERVE

6-83-0-W 10/29/2026 *HSC 12316N11095 *PRID6-83-0-W MRN-

GCMACORROSA0037QNXNMAINTENANCE

STANDARD: TRD 220-100-013 LAST

COMPLETED 02/01/2021 (Q-12316-

A05)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312302 ER01-ZJM9 SALT WATER BALLAST TANK; REPAIR

AND PRESERVE

5-115-1-W 10/29/2026 *HSC 12316N11022 *PRID5-115-1-W MRN-

GCMACORROSA0037QNVPMAINTENANCE

STANDARD: TRD 220-100-013 LAST

COMPLETED 02/01/2021 (Q-12316-

A05)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312329 ER01-ZJN0 BALLAST TANK 6-89-1-W; REPAIR AND

PRESERVE

6-89-1-W 10/29/2026 *HSC 12316N11100 *PRID6-89-1-W MRN-

GCMACORROSA0037QP0GMAINTENANCE

STANDARD: TRD 220-100-013 LAST

COMPLETED 02/01/2021 (Q-12316-

A05)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312330 ER01-ZJN1 BALLAST TANK 6-74-0-W; REPAIR AND

PRESERVE

6-74-0-W 10/29/2026 *HSC 12316N11087 *PRID6-74-0-W MRN-

GCMACORROSA0037QNXEMAINTENANCE

STANDARD: TRD 220-100-013 LAST

COMPLETED 02/01/2021 (Q-12316-

A05)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312333 ER01-ZJN2 BALLAST TANK 6-101-1-W; REPAIR AND

PRESERVE

6-101-1-W 10/29/2026 *HSC 12316N11043 *PRID6-101-1-W MRN-

GCMACORROSA0037QNXXMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

JRMC Page 10 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312307 ER01-ZJN3 BALLAST TANK 5-29-0-W; ASSESS 5-129-0-W 10/29/2026 *HSC 12316N11030 *PRID5-129-0-W MRN-

GCMACORROSA0017QNVXMAINTENANCE

STANDARD: G1N5 LAST COMPLETED

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL 38E9312334 ER01-ZJN4 BALLAST TANK 6-85-1-W; ASSES 6-85-1-W 10/29/2026 *HSC 12316N11096 *PRID6-85-1-W MRN-

GCMACORROSA0017QNXPMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312308 ER01-ZJN5 BALLAST TANK 5-121-1-W; ASSESS 5-121-1-W 10/29/2026 *HSC 12316N11025 *PRID5-121-1-W MRN-

GCMACORROSA0017QNVSMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312310 ER01-ZJN6 BALLAST TANK 6-56-1-W; ASSESS 6-56-1-W 10/29/2026 *HSC 12316N11071 *PRID6-56-1-W MRN-

GCMACORROSA0017QNWYMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312328 ER01-ZJN7 BALLAST TANK 6-81-3-W; ASSESS 6-81-3-W 10/29/2026 *HSC 12316N11093 *PRID6-81-3-W MRN-

GCMACORROSA0017QNXKMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312332 ER01-ZJN8 BALLAST TANK 6-35-0-W; ASSESS 6-35-0-W 10/29/2026 *HSC 12316N11059 *PRID6-35-0-W MRN-

GCMACORROSA0017QNWQMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312311 ER01-ZJN9 BALLAST TANK 6-29-0-W; ASSESS 6-29-0-W 10/29/2026 *HSC 12316N11058 *PRID6-29-0-W MRN-

GCMACORROSA0017QNWPMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312331 ER01-ZJO0 BALLAST TANK 6-83-0-W;ASSESS 6-83-0-W 10/29/2026 *HSC 12316N11095 *PRID6-83-0-W MRN-

GCMACORROSA0017QNXNMAINTENANCE

STANDARD: G1N5 LAST COMPLETED

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL 38E9312302 ER01-ZJO1 REV-01(IH)~SALTWATER BALLAST TANK

(5-115-1-W); ASSESS

5-115-1-W 10/29/2026 *HSC 12316N11022 *PRID5-115-1-W MRN-

GCMACORROSA0017QNVPMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312329 ER01-ZJO2 BALLAST TANK 6-89-1-W; ASSESS 6-89-1-W 10/29/2026 *HSC 12316N11100 *PRID6-89-1-W MRN-

GCMACORROSA0017QP0GMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312330 ER01-ZJO3 BALLAST TANK 6-74-0-W;ASSESS 6-74-0-W 10/29/2026 *HSC 12316N11087 *PRID6-74-0-W MRN-

GCMACORROSA0017QNXEMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312333 ER01-ZJO4 BALLAST TANK 6-101-1-W; ASSESS 6-101-1-W 10/29/2026 *HSC 12316N11043 *PRID6-101-1-W MRN-

GCMACORROSA0017QNXXMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY IAW

MRC G1N5 AND PER CORROSION CONTROL

38E9312320 ER01-ZJO5 ACCESSIBLE VOID 1-28-1-V; REPAIR 1-28-1-V 10/29/2026 *HSC 12322N11001 *PRID1-28-1-V MRN-

GCMACORROSA0037QP4GMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312330 ER01-ZJO6 BALLAST TANK 6-74-0-W; REPAIR AND

PRESERVE

6-74-0-W 3/2/2027 *HSC 12316N11087 *PRID6-74-0-W MRN-

GCMACORROSA0027QNXEMAINTENANCE

STANDARD: LSD 41 CSWT 123-051 LAST

COMPLETED 08/01/2021 (Q-12316-

A0C)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-051; BALLAST TANK; REPAIR.

38E9312308 ER01-ZJO7 BALLAST TANK 5-121-1-W; REPAIR AND

PRESERVE

5-121-1-W 4/8/2027 *HSC 12316N11025 *PRID5-121-1-W MRN-

GCMACORROSA0027QNVSMAINTENANCE

STANDARD: LSD 41 CSWT 123-051 LAST

COMPLETED 02/01/2021 (Q-12316-

A0C)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-051; BALLAST TANK; REPAIR.

38E9312310 ER01-ZJO8 BALLAST TANK 6-56-1-W; REPAIR AND

PRESERVE

6-56-1-W 4/8/2027 *HSC 12316N11071 *PRID6-56-1-W MRN-

GCMACORROSA0027QNWYMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312332 ER01-ZJO9 BALLAST TANK 6-35-0-W; REPAIR AND

PRESERVE

6-35-0-W 4/8/2027 *HSC 12316N11059 *PRID6-35-0-W MRN-

GCMACORROSA0027QNWQMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312311 ER01-ZJP0 BALLAST TANK 6-29-0-W; REPAIR AND

PRESERVE

6-29-0-W 4/8/2027 *HSC 12316N11058 *PRID6-29-0-W MRN-

GCMACORROSA0027QNWPMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

JRMC Page 11 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312331 ER01-ZJP1 BALLAST TANK 6-83-0-W; REPAIR AND

PRESERVE

6-83-0-W 4/8/2027 *HSC 12316N11095 *PRID6-83-0-W MRN-

GCMACORROSA0027QNXNMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312302 ER01-ZJP2 SALT WATER BALLAST TANK; REPAIR

AND PRESERVE

5-115-1-W 4/8/2027 *HSC 12316N11022 *PRID5-115-1-W MRN-

GCMACORROSA0027QNVPMAINTENANCE

STANDARD: LSD 41 CSWT 123-051 LAST

COMPLETED 02/01/2021 (Q-12316-

A0C)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-051; BALLAST TANK; REPAIR.

38E9312329 ER01-ZJP3 BALLAST TANK 6-89-1-W; REPAIR AND

PRESERVE

6-89-1-W 4/8/2027 *HSC 12316N11100 *PRID6-89-1-W MRN-

GCMACORROSA0027QP0GMAINTENANCE

STANDARD: LSD 41 CSWT 123-051 LAST

COMPLETED 08/01/2021 (Q-12316-

A0C)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-051; BALLAST TANK; REPAIR.

38E9312305 ER01-ZJP5 VOID (6-56-3-V); REPAIR AND PRESERVE 6-56-3-V 10/29/2026 *HSC 12322N1103 *PRID6-56-3-V MRN-

GCMACORROSA0037TSMVMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

38E9312333 ER01-ZJP8 BALLAST TANK 6-101-1-W; REPAIR AND

PRESERVE

6-101-1-W 4/8/2027 *HSC 12316N11043 *PRID6-101-1-W MRN-

GCMACORROSA0027QNXXMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312307 ER01-ZJP9 BALLAST TANK 5-129-0-W; REPAIR AND

PRESERVE

5-129-0-W 4/8/2027 *HSC 12316N11030 *PRID5-129-0-W MRN-

GCMACORROSA0027QNVXMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312334 ER01-ZJQ0 BALLAST TANK 6-85-1-W; REPAIR AND

PRESERVE

6-85-1-W 4/8/2027 *HSC 12316N11096 *PRID6-85-1-W MRN-

GCMACORROSA0027QNXPMAINTENANCE

STANDARD: LSD 41 CSWT 123-051 LAST

COMPLETED 03/07/2016 (Q-12316-

A0C)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-051; BALLAST TANK; REPAIR.

38E9312328 ER01-ZJQ1 BALLAST TANK 6-81-3-W; REPAIR AND

PRESERVE

6-81-3-W 4/8/2027 *HSC 12316N11093 *PRID6-81-3-W MRN-

GCMACORROSA0027QNXKMAINTENANCE

STANDARD: LSD 41 CSWT 123-051 LAST

COMPLETED 03/07/2016 (Q-12316-

A0C)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-051; BALLAST TANK; REPAIR.

38E9312309 ER01-ZJQ2 CHT TANK 5-31-2-W; REPAIR AND

PRESERVE

5-31-2-W 10/29/2026 *HSC 12319N91005 *PRID5-31-2-W MRN-

GCMACORROSA0037RN6PMAINTENANCE STANDARD:

TRD 220-100-013 LAST COMPLETED

12/11/2011 (Q-12319-

A07)VOID/TANK IS REQUIRED TO BE OPEN, CLEAN,

AND GAS FREE PER CORROSION CONTROL

ASSESSMENT AND MAINTENANCE MANUAL (CCAMM)

T9630-AB-MMD-010 REQUIREMENTS.

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-013.

CERTIFY AND MAINTAIN ATMOSPHERE SAFE

FOR WORKERS THROUGHOUT THE

AVAILABILITY. ALL SURFMEPP TECHNICAL

REFERENCE DOCUMENTS (TRDS) CAN BE

FOUND ON THE SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

OC).

38E9312303 ER01-ZJQ3 SEWAGE EJECTION TANK 3-108-1-W;

REPAIR

3-108-1-W 2/1/2027 *HSC 12319N91003 *PRID3-108-1-W MRN-

GCMACORROSA0027RN4SMAINTENANCE STANDARD:

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312309 ER01-ZJQ4 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

5-31-2-W 2/1/2027 *HSC 12319N91005 *PRID5-31-2-W MRN-

GCMACORROSA0027RN6PMAINTENANCE STANDARD:

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

JRMC Page 12 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312327 ER01-ZJQ5 WASTE STORAGE 6-83-1-W; REPAIR

AND PRESERVE

6-83-1-W 2/1/2027 *HSC 12319N91038 *PRID6-83-1-W MRN-

GCMACORROSA0027RNDGMAINTENANCE

STANDARD: LSD 41 CSWT 123-052 LAST

COMPLETED 03/07/2016 (Q-12319-

A0N)TANK/VOID REQUIRES STRUCTURAL REPAIR.

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

CSWT 123-052: WASTE WATER DRAIN TANK;

REPAIR.

38E9312305 ER01-ZJQ7 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

6-56-3-V 4/8/2027 *HSC 12322N1103 *PRID6-56-3-V MRN-

GCMACORROSA0027TSMVMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR IAW

SURFMEPP CORROSION TRD 220-100-016.

38E9312320 ER01-ZJQ8 ACCESSIBLE VOID 1-28-1-V; REPAIR 1-28-1-V 4/8/2027 *HSC 12322N11001 *PRID1-28-1-V MRN-

GCMACORROSA0027QP4GMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR ONLY

IN THE BOTTOM OF THE TANK IAW LSD 41

38E9312307 ER01-ZJT6 BALLAST TANK 5-129-0-W; REPAIR AND

PRESERVE

5-129-0-W 4/8/2027 *HSC 12316N11030 *PRID5-129-0-W MRN-

GCMACORROSA0027QNVXMAINTENANCE

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

38E9312334 ER01-ZJT7 BALLAST TANK 6-85-1-W; REPAIR AND

PRESERVE

6-85-1-W 4/8/2027 *HSC 12316N11096 *PRID6-85-1-W MRN-

GCMACORROSA0027QNXPMAINTENANCE

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

38E9312308 ER01-ZJT8 BALLAST TANK 5-121-1-W; REPAIR AND

PRESERVE

5-121-1-W 4/8/2027 *HSC 12316N11025 *PRID5-121-1-W MRN-

GCMACORROSA0027QNVSMAINTENANCE

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

38E9312310 ER01-ZJT9 BALLAST TANK 6-56-1-W; REPAIR AND

PRESERVE

6-56-1-W 4/8/2027 *HSC 12316N11071 *PRID6-56-1-W MRN-

GCMACORROSA0027QNWYMAINTENANCE

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

38E9312328 ER01-ZJU0 BALLAST TANK 6-81-3-W; REPAIR AND

PRESERVE

6-81-3-W 4/8/2027 *HSC 12316N11093 *PRID6-81-3-W MRN-

GCMACORROSA0027QNXKMAINTENANCE

STANDARD: TRD 220-100-015 LAST

COMPLETED 09/01/2015 (Q-12316-

A09)TANK/VOID REQUIRES TOUCH UP

PRESERVATION.

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

REGIONAL MAINTENANCE ACTIVITIES

(RMC/SRF/IMF) SHALL PROVIDE COPIES OF QA

DOCUMENTS TO THE LOCAL SURFMEPP

CORROSION REP FOR TANK CLOSEOUT AS

DIRECTED BY THE "OQE MINIMUM

REQUIREMENTS" SURFMEPP LTR AVAILABLE

AT

HTTPS://WWW.SPEAR.NAVY.MIL/SNAPSHOT

UNDER "REFERENCES/USER GUIDES". 009-32

OQE APPENDICES SHALL BE SUBMITTED TO

THE SURFMEPP CORROSION DIVISION (EMAIL:

SURFMEPP_CORROSION_STRUCTURES@NAVY

.MIL).ALL SURFMEPP TECHNICAL REFERENCE

DOCUMENTS (TRDS) CAN BE FOUND ON THE

SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

JRMC Page 13 of 17 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312302 ER01-ZJU1 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

5-115-1-W 4/8/2027 *HSC 12316N11022 *PRID5-115-1-W MRN-

GCMACORROSA0027QNVPMAINTENANCE

STANDARD: TRD 220-100-015 LAST

COMPLETED 09/01/2015 (Q-12316-

A09)TANK/VOID REQUIRES TOUCH UP

PRESERVATION.

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

REGIONAL MAINTENANCE ACTIVITIES

(RMC/SRF/IMF) SHALL PROVIDE COPIES OF QA

DOCUMENTS TO THE LOCAL SURFMEPP

CORROSION REP FOR TANK CLOSEOUT AS

DIRECTED BY THE "OQE MINIMUM

REQUIREMENTS" SURFMEPP LTR AVAILABLE

AT

HTTPS://WWW.SPEAR.NAVY.MIL/SNAPSHOT

UNDER "REFERENCES/USER GUIDES". 009-32

OQE APPENDICES SHALL BE SUBMITTED TO

THE SURFMEPP CORROSION DIVISION (EMAIL:

SURFMEPP_CORROSION_STRUCTURES@NAVY

.MIL).ALL SURFMEPP TECHNICAL REFERENCE

DOCUMENTS (TRDS) CAN BE FOUND ON THE

SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

38E9312329 ER01-ZJU2 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

6-89-1-W 4/8/2027 *HSC 12316N11100 *PRID6-89-1-W MRN-

GCMACORROSA0027QP0GMAINTENANCE

STANDARD: TRD 220-100-015 LAST

COMPLETED 09/01/2015 (Q-12316-

A09)TANK/VOID REQUIRES TOUCH UP

PRESERVATION.

PERFORM TOUCH UP PRESERVATION IAW

SURFMEPP CORROSION TRD 220-100-015.

REGIONAL MAINTENANCE ACTIVITIES

(RMC/SRF/IMF) SHALL PROVIDE COPIES OF QA

DOCUMENTS TO THE LOCAL SURFMEPP

CORROSION REP FOR TANK CLOSEOUT AS

DIRECTED BY THE "OQE MINIMUM

REQUIREMENTS" SURFMEPP LTR AVAILABLE

AT

HTTPS://WWW.SPEAR.NAVY.MIL/SNAPSHOT

UNDER "REFERENCES/USER GUIDES". 009-32

OQE APPENDICES SHALL BE SUBMITTED TO

THE SURFMEPP CORROSION DIVISION (EMAIL:

SURFMEPP_CORROSION_STRUCTURES@NAVY

.MIL).ALL SURFMEPP TECHNICAL REFERENCE

DOCUMENTS (TRDS) CAN BE FOUND ON THE

SURFMEPP SHAREPOINT SITE

(HTTPS://FLANKSPEED.SHAREPOINT-

MIL.US/SITES/NAVSEA_SURFMEPP_HQ/TECHD

38E…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .