6C1 job list WITH DETAIL SPECS.pdf

PDF 146 KB Posted

Attached to
USS RUSHMORE 6C1 SRA Sources Sought
Solicitation number
6C1
Issued by

About this file

This document is a Business Sensitive maintenance task list for a naval vessel, detailing 84 specific repair, preservation, and maintenance activities scheduled between February 2027 and May 2027. The tasks cover a wide range of ship systems and locations, including ventilation systems, deck coverings, hydraulic systems, electrical components, engine parts, bilge areas, structural elements, and various mechanical equipment across multiple ship compartments and levels.

Key maintenance activities include replacing nonskid deck coverings, overhauling ship service diesel generators, cleaning reheater ducts, preserving bilge areas, repairing hull structures, replacing water control valves, and conducting industrial support services for well deck assessments. Most tasks are designated for outside repair activities or depot-level maintenance, with planned completion dates primarily clustered around March and April 2027. The document indicates comprehensive preventive and corrective maintenance efforts aimed at preserving the vessel's operational readiness and structural integrity.

View the file

Other files

File Type Posted
LSD47 6C1 Tanks.pdf PDF
RUS 6C1 WITHOUT SPECS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Business Sensitive

09/06/2023 07:51:37 AM

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312301 DA01-5243 VENT PIPING FOR FUEL OIL TANK;

REPLACE

01-57-2-WEA 3/2/2027 DURING INSPECTION OF RAS STATION 4/6 (01-52-2-

WEA), S/F DISCOVERED THAT A VENTILATION PIPE

REQUEST OUTSIDE REPAIR ACTIVITY TO

OVERHAUL THE VENTILATION PLENUM AT

38E9313902 DA01-ZAP5 NONSKID DECK COVERING ON FLIGHT

DECK; REPLACE

NOT-APPLIC 3/24/2027 *HSC 63400SY1332A*PRIDFLIGHT DECK MRN-

GCMACORROSA0027QMZWMAINTENANCE

PRESERVE THE FLIGHT DECK IAW LSD 41

CSWT 634-018. USING TYPE V COATINGS

38E9366202 DB01-5124 REPLACE SYNTHETIC BOARDS 4-35-0-Q 4/8/2027 DURING CONDITION 1A OPERATIONS, S/F LAUNCHED

THE LCU WHICH BACKED INTO THE WELL DECK

SYNTHETIC BOARDS KNOCKING OUT 5 OR 6 BOLTS

AND LOOSENING SEVERAL STUDS. THIS RESULTED IN

THE 6 SYNTHETIC BOARDS ON THE PORT SIDE NEAR

FRAME 121 LOOSE AND NOT FULLY SECURED TO THE

BULKHEAD. THE BOARDS PROTRUDE OUT,

RENDERING WELL DECK OPERATIONS UNSAFE.

REQUEST OUTSIDE REPAIR ACTIVITY SRF-

SASEBO JAPAN TO REPLACE BOLTS, AND

REATTACH THE LOSE SYNTHETIC BOARDS

NEAR FRAME 121 ON THE PORT SIDE IAW

5840 AP-1

XXXPEJV - APPROXIMATELY 3 BOARDS WILL

NEED TO BE REPLACED. THE SIDE BOARDS ARE

AT THE TOP OF THE WELL DECK, PORT SIDE.

XXX

38E9366203 DB01-5179 WOODEN BATTERBOARD IN WELL

DECK; REPAIR

4-35-0-Q 4/8/2027 DURING CONDITION 1A OPERATIONS WHILE

RECOVERING AN LCU, THE LCU HIT THE SIDE OF THE

REQUESTING OUTSIDE REPAIR ACTIVITY TO

REPLACE THE WOODEN BATTLE BOARD IAW

38E9366502 DB01-5188 JIB CRANE OVERHAUL 1-121-2-Q 4/8/2027 DURING INSPECTION OF OLD JOB TO OVERHAUL

MONORAIL SYSTEM SHIPS FORCE NOTICED THAT THE

REQUEST OUTSIDE REPAIR ACTIVITY TO

UNRIG JIB CRANE FOR CANVAS SHOP

38E9313701 DB01-5201 NONSKID DECK COVERING ON

FORECASTLE DECK; REPLACE

02 LVL DECK 4/8/2027 DURING QUARTERLY INSPECTION IAW NSTM 631,

634 AND 772 AND UTILIZING MIP 6342/001 MRC Q-1

REQUEST OUTSIDE REPAIR ACTIVITY TO

REMOVE AND REPLACE ENTIRE NONSKID AND

38E9313701 DB01-5329 NONSKID DECK COVERING ON

FORECASTLE DECK; REPLACE

02 LVL DECK 4/8/2027

38E9366202 DB01-5331 SYNTHETIC BATTERBOARD; REPAIR 4-35-0-Q 4/8/2027 DURING OPERATIONS IN THE WELL DECK AT FRAME

131 THERE IS A MISSING WELL DECK BATTER BOARD

RECOMMEND DEPOT LEVEL REPAIR TO

PROCURE MATERIAL FOR DECKING AND

38E9361201 DB01-ZAB0 DECK EDGE CRES SAFETY NET

ASSEMBLY ON HELICOPTER DECK; LOAD

SHIP-WIDE 3/24/2027 *HSC 612210000S *PRIDSAFETY NETS MRN-

GCMAAUXILMA0017TXLKMAINTENANCE STANDARD:

LOAD TEST CRES DECK EDGE SAFETY NETS

IAW MRC A5K5 EVERY 36M. LOAD TEST

38E9358401 EA04-ZBG6 STERN GATE HYDRAULIC SYSTEM;

OVERHAUL

4-135-0-Q 4/8/2027 *HSC 584210 *PRIDSTERN GATE MRN-

GCMAAUXILMA0027P1VAMAINTENANCE

OVERHAUL STERN GATE HYDRAULIC SYSTEM

IN ACCORDANCE WITH CSWT LSD 41 584-025.

38E9358402 EA04-ZBJ3 STERN GATE RUBBER GASKET; REPLACE 4-135-0-Q 4/8/2027 *HSC 584210 *PRIDSTERN GATE MRN-

GCMAAUXILMA0027P1VAMAINTENANCE

STANDARD: CSWT LSD 41 584-001 LAST

COMPLETED 03/29/2015 (Q-58420-

A02)STERN GATE TRANSOM GASKET REQUIRES

REPLACE STERN GATE TRANSOM GASKET IN

ACCORDANCE WITH CSWT LSD 41 584-001.

38E9358901 EA04-ZBL5 15 TON TRAVELLING BRIDGE CRANE P/S

HOIST WINCH WIRE ROPE ASSEMBLY;

1-35-0-Q 4/8/2027 *HSC 589211 *PRIDBRIDGE CRANE MRN-

GCMAAUXILMA003B4687MAINTENANCE STANDARD:

LOAD TEST CRANE IN ACCORDANCE WITH

NSTM CHAPTER 572. REPORT CONDITIONS

38E9351401 EA05-4891 FLEXIBLE HOSE ASSEMBLY ON NO.ONE

AND NO.2 A/C PLANT; FABRICATE

3-29-0-E 3/2/2027 DURING ROUTINE PMS S/F DISCOVERED EXPIRED

FLEXIBLE HOSE. S/F TO REQUEST OUTSIDE ACTIVITY

REQUEST OUTSIDE ACTIVITY TO

MANUFACTURE AND HYDROSTATICALLY TEST

38E9351401 EA05-L068 FLEXIBLE HOSE ASSEMBLY ON NO.ONE

AND NO.2 A/C PLANT; FABRICATE

3-29-0-E 3/2/2027 DURING ROUTINE PMS S/F DISCOVERED EXPIRED

FLEXIBLE HOSE S/F TO REQUEST OUTSIDE ACTIVITY

REQUEST OUTSIDE ACTIVITY TO

MANUFACTURE HOSE UPON COMPLETION

38E9351404 EA05-ZBA0 WATER CONTROL VALVE FOR NO.2 A/C

PLANT CONDENSER; REPLACE

3-29-0-E 3/2/2027 *HSC 514221R1 *PRIDNO.2 MRN-

GCMAAUXILFA0027RYCSMAINTENANCE STANDARD:

REPLACE CONDENSER WATER CONTROL

VALVE IN ACCORDANCE WITH CSWT LCC 514-

Page 1 of 7 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9351405 EA05-ZBA1 WATER CONTROL VALVE FOR NO.ONE

A/C PLANT CONDENSER; REPLACE

3-29-0-E 3/2/2027 *HSC 514211R1 *PRIDNO.1 MRN-

GCMAAUXILFA0027RYCHMAINTENANCE STANDARD:

REPLACE CONDENSER WATER CONTROL

VALVE IN ACCORDANCE WITH CSWT LCC 514-

38E9351402 EA05-ZBA3 WATER CONTROL VALVE FOR NO.4 A/C

PLANT CONDENSER; REPLACE

3-74-1-E 3/2/2027 *HSC 514241R1 *PRIDNO.4 MRN-

GCMAAUXILFA0027SVMLMAINTENANCE STANDARD:

REPLACE CONDENSER WATER CONTROL

VALVE IN ACCORDANCE WITH CSWT LCC 514-

38E9351403 EA05-ZBA4 WATER CONTROL VALVE FOR NO.3 A/C

PLANT CONDENSER; REPLACE

3-74-1-E 3/2/2027 *HSC 514231R1 *PRIDNO.3 MRN-

GCMAAUXILFA0027SVMKMAINTENANCE STANDARD:

TRD 230-514-051 LAST COMPLETED

06/01/2020 (Q-51420-

A2A)CONDENSER WATER CONTROL VALVE REQUIRES

REPLACEMENT.

REPLACE CONDENSER WATER CONTROL

VALVE IN ACCORDANCE WITH CSWT LCC 514-

003. REPORT CONDITIONS FOUND TO SHIP'S

CSMP.

38E9312314 EE02-L056 FAN ROOM (01-14-2-Q); REPAIR AND

PRESERVE

01-14-2-Q 4/8/2027 PER 21530EE02ZCP1XX /PLEASE REFER THE REPORT

38RSM11001 OF 01-14-2-Q/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY HITOSHI IKEMOTO,

38E9312316 EM01-6780 BILGE AREA IN MAIN MACHINERY

ROOM NUMBER ONE; PRESERVE

5-52-0-E 3/2/2027 WHILE CONDUCTING INSPECTION OF SPACE. IT WAS

NOTED THAT THE BILGE HAS A 100' X 100' SECTION

REQUEST OUTSIDE ACTIVITY CONDUCT

CORROSION CONTROL MEASURES BY

38E9355101 EM01-L125 UPPER LEVEL DECK PLATE IN 5-52-0-E;

REPAIR

5-52-0-E 3/2/2027 0 0

38E9323326 EM01-U204 1B MPDE OVERSPEED COVERNOR ASSY;

REPAIR

5-52-0-E 3/2/2027 0 0

38E9323334 EM01-ZE82 1A MPDE SHUTDOWN AIR CNTRL VLV

ASSY ; REPAIR

5-52-0-E 3/2/2027 *HSC 233111 *PRID1A MPDE MRN-

GCMAPROPULA002B3253MAINTENANCE STANDARD:

REPAIR MPDE SHUTDOWN AIR CONTROL

VALVE ASSEMBLY (START/STOP RELAY VALVE,

38E9311001 EM01-ZE88 BILGE IN MAIN MACHINERY ROOM

NUMBER ONE; ASSESS

5-52-0-E 3/2/2027 *HSC 12341CC02211*PRIDBILGE MMR1 MRN-

GCMACORROSA0017U1TRMAINTENANCE

ACCOMPLISH SURVEY OF THE BILGE IN

ACCORDANCE WITH MRC G1N6. RECORD AND

38E9312317 EM01-ZEC0 BILGE AREA IN FWD SHAFT ALLEY;

PRESERVE

5-67-1-Q 3/2/2027 *HSC 12348CC18782*PRIDFWD SHFT ALY MRN-

GCMACORROSA0027TQEPMAINTENANCE

PRESERVE THE BILGE IAW LSD 41 CSWT 631-

045; PRESERVE THE BILGES.

38E9323335 EM02-U201 2A MPDE OVERSPEED GOVERNOR

ASSEMBLY; REPAIR

5-74-0-E 3/2/2027 ISEA REP DUANE PAULSEN

(DUANE.PAULSEN@NAVY.MIL) IDENTIFIED DURING

MATERIAL ASSESSMENT REVIEW THE FOLLOWING

_REPAIR AND SET THE OVERSPEED

MECHANISM OF THE MAIN PROPULSION

DIESEL ENGINE IN ACCORDANCE WITH

38E9323322 EM02-ZDZ2 2A MPDE CRANKCASE VACUUM

SYSTEM: CLEAN

5-74-0-E 3/2/2027 *HSC 233131B1 *PRIDNO. 2A MRN-

GCMAPROPULA0027UFWAMAINTENANCE

CLEAN MAIN PROPULSION DIESEL ENGINE

CRANKCASE VACUUM FAN, SEPARATOR AND

38E9323323 EM02-ZDZ4 2A MPDE L/O, J/W AND INJ CLG

THERMOSTATIC VLV; REPAIR

5-74-0-E 3/2/2027 *HSC 23313166 *PRID2A MPDE MRN-

GCMAPROPULA002A7590MAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323324 EM02-ZDZ7 2A MPDE R/L BANK INTERCOOLER;

CLEAN, INSPECT AND REPAIR

5-74-0-E 3/2/2027 *HSC 233131E1 *PRIDMPDE 2A CLR1 MRN-

GCMAPROPULA0027TWKSMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9323324 EM02-ZDZ9 2A MPDE R/L BANK INTERCOOLER;

CLEAN, INSPECT AND REPAIR

5-74-0-E 3/2/2027 *HSC 233131E2 *PRIDMPDE 2A CLR2 MRN-

GCMAPROPULA0027QP6BMAINTENANCE

CLEAN AND REPAIR THE AIR INTERCOOLER

AND AIR DRYER ASSEMBLY OF THE MAIN

38E9312319 EM02-ZE07 BILGE AREA IN MAIN MACHINERY

ROOM NUMBER 2; PRESERVE

5-74-0-E 3/2/2027 *HSC 12341CC02221*PRIDBILGE MMR2 MRN-

GCMACORROSA0027U1TSMAINTENANCE

PRESERVE THE BILGE IAW LSD 41 CSWT 631-

045; PRESERVE THE BILGES.

38E9323323 EM02-ZE08 2A MPDE L/O, J/W AND INJ CLG

THERMOSTATIC VLV; REPAIR

5-74-0-E 3/2/2027 *HSC 233131474 *PRID2A MPDE MRN-

GCMAPROPULA002A7595MAINTENANCE STANDARD:

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9323323 EM02-ZE10 2A MPDE L/O, J/W AND INJ CLG

THERMOSTATIC VLV; REPAIR

5-74-0-E 3/2/2027 *HSC 26212211W1 *PRID2A MPDE MRN-

GCMAPROPULA0027PQ7NMAINTENANCE

OVERHAUL THE LUBE OIL, JACKET WATER,

AND INJECTION COOLING WATER

38E9331108 EM03-ZBF2 NO.2 SSDG ATT PUMP; REPAIR 5-43-0-E 3/2/2027 *HSC 31122111 *PRIDNO. 2 MRN-

GCMAPROPULA002B2817MAINTENANCE STANDARD:

OVERHAUL THE ATTACHED LUBE OIL PUMP

OF THE SHIP SERVICE DIESEL GENERATOR IN

JRMC Page 2 of 7 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9331108 EM03-ZBF4 OVHL SSDG SW/JW PUMPS 5-43-0-E 3/2/2027 *HSC 31122116 *PRIDNO. 2 SW PMP MRN-

GCMAPROPULA0027M2KHMAINTENANCE

OVERHAUL THE ATTACHED JACKET WATER

AND SEAWATER COOLING PUMPS OF THE

38E9331108 EM03-ZBF6 OVHL SSDG SW/JW PUMPS 5-43-0-E 3/2/2027 *HSC 31122114 *PRIDNO. 2 JW PMP MRN-

GCMAPROPULA002B2341MAINTENANCE STANDARD:

OVERHAUL THE ATTACHED JACKET WATER

AND SEAWATER COOLING PUMPS OF THE

38E9331109 EM03-ZBF7 NO.1 SSDG AOR START SYSTEM

COMPONENT; REPAIR

5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL THE START AIR SYSTEM

COMPONENTS (AIR START DISTRIBUTOR, AIR

38E9331110 EM03-ZBG3 NO.2 SSDG ENG; REPAIR 5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL THE AIR START CHECK VALVESAND

REPLACE CYLINDER LINER ADAPTERS OF THE

38E9331113 EM03-ZBG9 NO. ONE SSDG BLOWER AIR BYPASS

VALVE; REPAIR

5-43-0-E 3/2/2027 *HSC 31121117 *PRIDSSDG 1 MRN-

GCMAPROPULA002B2350MAINTENANCE STANDARD:

OVERHAUL THE BLOWER AIR BYPASS VALVE

ON THE SHIP SERVICE DIESEL GENERATOR IN

38E9331110 EM03-ZBH6 NO.2 SSDG ENG; REPAIR 5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL THE SHIP SERVICE DIESEL

GENERATOR IN ACCORANCE WITH NAVSEA

38E9331106 EM03-ZBH8 NO. ONE SSDG ENGINE COMPONENT;

REPAIR

5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL AND ADJUST THE FUEL OIL

INJECTION NOZZLES AND REPLACE NOZZLE

38E9331110 EM03-ZBH9 NO.2 SSDG ENG; REPAIR 5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL AND ADJUST THE FUEL OIL

INJECTION NOZZLES AND REPLACE NOZZLE

38E9331110 EM03-ZBI0 NO.2 SSDG FO INJ PUMP AND

GOVERNOR; REPAIR AND CALIBRATE

5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL AND CALIBRATE THE FUEL OIL

INJECTION PUMPS OF THE SHIP SERVICE

38E9331106 EM03-ZBI1 NO.ONE SSDG FO INJT PMP; REPAIR

AND CALIBRATE

5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL AND CALIBRATE THE FUEL OIL

INJECTION PUMPS OF THE SHIP SERVICE

38E9331110 EM03-ZBI2 NO.2 SSDG FO INJ PUMP AND

GOVERNOR; REPAIR AND CALIBRATE

5-43-0-E 3/2/2027 *HSC 311221181 *PRIDNO. 2 MRN-

GCMAPROPULA0027SNNMMAINTENANCE

REMOVE AND DELIVER TO AUTHORIZED OEM

FACILITY THE ELECTROHYDRAULIC GOVERNOR

38E9331110 EM03-ZBI5 NO.2 SSDG ENG; REPAIR 5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL THE UPPER AND LOWER

TORSIONAL DAMPENERS OF THE SHIP

38E9331106 EM03-ZBI6 NO. ONE SSDG ENGINE COMPONENT;

REPAIR

5-43-0-E 3/2/2027 *HSC 3112111 *PRIDSSDG #1 MRN-

GCMAPROPULA002A8623MAINTENANCE STANDARD:

OVERHAUL THE FUEL OIL CONTROL SYSTEM

COMPONENTS OF THE SHIP SERVICE DIESEL

38E9331110 EM03-ZBI7 NO.2 SSDG ENG; REPAIR 5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL THE FUEL OIL CONTROL SYSTEM

COMPONENTS OF THE SHIP SERVICE DIESEL

38E9331110 EM03-ZBI9 NO.2 SSDG ENG; REPAIR 5-43-0-E 3/2/2027 *HSC 3112211 *PRIDSSDG 2 MRN-

GCMAPROPULA002B2349MAINTENANCE STANDARD:

OVERHAUL THE FLEX DRIVE AND GOVERNOR

DRIVE ASSEMBLIES OF THE SHIP SERVICE

38E9331103 EM04-ZCB7 NO.4 SSDG CENTER SECTION

OVERHAUL; ACCOMPLISH

5-89-01-E 3/2/2027 *HSC 3112411 *PRIDSSDG 4 MRN-

GCMAPROPULA0027M2PJMAINTENANCE

OVERHAUL AND ADJUST THE FUEL OIL

INJECTION NOZZLES AND REPLACE NOZZLE

38E9331107 EM04-ZCB8 NO.4 SSDG ATT SW, JW, AND LO PUMP;

REPAIR

5-89-01-E 3/2/2027 *HSC 31124111 *PRIDNO. 4 MRN-

GCMAPROPULA002B5840MAINTENANCE STANDARD:

OVERHAUL THE ATTACHED LUBE OIL PUMP

OF THE SHIP SERVICE DIESEL GENERATOR IN

38E9331107 EM04-ZCC0 NO.4 SSDG ATT SW, JW, AND LO PUMP;

REPAIR

5-89-01-E 3/2/2027 *HSC 31124116 *PRIDNO.4 SW PMP MRN-

GCMAPROPULA0027M2QBMAINTENANCE

OVERHAUL THE ATTACHED JACKET WATER

AND SEAWATER COOLING PUMPS OF THE

38E9331107 EM04-ZCC2 NO.4 SSDG ATT SW, JW, AND LO PUMP;

REPAIR

5-89-01-E 3/2/2027 *HSC 31124114 *PRIDNO.4 JW PMP MRN-

GCMAPROPULA0027M2PWMAINTENANCE

OVERHAUL THE ATTACHED JACKET WATER

AND SEAWATER COOLING PUMPS OF THE

38E9331112 EM04-ZCC7 CLN/RPR SSDG COOLING SYSTEM 5-89-01-E 3/2/2027 *HSC 3112411 *PRIDSSDG 4 MRN-

GCMAPROPULA0027M2PJMAINTENANCE

CLEAN AND REPAIR THE SHIP SERVICE DIESEL

GENERATOR COOLING SYSTEM COMPONENTS

38E9331103 EM04-ZCE6 NO.4 SSDG CENTER SECTION

OVERHAUL; ACCOMPLISH

5-89-01-E 3/2/2027 *HSC 3112411 *PRIDSSDG 4 MRN-

GCMAPROPULA0027M2PJMAINTENANCE

OVERHAUL THE SHIP SERVICE DIESEL

GENERATOR IN ACCORANCE WITH NAVSEA

38E9331103 EM04-ZCE9 NO.4 SSDG CENTER SECTION

OVERHAUL; ACCOMPLISH

5-89-01-E 3/2/2027 *HSC 3112411 *PRIDSSDG 4 MRN-

GCMAPROPULA0027M2PJMAINTENANCE

OVERHAUL AND CALIBRATE THE FUEL OIL

INJECTION PUMPS OF THE SHIP SERVICE

JRMC Page 3 of 7 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9331103 EM04-ZCF2 NO.4 SSDG CENTER SECTION

OVERHAUL; ACCOMPLISH

5-89-01-E 3/2/2027 *HSC 311241181 *PRIDNO. 4 MRN-

GCMAPROPULA0027SNNVMAINTENANCE

REMOVE AND DELIVER TO AUTHORIZED OEM

FACILITY THE ELECTROHYDRAULIC GOVERNOR

38E9331103 EM04-ZCG1 NO.4 SSDG CENTER SECTION

OVERHAUL; ACCOMPLISH

5-89-01-E 3/2/2027 *HSC 3112411 *PRIDSSDG 4 MRN-

GCMAPROPULA0027M2PJMAINTENANCE

OVERHAUL THE FUEL OIL CONTROL SYSTEM

COMPONENTS OF THE SHIP SERVICE DIESEL

38E9312336 ER01-5992 DISCHARGE PIPING (VALVE 4-33-9);

REPLACE

5-33-1-Q 2/1/2027 S/F DISCOVERED DEGRADED PIPING IN THE

DISCHARGE PIPE LEADING OVERBOARD FROM VALVE

S/F REQUEST OUTSIDE ACTIVITY TO

FABRICATE AND REPLACE DEGRADED SECTION

38E9312304 ER01-ZJL4 REV-01(IH)~ACCESSIBLE VOID 6-48-2-V;

ASSESS

6-48-2-V 10/29/2026 *HSC 12322N1102 *PRID6-48-2-V MRN-

GCMACORROSA0017TSMUMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY

IAW MRC G1N5 PER CORROSION CONTROL

38E9312306 ER01-ZJL6 REV-01(IH)~ACCESSIBLE VOID 6-56-4-V;

ASSESS

6-56-4-V 10/29/2026 *HSC 12322N1104 *PRID6-56-4-V MRN-

GCMACORROSA0017TSMWMAINTENANCE

ACCOMPLISH PRE-MAINTENANCE SURVEY

IAW MRC G1N5 PER CORROSION CONTROL

38E9312304 ER01-ZJP4 ACCESSIBLE VOID 6-48-2-V; REPAIR 6-48-2-V 10/29/2026 *HSC 12322N1102 *PRID6-48-2-V MRN-

GCMACORROSA0037TSMUMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-

38E9312306 ER01-ZJP6 ACCESSIBLE VOID 6-56-4-V; REPAIR 6-56-4-V 10/29/2026 *HSC 12322N1104 *PRID6-56-4-V MRN-

GCMACORROSA0037TSMWMAINTENANCE

OPEN, CLEAN, AND GAS FREE THE VOID/TANK

IAW SURFMEPP CORROSION TRD 220-100-

38E9312306 ER01-ZJP7 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

6-56-4-V 4/8/2027 *HSC 12322N1104 *PRID6-56-4-V MRN-

GCMACORROSA0027TSMWMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR IAW

SURFMEPP CORROSION TRD 220-100-016.

38E9312304 ER01-ZJQ6 REV-02(DV)~COFFERDAM; INSTALL AND

REMOVE

6-48-2-V 4/8/2027 *HSC 12322N1102 *PRID6-48-2-V MRN-

GCMACORROSA0027TSMUMAINTENANCE

CONDUCT BASE METAL BUILDUP REPAIR IAW

SURFMEPP CORROSION TRD 220-100-016.

38E9316804 ER09-5845 RAISED WATERTIGHT QUICK ACTING

SCUTTLE ASSEMBLY #03-63-1; REPLACE

03-63-1-L 4/8/2027 DURING SECAP INSPECTION SCUTTLE 03-63-1 WAS

DISCOVERED WITH HEAVY CORROSION ON THE

HINGE SIDE INSPECTORS RECOMMEND REPLACING

REQUESTING OUTSIDE ACTIVITY TO PROCURE

A NEW SCUTTLE, POWDER COAT NEW

SCUTTLE REMOVE OLD SCUTTLE INSTALL 38E9316801 ER09-5902 FLUSH WATERTIGHT QUICK ACTING

SCUTTLE ASSEMBLY #02-36-1; REPLACE

02-35-5-Q 4/8/2027 DURING PMS, IT WAS DISCOVERED THAT QAWTS 02-

36-1 HAS CORROSION ON THE FRAME AND BRACE

REQUESTING OUTSIDE ACTIVITY PROCURE

NEW QAWTS AND FRAME, POWDERCOAT

38E9312321 ES01-NP4F DECK IN FAN ROOM; PRESERVE 06-37-2-Q 4/8/2027 PER 21530NN01ZA08XX /PLEASE REFER THE REPORT

38RSM11001 OF 06-37-2-Q/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY HITOSHI IKEMOTO,

38E9312322 ES01-NP4G FAN ROOM(1-85-1-Q); REPAIR AND

PRESERVE

1-85-1-Q 4/8/2027 PER 21530DB01ZAA4XX /PLEASE REFER THE REPORT

38RSM11001 OF 1-85-1-Q/PLEASE SEE IN SHARE

/REPAIR OR REPLACE KICKPIPE WITH NEW

ONE./ ASSESSED BY MASAKI TAGUCHI, POC Y

38E9312322 ES01-NP4H FAN ROOM(1-85-1-Q); REPAIR AND

PRESERVE

1-85-1-Q 4/8/2027 PER 21530DB01ZAA4XX /PLEASE REFER THE REPORT

38RSM11001 OF 1-85-1-Q/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY MASAKI TAGUCHI,

38E9313902 ES01-NP4M NONSKID DECK COVERING ON FLIGHT

DECK; REPLACE

01-92-0-WEA 3/24/2027 PER 21530DB01ZA95XX /PLEASE REFER THE REPORT

38RSM11001 OF 01-92-0-WEA/PLEASE SEE IN SHARE

/REPLACE OR REPAIR WITH NEW DECK

COVERING./ ASSESSED BY YUUSUKE

38E9312323 ES01-NP4R STERN GATE OPERATION RM 3-138-2-

Q; PRESERVE

3-138-2-Q 4/8/2027 PER 21530EA04ZBK2XX /PLEASE REFER THE REPORT

38RSM11005 OF 3-138-2-Q/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY GO MIYATA, POC Y

38E9312319 ES01-NP4T BILGE AREA IN MAIN MACHINERY

ROOM NUMBER 2; PRESERVE

5-74-0-E 3/2/2027 PER 21530EM02ZDY5XX /PLEASE REFER THE REPORT

38RSM11011 OF 5-74-0-E(BILGE)/PLEASE SEE IN

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY GO MIYATA, POC Y

38E9312324 ES01-NP4V DECK SURFACE IN 3-74-1-E; PRESERVE 3-74-1-E 3/2/2027 PER 21530EA05ZB98XX /PLEASE REFER THE REPORT

38RSM11001 OF 3-74-1-E/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY GO MIYATA, POC Y

38E9312314 ES01-NP4Z FAN ROOM (01-14-2-Q); REPAIR AND

PRESERVE

01-14-2-Q 4/8/2027 PER 21530EE02ZCP1XX /PLEASE REFER THE REPORT

38RSM11001 OF 01-14-2-Q/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED./ ASSESSED BY HITOSHI IKEMOTO,

38E9313602 ES01-NP52 NONSKID DECK COVERING ON 1-14-0-

Q; REPLACE

1-14-0-Q 4/8/2027 PER 21530EE01ZB24XX /PLEASE REFER THE REPORT

38RSM11001 OF 1-14-0-Q/PLEASE SEE IN SHARE

/PRESERVATION IAW NSI 009-32 AND CCAMM

REQUIRED/ ASSESSED BY HITOSHI IKEMOTO,

38E9312325 ES01-NP55 PORT SIDE FLIGHT DECK SUPPORT

STRUCTURE; REPAIR

01-98-2-WEA 3/24/2027 DFS LSD-47-1009-2023 IS TIED TO THIS JCN. RATED AS

R3/S5 IAW SDRM IN SURFMEPP DM 220-042 REV C.

ACCOMPLISH REPAIR RECOMMENDATION IN

LEVEL TWO STRUCTURAL INSPECTION

JRMC Page 4 of 7 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9312325 ES01-NP56 PORT SIDE FLIGHT DECK SUPPORT

STRUCTURE; REPAIR

01-98-2-WEA 3/24/2027 DFS LSD-47-1009-2023 IS TIED TO THIS JCN. RATED AS

R3/S5 IAW SDRM IN SURFMEPP DM 220-042 REV C.

ACCOMPLISH REPAIR RECOMMENDATION IN

LEVEL TWO STRUCTURAL INSPECTION

38E9313601 ES01-NP73 REV-01(FO1)~DECK COAMING ON 06

LEVEL WEATHER DECK; REPAIR

06-21-01-WEA 4/8/2027 PER , R3/S5 FOR SDRM. 2" LG X 1/2" H HOLE IN DECK

COAMING AS A PART OF THE DECK HOUSE SIDE

CROP OUT AND REPLACE THE PLATE IN

ACCORDANCE WITH NSTM 100-2.8. ASSESSED

38E9313601 ES01-NP74 REV-01(FO1)~DECK COAMING ON 06

LEVEL WEATHER DECK; REPAIR

06-21-01-WEA 4/8/2027 PER , R3/S5 FOR SDRM. TWO HOLES, 6" LG X 3" H

AND 1/2" DIA, IN DECK COAMING AS A PART OF THE

CROP OUT AND REPLACE THE PLATE IN

ACCORDANCE WITH NSTM 100-2.8. ASSESSED

38E9312321 ES01-NP75 DECK IN FAN ROOM; PRESERVE 06-37-2-Q 4/8/2027 PER , R2/S5 FOR SDRM. DETERIORATED FLAT BAR OF

A PIPING SUPPORT ON 06 LEVEL DECK.

CROP OUT AND REPLACE THE FLAT BAR.

ASSESSED BY YOSHIZUMI IIDA, POC DAVID

38E9313602 ES01-NP76 NONSKID DECK COVERING ON 1-14-0-

Q; REPLACE

1-14-0-Q 4/8/2027 PER , R3/S5 FOR SDRM. HOLED WEB AND THINNING

FLANGE OF VERTICAL STIFFENER L6P ON THE

CROP OUT AND REPLACE THE STIFFENER IN

ACCORDANCE WITH NSTM 100-2.8. ASSESSED

38E9313602 ES01-NP77 NONSKID DECK COVERING ON 1-14-0-

Q; REPLACE

1-14-0-Q 4/8/2027 PER , R3/S5 FOR SDRM. HOLED WEB AND THINNING

FLANGE OF VERTICAL STIFFENER L5P ON THE

CROP OUT AND REPLACE THE STIFFENER IN

ACCORDANCE WITH NSTM 100-2.8. ASSESSED

38E9312322 ES01-NP78 FAN ROOM(1-85-1-Q); REPAIR AND

PRESERVE

1-85-1-Q 4/8/2027 PER , R3/S5 FOR SDRM. EDGE LOSS IN THE FLANGE

AND A HOLE IN THE WEB AT THE LOWER SECTION OF

CROP OUT AND REPLACE THE STIFFENER IN

ACCORDANCE WITH NSTM 100-2.8. ASSESSED

38E9312335 ES01-NP90 BALLAST TANK VENT PIPING; REPLACE 01-119-1-Q 4/8/2027 PER 21530DA01ZAS8, DETERIORATED PIPE WAS

FOUND AT STBD SIDE. DAMAGE SIZE WAS 2.

REPAIR OR REPLACE PIPE WITH NEW ONE.

ASSESSED BY MASAKI TAGUCHI, POC PAUL

38E9312349 ES01-NP9I DECK OF ESCAPE TRUNK; PRESERVE 5-66-4-T 3/2/2027 PER 21530EM01ZEB5, CCIMS PAINT CONDITION IS 4.

VISIBLE PART OF PAINT: 42.5 SQFT CORROSION

FOR DECK PAINT CONDITION, FULL

PRESERVATION REQUIRED. THE UT

JRMC Page 5 of 7 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9386401 EXSY-ZA48 WELL DECK IN 4-35-0-Q; ASSESS NOT-APPLIC 5/17/2027 *HSC 86411SV1443A*PRIDSVCE ROUTINE MRN-

GCMAKC000118217QPDQMAINTENANCE

STANDARD: NO "R" TASK TEMPLATE LAST

COMPLETED 09/01/2011 (R-86411-

A06)MRC G1N6 ASSESSMENT OF THE WELL DECK

REQUIRES INDUSTRIAL SUPPORT SERVICES.

PROVIDE INDUSTRIAL SERVICES IN SUPPORT

OF THE SURVEYOR(S) ACCOMPLISHING THE

MRC G1N6 ASSESSMENT PER CMP TASK I-

12342-A01. REQUIRED SERVICES INCLUDE:

(A) PROVIDE JLG AND OPERATOR TO

SUPPORT MRC G1N6 ASSESSMENT OF THE

WELL DECK OVERHEAD STRUCTURE. (B)

REMOVE BATTERBOARDS AND WELL DECK

PLANKING AS IDENTIFIED BY THE MRC G1N6

ASSESSMENT SURVEYOR. REINSTALL

REMOVED BATTERBOARDS AND WELL DECK

PLANKING AFTER COMPLETION OF THE

ASSESSMENT. (C) THE MRC G1N6

ASSESSMENT SURVEYOR SHALL NOTIFY THE

SHIP AND PORT ENGINEER 72 HOURS PRIOR

TO USE OF THE JLG AND OPERATOR. THE

SURVEYOR SHALL NOTIFY THE SHIP AND PORT

ENGINEER WHEN THE JLG AND OPERATOR

ARE NO LONGER REQUIRED. NOTE 1:

SCHEDULE THIS TASK FOR ACCOMPLISHMENT

CONCURRENT WITH CMP TASK I-12342-A01.

TASK NORMALLY ACCOMPLISHED DURING A

CMAV INSTEAD OF A CNO DEPOT

AVAILABILITY. NOTE 2: WORK SPECIFIED IN

PARAGRAPH (B) IS NOT REQUIRED WHEN

SHIPS FORCE REMOVES AND REINSTALLS THE

38E9386402 EXSY-ZA53 WAVEGUIDE AND TRANSMISSION LINE

DRY AIR LAY-UP; PROVIDE

NOT-APPLIC 5/17/2027 *HSC 86491SV1391A*PRIDSVCE ROUTINE MRN-

GCMAKC000118217QPHZMAINTENANCE STANDARD:

PROVIDE DRY AIR LAY-UP FOR ALL

PRESSURIZED WAVE GUIDES AND

38E9313601 OT01-0945 NONSKID DECK COVERING AND DECK

PLATE AT 06 LEVEL WEATHER DECK;

06-57-2-WEA 4/8/2027 DURING INSPECTION IT WAS NOTED THAT THE 06

LEVEL WEATHER DECK NONSKID IS IN NEED OF

REQUEST DEPOT LEVEL REPLACE ALL NON-

SKID ON 06 LEVEL WEATHER DECK NONSKID.

38E9367102 OW02-L011 NON-SKID DECK COVERING ON FWD 04

LEVEL WEATHER DECK; REPLACE

04-13-0-WEA 4/8/2027 FWD RAM WEATHER DECK FRAME 13-21 HAS

SIGNIFICANT CORROSION DAMAGE TO BOTH NON-

REQUEST OUTSIDE ACTIVITY REPAIR

CORROSION TO DECK AND RE-APPLY NON

38E9367103 OW02-L012 HULL STRUCTURE ON 04 LEVEL DECK;

REPAIR

04-13-0-WEA 4/8/2027 RAM EQPT RM 1 ON THE FWD RAM DECK HAS

SIGNIFICANT CORROSION TO THE METAL BELOW THE

REQUEST OUTSIDE ACTIVITY REPAIR AND

REPLACE THE CORRODED METAL UNDER THE

38E9365502 SERV-L128 ELM-225077; ACCOMPLISH 2-111-1-Q 4/8/2027 DURING THE PRC REPAIR IN COMPARTMENT 2-111-1-

Q CORROSION; HOLES, THINNING, ETC. WERE FOUND

REQUEST OUTSIDE ACTIVITY TO MAKE

REPAIRS TO ITEMS 5-7 AND 12-20 AS

38E9367101 SS02-4937 REHEATER AND DUCT IN 04-59-0-L;

CLEAN

04-59-0-L 4/8/2027

38E9364301 SS02-4938 REHEATER DUCT 03-31-1, 03-35-0-Q;

CLEAN

03-31-1-L 4/8/2027

38E9364101 SS02-4939 VENTILATION SYSTEM; CLEAN AND

INSPECT

06-25-3-L 4/8/2027 ACCESS TO REHEATER/DUCT INACCESSIBLE. SEE NOT

3 OF MRC A-14. MIP SERIES 5121

REQUESTING OUTSIDE ACTIVITY TO CLEAN

REHEATER/DUCT IN THE NEXT CNO/TYCOM

JRMC Page 6 of 7 Business Sensitive

ICN

JCN Summary Location PCD Problem Description Required Repair

38E9364102 SS02-4940 REHEATER DUCT 05 LVL; CLEAN 05-24-1-L 4/8/2027

38E9364102 SS02-4941 REHEATER DUCT 05 LVL; CLEAN 05-26-2-L 4/8/2027

38E9364101 SS02-4942 VENTILATION SYSTEM; CLEAN AND

INSPECT

06-34-2-L 4/8/2027 ACCESS TO REHEATER/DUCT INACCESSIBLE. SEE NOT

3 OF MRC A-14. MIP SERIES 5121

REQUESTING OUTSIDE ACTIVITY TO CLEAN

REHEATER/DUCT IN THE NEXT CNO/TYCOM

38E9364103 SS02-4944 REHEATER AND DUCT ON 05 LEVEL;

CLEAN

05-32-6-L 4/8/2027

38E9364103 SS02-4945 REHEATER AND DUCT ON 05 LEVEL;

CLEAN

05-32-1-L 4/8/2027

38e9364302 SS02-4946 REHEATER AND DUCT IN 05-56-2-L;

CLEAN

05-56-2-L 4/8/2027

38E9364102 SS02-4947 REHEATER DUCT 05 LVL; CLEAN 05-27-1-L 4/8/2027

38E9364301 SS02-4948 REHEATER DUCT 03-31-1, 03-35-0-Q;

CLEAN

03-35-0-Q 4/8/2027

38E9364103 SS02-4949 REHEATER AND DUCT ON 05 LEVEL;

CLEAN

05-35-8-L 4/8/2027

JRMC Page 7 of 7 Business Sensitive

List Report

File details come from the government source that posted it. Updated .