This is a conformed drawing set for the RTS Bus Fleet Maintenance & Operations Facility in Gainesville, Florida, prepared by Moses & Associates architects and engineers for the City of Gainesville. The project encompasses comprehensive mechanical, plumbing, electrical, telecommunications, and fire protection systems across five buildings: a maintenance facility with multiple levels and specialized bays, a service building housing chiller equipment, a fueling station, a bus wash building, and an administrative/operations building. The drawings detail HVAC systems including air handling units, variable air volume (VAV) terminal units, boilers, chillers, and exhaust fans; plumbing systems for sanitary waste and water distribution; electrical power distribution, lighting, fire alarm, and audio/visual systems; telecommunications infrastructure including backbone cabling and device outlets; and fire protection sprinkler systems. The document set consists of three volumes of conformed (final) drawings dated March 29, 2013, organized by building subsection and system type, with detailed schedules for equipment specifications, control sequences, and installation requirements.
The technical specifications require all equipment and materials to meet "Buy America" requirements and compliance with the 2010 Florida Building Code and associated standards including NFPA, ASHRAE, and UL requirements. Key mechanical systems include redundant 1,500 MBH natural gas boilers with 120 GPM heating hot water pumps, a 100-ton air-cooled chiller with redundant chilled water pumps, multiple packaged heat pump units, and an extensive network of variable frequency drives and direct digital controls integrated through a Building Automation System (BAS) using BACnet/MSTP protocol. The administrative/operations building features two custom air handling units with variable speed drives, demand-based ventilation with CO2 sensors, and comprehensive measurement and verification capabilities for tracking energy consumption across HVAC, lighting, and process loads. Telecommunications infrastructure includes redundant backbone cabling, fiber optic and copper pathways, server room equipment racks with multiple carriers (GRUCOM, Public Works, Cox, AT&T), and extensive camera, wireless access point, and access control system provisions throughout the facility complex.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFTED BY:
ARCHITECT'S PROJECT NO.:
DATE:
REVISION DATES:
PLANS CHECKED BY:
DATE CHECKED:
PHONE: FAX:
(352) 372-1378 (352) 378-1281
GAINESVILLE FLORIDA
5700 SW 34TH STREET SUITE 1307
32608
AA 0002486
for
A R C H I T E C T S
GENERAL:
Gainesville, Florida
G0.13
RTS BUS
FLEET
MAINTENANCE
& OPERATIONS
FACILITY
City of Gainesville
CONFORMED
DOCUMENTS
JLR
11046
MA
COVER SHEET - VOLUME 2
CONTENTS OF SET, PROJECT LOCATION
MAP, & APPLICABLE CODES
29 March 2013
RTS Bus Fleet Maintenance &
Operations Facility
Gainesville, Florida for the City of Gainesville
MECHANICAL
PLUMBING
G0.13 COVER SHEET - VOLUME 3:
CONTENTS OF SET
CONTENTS OF SET
GENERAL
Drawing Volume 3 of 3
SUB-SET 0 - GENERAL
0P0.00 LEGEND, ABBREVIATIONS & SCHEDULES
0P1.00 PLUMBING SITE PLAN
SUB-SET 1 - MAINTENANCE BUILDING
1P1.10 MAINTENANCE FACILITY PLAN - LEVEL 1 UNDERFLOOR CORE
1P1.11 MAINTENANCE FACILITY PLAN - LEVEL 1 UNDERFLOOR SOUTH
BAYS
1P1.12 MAINTENANCE FACILITY PLAN - LEVEL 1 UNDERFLOOR NORTH
BAYS
1P1.13 MAINTENANCE FACILITY PLAN - LEVEL 1 CORE
1P1.14 MAINTENANCE FACILITY PLAN - LEVEL 1 SOUTH BAYS
1P1.15 MAINTENANCE FACILITY PLAN - LEVEL 1 NORTH BAYS
1P1.16 MAINTENANCE FACILITY SECOND FLOOR & ROOF PLAN
1P1.20 MAINTENANCE FACILITY ENLARGED PLAN & SANITARY VENT RISER
1P1.41 MAINTENANCE FACILITY DETAILS & SCHEDULES
1P1.42 MAINTENANCE FACILITY DETAILS & SCHEDULES
SUB-SET 2 - SERVICE BUILDING
2P1.11 SERVICE BUILDING PLAN
SUB-SET 3 - FUELING BUILDING
3P1.11 FUELING STATION PLAN
3P1.21 ENLARGED FUELING STATION PLAN, RISERS, AND DETAILS
SUB-SET 4 - BUS WASH BUILDING
4P1.11 BUS WASH PLANS
SUB-SET 5 - ADMINISTRATIVE/OPERATIONS BUILDING
5P1.10 UNDERFLOOR PLAN
5P1.11 FIRST FLOOR PLAN - SANITARY WASTE & VENT
5P1.12 SECOND FLOOR PLAN - SANITARY WASTE & VENT
5P1.13 ROOF PLAN
5P1.21 FIRST FLOOR PLAN - WATER
5P1.22 SECOND FLOOR PLAN - WATER
5P1.31 SANITARY, WASTE, AND VENT RISER DIAGRAM
TELECOMMUNICATIONS
ELECTRICAL
FIRE PROTECTION
SUB-SET 0 - GENERAL
0F0.00 LEGEND, NOTES, AND DETAILS
0F1.00 FIRE PROTECTION SITE PLAN
SUB-SET 1 - MAINTENANCE BUILDING
1F1.10 MAINTENANCE FACILITIES PLAN - LEVEL 1 CORE
1F1.11 MAINTENANCE FACILITIES PLAN - LEVEL 1 SOUTH BAYS
1F1.12 MAINTENANCE FACILITIES PLAN - LEVEL 1 NORTH BAYS
1F2.00 MAINTENANCE FACILITIES PLAN - LEVEL 2 OVERALL PLAN
SUB-SET 0 - GENERAL
0E0.00 ELECTRICAL LEGEND
0E1.00 ELECTRICAL SITE PLAN
0E1.01 ELECTRICAL SITE PLAN
0E1.02 ENLARGED SITE PLAN
0E2.01 SINGLE LINE DIAGRAM
0E3.01 DETAILS
0E3.02 DETAILS
0E3.03 DETAILS
0E3.04 DETAILS
0E3.05 DETAILS
0E3.06 DETAILS
0E3.07 AUDIO/VISUAL DIAGRAMS
0E3.08 AUDIO/VISUAL DIAGRAMS
0E3.09 AUDIO/VISUAL DIAGRAMS
0E3.10 AUDIO/VISUAL DIAGRAMS
0E3.11 AUDIO/VISUAL DIAGRAMS
0E4.01 LIGHTING FIXTURE SCHEDULES
0E4.02 SCHEDULES
0E4.03 SCHEDULES
0E4.04 MAINTENANCE BLDG PANELBOARD SCHEDULES
0E4.05 MAINTENANCE BLDG PANELBOARD SCHEDULES
0E4.06 MAINTENANCE BLDG PANELBOARD SCHEDULES
0E4.07 MAINTENANCE BLDG PANELBOARD SCHEDULES
0E4.08 MAINTENANCE BLDG PANELBOARD SCHEDULES
0E4.09 GENERATOR HOUSING PANELBOARD SCHEDULES
0E4.10 FUELING STATION PANELBOARD SCHEDULES
0E4.11 BUS WASH PANELBOARD SCHEDULES
0E4.12 ADMINISTRATIVE BLDG PANELBOARD SCHEDULES
0E4.13 ADMINISTRATIVE BLDG PANELBOARD SCHEDULES
0E4.14 ADMINISTRATIVE BLDG PANELBOARD SCHEDULES
SUB-SET 1 - MAINTENANCE BUILDING
1E1.10 POWER LEVEL 1 CORE
1E1.11 POWER LEVEL 1 SOUTH BAYS
1E1.12 POWER LEVEL 1 NORTH BAYS
1E1.13 POWER LEVEL 2 CORE
1E1.20 MECHANICAL POWER LEVEL 1 CORE
1E1.21 MECHANICAL POWER LEVEL 1 SOUTH BAYS
1E1.22 MECHANICAL POWER LEVEL 1 NORTH BAYS
1E1.23 MECHANICAL POWER LEVEL 2 CORE
1E1.24 MECHANICAL POWER - ROOF CORE
1E1.25 MECHANICAL POWER - ROOF SOUTH BAYS
1E1.26 MECHANICAL POWER - ROOF NORTH BAYS
1E1.30 LIGHTING LEVEL 1 CORE
1E1.31 LIGHTING LEVEL 1 SOUTH BAYS
1E1.32 LIGHTING LEVEL 1 NORTH BAYS
1E1.33 LIGHTING LEVEL 2 CORE
1E1.34 LIGHTING LEVEL 2 SOUTH BAYS
1E1.35 LIGHTING LEVEL 2 NORTH BAYS
1E1.40 FIRE ALARM LEVEL 1 CORE
1E1.41 FIRE ALARM LEVEL 1 SOUTH BAYS
1E1.42 FIRE ALARM LEVEL 1 NORTH BAYS
1E1.43 FIRE ALARM LEVEL 2 CORE
1E1.50 SYSTEMS LEVEL 1 CORE
1E1.51 SYSTEMS LEVEL 1 SOUTH BAYS
1E1.52 SYSTEMS LEVEL 1 NORTH BAYS
1E1.53 SYSTEMS LEVEL 2 CORE
1E1.61 LIGHTNING PROTECTION
SUB-SET 0 - GENERAL
0T0.00 TELECOMMUNICATIONS LEGEND
0T2.01 VOICE RISER DIAGRAM
0T2.02 VIDEO RISER DIAGRAM
0T3.01 DETAILS
0T3.02 DETAILS
SUB-SET 1 - MAINTENANCE BUILDING
1T1.10 TELECOMMUNICATIONS LEVEL 1 CORE
1T1.11 TELECOMMUNICATIONS LEVEL 1 SOUTH BAYS
1T1.12 TELECOMMUNICATIONS LEVEL 1 NORTH BAYS
1T1.13 TELECOMMUNICATIONS LEVEL 2 CORE
1T1.14 TELECOMMUNICATIONS LEVEL 2 SOUTH BAYS
1T1.15 TELECOMMUNICATIONS LEVEL 2 NORTH BAYS
SUB-SET 2 - SERVICE BUILDING
2T1.11 - SERVICE BUILDING PLAN
SUB-SET 3 - FUELING BUILDING
3T1.11 FUELING STATION PLAN
SUB-SET 4 - BUS WASH BUILDING
4T1.11 BUS WASH PLAN
SUB-SET 5 - ADMINISTRATIVE OPERATIONS BUILDING
5T1.11 FIRST FLOOR PLAN
5T1.12 SECOND FLOOR PLAN
SUB-SET 0 - GENERAL
0M0.11 MECHANICAL LEGEND & DETAILS
0M0.21 MECHANICAL SCHEDULES
0M0.31 MECHANICAL DETAILS
0M0.41 MECHANICAL CONTROLS
0M0.42 MECHANICAL CONTROLS
0M0.43 MECHANICAL CONTROLS
SUB-SET 1 - MAINTENANCE BUILDING
1M1.11 LEVEL 1 PLAN - CORE
1M1.12 LEVEL 1 PLAN - SOUTH BAYS
1M1.13 LEVEL 1 PLAN - NORTH BAYS
1M2.11 LEVEL 2 PLAN - CORE
1M2.12 LEVEL 2 PLAN - SOUTH BAYS
1M2.13 LEVEL 2 PLAN - NORTH BAYS
1M3.11 ROOF PLAN - CORE
1M3.12 ROOF PLAN - SOUTH BAYS
1M3.13 ROOF PLAN - NORTH BAYS
SUB-SET 2 - SERVICE BUILDING
2M1.11 FLOOR PLAN
SUB-SET 3 - FUELING BUILDING
3M1.11 FLOOR PLAN
SUB-SET 4 - BUS WASH BUILDING
4M1.11 FLOOR PLAN
SUB-SET 5 - ADMINISTRATIVE/OPERATIONS BUILDING
5M1.11 FIRST FLOOR PLAN
5M1.12 SECOND FLOOR PLAN
5M1.13 ROOF PLAN
SUB-SET 2 - SERVICE BUILDING
2E1.11 - SERVICE BUILDING PLAN
SUB-SET 3 - FUELING BUILDING
3E1.11 FUELING BUILDING PLAN - POWER
3E1.21 FUELING BUILDING PLAN - MECHANICAL POWER
3E1.31 FUELING BUILDING PLAN - LIGHTING
3E1.41 FUELING BUILDING PLAN - FIRE ALARM
3E1.51 FUELING BUILDING PLAN - LIGHTNING PROTECTION
3E1.61 FUELING BUILDING PLAN - SYSTEMS
3E1.71 FUELING MANAGEMENT SYSTEM CONDUIT SCHEMATIC
SUB-SET 4 - BUS WASH BUILDING
4E1.11 BUS WASH PLAN - POWER
4E1.21 BUS WASH PLAN - MECHANICAL POWER
4E1.31 BUS WASH PLAN - LIGHTING
4E1.41 BUS WASH PLAN - SYSTEMS
4E1.51 BUS WASH PLAN - LIGHTNING PROTECTION
SUB-SET 5 - ADMINISTRATIVE/OPERATIONS BUILDING
5E1.11 FIRST FLOOR PLAN - POWER
5E1.12 SECOND FLOOR PLAN - POWER
5E1.21 FIRST FLOOR PLAN - MECHANICAL POWER
5E1.22 SECOND FLOOR PLAN - MECHANICAL POWER
5E1.23 ROOF PLAN - MECHANICAL POWER
5E1.31 FIRST FLOOR PLAN - LIGHTING
5E1.32 SECOND FLOOR PLAN - LIGHTING
5E1.41 FIRST FLOOR PLAN - FIRE ALARM
5E1.42 SECOND FLOOR PLAN - FIRE ALARM
5E1.51 FIRST FLOOR PLAN - SYSTEMS
5E1.52 SECOND FLOOR PLAN - SYSTEMS
5E1.61 FIRST FLOOR PLAN - AUDIO/VISUAL
5E1.62 SECOND FLOOR PLAN - AUDIO/VISUAL
5E1.71 LIGHTNING PROTECTION ROOF PLAN
Moses & Associates, Inc.
2209 NW 40th Terrace, Ste A Gainesville, Florida 32605 FL License EB-0003097
P 352-372-1911 F 352-372-0186 moses-eng.com
M&A #11211
1F2.10 MAINTENANCE FACILITIES PLAN - LEVEL 2 CORE & SECTION
1F3.01 FIRE PUMP DETAILS
SUB-SET 2 - SERVICE BUILDING
SUB-SET 3 - FUELING BUILDING
SUB-SET 4 - BUS WASH BUILDING
SUB-SET 5 - ADMINISTRATIVE/OPERATIONS BUILDING
5F1.11 FIRST FLOOR PLAN
5F1.12 SECOND FLOOR PLAN
5F1.21 FIRE PROTECTION SECTIONS
5F1.22 FIRE PROTECTION SECTIONS
5F1.31 FIRE PROTECTION ENLARGED PLAN
No. Description Date
A AMPS; AREA
AAV AUTOMATIC AIR VENT
ABV CLG ABOVE FINISHED CEILING
AC AIR CONDITIONING UNIT
ACH AIR CHANGE PER HOUR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AM AIRFLOW MONITOR
AMS AIRFLOW MEASURING STATION
AL ALUMINUM
AP ACCESS PANEL
AH ATOMIZING HUMIDIFIER
BD BALANCING DAMPER
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BTU BRITISH THERMAL UNITS
BTUH BTU PER HOUR
B BOILER
C CONDENSATE
CAC CONTROL AIR COMPRESSOR
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHW CHILLED WATER
CHP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEANOUT
CR CONDENSATE RETURN (STEAM)
CT COOLING TOWER
CU CONDENSING UNIT; COPPER
CV COEFFICIENT OF VALVE
DB DRY BULB
DC DUST COLLECTOR
DDC DIRECT DIGITAL CONTROLS
DEFL DEFLECTION
DG DOOR GRILLE
DIA DIAMETER
DS DUCT SILENCER
DTW DUAL TEMPER WATER
DTWR DUAL TEMPER WATER RETURN
DTWS DUAL TEMPER WATER SUPPLY
DS DUCT SILENCER
EA EACH
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
EV EXHAUST VALVE
EWT ENTERING WATER TEMPERATURE
EXST EXISTING
EXH EXHAUST
°F DEGREES FAHRENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER, FLOOR DRAIN
FG FILTER GRILLE
FH FUME HOOD
FMS FLOW MEASURING STATION
FO FLAT OVAL
FPM FEET PER MINUTE
FRP FIBERGLASS REINFORCED PLASTIC
FT FEET
FT WG FEET OF WATER, GAUGE
FTU FAN TERMINAL UNIT
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HG HOT GAS
HHW HEATING HOT WATER
HWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HP HEAT PUMP; HORSEPOWER
HR HOUR
HX HEAT EXCHANGER
ID INSIDE DIAMTER
IN. WG INCHES OF WATER, GAUGE
KW KILOWATTS
ABBREVIATIONS
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LB POUND
LD LINEAR DIFFUSER
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSANDS OF BTU'S
MCF THOUSANDS OF CUBIC FEET
MD MOTORIZED DAMPER
MIN MINUTE; MINIMUM
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
NTS NOT TO SCALE
OA OUTDOOR AIR
OAL OUTDOOR AIR LOUVER
OC ON CENTER
OD OUTSIDE DIAMETER
P PUMP
PCW PROCESS COOLING WATER
PCP PROCESS COOLING WATER PUMP
PCWR PROCESS COOLING WATER RETURN
PCWS PROCESS COOLING WATER SUPPLY
PH PHASE
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
R RADIUS
RA RETURN AIR
RD ROUND DIFFUSER
RAG RETURN AIR GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID
RP REDUCED PRESSURE
RPM REVOLUTIONS PER MINUTE
RAR RETURN AIR REGISTER
RS REFRIGERANT SUCTION
RV ROOF VENT
SA SUPPLY AIR
SAR, SR SUPPLY AIR REGISTER
SD SMOKE DAMPER
SF SQUARE FEET, SUPPLY FAN
SG SOFFIT GRILLE
SIM SIMILAR
SP STATIC PRESSURE
SPEC SPECIFICATION
SR SIDEWALL REGISTER
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STM STEAM
SV SUPPLY VALVE
TEMP TEMPERATURE
TG TRANSFER GRILLE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UC UNDERCUT DOOR - 3/4"
UG UNDERGROUND
UH UNIT HEATER
V VOLTS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VFM VENTURI FLOW METER
VLV VALVE
VVU VARIABLE VOLUME UNIT
WB WET BULB
WPD WATER PRESSURE DROP
XXX
BALL VALVE
GENERAL LEGEND
UNIT SYMBOL W/ UNIT NUMBER
GATE VALVE
CHECK VALVE
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
GAUGE CONNECTOR PLUG
IN-LINE STRAINER
THERMOMETER
THERMOMETER WELL
UNION
AUTOMATIC AIR VENT
GAUGE AND BALL VALVE
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VENTURI FLOW METER
FLEXIBLE PIPE CONNECTION
CALIBRATED BALANCING VALVE
PIPE DOWN
PIPE UP
RADIUSED ELBOW (RADIUS = 1.5 X WIDTH)
DUCT/PIPE
MECHANICAL GENERAL NOTES
1. ALL EQUIPMENT & MATERIALS SHALL MEET "BUY AMERICA" REQUIREMENTS PER
SPECIFICATION 01000.
2. DUCT SIZES ARE SHEET METAL SIZES. NO DUCTWORK SHALL RUN PARALLEL
WITH AND OVER WALLS.
3. VERIFY COLLAR SIZES ON ALL AIR TERMINALS AND EQUIPMENT INLETS AND
OUTLETS. TRANSITION DUCTWORK AS NECESSARY.
4. CONTRACTOR SHALL VERIFY CLEARANCE SPACE AVAILABLE, OFFSETS
REQUIRED, STRUCTURAL OPENINGS, AND WORK BY OTHER TRADES PRIOR TO
FABRICATION OF DUCTWORK. PRESSURE TEST ALL REFRIGERANT PIPING PER
SPECIFICATION.
5. KEEP ALL REFRIGERANT PIPING CAPPED AND SEALED TO PREVENT
CONTAMINANTS FROM ENTERING PIPING DURING CONSTRUCTION. UNCAPPED
PIPING SHALL BE REMOVED AND REPLACED AT OWNERS' DISCRETION.
6. CONTRACTOR SHALL INSTALL ALL EQUIPMENT, PIPING, AND DUCTWORK SUCH
THAT MANUFACTURER'S RECOMMENDED CLEARANCES ARE MET FOR ALL
ACCESS PANELS, MOTORS, FANS, BELTS, FILTERS, AND AIR INTAKES.
7. ROUTE ALL PIPING CONCEALED ABOVE CEILING OR IN WALL. SUBMIT LOCATIONS
FOR ANY EXPOSED PIPING ROUTING TO ARCHITECT/ENGINEER FOR APPROVAL.
8. ALL PIPING PASSING THROUGH FIRE-RATED WALLS SHALL HAVE A FIRE RATED
SLEEVE AND SHALL BE PROTECTED PER SPECIFICATIONS.
9. PROVIDE ALL FITTINGS, ACCESSORIES, AND PIPING AS REQUIRED FOR A FULLY
FUNCTIONAL SYSTEM AND TO MEET THE DESIGN INTENT.
DIVISION 15 CODES & STANDARDS
1 GENERAL
1.1 THE WORK COVERED BY THIS DIVISION CONSISTS OF PROVIDING ALL LABOR,
EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS NECESSARY FOR THE
INSTALLATION OF THE MECHANICAL WORK AS HEREIN CALLED FOR AND SHOWN ON THE
DRAWINGS.
2 CODES
2.1 ALL WORK UNDER DIVISION 15 SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
CODES LISTED HEREIN. THE DESIGN HAS BEEN BASED ON THE REQUIREMENTS OF
THESE CODES; AND WHILE IT IS NOT THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY THAT ALL WORK CALLED FOR COMPLIES WITH THESE CODES, HE SHALL BE
RESPONSIBLE FOR CALLING TO THE ARCHITECT/ENGINEER'S ATTENTION ANY
DRAWINGS OR SPECIFICATIONS THAT ARE NOT IN CONFORMANCE WITH THESE OR
OTHER CODES PRIOR TO ORDERING EQUIPMENT OR INSTALLING WORK.
2.2 COMPLY WITH REGULATIONS AND CODES OF UTILITY SUPPLIERS.
2.3 WHERE NO SPECIFIC METHOD OR FORM OF CONSTRUCTION IS CALLED FOR IN THE
CONTRACT DOCUMENTS, THE CONTRACTOR SHALL COMPLY WITH CODE
REQUIREMENTS WHEN CARRYING OUT SUCH WORK.
2.4 WHERE CODE CONFLICT EXISTS, GENERALLY THE MOST RESTRICTIVE REQUIREMENT
APPLIES. COMPLY WITH CURRENT CODE EDITION, UNLESS NOTED.
2.5 ADDITIONAL CODES OR STANDARDS APPLYING TO A SPECIFIC PART OF THE WORK AY
BE INCLUDED IN THAT SECTION.
2.6 THE FOLLOWING CODES GOVERN THE WORK:
2.6.1 FLORIDA BUILDING CODE - BUILDING - 2010.
2.6.2 FLORIDA BUILDING CODE - PLUMBING - 2010.
2.6.3 FLORIDA BUILDING CODE - MECHANICAL - 2010.
2.6.4 FLORIDA BUILDING CODE - FUEL GAS - 2010.
2.6.5 FLORIDA BUILDING CODE - TEST PROTOCOLS FOR HIGH VELOCITY
HURRICANE ZONES - 2010.
2.6.6 UNIFORM FIRE CODE (NFPA 1) - 2009 FLORIDA EDITION.
2.6.7 NATIONAL ELECTRIC CODE (NFPA 70) - 2008.
2.6.8 LIFE SAFETY CODE (NFPA 101) - 2009 FLORIDA EDITION.
2.6.9 INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS
(NFPA 90A) - 2009.
2.6.10 INSTALLATION OF SPRINKLER SYSTEMS (NFPA 13) - 2007.
2.6.11 FAC 69A-60 FLORIDA FIRE PREVENTION CODE - 2010.
3 STANDARDS
3.1 ALL DIVISION 15 MATERIALS, INSTALLATION AND SYSTEMS SHALL MEET THE
REQUIREMENTS OF THE FOLLOWING STANDARDS, INCLUDING THE LATEST ADDENDA AND
AMMENDMENTS, TO THE EXTENTREFERENCED:
3.1.1 UNDERWRITERS' LABORATORIES (UL)
3.1.2 AMERICAN NATIONAL STANDARDS INSTITUTION (ANSI)
3.1.3 AMERICAN SOCIETY OF TESTING MATERIALS (ASTM)
3.1.4 NATIONAL FIRE PROTECTION (NFPA)
3.1.5 NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
3.1.6 AIR CONDITIONING AND REFRIGERATION INSTITUTE (ARI)
3.1.7 SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL
ASSOCIATION (SMACNA)
3.1.8 AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING
ENGINEERS (ASHRAE)
3.1.9 AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)
3.1.10 STANDARDS OF THE HYDRONIC INSTITUTE (IBR)
ALL EQUIPMENT AND MATERIALS SHALL
MEET "BUY AMERICA" REQUIREMENTS
PER SPECIFICATION 01000.
FULL RADIUS ELBOW HALF RADIUS ELBOW
W
1.0 X W1.5 X W
W
B
A
MAINTAIN SAME
DIMENSIONS
SQUARE ELBOW WITH TURNING VANES
NOTES:
1. FULL RADIUS ELBOWS SHALL BE USED FOR ALL LOW PRESSURE
SYSTEMS. HALF RADIUS ELBOWS SHALL ONLY BE PERMITTED
WHERE FULL RADIUS ELBOWS WILL NOT FIT. MECHANICAL
CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM ENGINEER
PRIOR TO INSTALLATION OF HALF RADIUS ELBOWS.
2. FOR SQUARE ELBOWS, DIMENSIONS 'A' AND 'B' MUST BE EQUAL,
UNLESS OTHERWISE SHOWN ON DRAWINGS.
3. FOR LOW PRESSURE SYSTEMS, SQUARE OR RECTANGULAR ELBOWS
WITH TURNING VANES SHALL ONLY BE PROVIDED WHERE FULL
RADIUS OR HALF RADIUS ELBOW WILL NOT FIT, UNLESS OTHERWISE
SHOWN ON DRAWINGS. MECHANICAL CONTRACTOR SHALL OBTAIN
WRITTENAPPROVAL FROM ENGINEER PRIOR TO INSTALLATION OF
SQUARE OR RECTANGULAR ELBOWS.
MAIN DUCT
FINISHED CEILING
CONICAL SPIN-IN FITTING
SMACNA 45 DEGREE
RECTANGULAR WITH TRANSITION
TO ROUND MAY BE REQUIRED
ROUND SHEET METAL
DUCT AS REQUIRED
INSULATE AS MAIN DUCTADAPTOR AS REQUIRED
NOTE: PROVIDE ADAPTOR WITH
SIDE CONNECTION WHERE
OBSTRUCTIONS DO NOT ALLOW
CONNECTION TO TOP
INSULATE SUPPLY DIFFUSERS
BACK WITH 2" FIBERGLASS
AND SEAL EDGES FLEX DUCT 8'-0" MAX FOR
SUPPLY RIGID SHEET
METAL FOR EXHAUST
BALANCING DAMPER IN
ALL DUCT RUNOUTS
(MAY BE IN SPIN-IN)
NOTES:
1. DETAIL IS FOR CONCEALED DUCT.
WHERE EXPOSED, DUCT RUNOUTS TO
CDs SHALL BE DOUBLE WALL HARD
DUCT.
2. EXHAUST SIMILAR BUT DO NOT USE FLEX
DUCT AND DO NOT INSULATE BACK OF
GRILLE.
8 9
1/4" MINIMUM CLEARANCE
1" MINIMUM OVERLAP (4 SIDES)
1-1/2" x 1-1/2" x 14 GAUGE ANGLES MINIMUM WITH No.10 GALVANIZED SCREWS @ 12" OC (MIN. 2 PER
SCREW OR TACK WELD FIRE DAMPER TO SLEEVE.
SAME SPACING AS ANGLES
UL-555, 1-1/2 HOUR SPRING ACTUATED FIRE DAMPER.
SLEEVE SHALL BE AT LEAST DUCT GAUGE PER SMACNA
AND NFPA 90A
GALVANIZED STEEL DUCT
6" MAXIMUM
ACCESS PANEL
SIDE) DO NOT ATTACH TO WALL
HORIZONTAL INSTALLATION SIMILAR.
MOTOR HOUSING
1. SECURE FAN TO PREFABRICATED CURB.
2. SEE ARCHITECTURAL DRAWINGS FOR ROOF CURB INSTALLATION.
3. RUN ELECTRIC LINES THRU CLEARANCE HOLE PROVIDED IN GRAVITY
DAMPER, THEN THRU VENTILATOR ELECTRICAL CONDUIT GUIDE.
GRAVITY BACKDRAFT
OR MOTORIZED
DAMPER AS SPECIFIED
RIGID CONDUIT FOR
ELECTRICAL WIRING
SEE NOTE 2
PERFABRICATED
ROOF CURB.
SEE
SPECIFICATIONS.
ELECTRICAL
CONDUIT GUIDE
SEE NOTE 1
SEE NOTE 2
ROOF
TRANSITION DUCT TO
FULL SIZE OF DAMPER
SUPPLIED WITH ROOF
FAN
SEE PLANS FOR
DUCT SIZES AND
LOCATIONS
NOTES:
LENGTH OF
3D
NOTES:
1. EXTERNALLY INSULATED ROUND DUCT RUNOUT 2" LARGER THAN NECK UNLESS
OTHERWISE NOTED.
2. MINIMUM STRAIGHT LENGTH TO BOX SHALL BE 3 DUCT DIAMETERS OR
MANUFACTURER'S RECOMMENDATION, WHICHEVER IS GREATER.
3. D=DUCT DIAMETER
VAV BOX
MAIN SA DUCT
FULL SIZE OF OUTLET
OR HEATING COIL
D
D+2
OFFSETS/ELBOWS
AS REQ'D
CONICAL SPIN-IN
STRAIGHT
ACCESS PANELS
MIN
MAIN DUCT
W/4 45°
W
(4"MIN)
4W
PROVIDE STANDOFF
ON INSULATED DUCTS
DRAFTED BY:
ARCHITECT'S PROJECT NO.:
DATE:
REVISION DATES:
PLANS CHECKED BY:
DATE CHECKED:
PHONE: FAX:
(352) 372-1378 (352) 378-1281
GAINESVILLE FLORIDA
5700 SW 34TH STREET SUITE 1307
32608
AA 0002486
for
A R C H I T E C T S
Gainesville, Florida
0M0.11
RTS BUS
FLEET
MAINTENANCE
& OPERATIONS
FACILITY
City of Gainesville
CONFORMED
DOCUMENTS
TA /
EJD
11046
TA
MECHANICAL LEGEND AND NOTES
29 March 2013
MECHANICAL:
J. ANTHONY ANDRESS
PE - 0046536
Moses & Associates, Inc.
2209 NW 40th Terrace, Ste A Gainesville, Florida 32605 FL License EB-0003097
P 352-372-1911 F 352-372-0186 moses-eng.com
M&A #11211
DUCT RUNOUT TO AIR OUTLETS/ INLETS DETAIL
NTS
4 FIRE DAMPER DETAIL
NTS
ROOF EXHAUST FAN DETAIL
NTS
VAV BOX DUCT DETAIL
NTS
1DUCT DELBOW DETAIL
NTS
BLDG 1: ROOF VENT SCHEDULE
MARK RV-101 RV-102 RV-103 RV-104
MANUFACTURER COOK COOK COOK COOK
MODEL TR-16 TR-16 TR-12 TR-8
THROAT DIAMIETER 16.5 16.5 12.5 8.5
CURB CAP ID 28 28 20 18
SCHEDULE NOTES 1 1 1 1
SCHEDULE NOTES
(1) PROVIDE ROOF CURB
BLDG 1: COMPUTER ROOM AIR CONDITIONING UNIT SCHEDULE
MARK CRAC-11 CRAC-12
MANUFACTURER DATA AIRE DATA AIRE
MODEL GFAD028 GFAD028
SYSTEM TYPE DOWNFLOW - DUCTED DOWNFLOW - DUCTED
VOLT-PHASE 460-3 460-3
DESIGN CONDITIONS
INDOOR DESIGN TEMP DB/WB (°F) 72/60 72/60
FAN DATA
TOTAL AIR (CFM) (HIGH SPEED) 3,600 3,600
ESP (IN WG) 0.5 0.5
MOTOR SIZE (HP) 3.7 3.7
COOLING COIL DATA
TYPE DX DX
TOTAL CAPACITY (BTUH) 95,700 95,700
MAX FACE VELOCITY (FPM) 300 300
SUCTION TEMP (°F) - -
REFRIGERANT PIPE SIZE RL-RS (IN.) NOTE 2 NOTE 2
CONDENSING UNIT
MARK CM-11 CM-12
MODEL GHRC032 GHRC032
TOTAL CAPACITY (BTUH) 95,700 95,700
SENSIBLE CAPACITY (BTUH) 79,700 79,700
VOLT-PHASE 480-3 480-3
UNIT AMPACITY (FLA) 1.7 1.7
HEATING COIL DATA
TYPE ELECTRIC ELECTRIC
POWER (kW) 15 15
STAGES SCR SCR
TOTAL CAPACITY (BTUH) 51,225 51,225
EAT - LAT (°F) 50-70 50-70
HUMIDIFIER DATA
TYPE ELECTRIC STEAM ELECTRIC STEAM
CAPACITY (PPH) 10 10
POWER (kW) 3.3 3.3
FILTER SECTION
TYPE 4" - 30% 4" - 30%
DIRTY PD (IN WG) 1 1
SCHEDULE NOTES 1, 2, 3, 4 1, 2, 3, 4
SCHEDULE NOTES
(1) MERV-8 FILTERS.
(2) PROVIDE REFRIGERANT PIPING SIZED PER MANUFACTURER'S RECOMMENDATIONS.
(3) PROVIDE COMPRESSOR SOUND ATTENUATION BLANKETS
(4) PROVIDE DOWNFLOW PLENUM WITH REAR DISCHARGE DUCT CONNECTION
BLDG 1: BOILER SCHEDULE
MARK B-1 B-2
MANUFACTURER AERCO AERCO
MODEL BMK 1.5 LN GWB BMK 1.5 LN GWB
FUEL NAT GAS NAT GAS
GROSS INPUT (MBH) 1,500 1,500
NET OUTPUT (MBH) 1,290 1,290
MIN EFFICIENCY 86% 86%
TURNDOWN RATIO 20:1 20:1
BLOWER MOTOR VOLTS-PHASE 120-1 120-1
WATER SUPPLY TEMP (°F) 180 180
WATER RETURN TEMP (°F) 156 156
WATER FLOW (GPM) 62 62
SCHEDULE NOTES 1 1
SCHEDULE NOTES
1 PROVIDE BOILER CONTROL SYSTEM
BLDG 1: VAV DX A/C SPLIT SYSTEM UNIT SCHEDULE
UNIT TYPE SPLIT A/C SPLIT A/C
MANUFACTURER AAON AAON
CONDENSING UNIT MARK CU-11 CU-12
CONDENSING UNIT MODEL CCB-017-3-D CCB-017-3-D
AIR HANDLING UNIT MARK AHU-11 AHU-12
AIR HANDLING UNIT MODEL M2-H-014 M2-H-014
AIR HANDLING UNIT TYPE HORIZONTAL HORIZONTAL
DESIGN CONDITIONS
WINTER OUTDOOR (°F) 10 10
WINTER INDOOR (°F) 70 70
SUMMER OUTDOOR DB/WB (°F) 95/75 95/75
SUMMER INDOOR DB/WB (°F) 75/62 75/62
AHU FAN SECTION
SUPPLY AIR (CFM) 6,000 6,000
OUTDOOR AIR (CFM) 1,000 1,000
EXTERNAL STATIC PRESSURE (IN WG) 1.5 1.5
FAN MOTOR (HP) 10 10
VOLTS-PHASE 460-3 460-3
AHU EVAPORATOR SECTION
SENSIBLE COOLING CAPACITY (BTUH) 163,800 163,800
TOTAL COOLING CAPACITY (BTUH) 207,200 207,200
AIR ENTERING COOLING DB/WB (°F) 78.3/64.4 78.3/64.4
CONDENSING SECTION
VOLTS-PHASE 460-3 460-3
LEAD COMPRESSOR DIGITAL SCROLL DIGITAL SCROLL
LAG COMPRESSOR SCROLL W/ HOT GAS BYPASS SCROLL W/ HOT GAS BYPASS
EER 12.9 12.9
SUCTION LINE SIZE (IN) NOTE 2 NOTE 2
LIQUID LINE SIZE (IN) NOTE 2 NOTE 2
SCHEDULE NOTES 1, 2, 3, 4 1, 2, 3, 4
SCHEDULE NOTES
(1) SINGLE POINT ELECTRICAL CONNECTION
(2) REFRIGERANT PIPE SIZING PER MANUFACTURER'S RECOMMENDATIONS
(3) PROVIDE COMPRESSOR SOUND ATTENUATION BLANKET
(4) PROVIDE VIBRATIION ISOLATION CURB WITH INTERNAL SOUND ATTENUATION BARRIER.
BLDG 1: EXHAUST FAN SCHEDULE
MARK EF-101-112 EF-121-124 EF-125 EF-131 & 133 EF-132 EF-134 EF-136, & 137
LOCATION BLDG 1 - ROOF BLDG 1 - ROOF BLDG 1 - ROOF BLDG 1 - ROOF BLDG 1 - ROOF BLDG 1 - ROOF BLDG 1 - SUSPENDED
MANUFACTURER COOK CARMON CARMON COOK COOK COOK COOK
MODEL 60HXEL12B CMB-25 BXI-12A0 135ACEB 70ACEB 100ACEB 100SQNB
TYPE - - - DOWNBLAST CENTRIFUGAL DOWNBLAST CENTRIFUGAL DOWNBLAST CENTRIFUGAL CENTRIFUGAL
CLASS - I - - - - INLINE
DRIVE BELT BELT BELT BELT BELT BELT BELT
AIRFLOW (CFM) 40,000 3,600 400 1,000 200 500 600
TSP (IN WG) 0.15 3.5 3.5 0.5 0.5 0.5 0.5
MOTOR SECTION
VOLTS-PHASE 460-3 460-3 460-3 277-1 277-1 277-1 277-1
BHP/HP 6.64/7.5 3.38/5 0.33/1 0.164/0.25 0.129/0.167 0.100/0.167 0.152 w/0.25
DRIVE TYPE STD STD STD STD STD STD STD
SOUND DATA (DB)
63 HZ 88 79 77 66 78 65 70
125 HZ 89 82 75 68 73 68 67
250 HZ 85 86 84 67 76 72 69
500 HZ 82 87 76 60 62 64 68
1000 HZ 79 83 75 58 58 58 64
2000 HZ 77 79 71 54 52 55 61
4000 HZ 74 72 63 49 49 50 56
8000 HZ 67 64 56 45 45 46 51
SONES 23 - - 6.4 9.0 7.6 8.6
SCHEDULE NOTES 7,8,10 1, 2, 3, 4, 5 1, 2, 3, 4, 5 7,8,9,10 7,8,9,10 7,8,9,10 6 (EF-137), 8,9,11
SCHEDULE NOTES
(1) PROVIDE DECK PLATFORM (7) PROVIDE ROOF CURB
(2) PROVIDE INLET TEE (8) PROVIDE BACKDRAFT DAMPER
(3) PROVIDE INLET FLEX (9) PROVIDE DISCONNECT
(4) PROVIDE WEATHER COVER (10) PROVIDE BIRD SCREEN
(5) PROVIDE HOUSING DRAIN (11) EF-135 DELETED FROM LIST
(6) PROVIDE LINE VOLTAGE WALL T-STAT.
BLDG 1: HHW PUMP SCHEDULE
MARK HWP-1 HWP-2
DUTY HHW HHW
MANUFACTURER TACO TACO
MODEL KV2009 KV2009
SIZE - -
SPEED (RPM) 1760 1760
TYPE INLINE INLINE
CAPACITY (GPM) 120 120
TOTAL HEAD (FT HD) 50 50
MINIMUM EFFICIENCY (%) 53 53
IMPELLER DIAMETER (IN) 7.9 7.9
MOTOR (HP) 3 3
VOLTS-PHASE 480-3 480-3
DRIVE TYPE STD STD
SCHEDULE NOTES
SCHEDULE NOTES
BLDG 1: HU HHW COIL SCHEDULE
MARK HC1A HC1B
LOCATION HU-11 HU-12
TYPE HHW HHW
EWT (F) 180 180
LWT (F) 134 134
DUTY HEAT HEAT
DESIGN CONDITIONS
SUPPLY AIR CFM 25,000 25,000
OUTDOOR AIR CFM - -
EAT (F) 60 60
LAT (F) 108 108
MAX FACE VELOCITY (FPM) 695 695
TOTAL CAPACITY (BTUH) 1,326,000 1,326,000
HHW FLOW (GPM) 62 62
MAX WATER PD (FT HD) 4.5 4.5
MAX AIR PD (IN WG) 0.5 0.5
MIN ROW/MAX FPI 2/12 2/12
CONTROL
VALVE MARK 1-3 1-3
TYPE 3-WAY 3-WAY
SIZE (IN) 2 2
CV 25 25
SCHEDULE NOTES 1, 2, 3 1, 2, 3
SCHEDULE NOTES
(1) REFER TO HU SCHEDULE
(2) EACH COIL
(3) REFER TO AHU COIL PIPING DIAGRAMS
BLDG 1: HEATING UNIT SCHEDULE
MARK HU-11 HU-12
BASIS OF DESIGN AAON AAON
MODEL CUSTOM CUSTOM
TYPE SINGLE ZONE SINGLE ZONE
LOCATION INDOOR INDOOR
FAN SECTION
FAN TYPE - -
FAN QUANTITY 2 2
DRIVE TYPE DIRECT DIRECT
FAN CFM 2 @ 12,500 2 @ 12,500
TOTAL CFM 25,000 25,000
TSP (IN WG)
ESP (IN WG) 0.5 0.5
MOTOR SECTION
EACH MOTOR BHP 2 @ 10.57 2 @ 10.57
EACH MOTOR HP 2 @ 15 2 @ 15
VOLT-PHASE 460-3 460-3
DRIVE STD STD
PRE FILTER SECTION
TYPE 2" PANEL 2" PANEL
EFFICIENCY (%) 30 30
SIZE (INxIN) 24x24 24x24
QUANTITY - -
DIRTY PD (IN WG) 1.0 1.0
AFTER FILTER SECTION
TYPE 12" BAG 12" BAG
EFFICIENCY (%) 90 90
SIZE (INxIN) 24X24 24X24
QUANTITY - -
DIRTY PD (IN WG) 1.2 1.2
AHU EQUIPMENT
SA SMOKE DAMPER NO NO
RA SMOKE DAMPER NO NO
HEATING COIL YES YES
SCHEDULE NOTES 1, 2, 3, 4 1, 2, 3, 4
SCHEDULE NOTES
(1) SUPPLY DUCT SHALL BE SINGLE WALL, UNINSULATED GALVANIZED SPIRAL AND RECTANGULAR
(2) MERV 8
(3) SIZE SHOWN ON DRAWINGS
(4) REFER TO HU COIL SCHEDULE
BLDG 1: PACKAGED HEAT PUMP SCHEDULE
UNIT TYPE HEAT PUMP HEAT PUMP
MARK PHP-11 PHP-12
MANUFACTURER CARRIER CARRIER
MODEL 50EZ-A48-60 50EZ-A48-60
VOLT-PHASE 460-3 460-3
SEER 13.5 13.5
COP @ 47°F 3.6 3.6
HSPF 7.7 7.7
DESIGN CONDITIONS
WINTER OUTDOOR (°F) 25 25
WINTER INDOOR (°F) 70 70
SUMMER OUTDOOR DB/WB (°F) 96/80 96/80
SUMMER INDOOR DB/WB (°F) 75/63 75/63
FAN SECTION (1)
SUPPLY AIR (CFM) 1,600 1,600
OUTDOOR AIR (CFM) - -
EXTERNAL STATIC PRESSURE (IN WG) - -
FAN MOTOR (HP) 1.0 1.0
PERFORMANCE SECTION
SENSIBLE COOLING CAPACITY (BTUH) - -
TOTAL COOLING CAPACITY (BTUH) 47,000 47,000
AIR ENTERING COOLING DB/WB (°F) 96/80 96/80
AIR ENTERING HEATING (°F) 52/52 52/52
ELECTRIC HEAT SECTION (1)
CAPACITY (kW) 10 10
VOLTS-PHASE 460-3 460-3
STAGES - -
SCHEDULE NOTES 1, 2, 3 1, 2, 3
SCHEDULE NOTES
(1) SINGLE POINT ELECTRICAL CONNECTION
(2) PROVIDE ROOF CURB AND TIE DOWNS
(3) PROVIDE COMBINATION CONCENTRIC SUPPLY/RETURN DIFFUSER/GRILLE.
BLDG 1: VARIABLE VOLUME TERMINAL UNIT SCHEDULE
MINIMUM MINIMUM ELECTRIC REHEAT COIL
TAG SIZE NOMINAL COOLING INLET V-PH KW BTUH STAGES EAT LAT REMARKS
(1) (2) CFM CFM STATIC
VAV-1101 10 800 320 0.35 277-1 4 13,700 SCR 55 80
VAV-1102 6 340 140 0.35 277-1 2 6,800 SCR 55 80
VAV-1103 7 440 180 0.35 277-1 2 6,800 SCR 55 80
VAV-1104 8 560 220 0.35 277-1 3 10,200 SCR 55 85
VAV-1105 10 750 300 0.35 277-1 4 13,700 SCR 55 80
VAV-1106 6 300 120 0.35 277-1 2 6,800 SCR 55 80
VAV-1107 6 300 120 0.35 277-1 2 6,800 SCR 55 80
VAV-1108 7 490 200 0.35 277-1 2 6,800 SCR 55 85
VAV-1109 6 380 150 0.35 277-1 2 6,800 SCR 55 80
VAV-1110 10 900 360 0.35 277-1 5 17,100 SCR 55 85
VAV-1111 6 300 50 0.35 277-1 - - - 55 55 Cooling Only VAV-1112 6 300 50 0.35 277-1 - - - 55 55 Cooling Only
VAV-1201 8 650 260 0.35 277-1 4 13,700 SCR 55 85
VAV-1202 14 1700 680 0.35 480-3 8 27,300 SCR 55 80
VAV-1203 14 2000 800 0.35 480-3 10 34,100 SCR 55 80
VAV-1204 12 1260 500 0.35 480-3 7 23,900 SCR 55 85
SCHEDULE NOTES:
(1) TAG KEY: VAV-XXYY; WHERE XX=AHU YY=BOX
(2) BASIS OF DESIGN: PRICE SDV WITH ELECTRIC HEAT.
(3) PROVIDE UNIT MOUNTED CONTROLS TRANSFORMER ON ALL UNITS INCLUDING THOSE WITHOUT ELECTRIC HEAT.
BLDG 2: AIR COOLED CHILLER SCHEDULE
MARK CH-1
MANUFACTURER SMARDT
MODEL AC037
MINIMUM CAPACITY (TONS) 100
VOLTS-PHASE 460-3
IPLV/NPLV (kW/Ton) 0.662
EER 18.1
GLYCOL 20% PROPYLENE
EWT (F) 60
LWT (F) 44
OUTDOOR TEMP (F) 95
CHW FLOW (GPM) 155
MINIMUM % LOAD 15%
STAGES VARIABLE
SCHEDULE NOTES 1,2
SCHEDULE NOTES
(1) PROVIDE INTEGRAL DISCONNECT
(2) PROVIDE HOT GAS BYPASS
BLDG 2: PUMP SCHEDULE
MARK CHP-1 CHP-2
DUTY CHW CHW
MANUFACTURER TACO TACO
MODEL FI2009 FI2009
SIZE - -
SPEED (RPM) 1760 1760
TYPE END SUCTION END SUCTION
CAPACITY (GPM) 150 150
TOTAL HEAD (FT HD) 70 70
MINIMUM EFFICIENCY (%) 66 66
IMPELLER DIAMETER (IN) 8.5 8.5
MOTOR (HP) 5 5
VOLTS-PHASE 480-3 480-3
DRIVE TYPE STD STD
SCHEDULE NOTES
SCHEDULE NOTES
BLDG 3: SPLIT SYSTEM HEAT PUMP SCHEDULE
UNIT TYPE HEAT PUMP
MANUFACTURER CARRIER
CONDENSING UNIT MARK CU-31
CONDENSING UNIT MODEL 25HBA336
AIR HANDLING UNIT MARK AHU-31
AIR HANDLING UNIT MODEL FY4ANF024005
AIR HANDLING UNIT TYPE VERTICAL
SEER 13
COP @ 47F 3.54
HSPF 8.2
DESIGN CONDITIONS
WINTER OUTDOOR (°F) 25
WINTER INDOOR (°F) 70
SUMMER OUTDOOR DB/WB (°F) 96/80
SUMMER INDOOR DB/WB (°F) 75/63
FAN SECTION
SUPPLY AIR (CFM) 800
OUTDOOR AIR (CFM) 60
EXTERNAL STATIC PRESSURE (IN WG) 0.4
FAN MOTOR (HP) 1/4
VOLTS-PHASE 208-1
EVAPORATOR SECTION
SENSIBLE COOLING CAPACITY (BTUH) 18,000
TOTAL COOLING CAPACITY (BTUH) 24,000
AIR ENTERING COOLING DB/WB (°F) 80/67
AIR ENTERING HEATING (°F) 70.0
CONDENSING SECTION
VOLTS-PHASE 208-1
SUCTION LINE SIZE (IN) NOTE 2
LIQUID LINE SIZE (IN) NOTE 2
ELECTRIC HEAT SECTION
CAPACITY (kW) 5.0
VOLTS-PHASE 208-1
STAGES 1
SCHEDULE NOTES 1, 2
SCHEDULE NOTES
(1) SINGLE POINT ELECTRICAL CONNECTION
(2) REFRIGERANT PIPE SIZING PER MANUFACTURER'S RECOMMENDATIONS
(3) PROVIDE FULL SIZE AUX DRAIN PAN UNDER AHU WITH FLOAT SWITCH FOR SHUT DOWN.
BLDG 3: EXHAUST FAN SCHEDULE
MARK EF-301-303 EF-304
LOCATION BLDG 3- ABV CEILING BLDG 3 - ABV CEILING
MANUFACTURER COOK COOK
MODEL GC-144 GC-520
TYPE CEILING FAN CEILING BLOWER
CLASS - -
DRIVE DIRECT DIRECT
AIRFLOW (CFM) 120 320
TSP (IN WG) 0.25 0.35
MOTOR SECTION
VOLTS-PHASE 208-1 208-1
BHP/HP 89.5 w/~0 146 w/0.062
DRIVE TYPE STD STD
SOUND DATA (DB)
63 HZ 51 68
125 HZ 59 68
250 HZ 55 63
500 HZ 54 58
1000 HZ 50 50
2000 HZ 43 45
4000 HZ 38 45
8000 HZ 31 43
SONES 3 5
SCHEDULE NOTES 1,2,3 1,2,3,6
SCHEDULE NOTES
(1) PROVIDE DISCONNECT & THERMAL OVERLOAD
(2) PROVIDE DELUXE ALUMINUM GRILLE
(3) PROVIDE WALL CAP
(4) PROVIDE WEATHER COVER
(5) PROVIDE HOUSING DRAIN
(6) PROVIDE LINE VOLTAGE WALL T-STAT.
BLDG 5: CUSTOM AHU COOLING COIL SCHEDULE
MARK CC1A CC1B
LOCATION AHU-51 AHU-51
TYPE CHW CHW
EWT (°F) 44 44
LWT (°F) 60 60
SST (°F) N/A N/A
TRAP DEPTH (IN) 12 12
FACE DAMPER NO NO
DESIGN CONDITIONS
SUPPLY AIR CFM 15,000 12,000
OUTDOOR AIR CFM (MAX) 3,000 2,400
OUTDOOR AIR CFM (MIN) 2,000 1,700
EAT DB/WB (°F) 78.4/65.5 78.4/65.5
LAT DB/WB (°F) 52.7/52.4 53.2/53.0
FACE VELOCITY (FPM) 439 443
SENSIBLE CAPACITY (BTUH) 409,900 320,900
TOTAL CAPACITY (BTUH) 563,600 434,300
CHW FLOW (GPM) 70 54
MAX WATER PD (FT HD) 17 15
MAX AIR PD (IN WG) 0.64 0.64
ESP (IN WG) 2.5 2.5
TSP (IN WG) 6.0 6.0
MIN ROW/MAX FPI 6 - 10 6 - 10
CONTROL
VALVE MARK 1-1 1-2
TYPE 3-WAY 3-WAY
SIZE (IN) 1.5 1.5
CV 25 25
SEPARATE CIRCUIT N/A N/A
SCHEDULE NOTES 1, 2, 3, 4 1, 2, 3, 4
SCHEDULE NOTES
(1) REFER TO CUSTOM AHU SCHEDULE
(2) REFER TO CONDENSATE TRAP DETAIL
(3) REFER TO AHU COIL PIPING DIAGRAMS
(4) VALVE SELECTED FOR TOTAL FLOW OF ALL COILS SERVED
BLDG 5: CUSTOM AIR HANDLING UNIT SCHEDULE
MARK AHU-51 AHU-52
BASIS OF DESIGN TEMTROL TEMTROL
MODEL CUSTOM CUSTOM
TYPE CHW SINGLE ZONE CHW SINGLE ZONE
LOCATION INDOOR INDOOR
FAN SECTION
FAN TYPE PLENUM PLENUM
FAN QUANTITY 1 1
DRIVE TYPE BELT BELT
FAN CFM 15,000 12,000
TOTAL CFM 15,000 12,000
TSP (IN WG) 6.0 6.0
ESP (IN WG) 2.5 2.5
MOTOR SECTION
EACH MOTOR BHP 19.8 17.2
EACH MOTOR HP 25 20
VOLT-PHASE 180-3 180-3
DRIVE VFD VFD
PRE FILTER SECTION
TYPE 2" PANEL 2" PANEL
EFFICIENCY (%) 30 30
SIZE (INxIN) 24x24 24x24
QUANTITY - -
DIRTY PD (IN WG) 1 1
AFTER FILTER SECTION
TYPE 12" BAG 12" BAG
EFFICIENCY (%) 90 90
SIZE (INxIN) 24X24 24X24
DIRTY PD (IN WG) 1.2 1.2
SOUND DATA (DB)
63 HZ 102 100
125 HZ 100 99
250 HZ 103 101
AHU EQUIPMENT
COOLING COIL YES YES
SCHEDULE NOTES 1, 2, 3, 4, 5 1, 2, 3, 4, 5
SCHEDULE NOTES
(1) SINGLE PLENUM FAN IN EACH AHU.
(2) PROVIDE VFD.
(3) MERV 13
(4) SIZE SHOWN ON DRAWINGS
(5) REFER TO CUSTOM AHU COIL SCHEDULE
BLDG 5: EXHAUST FAN SCHEDULE
MARK EF-501 EF-502-503
LOCATION BLDG 5 - ROOF BLDG 5 - ROOF
MANUFACTURER COOK COOK
MODEL 120ACEB 100ACEB
TYPE DOWNBLAST CENTRIFUGAL DOWNBLAST CENTRIFUGAL
CLASS - -
DRIVE BELT BELT
AIRFLOW (CFM) 840 460
TSP (IN WG) 0.50 0.50
MOTOR SECTION
VOLTS-PHASE 277-1 277-1
BHP/HP 0.13/0.25 0.093/0.25
DRIVE TYPE STD STD
SOUND DATA (DB)
63 HZ 65 65
125 HZ 67 67
250 HZ 69 72
500 HZ 60 63
1000 HZ 58 58
2000 HZ 55 54
4000 HZ 49 49
8000 HZ 45 46
SONES 7 7
SCHEDULE NOTES 1,2,3,4 1,2,3,4
SCHEDULE NOTES
(1) PROVIDE DISCONNECT.
(2) PROVIDE BACKDRAFT DAMPER.
(3) PROVIDE BIRD SCREEN.
(4) PROVIDE ROOF CURB..
BLDG 5: VARIABLE VOLUME TERMINAL UNIT SCHEDULE
MINIMUM MINIMUM ELECTRIC REHEAT COIL
TAG SIZE NOMINAL COOLING INLET V-PH KW BTUH STAGES EAT LAT REMARKS
(1) (2) CFM CFM STATIC (5)
VAV-5101 6 320 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5102 12 1340 540 0.35 277-1 6 20,500 SCR 55 80
VAV-5103 8 680 270 0.35 277-1 3 10,200 SCR 55 80
VAV-5104 7 400 120 0.35 277-1 3 10,200 SCR 55 85
VAV-5105 6 320 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5106 6 320 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5107 7 400 120 0.35 277-1 3 10,200 SCR 55 85
VAV-5108 6 340 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5109 8 520 160 0.35 277-1 3 10,200 SCR 55 85
VAV-5110 6 270 80 0.35 277-1 2 6,800 SCR 55 85
VAV-5111 7 500 150 0.35 277-1 3 10,200 SCR 55 85
VAV-5112 14 1880 560 0.35 480-1 10 34,100 SCR 55 85
VAV-5113 6 300 50 0.35 277-1 - - 55 - 55 Cooling only. Provide Controls Power.
VAV-5114 12 1200 360 0.35 480-1 6 20,500 SCR 55 85
VAV-5115 10 800 240 0.35 277-1 4 13,700 SCR 55 85
VAV-5116 8 640 190 0.35 277-1 4 13,700 SCR 55 85
VAV-5117 6 320 130 0.35 277-1 2 6,800 SCR 55 80
VAV-5118 14 1800 540 0.35 480-1 10 34,100 SCR 55 85
VAV-5119 14 1800 540 0.35 480-1 10 34,100 SCR 55 85
VAV-5120 4 160 20 0.35 277-1 - - SCR 55 55 Cooling only. Provide Controls Power.
VAV-5201 6 340 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5202 6 340 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5203 6 340 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5204 6 320 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5205 8 520 160 0.35 277-1 3 10,200 SCR 55 85
VAV-5206 6 320 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5207 6 320 100 0.35 277-1 2 6,800 SCR 55 85
VAV-5208 6 280 110 0.35 277-1 2 6,800 SCR 55 80
VAV-5209 7 440 180 0.35 277-1 3 10,200 SCR 55 80
VAV-5210 6 320 100 0.35 277-1 3 10,200 SCR 55 85
VAV-5211 4 130 40 0.35 277-1 1 3,400 SCR 55 85
VAV-5212 6 300 90 0.35 277-1 2 6,800 SCR 55 85
VAV-5213 4 160 20 0.35 277-1 - - 55 55 55 Cooling only. Provide Controls Power.
VAV-5214 5 240 70 0.35 277-1 2 6,800 SCR 55 85
VAV-5215 10 900 270 0.35 277-1 5 17,100 SCR 55 85
VAV-5216 10 1020 310 0.35 277-1 6 20,500 SCR 55 85
VAV-5217 7 480 140 0.35 277-1 3 10,200 SCR 55 85
VAV-5218 8 600 240 0.35 277-1 3 10,200 SCR 55 80
VAV-5219 8 600 180 0.35 277-1 4 13,700 SCR 55 85
VAV-5220 10 800 240 0.35 277-1 4 13,700 SCR 55 85
VAV-5221 7 480 140 0.35 277-1 3 10,200 SCR 55 85
VAV-5222 8 600 240 0.35 277-1 4 13,700 SCR 55 80
VAV-5223 6 280 80 0.35 277-1 2 6,800 SCR 55 85
VAV-5224 7 380 150 0.35 277-1 2 6,800 SCR 55 80
VAV-5225 5 240 70 0.35 277-1 2 6,800 SCR 55 85
VAV-5226 7 410 120 0.35 277-1 3 10,200 SCR 55 85
VAV-5227 5 220 70 0.35 277-1 2 6,800 SCR 55 85
SCHEDULE NOTES:
(1) TAG KEY: VAV-XYY; WHERE X=AHU YY=BOX
(2) BASIS OF DESIGN: PRICE MODEL SDV WITH SCR CONTROLLED ELECTRIC HEAT.
(3) PROVIDE UNIT MOUNTED INTEGRAL INTERLOCKING POWER DISCONNECT SWITCH.
(4) PROVIDE UNIT MOUNTED CONTROLS TRANSFORMER FOR ALL UNITS INCLUDING THOSE WITHOUT ELECTRIC HEAT.
(5) THIS IS DESIGN LAT.
BLDG 5: DUCT SILENCER SCHEDULE
MARK DS-51A DS-51B DS-51C DS-52A DS-52B
LOCATION SA DUCT SA DUCT SA DUCT SA DUCT SA DUCT
MANUFACTURER PRICE PRICE PRICE PRICE PRICE
TYPE ELBOW STRAIGHT STRAIGHT ELBOW STRAIGHT
LENGTH 5 FEET 5 FEET 5 FEET 5 FEET 5 FEET
SIZE 20X16 34X20 36X20 26X18 48X18
AIRFLOW (CFM) 3,000 6,500 5,500 4,000 8,000
MAX APD 0.30 0.30 0.30 0.30 0.30
SCHEDULE NOTES
SCHEDULE NOTES
BLDG 1: ROOF VENT SCHEDULE
MARK UH-1, 2, 3, 4
MANUFACTURER MARKEL
MODEL G1G5105N
CAPACITY (KW) 5
VOLTS-PHASE 277-1
CFM 400
SCHEDULE NOTES 1,2,3
SCHEDULE NOTES
(1) PROVIDE WALL BRACKET FOR VERTICAL MOUNT
(2) PROVIDE BUILT IN THERMOSTAT
(2) PROVIDE INTEGRAL DISCONNECT
BLDG 4: ROOF VENT SCHEDULE
MARK RV-401
MANUFACTURER COOK
MODEL TR-20
THROAT DIAMIETER 20.5
CURB CAP ID 28
SCHEDULE NOTES 1
SCHEDULE NOTES
(1) PROVIDE ROOF CURB
BLDG 5: ROOF VENT SCHEDULE
MARK RV-501
MANUFACTURER COOK
MODEL GI
THROAT SIZE 42X20
SCHEDULE NOTES 1
SCHEDULE NOTES
(1) PROVIDE ROOF CURB
ALL EQUIPMENT AND MATERIALS SHALL
MEET "BUY AMERICA" REQUIREMENTS
PER SPECIFICATION 01000.
DRAFTED BY:
ARCHITECT'S PROJECT NO.:
DATE:
REVISION DATES:
PLANS CHECKED BY:
DATE CHECKED:
PHONE: FAX:
(352) 372-1378 (352) 378-1281
GAINESVILLE FLORIDA
5700 SW 34TH STREET SUITE 1307
32608
AA 0002486
for
A R C H I T E C T S
Gainesville, Florida
0M0.21
RTS BUS
FLEET
MAINTENANCE
& OPERATIONS
FACILITY
City of Gainesville
CONFORMED
DOCUMENTS
TA /
EJD
11046
TA
MECHANICAL SCHEDULES
29 March 2013
MECHANICAL:
J. ANTHONY ANDRESS
PE - 0046536
Moses & Associates, Inc.
2209 NW 40th Terrace, Ste A Gainesville, Florida 32605 FL License EB-0003097
P 352-372-1911 F 352-372-0186 moses-eng.com
M&A #11211
MAINTAIN 6" ALONG
ALONG BOTTOM RUN
BOTTOM COIL
TOP COIL
SENSOR
TERMINATION
TYPICAL
TRANSMITTER
J-BOX. QUANTITY
VARIES WITH COIL
AREA
SUPPORT RAIL
SENSING ELEMENT
TUBING TO PROTECT SENSING ELEMENT
WIRE
NOTES:
1. PROVIDE 1 LINEAR FOOT OF
SENSING ELEMENT FOR EVERY
SQUARE FOOT OF COIL AREA
NON-METALIC
CAPILLARY 6" Ø
MOUNTING CLIP
COIL
RETURN
SUPPLY
AAV AT HIGH POINT
MANUAL VENT
AAV AT HIGH POINT
MANUAL DRAIN
M
INLET - 2 Ø STRAIGHT PIPE
OUTLET - 5 Ø STRAIGHT PIPE
*NO DEVICES IN STRAIGHT RUN*
NO
NOTES:
1. COIL PIPED TO FAIL OPEN TO COIL.
FLOOR DRAIN
W/FUNNEL
FLOOR
180° BEND
INSULATED
STAINLESS STEEL
DRAIN PAN
CLEANOUT PLUGS
"A"
"B"
"C"
AIR
GAP
PER
CODE
COORDINATE
MINIMUM WITH UNIT
SUPPORT
NOTES:
1. CONTRACTOR SHALL COORDINATE DRAIN DIMENSIONS AND PAD/RAIL HEIGHT TO ENSURE
PROPER COIL DRAINAGE AND CLEARANCE FOR TRAP.
2. WHERE UNIT HEIGHT DOES NOT ALLOW PROPER DRAIN HEIGHT, DRAIN PIPE TO DROP DOWN
THRU FLOOR AND INSTALL TRAP AT FLOOR BELOW. ROUTE PIPING TO NEAREST FLOOR DRAIN.
3. SEE SPECIFICATIONS FOR PIPE MATERIALS.
4. DRAW-THRU UNITS: BLOW-THRU UNITS:
A = SP + 1" A = 1/2"
B = 1/2 SP + 1/2" B = SP + 1/2"
C = 1-1/2 SP + 1-1/2" C = SP + 1"
SP TO BE MAXIMUM STATIC PRESSURE ON DRAIN PAN INCLUDING MAXIMUM FILTER
PRESSURE DROP AND PRESSURE DROP OF FUTURE COMPONENTS OF UNIT IF APPLICABLE.
1/2"
PIPE TO FLOOR DRAIN
PROVIDE AIR GAP FITTING
1"
1/2"
BFP
M
WATER METER
PRESSURE REDUCING VALVE
B&G NO. 12 OR EQUAL SET
@ 20 PSIG
WATTS 909QT, OR EQUAL
BACKFLOW PREVENTER
VENTURI FLOW METER
AIR CHARGING VALVE
PROVIDE AAV AT ALL HIGH
POINTS IN SYSTEM
MOGUL 5 GAL. CHEMICAL
SHOT FEEDER
BLADDER TYPE
COMPRESSION TANK.
ASME SAFETY RELIEF
VALVE-ROUTE DRAIN FULL
SIZE TO FD CUT PIPE
END AT 45 DEGREE
LOW WATER CUTOFF
CONNECT TO GAS PIPING
ELIMINATOR R-3
ROLAIRTROL AIR
DISTRIBUTION HHW PUMP
1 32
BALANCING COCK
G
15 CW MAKEUP
HI CAPACITY AAV PIPE TO FD16
17 NON-SLAM CHECK VALVE
AND SUPPORT PUMP WITH
WALL BRACKET OR STANDS
3" HHWR
3" HHWS
MINIMUM 30 GAL
ACCEPTANCE VOLUME
1/4"
3/4"
G
B
1/4"
B
HWP
18 ROTOMETER TO MEASURE GAS FLOW
3" HHWS
3" HHWS
3" HHWS3" HHWS
3" HHWR3" HHWR3" HHWR
3"
H H
W S
3" H
H W
R
1814 18
HWP3"
H
H W
S
AAV AT ALL HIGH POINTS IN
THE SYSTEM-TYPICAL
PIPE TO FLOOR DRAIN
1/4" TYP
4"
MINIMUM 20 GAL ACCEPTANCE VOLUME.
BLADDER STYLE COMPRESSION TANK
PROVIDE AIR GAP FITTING
AIR COOLED
CHILLER
AIR ELIMINATOR-ROLAIRTROL R-4
MOGUL 5 GALLONS-
CHEMICAL SHOT FEEDER
DOWNSTREAM OF VFM
PIPE DIAMETERS CLEAR
CLEAR UPSTREAM AND 2
PROVIDE 5 PIPE DIAMETERS
45 DEGREE ANGLE
6" OF GRADE, CUT END AT
DRAIN FULL SIZE TO WITHIN
VALVE SET @ 100 PSIG. PIPE
1" ASME PRESSURE RELIEF
BASE MOUNTED END SUCTION
SUPPORT PUMP WITH
AIR CHARGING VALVE
HIGH CAPACITY AAV
CW MAKEUP
NOT USED
WATTS-909QT OR EQUAL-
BACKFLOW PREVENTER
@ 20 PSIG
B&G NO. 12 OR EQUAL, SET
PRESSURE REDUCING VALVE
VIBRATION ISOLATION ON PAD
1"
BFP
3/4"
3/4"
4" CHWS
3/4"
OUTSIDE
OUTSIDE
4" CHWR
TO AHU'S
4" CHWS
FROM AHU'S
4" CHWR CHP
1/4" TYP
CHP
CHILLED WATER PUMP
4" CHWS4" CHWS
4" CHWR CH
M
FM
FM
TS
TS
17 14
16 "ONICON" INSERTION TYPE
FLOW/BTU METER. REFERENCE
MANUFACTURER'S INSTALL
REQUIREMENTS.
17 TEMPERATURE SENSOR WITH WELL
18 CHILLER FLOW SAFETY SWITCH
3" CHW
COIL
RETURN
SUPPLY
AAV AT HIGH POINT
MANUAL VENT
AAV AT HIGH POINT
MANUAL DRAIN
M
INLET - 2 Ø STRAIGHT PIPE
OUTLET - 5 Ø STRAIGHT PIPE
*NO DEVICES IN STRAIGHT RUN*
NO
NOTES:
1. COIL PIPED TO FAIL OPEN TO COIL.
C
DRAFTED BY:
ARCHITECT'S PROJECT NO.:
DATE:
REVISION DATES:
PLANS CHECKED BY:
DATE CHECKED:
PHONE: FAX:
(352) 372-1378 (352) 378-1281
GAINESVILLE FLORIDA
5700 SW 34TH STREET SUITE 1307
32608
AA 0002486
for
A R C H I T E C T S
Gainesville, Florida
0M0.31
RTS BUS
FLEET
MAINTENANCE
& OPERATIONS
FACILITY
City of Gainesville
CONFORMED
DOCUMENTS
TA
11046
CD
MECHANICAL DETAILS
29 March 2013
MECHANICAL:
AVERAGING COIL DISCHARGE TEMP
SENSOR ROUTING DIAGRAM NTS
2 WAY AHU COOLING COIL PIPING DIAGRAM
NTS
CONDENSATE P-TRAP DETAIL
NTS
14HEATING HOT WATER BOILER PIPING DIAGRAM
NTS
AIR COOLED CHILLER PIPING DIAGRAM
NTS
Moses & Associates, Inc.
2209 NW 40th Terrace, Ste A Gainesville, Florida 32605 FL License EB-0003097
P 352-372-1911 F 352-372-0186 moses-eng.com
M&A #11211
J. ANTHONY ANDRESS
PE - 0046536
3 WAY AHU HEATING COIL PIPING DIAGRAM
NTS
S
AIRFLOW MEASURING STATION
ANALOG IN
AMS
ANALOG OUT
DIGITAL IN
DIGITAL OUT
AI
AO
DI
DO
CURRENT SENSING RELAY
BAS COMMUNICATION LINK
DUCT SMOKE DETECTOR (BY DIV 16)
DIFFERENTIAL PRESSURE TRANSMITTER
ELECTRIC-PNEUMATIC SWITCH
ELECTRIC-PNEUMATIC TRANSDUCER
END SWITCH
FLOW SWITCH
RELAY
TEMPERATURE SENSOR (POINT)
OCCUPANCY SENSOR
SPACE THERMOSTAT
TEMPERATURE SENSOR (AVERAGING)
TIME DELAY RELAY
VARIABLE FREQUENCY DRIVE
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
VELOCITY PRESSURE SENSOR
FLOW METER
ACTUATOR FEEDBACK
FIRE OR HIGH TEMPERATURE STAT
FLOAT SWITCH
FREEZESTAT
SPACE HUMIDISTAT
HIGH STATIC PRESSURE SWITCH
HUMIDITY SENSOR
LOW STATIC PRESSURE SWITCH
MOTORIZED ACTUATOR (PNEUMATIC)
DIFFERENTIAL PRESSURE SWITCH
PRESSURE TRANSMITTER
ABOVE FINISHED FLOOR
CHILLED WATER RETURN
CHILLED WATER SUPPLY
EXHAUST AIR
FIRE ALARM CONTROL PANEL
MOTORIZED ACTUATOR (ELECTRIC)
FAIL TO LAST POSITION
FAIL OPEN
FAIL CLOSED
RETURN AIR
HARDWIRE INTERLOCK
HARWIRE INTERLOCK WIRING
STARTER
TEST PORT
EPT
COMM
DP
EP
EP
FS
R
T
OS
TS
VP
TDR
VFD
FM
FB
FR
FS
FZ
H
HI
HS
LL
M
PS
P
AFF
CHWR
EA
FACP
FTL
FO
FC
RA
CHWS
M
CSR
D
TS
I
CONTROLS LEGEND
SSEQUENCE OF OPERATION: CU-11/AHU-1 & CU-12/AHU-12 (STATIC PRESSURE CONTROL)
SAFETY CONTROL SEQUENCES: THE FOLLOWING SAFETY FUNCTIONS SHALL BE OPERATIONAL WHETHER THE
UNIT OPERATION IS IN "HAND" OR "AUTO".
1. SMOKE DETECTORS: SMOKE DETECTORS SHALL BE INSTALLED IN THE SUPPLY AIR DUCTS WHERE SHOWN
ON THE DRAWINGS TO STOP FAN AND SIGNAL THE FIRE ALARM.
START - STOP SEQUENCES: PROVIDE THE FOLLOWING OPERATIONAL AND INTERLOCK FUNCTIONS WHEN THE AIR CONDITIOING UNIT FAN IS STARTED AND STOPPED, UNLESS OTHERWISE NOTED. THESE SEQUENCES SHALL BE FUNCTIONAL FOR ANY REASON THE FAN STARTS-STOPS IN ANY MODE OF OPERATION (ALL H-O-A MODES, ALL
VFD MODES, ALL AUTOMATIC AND SAFETY FUNCTIONS, AND LOCAL MANUAL START-STOP).
1. OUTDOOR AIR SUPPLY AND RETURN DAMPERS: OPEN OA DAMPERS ON FAN START. IF FAN FAILS TO START WITHIN 60 SECONDS AFTER DAMPERS ARE OPEN, CLOSE OA DAMPER AND SIGNAL FAN FAILURE ALARM.
CLOSE OA DAMPER ON FAN STOP.
OCCUPIED/UNOCCUPIED CYCLE: UNIT SHALL RUN CONTINUOUSLY.
1. START: INITIATE THE START SEQUENCE DESCRIBED IN : "START-STOP SEQUENCES".
2. OUTDOOR AIR CONTROL: PROVIDE AIR MONITOR STATION IN OUTDOOR AIR DUCT. MODULATE THE OUTDOOR AIR DAMPER AND RETURN AIR DAMPER IN SEQUENCE TO MAINTAIN OUTDOOR AIRFLOW VOLUME LISTED IN THE AIR HANDLING UNIT SCHEDULE REGARDLESS OF FAN SPEED OR FILTER LOADING. ONCE OUTSIDE AIR DAMPER HAS REACHED 100% AND MORE OUTSIDE AIRFLOW IS NEEDED, MODULATE RETURN AIR DAMPER
CLOSED (NO LESS THAN 50%).
3. FAN SPEED CONTROL: PROVIDE STATIC PRESSURE SENSOR MOUNTED IN SUPPLY AIR DUCT TO MODULATE THE VARIABLE SPEED DRIVE TO MAINTAIN AN INITIAL SET POINT OF 1.0 IN W.G. (ADJUSTABLE). OPTIMIZED BY TAB
CONTRACTOR.
4. COOLING COIL CONTROL: PROVIDE TEMPERATURE SENSOR TO MODULATE THE COOLING CAPACITY AS REQUIRED TO MAINTAIN A CONSTANT SUPPLY AIR TEMPERATURE OF 55°F. RESET THE SUPPLY AIR TEMPERATURE IN RESPONSE TO THE FOLLOWING RESET SCHEDULE: OUTSIDE AIR TEMPERATURE 30°F-70°F (ADJUSTABLE) AND SUPPLY AIR TEMPERATURE RESET RANGE OF 60°F-55°F (ADJUSTABLE). CONTINUE MONITORING RETURN AIR HUMIDITY AND RESET SUPPLY AIR TO 55°F IN THE EVENT RETURN AIR HUMIDITY RISES
ABOVE 60% RH. REMAIN IN DEHUMIDIFICATION MODE FOR A MINIMUM OF 1 HOUR.
EQUENCE OF OPERATION: CU-11/AHU-1 & CU-12/AHU-12 (STATIC PRESSURE CONTROL)
SAFETY CONTROL SEQUENCES: THE FOLLOWING SAFETY FUNCTIONS SHALL BE OPERATIONAL WHETHER THE
UNIT OPERATION IS IN "HAND" OR "AUTO".
1. SMOKE DETECTORS: SMOKE DETECTORS SHALL BE INSTALLED IN THE SUPPLY AIR AND RETURN AIR
DUCTS WHERE SHOWN ON THE DRAWINGS TO STOP FAN AND SIGNAL THE FIRE ALARM.
2. HIGH STATIC PRESSURE LIMIT: PROVIDE SEPARATE HIGH STATIC PRESSURE SWITCH (ADJUSTABLE) UPSTREAM OF ALL DAMPERS TO STOP THE FAN WHEN STATIC PRESSURE RISES TO 4.0 IN W.G.. MANUAL RESET.
START - STOP SEQUENCES: PROVIDE THE FOLLOWING OPERATIONAL AND INTERLOCK FUNCTIONS WHEN THE AIR CONDITIOING UNIT FAN IS STARTED AND STOPPED, UNLESS OTHERWISE NOTED. THESE SEQUENCES SHALL BE FUNCTIONAL FOR ANY REASON THE FAN STARTS-STOPS IN ANY MODE OF OPERATION (ALL H-O-A MODES, ALL
VFD MODES, ALL AUTOMATIC AND SAFETY FUNCTIONS, AND LOCAL MANUAL START-STOP).
1. OUTDOOR AIR SUPPLY AND RETURN DAMPERS: OPEN ALL DAMPERS ON FAN START. IF FAN FAILS TO START WITHIN 60 SECONDS AFTER DAMPERS ARE OPEN, CLOSE DAMPERS AND SIGNAL FAN FAILURE ALARM.
CLOSE SUPPLY AIR, OUTSIDE AIR DAMPER AND RETURN AIR DAMPER ON FAN STOP.
OCCUPIED CYCLE: UNIT RUNS CONTINUOUSLY.
1. START: INITIATE THE START SEQUENCE DESCRIBED IN : "START-STOP SEQUENCES".
2. OUTDOOR AIR CONTROL: PROVIDE AIR MONITOR STATION IN OUTDOOR AIR DUCT. MODULATE THE OUTDOOR AIR DAMPER AND RETURN AIR DAMPER IN SEQUENCE TO MAINTAIN OUTDOOR AIRFLOW VOLUME LISTED IN THE AIR HANDLING UNIT SCHEDULE REGARDLESS OF FAN SPEED OR FILTER LOADING. ONCE OUTSIDE AIR DAMPER HAS REACHED 100% AND MORE OUTSIDE AIRFLOW IS NEEDED, MODULATE RETURN AIR DAMPER
CLOSED (NO LESS THAN 50%).
3. FAN SPEED CONTROL: PROVIDE STATIC PRESSURE SENSOR MOUNTED IN SUPPLY AIR DUCT TO MODULATE THE VARIABLE SPEED DRIVE TO MAINTAIN AN INITIAL SET POINT OF 1.0 IN W.G. (ADJUSTABLE). OPTIMIZED BY TAB
CONTRACTOR.
4. COOLING COIL CONTROL: PROVIDE TEMPERATURE SENSOR TO MODULATE THE COOLING CAPACITY AS REQUIRED TO MAINTAIN A CONSTANT SUPPLY AIR TEMPERATURE OF 55°F. RESET THE SUPPLY AIR TEMPERATURE IN RESPONSE TO THE FOLLOWING RESET SCHEDULE: OUTSIDE AIR TEMPERATURE 30°F-70°F (ADJUSTABLE) AND SUPPLY AIR TEMPERATURE RESET RANGE OF 65°F-55°F (ADJUSTABLE). CONTINUE MONITORING RETURN AIR HUMIDITY AND RESET SUPPLY AIR TO 55°F IN THE EVENT RETURN AIR HUMIDITY RISES
ABOVE 60% RH. REMAIN IN DEHUMIDIFICATION MODE FOR A MINIMUM OF 1 HOUR.
INDICATION: PROVIDE THE FOLLOWING INDICATION AT BAS.
1. FAN STATUS: CURRENT SENSING RELAY FOR AIR HANDLING UNIT FAN.
2. FILTER PRESSURE DROP: DIFFERENT PRESSURE (ANALOG).
3. SUPPLY AIR TEMPERATURE: AVERAGING SENSOR (ANALOG).
4. COOLING COIL LEAVING AIR TEMPERATURE: AVERAGING SENSOR (ANALOG).
5. RETURN AIR TEMPERATURE: POINT SENSOR (ANALOG).
6. RETURN AIR HUMIDITY: (ANALOG).
7. MIXED AIR TEMPERATURE: AVERAGING SENSOR (ANALOG).
8. OUTDOOR AIR DAMPER/COMMAND AND POSITION: PERCENT OPEN (ANALOG).
9. RETURN AIR DAMPER/COMMAND ANDPOSITION: PERCENT OPEN (ANALOG).
10. VARIABLE SPEED DRIVE: PERCENT FULL SPEED OR HERTZ (ANALOG).
11. FAN START/STOP COMMAND: (BINARY)
12. OUTDOOR AIR FLOW: CFM (ANALOG).
13. OUTDOOR AIR TEMPERATURE: (ANALOG).
14. STATIC PRESSURE: STATIC PRESSURE IN SUPPLY DUCT (ANALOG).
15. ALL SET POINTS.
ALARMS: PROVIDE THE FOLLOWING ALARMS.
1. FAN FAILURE: FAN FAILURE FOR ANY REASON AND IF FAN FAILURE IS DUE TO A MANUAL SHUTDOWN AT
THE VFD, BAS SHALL RESTART FAN WHEN VFD IS RETURNED TO NORMAL.
2. FILTER PRESSURE DROP HIGH: (PRE-FILTER OR FINAL FILTER)
3. HIGH STATIC PRESSURE SHUTDOWN: 4.0 IN W.G.
4. HIGH SUPPLY AIR TEMPERATURE: GREATER THAN 3°F ABOVE SETPOINT
5. STATIC PRESSURE: LESS THAN 0.5 IN. WG BELOW SETPOINT.
OA
FC
FO
RA
SA
TO FACP
P R
E -F
IL
TE
R
BOLD LINE INDICATES
LIMITS OF AHU
CABINET
C
C
DX VAV SPLIT SYSTEM CONTROL DIAGRAM
NOT TO SCALE
SUPPLY
FAN
F A
N S
P E
E D
C O
N
TR
O L
S
TA
R T/
S
TO
P
F/A SHUT DOWN
VFD
PS
TS
MAIAO
AI AI
TS TS
DI
CSR TS
AI
SP
AI
DM
AI
AO
AO DO
A
FT
E R
F
IL
TE
R
TS
AMS
AI
AI
LOCATE APPROXIMATELY
2/3 DOWN SA DUCT
AAON
CONTROLLER
T O
B A
S B
A C
N E
T /M
S
TP
C O
M M
FOR CU/AHU-11 AND CU/AHU-12
DIAI
TS
HS
AI
AI
AO
RSRL
AI
TS
HL
DI
ALL CONTROL DEVICES AND FUNCTIONS
WITHIN THIS DASHED LINE BOX ARE PROVIDED
BY THE A/C EQUIPMENT MANUFACTURER
SA
TO FACP
P R
E -F
IL
TE
R
BOLD LINE INDICATES
LIMITS OF AHU
CABINET
H
C
HHWR
HHWS
HHW HEATING AHU CONTROL DIAGRAM
NOT TO SCALE
SUPPLY
FAN
PS TS
AI
D
M
AI
AO
A
FT
E R
F
IL
TE
R
CSRDI
DO
RA
TS
AI
PS
DI DI
APPLICABLE FOR HU-11 AND HU-12
AI SPACE TEMP
SPACE SENSOR
T
HEATING HOT WATER AHU SEQUENCE OF OPERATION
SAFETY CONTROL SEQUENCES: PROVIDE THE FOLLOWING SAFETY FUNCTIONS:
1. SMOKE DETECTORS: PROVIDE SMOKE DETECTOR(S) IN THE SUPPLY AIR DUCT AND WHERE SHOWN ON THE
DRAWINGS TO SIGNAL THE FIRE ALRM AND STOP THE FAN.
START-STOP SEQUENCES: PROVIDE THE FOLLOWING OPERATIONAL AND INTERLOCK FUNCTIONS WHEN THE AHU IS STARTED AND STOPPED. UNLESS OTHERWISE NOTED THESE SEQUENCES SHALL BE FUNCTIONAL FOR ANY REASON THE FAN STARTS OR STOPS IN ANY MODE OF OPERATION (ALL AUTOMATIC AND SAFETY FUNCTIONS, AND LOCAL MANUAL START-STOP).
1. BOILER/HHW PUMPS START: PROVIDE SPACE THERMOSTAT SET AT 65°F (ADJUSTABLE) TO SIGNAL A CALL FOR BOILER/HHW PUMP SYSTEM TO START AND ENABLE HU-11 AND HU-12. SEE BOILER/HHW PUMPS SEQUENCE OF OPERATION. ONCE THIS SYSTEM IS CIRCULATING HHW AT THE DESIGN TEMPERATURE CONTINUE AHU START
AS FOLLOWS.
2. FAN START: SIGNAL FAN TO START.
3. HEATING HOT WATER VALVE: ENABLE CONTROLS ON FAN START. CLOSE VALVE TO COIL ON FAN STOP.
ON CYCLE:
1. START: INITITATE THE START SEQUENCE DESCRIBED IN "START-STOP SEQUENCES"
2. HEATING HOT WATER COIL CONTROL: PROVIDE A POINT TYPE TEMPERATURE SENSOR IN THE SUPPLY AIR DUCT LEAVING THE UNIT AND MODULATE THE HHW CONTROL VALVE TO MAINTAIN THE SCHEDULED LEAVING AIR
TEMPERATURE OF 85°F.
OFF CYCLE:
STOP: INTIATED THE STOP SEQUENCE DESCRIBED IN "START-STOP SEQUENCES"
INDICATIONS
1. FAN STATUS: CURRENT SENSING RELAY FOR FAN.
2. PRE-FILTER PRESSURE DROP: ADJUSTABLE DIFERENTIAL PRESSURE SWITCH.
3. AFTER-FILTER PRESSURE DROP: ADJUSTABLE DIFERENTIAL PRESSURE SWITCH.
4. RETURN AIR TEMPERATURE: POINT SENSOR (ANALOG).
5. SUPPLY AIR TEMPERATURE: POINT SENSOR (ANALOG).
6. HEATING HOT WATER VALVE POSITION: PERCENT OPEN (ANALOG).
7. SPACE TEMPERATURE
8. FAN COMMAND
ALARMS
1. FAN FAILURE: SIGNAL ALARM IF FAN IS OFF WHEN CALLED TO BE ON.
2. HIGH PRE-FILTER PRESSURE DROP: 1.0 IN. WG (ADJUSTABLE)
2. HIGH AFTER-FILTER PRESSURE DROP: 2.0 IN. WG (ADJUSTABLE)
3. LOW SUPPLY AIR TEMPERATURE: ALARM IF BELOW 80°F.
COMPUTER ROOM A/C UNIT CONTROL DIAGRAM
NTS
ROOM TEMPERATURE
AND RELATIVE
HUMIDITY SENSORS
FOR BAS MONITORING.
LOCATE ON "COLD
AISLE" SIDE OF RACKS.
UNIT CONTROL PANEL
WITH LARGE GRAPHICS
DISPLAY AND (BY CRAC
MANUFACTURER) LCD
SCREEN. PROVIDE
NETWORK INTERFACE
CARD FOR INTEGRATION
TO BAS VIA BACNET MSTP.
PUSH-BUTTON
UNIT DISCONNECT
(COORDINATE WITH DIV.
16 IN ACCORDANCE
WITH NEC 645.10.)
AI
SA
RA
AI
FILTER
DX COOLING COILS
SCR ELECTRIC REHEAT COIL
HUMIDFICATION SECTION
FIRE ALARM
SHUTDOWN
RELAY BY DIV 16
PLENUM FAN(S)
DOWN DISCHARGE PLENUM
SECTION WITH REAR DUCT
ATTACHMENT COLLAR
T
RH
TS
R
TS
COMMTO BAS
BACNET/MSTP
AI
RH
DI STATUS
CSR
AI
AI
REMOTE CONDENSER
MODULE
AI
TS
COMPUTER ROOM A/C CONTROL SEQUENCE (CRAC-11, CRAC-12)
FAN: UNIT FAN SHALL RUN CONTINUOUSLY.
TEMPERATURE CONTROL
COOLING SHALL BE ACTIVATED UPON A RISE IN ROOM TEMPERATURE ABOVE SETPOINT AND DEACTIVATED UPON A
DROP IN ROOM TEMPERATURE BELOW SETPOINT USING A 3°F DIFFERENTIAL.
HUMIDITY CONTROL
HUMIDIFIER SHALL BE ACTIVATED UPON A DROP IN ROOM HUMIDITY BELOW SETPOINT. UPON AN INCREASE IN ROOM HUMIDITY ABOVE SETPOINT OVERRIDE COOLING ON AND MAINTAIN ROOM TEMPERATUER USING REHEAT
COIL.
SETPOINTS
COOLING = 75°F (ADJUSTABLE)
HUMIDITY = 52%RH (ADJUSTABLE)
CONTROLS SYSTEM RISER DIAGRAM
NTS
BAS
SERVER
LOCATED IN BLDG 1
ROOM 1126
BACNET/IP
BACNET/IP
BACNET/MSTP
AHU-51
AAC
BLC
BLDG 1
BACNET/IP
AHU-51
VFD
VAV- 5201
THRU
VAV-5229
ASC
EF-501
THRU
EF-…