RTI Linen Laundry PWS.docx

DOCX document 40 KB Posted

Attached to
Linen Laundry and Weekly Exchange Service
Solicitation number
W912QG26QA012
Issued by

About this file

This is a Performance Work Statement (PWS) for linen laundry and weekly exchange services supporting the 218th Regiment (Regional Training Institute) McCrady Training Center in Eastover, South Carolina. The contractor shall provide complete laundry, sanitation, and weekly linen exchange services for basic leader course and officer candidate school students, including all personnel, equipment, transportation, materials, and supplies. Required linen quantities include 400 twin flat sheets weekly (800 minimum inventory), 200 blankets weekly (400 minimum inventory), and 200 pillowcases weekly (400 minimum inventory), with quantities subject to 10% fluctuation based on occupancy. Service delivery occurs 44 weeks annually with scheduled pickup and delivery between 0900-1600 hours on Tuesday through Thursday, coordinated with the Contracting Officer Representative. The base contract period runs from August 1, 2026 through July 31, 2027, with four additional option years.

The contractor is responsible for ensuring linens are cleaned, sanitized, and free of stains or odors, maintaining sanitation compliance documentation, and replacing any linens lost or damaged due to contractor negligence. Performance standards require 95% on-time pickup and delivery performance, 98% acceptance rate for linen cleanliness, and 100% compliance with minimum inventory maintenance. All contractor and subcontractor employees must complete AT Level I Awareness training within 30 calendar days of contract start, undergo background checks using NCIC-III and TSDB standards, comply with personal identity verification requirements (FAR 52.204-9), complete iWATCH training within 30 calendar days, and comply with all installation access, security, safety, and fire regulations. Contractor personnel must possess valid driver's licenses, current vehicle registration, and proof of insurance to access the installation. The anticipated award date is June 3, 2026, with a 100% small business set-aside using NAICS code 812332 and PSC code S209, and award will be made to the quoter representing best value based on technical capability to meet PWS requirements, past performance, and price.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Linen Laundry and Weekly Exchange Service 218th RTI - McCrady Training Center

1. Purpose This Performance Work Statement (PWS) establishes requirements for contractor-provided laundry, sanitation, and weekly exchange of bed linens in support of lodging operations at 218th Regiment (Regional Training Institute) McCrady Training Center for Basic Leader Course and Officer Candidate School students.

2. Scope The contractor shall provide all personnel, supervision, equipment, transportation, materials, and services necessary to collect, launder, sanitize, package, and return clean bed linens on a recurring weekly basis.

3. Estimated Quantities and Linen Supply The contractor shall provide all linens required to support weekly exchange services.

Twin flat sheets: Weekly 400 | Minimum Inventory 800 Blankets: Weekly 200 | Minimum Inventory 400 Pillowcases: Weekly 200 | Minimum Inventory 400 Quantities may fluctuate by ±10% based on occupancy.

4. Place of Performance McCrady Training Center, 5411 Leesburg Road, Building 3800, Eastover, SC 29044. Pickup and delivery staging will occur in the supply room adjacent to the loading dock. Contractor personnel must possess a valid driver's license, current registration, and proof of insurance to access the installation.

5. Delivery Schedule The base period of performance shall be from 1 August 2026 to 31 July 2027, with 4 subsequent option years. Service is required 44 weeks out of the year, as there will be 8 weeks that the exchange service will not be required. The Government will provide notice to the Contractor which weeks service is not required. Contractor shall pick up and drop off between 0900 and 1600 hours, on a set day of the week, Tuesday through Thursday, and shall be coordinated with the Contracting Officer Representative (COR).

5.1 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

5.2 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contract employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders for the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

5.3 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

5.3.1 New Year’s Day: January 1st

5.3.2 Martin Luther King, Jr.’s Birthday

5.3.3 President’s Day

5.3.4 Memorial Day

5.3.5 Juneteenth National Independence Day: June 19th

5.3.6 Independence Day: July 4th

5.3.7 Labor Day

5.3.8 Columbus Day

5.3.9 Veteran’s Day: November 11th

5.3.10 Thanksgiving Day

5.3.11 Christmas Day: December 25th

5.4 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

5.5 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).

6. Contractor Responsibilities

- Shall provide weekly pickup and delivery services as stated above.

- Shall ensure linens are cleaned, sanitized, and free of stains or odors.

- Shall replace linens lost or damaged due to contractor negligence.

- Shall maintain sanitation compliance documentation and provide this documentation to the Government upon request.

-Shall complete the training as required in paragraph 9.

7. Government Responsibilities

- Will provide staging areas.

- Will provide access during scheduled service times.

- Will stage soiled linens for pickup.

8. Performance Requirements Summary (PRS)

Performance Objective
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Timely Pickup/Delivery
Service performed within scheduled window
95% on-time performance
100% Inspection
Cleanliness
Linens returned clean and sanitized
98% acceptance rate
Random inspection
Inventory Availability
Minimum linen inventory maintained
100% compliance
100% Inspection

9. Training AT Level I Awareness training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 7 calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.

Access and general protection/security policy and procedures. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 60 calendar days after contract award.

File details come from the government source that posted it. Updated .