RTD2 RFP M67854-22-R-7208 FINAL.pdf
PDF 899 KB Posted
- Solicitation number
- M67854-22-R-7208
- Issued by
-
United States Marine Corps
About this file
This is a Request for Proposal (RFP) solicitation for research and technology development support services. The Joint Intermediate Force Capabilities Office (JIFCO) Quantico, VA is seeking contractor services including research and technology development, technical analyses, systems integration, engineering tasks, experimental research including bioeffects, test and evaluation, prototype development and demonstration, and modeling and simulation. The potential single award, cost plus fixed fee Indefinite Delivery/Indefinite Quantity contract would have a one year base period and four one-year ordering periods for a total of five years. The North American Industry Classification System code is 541715. Responses are due through the System for Award Management at https://www.sam.gov. The RFP will be available at the same location and include all amendments. Interested parties must register in SAM to be eligible for award, which will be made to a single vendor utilizing the Best Value Trade-Off approach. No phone calls will be accepted and all communication must be through the contracting office via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RTD2 M67854-22-R-7208 Amendment 0002.pdf | ||
| RTD2 Q and A Response and M67854-22-R-7208 Amendment 0001.zip | ZIP file | |
| RTD2 RFP Attachments M67854-22-R-7208.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
X C X D
EX
X
G
F 33 - 44
45 - 56
H 57 - 64
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 64
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
M67854 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 8
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 13 - 16 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
17 - 31
PART II - CO NTRACT CLAUSES
COMMANDER MARCORSYSCOM
CODE CT
2200 LESTER STREET
QUANTICO VA 22134-6050
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
03 May 2022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
M6785422R7208
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 9,999 Each Research and Analysis
CPFF
The contractor shall provide research and analysis services directed in accordance with PWS section 5.3.1. Deliverables shall be in accordance with the
Performance Work Statement (PWS).
This CLIN is subject to periodic ordering. Multiple monthly orders may be placed under this CLIN and shall not exceed the period of performance (e.g. the government can order only one month or multiple months during the period of performance).
FOB: Destination
PSC CD: AJ12
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
UNIT UNIT PRICE MAX AMOUNT
0002 9,999 Each Technology Development and Integration
CPFF
The contractor shall provide technology development and integration services directed in accordance with PWS section 5.3.2. Deliverables shall be in accordance with the PWS.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0003 9,999 Each Evaluation, Experimentation, & Demonstra
CPFF
The contractor shall provide test, evaluation, experimentation, demonstration and assessment services directed in accordance with PWS section 5.3.3. Deliverables shall be in accordance with the PWS.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0004 9,999 Each Modeling and Simulation
CPFF
The contractor shall provide modeling and simulation services directed in accordance with PWS section 5.3.4. Deliverables shall be in accordance with the
PWS.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0005 9,999 Each Fabricating & Building
CPFF
The contractor shall provide fabricating and building services directed in accordance with PWS section 5.3.5. Deliverables shall be in accordance with the
PWS.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0006 9,999 Each System Design & Technical Data
CPFF
The contractor shall provide system design documentation and technical data packages directed in accordance with PWS section 5.3.6. Deliverables shall be in accordance with the PWS.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0007 9,999 Each Travel Other Direct Costs (ODC)
COST
The contractor shall perform travel to support an order as stated in the PWS requirements. No fee or profit shall be applied to travel cost. All travel shall be pre-approved in writing (via email) by the COR before cost is incurred.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0008 9,999 Each Other Direct Costs
COST
ODCs shall not be obtained (regardless of dollar value) without prior written consent from the COR. This is accordance with section 1.6.14 of the PWS.
government can order only one month or multiple months during the period of performance).
UNIT UNIT PRICE MAX AMOUNT
0009 UNDEFINED
Contract Data Line Items (CDRLS)
FFP
Contract Data Line Items (CDRLS) A001 - A003
Not Separately Priced (NSP) government can order only one month or multiple months during the period of performance). Each Task Order will include the required CDRLs.
MAX
NET AMT
SECTION B
B1. MAXIMUM CONTRACT CEILING AND MINIMUM CONTRACT GUARANTEE
(a) Maximum. The maximum Contract ceiling value of all Contracts in this SINGLE award procurement is established at $48 Million.
(b) Minimum. The minimum guaranteed award amount for this Indefinite-Delivery, Indefinite-Quantity (ID/IQ)
Contract is $500 dollars per Contractor for the full term of the Contract. The exercise of the option period does not re-establish the Contract minimum.
(c) The Government has no obligation to issue Task Orders to the Contractor beyond the amount specified in paragraph (b). Once the conditions of paragraph (b) have been met.
B2. SERVICE CONTRACT LABOR STANDARDS (SCLS) GENERAL EXEMPTION
The ID/IQ Contract labor categories are considered bona fide executive, administrative, professional labor and are exempt from the SCLS if used to perform the type of professional IT services within the scope of this Contract. The
ID/IQ Contract does not include wage determinations or SCLS clauses.
B3. TASK ORDER CONTRACT TYPES
Research and Technology Development Support Services (RTD2) is a single Award Task Order Contract (SATOC).
It is an ID/IQ Contract for United States Marine Corp research and technology development service-based requirements. Task Order Contract types permitted is FAR 16.306 Cost-plus-fixed-fee contracts.
Task Orders may also incorporate FAR 16.504 Indefinite-quantity contracts and FAR 17.2 Option periods procuring
Commercial-items or Non-commercial items. These Contract types can be used individually or in combination within a single Task Order comprising multiple Contract Line Item Numbers (CLINs). All Task Orders awarded will be subject to the percentage fee negotiated within the IDIQ contract and will not be exceeded. The Task Orders may be issued as unilateral or bilateral, as needed.
B4. ORDERING PERIODS
The ordering period is 60 months After Date of the Contract (ADC). Orders may be placed up until the last day of the last order period but shall not extend more than 6 months after the last day of the ordering period.
The ordering periods are as follows:
Ordering Period 1: ADC through 12 months
Ordering Period 2: 13 months through 24 months
Ordering Period 3: 25 months through 36 months
Ordering Period 4: 37 months through 48 months
Ordering Period 5: 49 months through 60 months
B5. ORDERING AGENCY
The agency authorized to place Delivery Orders against this contract is:
Commander
Marine Corps Systems Command
2200 Lester Street
Quantico, VA 22134
B6. TRAVEL PRICING (ALL ORDER TYPES)
Contractor personnel may be required to travel to support the requirements of this Contract as stated in individual
Task Orders (TOs). Local travel and travel outside of the local area may be required both in the Contiguous United
States (CONUS) and Outside the Contiguous United States (OCONUS). For those TOs requiring travel, the Contractor shall include estimated travel requirements in the proposal as required by the Ordering Contracting Officer (OCO).
Travel shall not commence without written consent in accordance with instructions in the TO.
If authorized in the Task Order, travel will be reimbursed at actual cost in accordance with the limitations set forth in
FAR Subpart 31.205-46, Travel Costs. Profit shall not be applied to travel costs. To the extent authorized by the Task
Order, Contractors may apply indirect costs to travel in accordance with the Contractor’s usual accounting practices consistent with FAR 31.2. The OCO must identify a not-to-exceed travel ceiling under a separate CLIN on the Task
Order.
B7. OTHER DIRECT COSTS (ODCs) (ALL ORDER TYPES)
ODCs may consist of software, materials, and Task Order-related items that are incidental to the services being performed. The cost of general-purpose items required for the conduct of the Contractor’s normal business operations will not be considered an allowable ODC in the performance of this Contract. Profit is not allowed on ODCs for any
Task Order; however, applicable burdens are allowed in accordance with Contractor’s accounting practices. If applicable, the OCO must identify a not-to-exceed ODC ceiling under a separate CLIN on the Task Order.
B8. WORK OUTSIDE THE CONTIGUOUS UNITED STATES (OCONUS)
Task Orders issued under this ID/IQ may require performance outside the Contiguous United States (CONUS).
CONUS means the 48 contiguous States and the District of Columbia. Any additional applicable clauses for OCONUS work may be added to the Task Orders.
OCONUS includes:
1. Outside the United States and its territories, and
2. NON-FOREIGN OCONUS AREA. The states of Alaska and Hawaii, the Commonwealths of Puerto Rico and the Northern Mariana Islands, Guam, and U.S. territories and possessions.
It is anticipated that there may be Task Orders under this Contract for work outside the United States. The Contractor will be compensated for work performed OCONUS pursuant to the Task Order, including any applicable Status of
Forces Agreements (SOFA). Standard references for OCONUS pricing include:
The U.S. Department of State’s Bureau of Administration, Office of Allowances, (https://aoprals.state.gov/) publishes quarterly report indexes of living costs abroad, per-diem rate maximums, quarter’s allowances, hardship differentials, and danger pay allowances for Contractors to follow when proposing on OCONUS efforts. No allowances, other than those listed by the U. S. Department of State, shall be allowed on Task Orders.
The Department of State Standardized Regulations (DSSR) are the controlling regulations for allowances and benefits available to all U.S. Government civilians assigned to foreign areas; however, for Task Orders issued under the ID/IQ
Contract, Contractor civilians assigned to foreign areas shall not exceed the allowances and benefits in the DSSR as well. For OCONUS Task Orders where costs are not specifically addressed in the DSSR, the Government will reimburse the Contractor for all reasonable, allowable, and allocable costs in accordance with FAR 31, Contract Cost
Principles and Procedures.
Section C - Descriptions and Specifications
All efforts shall be performed in accordance with the Performance Work Statement (PWS) entitled “Research and
Technology Development Support Services (RTD2),” which is incorporated by reference herein and is also referenced in Section J of this RFP/contract. The PWS and “Research and Technology Development Support Services (RTD2),” shall be interpreted by all parties as being provided in the schedule for purposes of the application of FAR clause
52.215-8, "Order of Precedence-Uniform Contract Format," which is incorporated by reference in Section I of the
RFP/contract.
Section D - Packaging and Marking
D1. The contractor shall package and mark all deliverables associated with this requirement for services as indicated in deliverables or individual task orders. In addition, the contractor shall include the contract number, title of the deliverable, due date, date prepared, preparers’ name, and the name of the Contracting Officer’s Representative or duly responsibly representative.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
0009 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-5 Inspection Of Services Cost-Reimbursement APR 1984
52.246-8 Inspection Of Research And Development Cost
Reimbursement
MAY 2001
52.246-15 Certificate of Conformance APR 1984
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 19-AUG-2022 TO
20-AUG-2027
N/A JOINT INTERMEDIATE FORCE
CAPABILITIES OF
MICHAEL DURNAVICH
3097 RANGE ROAD
QUANTICO VA 22134
(703) 432-0095
M67854
0002 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 19-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984
Section G - Contract Administration Data
OTHER ADMINISTRATION DATA
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor’s facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the “Changes” clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contacting Officer’s.
In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
The address and telephone number of the Contracting Officer is:
Will be provided at contract award.
The address and telephone number of the Contract Officer Representative is:
Will be provided at contract award.
252.204-7006 Billing Instructions OCT 2005
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of
Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting
Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the
Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
Issue By DoDAAC
Admin DoDAAC**
Inspect By DoDAAC
Ship To Code
Ship From Code
Mark For Code
Service Approver (DoDAAC)
Service Acceptor (DoDAAC)
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert
“See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the
DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition
Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
52.202-1 Definitions JUN 2020
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020
52.203-7 Anti-Kickback Procedures JUN 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct DEC 2021
52.203-15 Whistleblower Protections Under the American Recovery and
Reinvestment Act of 2009
JUN 2010
52.203-16 Preventing Personal Conflicts of Interest JUN 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-2 Security Requirements MAR 2021
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-12 Unique Entity Identifier Maintenance OCT 2016
52.204-13 System for Award Management Maintenance OCT 2018
52.204-14 Service Contract Reporting Requirements OCT 2016
52.204-15 Service Contract Reporting Requirements for Indefinite-
Delivery Contracts
OCT 2016
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
DEC 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other
Covered Entities
DEC 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
DEC 2021
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.210-1 Market Research DEC 2021
52.215-2 Audit and Records--Negotiation JUN 2020
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
JUN 2020
52.215-12 Subcontractor Certified Cost or Pricing Data JUN 2020
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUN 2020
52.215-14 Integrity of Unit Prices DEC 2021
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997
52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
DEC 2021
52.216-8 Fixed Fee JUN 2011
52.219-16 Liquidated Damages-Subcontracting Plan SEP 2021
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-2 Payment For Overtime Premiums JUL 1990
52.222-3 Convict Labor JUN 2003
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-35 Equal Opportunity for Veterans JUN 2020
52.222-37 Employment Reports on Veterans JUN 2020
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons DEC 2021
52.222-54 Employment Eligibility Verification DEC 2021
52.223-6 Drug-Free Workplace MAY 2001
52.224-1 Privacy Act Notification APR 1984
52.224-2 Privacy Act APR 1984
52.227-1 Authorization and Consent JUN 2020
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.227-3 Patent Indemnity APR 1984
52.230-2 Cost Accounting Standards JUN 2020
52.230-3 Disclosure And Consistency Of Cost Accounting Practices JUN 2020
52.230-6 Administration of Cost Accounting Standards JUN 2010
52.232-9 Limitation On Withholding Of Payments APR 1984
52.232-17 Interest MAY 2014
52.232-18 Availability Of Funds APR 1984
52.232-20 Limitation Of Cost APR 1984
52.232-22 Limitation Of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-24 Prohibition of Assignment of Claims MAY 2014
52.232-25 Prompt Payment JAN 2017
52.232-25 Alt I Prompt Payment (Jan 2017) Alternate I FEB 2002
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2021
52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.237-3 Continuity Of Services JAN 1991
52.242-4 Certification of Final Indirect Costs JAN 1997
52.242-5 Payments to Small Business Subcontractors JAN 2017
52.242-13 Bankruptcy JUL 1995
52.243-2 Alt V Changes--Cost-Reimbursement (Aug 1987) - Alternate V APR 1984
52.243-7 Notification Of Changes JAN 2017
52.244-2 Subcontracts JUN 2020
52.244-5 Competition In Subcontracting DEC 1996
52.245-1 Alt I Government Property (SEP 2021) Alternate I APR 2012
52.245-9 Use And Charges APR 2012
52.246-25 Limitation Of Liability--Services FEB 1997
52.249-5 Termination For Convenience Of The Government
(Educational And Other Nonprofit Institutions)
AUG 2016
52.249-6 Termination (Cost Reimbursement) MAY 2004
52.249-14 Excusable Delays APR 1984
52.250-1 Alt I Indemnification Under Public Law 85-804 (Apr 1984) -
Alternate I
APR 1984
52.252-2 Clauses Incorporated By Reference FEB 1998
52.252-4 Alterations in Contract APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7000 Disclosure Of Information OCT 2016
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.209-7009 Organizational Conflict of Interest--Major Defense
Acquisition Program
MAY 2019
252.216-7009 Allowability of Legal Costs Incurred in Connection With a
Whistleblower Proceeding
SEP 2013
252.223-7004 Drug Free Work Force SEP 1988
252.225-7048 Export-Controlled Items JUN 2013
252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014
252.227-7014 Rights in Noncommercial Computer Software and
Noncommercial Computer Software Documentation
FEB 2014
252.227-7016 Rights in Bid or Proposal Information JAN 2011
252.227-7017 Identification and Assertion of Use, Release, or Disclosure
Restrictions
JAN 2011
252.227-7019 Validation of Asserted Restrictions--Computer Software SEP 2016
252.227-7020 Rights In Special Works JUN 1995
252.227-7025 Limitations on the Use or Disclosure of Government-
Furnished Information Marked with Restrictive Legends
MAY 2013
252.227-7027 Deferred Ordering Of Technical Data Or Computer Software APR 1988
252.227-7037 Validation of Restrictive Markings on Technical Data SEP 2016
252.232-7010 Levies on Contract Payments DEC 2006
252.235-7002 Animal Welfare DEC 2014
252.235-7004 Protection of Human Subjects JUL 2009
252.235-7011 Final Scientific or Technical Report DEC 2019
252.242-7004 Material Management And Accounting System MAY 2011
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
(a) Definition. First-tier subcontract means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor's supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor's general and administrative expenses or indirect costs.
(b) The Contractor shall report, in accordance with paragraphs (c) and (d) of this clause, annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1-September 30).
(c) The Contractor shall report the following information:
(1) Contract number and, as applicable, order number.
(2) The total dollar amount invoiced for services performed during the previous Government fiscal year under the contract.
(3) The number of Contractor direct labor hours expended on the services performed during the previous
Government fiscal year.
(4) Data reported by subcontractors under paragraph (f) of this clause.
(d) The information required in paragraph (c) of this clause shall be submitted via the internet at www.sam.gov. (See
SAM User Guide). If the Contractor fails to submit the report in a timely manner, the contracting officer will exercise appropriate contractual remedies. In addition, the Contracting Officer will make the Contractor's failure to comply with the reporting requirements a part of the Contractor's performance information under FAR subpart
42.15.
(e) Agencies will review Contractor reported information for reasonableness and consistency with available contract information. In the event the agency believes that revisions to the Contractor reported information are warranted, the agency will notify the Contractor no later than November 15. By November 30, the Contractor shall revise the report, or document its rationale for the agency.
(f)(1) The Contractor shall require each first-tier subcontractor providing services under this contract, with subcontract(s) each valued at or above the thresholds set forth in 4.1703(a)(2), to provide the following detailed information to the Contractor in sufficient time to submit the report:
(i) Subcontract number (including subcontractor name and unique entity identifier); and
(ii) The number of first-tier subcontractor direct-labor hours expended on the services performed during the previous
Government fiscal year.
(2) The Contractor shall advise the subcontractor that the information will be made available to the public as required by section 743 of Division C of the Consolidated Appropriations Act, 2010.
52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)
(a) Invoicing.
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the
Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the
Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act.
Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
http://www.sam.gov/
(3) The designated payment office will make interim payments for contract financing on the (Contracting
Officer insert day as prescribed by agency head; if not prescribed, insert “30th”) day after the designated billing office receives a proper payment request.
In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs. (1) For the purpose of reimbursing allowable costs (except as provided in subparagraph
(b)(2) of the clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only--
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for--
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made--
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless--
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates. (1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the
Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period. The appropriate
Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General organizational information and limitation on allowability of compensation for certain contractor personnel. See 31.205-6(p). Additional salary reference information is available at https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedBeforeJune24.pdf and https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedafterJune24.pdf.
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year's submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: Contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.
https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedBeforeJune24.pdf https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedBeforeJune24.pdf https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedafterJune24.pdf https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedafterJune24.pdf
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify (i) the agreed-upon final annual indirect cost rates,
(ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the
Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.
(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may--
(A) Determine the amounts due to the Contractor under the contract; and
(B) Record this determination in a unilateral modification to the contract.
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates--
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.
(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be (1) Reduced by amounts found by the Contracting
Officer not to constitute allowable costs or (2) Adjusted for prior overpayments or underpayments.
(h) Final payment. (1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractor's compliance with all terms of this contract, the
Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver--
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except--
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.
52.216-18 ORDERING. (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from through [insert dates].
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when--
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either--
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the
Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,500.00 (insert dollar figure or quantity), the Government is not obligated to purchase, nor is the
Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of $48,000,000.00 (insert dollar figure or quantity);
(2) Any order for a combination of items in excess of $48,000,000.00 (insert dollar figure or quantity); or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .