This document is an Addendum to the Contract Documents for the Town of Madison WTP ARPA Improvements Project. The project is being managed by the Rapidan Service Authority (RSA) and is located in Madison County, Virginia. The project entails the installation of a new 0.25 MGD flocculation/sedimentation/filtration train to provide redundancy for the existing single-train system. Additional project elements include intake rehabilitation, a pre-engineered filter building, new electrical service, yard piping, electrical and controls, and furnishing and installing all ancillary components. A mandatory pre-bid conference was held on June 15, 2023, and sealed bids are due by 11 AM on July 20, 2023 at the RSA Ruckersville Office.
The Addendum provides updates and clarifications to the contract documents, including changes to drawings, additions of new notes, and responses to questions from bidders. Key updates include requirements for butterfly valve specifications, a two-stage construction sequence, notification of plant shutdowns, turbidity meter locations and specifications, and updates to electrical drawings and schematics. There are no changes to the project manual or pricing terms noted in the Addendum. The project is funded through the American Rescue Plan Act (ARPA) and does not have any prevailing wage or Davis-Bacon requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 1 for the
Town of Madison WTP ARPA Improvements Project
Prepared For
Rapidan Service Authority 11235 Spotswood Trail Ruckersville, VA 22968
Prepared by C. Robert L. Mangrum, P.E., BCEE
Mangrum Consulting & Design 1500 Clayton Avenue Lynchburg, VA 24503
Addendum Date: June 28, 2023
This Addendum No. 1, dated June 28, 2023 amends or supplements the Contract Documents titled Town of Madison WTP ARPA Improvements Project Dated June 5, 2023 as indicated below:
Changes to Drawings:
Item 1: Drawing D-002 Note F, delete item 1 and replace with: “All butterfly valves shall be Bray wafer style with cast iron body, nylon coated disc, EPDM seat and shaft seal.
Manually controlled butterfly valves shall have lever or gear operated handwheel actuators. Automatic butterfly valves have double acting, weatherproof electric actuators manufactured by Bray that employ spring assisted closure for normally closed under power loss conditions.”
Item 2: Drawing D-002 Note K, add the following: “1g. All electric actuators for butterfly valves shall employ spring assisted closure for normally closed under power loss conditions.”
Item 3: Add the following to Drawing D-004, “H. The work shown on Sheet D-102
(EXISTING FILTER BUILDING BASEMENT AND NEW PIPE GALLERY PLAN
SEQUENCE 1) represents the first step of contract work to be performed in a two-stage construction sequence resulting from constraints required to keep the existing plant operational. Sheet D-103 (EXISTING FILTER BUILDING BASEMENT AND NEW PIPE GALLERY PLAN SEQUENCE 2) represents the second step of contract work to be performed in the existing filter basement. All work shown on D-102 (Sequence 1) AND all associated and related work (eg. electrical, I&C, mechanical, etc.) shown elsewhere in the contract documents shall be deemed substantially complete by Owner in accordance with the contract documents prior to commencing with any work shown on D-103 or any associated work (eg. electrical, I&C, mechanical, etc.) pertaining to or associated with the work on D-103. The existing filter shall remain in service and fully functional until Owner provides written authorization for it to be removed from service to facilitate sequence 2 work in the existing filter building basement.”
Item 4: Add the following Drawing D-004, “I. Contractor shall provide Owner written notice at least 7-days in advance of any requested plant shut down(s) as required to perform contract work. Upon approval by the Owner, the maximum duration of any single shutdown shall not exceed 3.0 consecutive calendar days (72 consecutive hours).”
Item 5: Drawing D-102, delete note 31 and replace with: “Furnish and install three (3) wall mounted turbidity meters, HF Scientific MTOL+ EPA model with 120V power and 4- 20 mA output. Tap raw water process pipe, tap settled water/filter 1 influent process pipe and tap filter effluent process pipe each with ½” saddle tap and stainless steel ball valve. Connect each turbidity meter to corresponding ball valve using ¼” PE tubing.
Route each turbidity meter unit drain to nearest floor drain using ¼” PE tubing.”
Item 6: Drawing D-104, delete Note 17 and replace with: “Furnish and install a wall mounted turbidity meter, HF Scientific MTOL+ EPA model with 120V power and 4-20 mA output. Tap filter 2 effluent process pipe with ½” saddle tap and stainless steel ball valve. Connect turbidity meter to ball valve using ¼” PE tubing. Route turbidity meter unit drain to nearest floor drain using ¼” PE tubing.”
Item 7: Drawing D-104, add the following note: “18: Furnish and install a wall mounted turbidity meter, HF Scientific MTOL+ EPA model with 120V power and 4-20 mA output.
Tap settled water/filter 2 influent process pipe with ½” saddle tap and stainless steel ball valve. Connect turbidity meter to ball valve using ¼” PE tubing. Route turbidity meter unit drain to nearest floor drain using ¼” PE tubing.”
Item 8A: Drawing M-101, delete note 9 and replace with “36"w x 48"h Vinyl normal opening window, low E-366 with argon.”
Item 8B: Drawing M-101, delete note 10 and replace with “36"w x 48"h Vinyl normal opening window, low E-366 frosted privacy glass with argon.”
Item 9: Drawing M-102 add the general note: “D. Utility sink and tankless water heater to be located on south wall near future booster pump discharge pipe floor penetration.”
Item 10: Add the following to Drawing E-001, “27. Conduits for instrumentation and control wiring have not been shown in the contract documents. Drawing E-603 provides an itemization of all Digital and Analog signals for each instrument and indicates where the wiring shall be terminated/landed. Digital and Analog signals shall be in separate conduits. Minimum conduit size for digital signals for each instrument shall be ¾”C. The minimum size for analog signals for each instrument shall be ¾”C. See Drawing E-602 (attached to addendum) notes A, B, C and D for additional information.”
Item 11: Drawing E-102, delete Note 12 and replace with: “3/4”C w/2 #12 and 1 #12 GND to PB2 for each of the three (3) turbidity meters referenced in item 5 hereinabove.
Item 12: Drawing E-103, delete Note 4 and replace with: “Future booster pump No.1, 1"C w/ 3 #10 and 1 - #10 GND to PCPRNH.”
Item 13: Drawing E-103, delete Note 5 and replace with: “Future booster pump No.2, 1"C w/ 3 #10 and 1 - #10 GND to PCPRNH.”
Item 14: Drawing E-103, delete Note 16 and replace with: “3/4”C w/2 #12 and 1 #12 GND to PB1.
Item 15: Drawing E-103, add the following: “Note 17. 3/4”C w/2 #12 and 1 #12 GND to PB1 for settled water/filter 2 influent turbidity meter.”
Item 16: Replace Drawing E-601 with the attached updated E-601.
Item 17: Replace Drawing E-602 with the attached updated E-602.
Item 18: Replace Drawing E-603 with the attached updated E-603.
Item 19: Replace Drawing E-604 with the attached updated E-604.
Item 20: See attached “VDH Drain Field Permitting Package” for details for installing new septic tank and drain field at the location shown on Drawing C-101.
Item 21: On Drawing C-101, delete the reference note by new drain field location “SEE NOTE X ON C-502” and replace with: “See VDH Drain field Permitting Package Contained in Addendum No.1.”
Changes to Project Manaual:
None.
Questions & Responses:
Question 1: The specs call for the contractor’s qualification to be submitted within 5 days of submitting bid. The Bid Form notes the qualification is to be submitted with bid. Can the qualifications be submitted after the bid by the low bidder?
Response 1: The contractor’s qualifications can be submitted with the bid or alternatively the qualifications must be provided by the apparent low bidder within five
(5) days of being requested by OWNER after the bid.
Question 2: When is the last day to submit questions?
Response 2: The last date and time to submit questions is 5:00 PM on July 6, 2023.
Question 3: Does AIS or prevailing wage and/or Davis Bacon requirements pertain to this project?
Response 3: No.
Question 4: What brand of electric actuators are needed for the plug valves? Bray electric actuators are mentioned on the butterfly valves but nothing on the plug valves.
Response 4: Electric actuators for plug valves for open/close (FV) service and modulating (FCV) service shall meet requirements specified in Item K on D-002 and shall be Rotork, Limitorque, or AUMA.
Question 5: There’s only one plug valve (#41 on drawing D-102) that calls out that it’s modulating. Are the rest supposed to be open/close? There’s nothing clarifying what they’re supposed to be.
Response 5: Valves with electric actuators identified on the C and D drawings indicate open/close service with the designation “FV” or “open/close” or “Electric Actuated”; for modulating valves identified on C and D drawings, modulating service have the designation of “FCV” or “modulating”. Drawing C-104 (Yard Piping) identifies additional plug valves for the project, both modulating (FCV) and open/close (FV). Drawing E-602 (updated attached) identifies each valve for the project with FV or FCV. Drawing E-604 (Panel Schedule) also identifies all electric actuated valves with FV or FCV.
Attachments Prebid Meeting Attendee List Drawing E-601 Drawing E-602 Drawing E-603 Drawing E-604 VDH Drain Field Permitting Package
END OF ADDENDUM NO. 1
PREBID MEETING ATTENDEE LIST
RSA
R a,ldan Service A uthority
June 15, 2023 Pre-B id M eeting -
Tow n of M ad ison W
TP ARPA Im provem ents Project
N am e C om pany N am e
A ddress
Phone
Em ail A ddress
-];'1 ;-/4-s {,.
vJ,µ,l>' :r;i (, f!Y fo h:.,,s ,,., •• J
.J,JP
s(11..,,.,,,;,Jc,,J( 11
3~,-,,,/4 J,,,.. / V,.
'JJ(,ft)
'(c,-[i b-!JU cf...~ J~.,(),.~}.
Jf
G.v l!
t"\.
<-o.s bum
• ,g
Cu"-s-+.--vd,.._
+.,.,.1,.,, T
IV
'-()3
-11,J,-SS-,1
0i" t"
CG-w\,d-vvd.-un .c.b
CL ff-J-v,, b l;.> l i;-/5 d,v.rch ,.,.
.Jclii+o.,E!) eotl\..·.s.l.,cot1
C'l>" d -r//C
-f/v,-v L y 11<-\,bu.<3'
V fl
2'150 '/3'/-'$'!5-d3d)
1,r~L G -ru,11 oM l" M v -lh., A
,~c-,1
IL
L
\o~<..@ c..0,,.,\.-.ie"JS'flr
")'"""'') .. S<,l..1
A ~l,_\..,,._L
V
8o<t-., > \ - '!..S'O
L
,o---, :::fat C» rl ,• /\ ~C
(·,,w
:-JJ
?.,'21..-( c)'vr-" (Z.-,,1.
'i1'f--'f'/2.Jf(,3l, ~:,e~ A vJ.-,~
( c,i' y A 2-'i ff f -.,-,,.M
~ 1,i,.;:,,, , • .)1 '~ "'°
{a rt'( O
,.w:oRO f,+Tf/J/{,'I.J
,1.z,.f /11lt-1111J6,, lSfo
-7ivtN S
" C.01/l(FtJll.P .fCc
C,o,-,.flp,.
h n
/i!N //,.t/Jv¼ vn C<P,.-;
G ,,f1o('i.,., 5'" 1 v-. {(,t_J AAo,.i.,, 1 t,, E~
1f-ft. .• 1f-cJ.,,'fL {! Vo{/~
••;t,.
L,,,.. VA
2,1.,,,/i'f' 'iytJ-rn
-o,~( ·•c+
-:5 e-\+-
~ol,;"5,,.. Ce.la, M =~~,·,1 ro 10/G I) S'tD-g;,,; -jllol,;•je-r© h
,n e
411+Je/l.s VA-
)?-7]'1
J.\\,,IJ; .,. <
O
M
I rE _
RSA
R apidan Service Auchorlty June 15, 2023
Pre-B id M eeting - Tow n of M adison W
TP ARPA Im provem ents Project
N am e C om pany N am e
A ddress
Phone # Em ail A ddress t:'.13l-l- W bik.
(½ f'<.t-rvlk'"' "i'H,o
(6 l~ f'.4
/J j<.,\.fuM l,_,,,~ r l)(cJM
½ l\1-lr e,1cro rod'-<
,:1.r, 0-"'-"+<'''t' lf!,li-3').7-% Si .,.,6\1<-U>"S>'r,,~;o .. ,Co
'L n, r; I
S,/.• .~v•>
,A y{
5'f" , J_f,• -&
1.S J"~
IM
-,v
V"1
°'"'e -p ,((' , ro..., ( \0.--4
(.I,~
(IA
f"\<> I
0.'/~~,,.<, (•"" c-lr/-<-f zt.
,J.t,v,.,.,.,.,;,-A-<,.
h,i.;,_.,,..f;"':Je_ ;{j-,,,tJ
G P?
G
,f>D um
-;;-.,1,"?,<;5',, 1,.';l, c-p f'L o n f-r~ do·-n
.C z_ o+ ii
UPDATED DRAWINGS
480 / 277Y / 3Ø / 60 Hz / 4W UG Utility Power Service
CT Cabinet
Meter Base
4” C w/4 – 350KCMIL (2 Sets)
4” C w/4 – 350KCMIL (2 Sets)
Utility Service Entrance Main Breaker Disconnect (MBD) 600 A 480 / 277Y / 3Ø / 60 Hz
Ground BUS
Neutral BUS 1/0 BCSD
1/0 BCSD
16' Min.
Future ATS
600 A
Mounted 1st Floor New Filter Building
Distribution Panel Board Filter Building (FBPB) 480 / 277Y / 3Ø / 60 Hz 346 FLA Connected 249 FLA Running Main Breaker 600 A Min. SSCR 65k AIC
4” C w/4 – 350KCMIL
& 1-1/0 GND (2 SETS)
/ 3P
30 Backwash Pump 1 1.5” C w/3 – #4
&1 - #4 GND
Manufacturer Supplied Wall Mounted on SS Unistrut at Front of New Sed Basin
Sludge Removal System Control Panel (SRCP) 120V / 1Ø / 60 Hz
5 FLA
Main Breaker 20 A
HMI
PLC
Sludge Collector Drive 0.25 VFD
30 A / 3P
3/4”C w/2 – #10
&1 - #10 GND
1” C w/3 – #12
&1 - #12 GND
/ 3P
200 A / 3P
Space
Instrumentation Controls Sub-Contractor Supplied Floor or Wall Mounted 1st Floor New Filter Building
Process Control Panel & Remote Network Head (PCPRNH) 480 / 277Y / 3Ø / 60 Hz 155 FLA Connected 122 FLA Running Main Breaker 200 A
3”C w/4 – #3/0
&1 - #1 GND
R em ot e
N et w or k H ea d
Fu tu re
Fu tu re
Fu tu re
VF
D
VF
D
Lo ad
R ea ct or
Future 7.5
HP VFD
Booster No.1
Future 7.5
HP VFD
Booster No.2
0.5 Floc Mixer No.1
0.5 Floc Mixer No.2
NF 3P
Disconnect
NF 3P
Disconnect
NF 3P
Disconnect
1” C w/3 – #12
&1 - #12 GND
1” C w/3 – #12
&1 - #12 GND
Lo ad
R ea ct or
Motor Starter
& OL
Protection
Motor Starter
& OL
Protection
NF 3P
Disconnect 30 High Service Pump No.1 (existing dual voltage motor)
NF 3P
Disconnect
30 High Service Pump No.2 (existing dual voltage motor)
1.5” C w/3 – #4
&1 - #4 GND
HOA
Hand
OPEN
Hand
CLOSE
New Filter Influent Valve New Filter Drain Valve New Filter Backwash Valve New Filter Air Scour Valve
Ex. Filter Influent Valve Ex. Filter Drain Valve Ex. Filter Backwash Valve Ex. Filter Air Scour Valve Ex. Filter Influent Valve 2
New Sed Basin Sludge Valve
HOA
Hand
ON
Hand
OFF
High Service Pump No.1
High Service Pump No.2
Raw Water Pump No.1 Raw Water Pump No.2
Backwash Pump No.1
Remote Display
Remote Display
60 A / 3P Manufacturer Supplied Integrally Mounted to Blower
Air Scour Backwash Blower Control Panel (ASBBCP) 480 V / 277Y / 3Ø / 60 Hz
50 FLA
HMI
120V - Controls
Air Scour Backwash Blower
1.5” C w/4 – # 6
&1 - #6 GND
Fused 3P Disconnect
HOA
Ex. Raw Water Influent Valve Train 1 Influent Valve Train 2 Influent Valve
New Filter Effluent Valve Filter Backwash Control Valve New Filter Filter-To-Waste Valve
Ex. Filter Effluent Valve Ex. Filter Filter-To-Waste Valve
Hand Potentiometer
16" HMI
75 A / 3P
75 A / 3P 1.5” C w/4 – #4
&1 - #6 GND
Wall Mounted Beside PB1 (1st Floor New Filter Bldg.)
45 KVA
54 FLA HV
125 FLA LV
480 V / 208Y / 3Ø / 4W / 60 Hz
TX
3” C w /4
1/
&1
#4 G
N D
Wall Mounted 1st Floor New Filter Building
/ 3P
Space
/ 3P Space
/ 3P Space
/ 3P Space
/ 3P Space
/ 3P
Space
/ 3P
Space
/ 3P
30 / 3P
Space
1”C w/4 – #10
&1 - #10 GND
Wall Mounted Near FBPB 1st Floor of New Filter Building
15 KVA
18 FLA HV
36 FLA LV
480 V / 240 / 3Ø / 4W / 60 Hz
TX
1.
5”
C w
/4
&1
#6 G
N D
JB w/Tap; Wall Mounted in Basement of Ex. Filter Bldg.1.5” C w/4 – #6
&1 - #6 GND5 HP Starter
& OL
240V 3Ø
JB
5 HP Starter
& OL
240V 3Ø
To Raw Water
Pump 2
JB
1.
5”
C w
/4
&1
#6 G
N D
Ethernet - Fiber Switch
3/4"C w/1 Fiber Cable (Ethernet IP) Ethernet - Panel SRCP at New Sedimentation BasinFiber Switch
4” C w/4 – 350KCMIL
&1 - 1-1/0 GND (2 SETS)
Junction Box in Basement of Existing Filter Building for Future Generator Connection
Motor Starter
& OL
Protection
1.5” C w/3 – #4
&1 - #4 GND
SCADA Cabinet in Office Ethernet - 2nd Floor New Filter Bldg.3/4"C w/3 Ethernet Cables Fiber Switch
PB1
208Y / 3Ø / 60 Hz Main Breaker 125 A
See Panel Schedule
Space
Wall Mounted Basement in Ex.
Filter Bldg
Wall Mounted Basement in Ex.
Filter Bldg
Wall Mounted Basement in Ex.
Filter Bldg
Wall Mounted Basement in Ex.
Filter Bldg To Raw Water Pump1
To Be Wall Mounted Near Main Breaker Disconnect
Motor Heater
NF 3P
Disconnect
Wall Mounted Basement Ex. Filter Building
PB2
208Y / 3Ø / 60 Hz Main Breaker 125 A
See Panel Schedule
3” C w/4 – #1/0 &1 - #4 GNDManufacturer Supplied
Wall Mounted Basement Ex. Filter Bldg.
Backwash Pump Control Valve Panel (BWPCVP) 120V / 1Ø / 60 Hz
10 FLA
Main Breaker 20 A
HMI
3/4”C w/2 – #10
&1 - #10 GND
NF 1P
Disconnect
NF 1P
Disconnect
PLC
1.
5”
C w
/4
&1
#6 G
N D
Wall Mounted Beside PB2 (Basement Ex. Filter Bldg.)
45 KVA
54 FLA HV
125 FLA LV
480 V / 208Y / 3Ø / 4W / 60 Hz
TX
Wall / Ceiling Mounted 1st Floor New Filter Building
15 KW Unit Heater 480 V / 277Y / 3Ø / 60 Hz
18 FLA
Controls
1” C w/4 – # 10
&1 - #10 GND
NF 3P
Disconnect
3/4” C w/One 18 ga 7 wire cable Wall Mounted
Thermostat
PCPNRH
1st Floor New Filter Building
Ethernet - Fiber Switch
3/4"C w/1 Fiber Cable (Ethernet IP)
Pump Control Valve 0.25
3/4” C w/2 – #12
&1 - #12 GND
SHEET OF
SHEET TITLE
CHECKED BY:
DRAWN BY:
DATE:
PROJECT NO:
M
AR
K D
ES
C
R
IP
TI
O
N
O W
N
ER
D
AT
E
X:
\P
R O
J\
TC
S2
1_ M
C D
-R
SA
-M
AD
C O
W
TP
\C
AD
\2
1E
1-
AD
D 1.
D W
G P
LO
T:
/2
8/
0:
A M
BI
D S
ET
6/
5/
6/ 5/
RA
PI
DA
N
SE
RV
IC
E
AU
TH
O
RI
TY
TO
W N
O F
M
AD
IS
O
N W
TP
AR
PA
IM
PR
O
VE
M
EN
TS
P R
O
JE
C T
R
AP
ID
AN
S
ER
VI
C
E
AU
TH
O
R
IT
Y M
AD
IS
O N
, V
IR
G
IN
IA
TCS2231
MAY 2, 2023
MCT
CRLM
E-601 36 39
ELECTRICAL
SINGLE LINE
6/
/2
AD
D
EN
D
U
Existing Filter Building Basement Level
Raw Water Flow Meter
FCV Raw Influent Valve
HydroAct Transmitter
FCV Filter No.1 Effluent Valve
LIT Clearwell Level
Existing Filter Building Upstairs Level
FV Filter No.1 Filter Backwash Valve
FV Filter No.1 Filter Drain Valve
FCV Filter No.1 Filter-to-Waste Valve
LIT Filter No.1 Level General Location: Outside
Sludge Removal System Control Panel
(Manufacturer Furnished)
Air Scour Blower Control Panel
(Manufacturer Furnished)
New Filter Building 1st Floor
FV Filter No.2 Drain Valve
FV Filter No.2 Air Scour Valve
FCV Train No.1 Influent Valve LIT Filter No.2 Level
FCV Train No.2 Influent Valve
FV Filter No.2 Influent Valve
F1 Filtered Water Flow Meter
F2 Filtered Water Flow Meter & Backwash Feed
FV Filter No.1 Air Scour Valve
Contained within the Process Control Panel (Furnished by Systems Integrator)
Starter Backwash Pump No.1
Starter High Service Pump No.1
Starter High Service Pump No.2
VFD New Floc No.1
VFD New Floc No.2
Starter Raw Water Pump No.1
Starter Raw Water Pump No.2
PIT Filter No.1 Head Loss
FV Sed Basin Sludge Valve
Train 2 Flow Meter
FV Filter No.1 Influent Valve
FV
Backwash Pump Control Valve Control Panel
(Manufacturer Furnished)
Backwash Flow Meter Backwash Valve Position Set/Indication
Check Valve Function
PIT Filter No.2 Head Loss
Filter No.1 Influent Valve 2
Process Control Panel and Network Head (Furnished by Systems Integrator) Located in 1st Floor of New Filter Building
Turbidity Raw Water
Turbidity Settled Water to F1
Turbidity Settled Water to F2
Turbidity F2 Filtered Water
General Notes:
A. Instruments to be furnished and installed by the General Contractor are itemized by general project location on this drawing. The Controls Systems Integrator, VAI, is not responsible for furnishing nor installing the instruments shown on this sheet.
B. Contractor shall furnish and install a dedicated power conduit for each instrument.
C. Contractor shall furnish and install a dedicated digital control signal conduit and cabling as required for each instrument to convey the type and quantity of I/O itemized on Table 3 Drawing E-603 for that instrument. 3/4"C minimum size.
D. Contractor shall furnish and install a dedicated analog control signal conduit and cabling as required for each instrument to convey the type and quantity of I/O itemized on Table 3 Drawing E-603 for that instrument. 3/4"C minimum size.
E. Contractor shall furnish and install a dedicated network conduit and cabling for each instrument as required per Table 3 Drawing E-603 for that instrument. 3/4"C minimum size.
Turbidity Filtered Water F1
FCV Filter No.2 Filter-to-Waste Valve
FV Filter No.2 Backwash Valve
FCV Filter No.2 Effluent Valve
SHEET OF
SHEET TITLE
CHECKED BY:
DRAWN BY:
DATE:
PROJECT NO:
M
AR
K D
ES
C
R
IP
TI
O
N
O W
N
ER
D
AT
E
X:
\P
R O
J\
TC
S2
1_ M
C D
-R
SA
-M
AD
C O
W
TP
\C
AD
\2
1E
2-
AD
D 1.
D W
G P
LO
T:
/2
8/
0:
A M
BI
D S
ET
6/
5/
6/ 5/
RA
PI
DA
N
SE
RV
IC
E
AU
TH
O
RI
TY
TO
W N
O F
M
AD
IS
O
N W
TP
AR
PA
IM
PR
O
VE
M
EN
TS
P R
O
JE
C T
R
AP
ID
AN
S
ER
VI
C
E
AU
TH
O
R
IT
Y M
AD
IS
O N
, V
IR
G
IN
IA
TCS2231
MAY 2, 2023
MCT
CRLM
E-602 37 39
CONTROLS
NETWORK
SCHEMATIC
6/
/2
AD
D
EN
D U
M
General Location of IO DO DI AO AI Ethernet IP Modbus
TCP
Ex. Filter Building (Basement) 36 63 11 26 1 0
Outdoors - Yard Piping 10 16 4 7 0 0
New Filter Building - 1st Floor 18 32 2 7 2 0
Total Connected 64 111 17 40 3 0 235
DO DI AO AI Ethernet IP Modbus
TCP
PCPNH Panel (New Filter Building, 1st Floor) 72 120 24 48 12 Capable 276
Description of Signal & PLC/SCADA Programming Features Signal Type
Modulating Valve;
Quantity 5
Open/Close Valve;
Quantity 5
Future Use on Western
Wall
Level / Pressure /
Flow;
Quantity 5
Motor Starter;
Quantity 2
Backwash Pump
Control Valve Panel
Turbidity Meter;
Quantity 3
HydroAct;
Quantity 1
Open/Close Valve;
Quantity 1
Modulating Valve;
Quantity 2
Flow Meter;
Quantity 1
Control Panels;
Quantity 2
Open/Close Valve;
Quantity 4
Modulating Valve;
Quantity 0
VFDs;
Quantity 2
Flow Meter;
Quantity 1
Motor Starter;
Quantity 3
Turbidity Meter;
Quantity 2
Level / Pressure
Transmitter;
Quantity 2
Remote start/Open DO 5 5 5 2 1 1 2 2 4 2 3
Remote stop/Close DO 5 5 5 2 1 1 2 2 4 2 3
Local/Remote Control Status DI 5 5 5 2 1 1 2 2 4 2 3
Status indication DI 5 5 5 2 1 1 2 2 4 2 3
General Alarm DI 5 5 5 5 2 1 3 1 1 2 1 2 4 2 1 3 2 2
Spare Digital Cable/Conductor(s)
Speed Control or Position Control AO 5 5 1 2 2 2 Feed Back on Speed or Position
Inidication AI 5 5 1 2 2 2
Instrument Reading(s) AI 5 5 1 3 1 1 2 1 2 2
Spare Analog Cable(s)
Ethernet IP via Cat 5 Cable Network 1 2
Spare Network Cables Network
IO in Existing Filter Building - Basement IO Outdoors IO in New Filter Building - 1st Floor
Table 1
Connected I/O Points & Ethernet Ports
Table 2
Minimum Installed I/O Points & Ethernet Ports
Table 3
Itemization of Instrumentation Control Signals & PLC/SCADA Programming Requirements for New Equipment
SHEET OF
SHEET TITLE
CHECKED BY:
DRAWN BY:
DATE:
PROJECT NO:
M
AR
K D
ES
C
R
IP
TI
O
N
O W
N
ER
D
AT
E
X:
\P
R O
J\
TC
S2
1_ M
C D
-R
SA
-M
AD
C O
W
TP
\C
AD
\2
1E
3-
AD
D 1.
D W
G P
LO
T:
/2
8/
0:
A M
BI
D S
ET
6/
5/
6/ 5/
RA
PI
DA
N
SE
RV
IC
E
AU
TH
O
RI
TY
TO
W N
O F
M
AD
IS
O
N W
TP
AR
PA
IM
PR
O
VE
M
EN
TS
P R
O
JE
C T
R
AP
ID
AN
S
ER
VI
C
E
AU
TH
O
R
IT
Y M
AD
IS
O N
, V
IR
G
IN
IA
TCS2231
MAY 2, 2023
MCT
CRLM
E-603 38 39
I O SUMMARY/
6/
/2
AD
D
EN
D U
M
SHEET OF
SHEET TITLE
CHECKED BY:
DRAWN BY:
DATE:
PROJECT NO:
M
AR
K D
ES
C
R
IP
TI
O
N
O W
N
ER
D
AT
E
X:
\P
R O
J\
TC
S2
1_ M
C D
-R
SA
-M
AD
C O
W
TP
\C
AD
\2
1E
4-
AD
D 1.
D W
G P
LO
T:
/2
8/
0:
A M
BI
D S
ET
6/
5/
6/ 5/
RA
PI
DA
N
SE
RV
IC
E
AU
TH
O
RI
TY
TO
W N
O F
M
AD
IS
O
N W
TP
AR
PA
IM
PR
O
VE
M
EN
TS
P R
O
JE
C T
R
AP
ID
AN
S
ER
VI
C
E
AU
TH
O
R
IT
Y M
AD
IS
O N
, V
IR
G
IN
IA
TCS2231
MAY 2, 2023
MCT
CRLM
E-604 39 39
PANEL
SCHEDULES
6/
/2
AD
D
EN
D
U
VDH DRAIN FIELD PERMITTING PACKAGE
| END OF ADDENDUM NO. 1 |
| TCS2231-20230628-ADD1.pdf |
| Sheets and Views |
| E-601 ELECTRICAL SINGLE LINE |
| E-602 CONTROLS NETWORK SCHEMATIC |
| E-603 I O SUMMARY |
| E-604 PANEL SCHEDULES |
{"type":"Document","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":true}
{"type":"Document","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":true}
File details come from the government source that posted it. Updated .