RR-23-4915_AddendumNo1_10272023.pdf
PDF 4 MB Posted
- Attached to
- RR-23-4915 Jane Addams Memorial Tollway (I-90) Ramp Pavement Repairs at Genoa Road Mile Post 25. 0
- Solicitation number
- 24-557THA-ENGCO-B-39210
- Issued by
- Boone County, Illinois
About this file
This document is an addendum to Contract No. RR-23-4915 issued by the Illinois State Toll Highway Authority for the Jane Addams Memorial Tollway (I-90) Ramp Pavement Repairs at Genoa Road Mile Post 25.0. The contract includes ramp pavement repairs, hot-mix asphalt removal, PCC patching, asphalt overlay, warm-mix asphalt shoulder, aggregate shoulder improvements, permanent pavement marking, maintenance of traffic, and other miscellaneous work. The addendum revises the Schedule of Prices, adds new Special Provision pages, and includes revised and new contract drawings. The bid opening date is November 3, 2023, and the anticipated notice-to-proceed is February 13, 2024. Substantial completion is required by June 17, 2024, and final completion by July 29, 2024.
The contract has a Disadvantaged Business Enterprise (DBE) goal of 24% and a Veteran-Owned Small Business (VOSB) goal of 3%. The contract allows for a bid credit cap of $30,000. The Tollway also has an Equal Employment Opportunity (EEO) goal of 6.3% minority and 6.9% female participation. The contract includes various short duration ramp detours requiring coordination with several different jurisdictions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. RR-23-4915 Addendum 1 Page 1 of 3 10/27/2023
ADDENDUM NO. 1
TO
CONTRACT REQUIREMENTS
FOR CONTRACT RR-23-4915
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 10/27/2023
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, November 3, 2023
NOTICE OF REVISION TO CONTRACT
NOTES:
1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-5R and P-6R which have been revised and included as part of the Schedule of Prices.
2. The following new Special Provision page is included in the Contract with this Addendum: J-3A.
3. The following revised Contract Drawings are included in this Addendum: Drawings 3, 6 and 30.
4. The following new Contract Drawings are included in this Addendum: Drawings 20A and 20B.
5. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on October 4, 2023, are included in this Addendum.
Addendum 1 Page 2 of 3 10/27/2023
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE SCHEDULE OF PRICES
SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES
SP
PAY ITEM
NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY
CHANGE
NEW
QUANTITY
42001300 PROTECTIVE COAT SQ YD 39 10 49
* 44213200 SAW CUTS FOOT 116 30 146
* JI442863
ACCELERATED
PORTLAND CEMENT
CONCRETE PATCHING,
CLASS B, TYPE II, 11
INCHES
SQ YD 22 10 32
* JI442905 DOWEL BARS 1 1/2" EACH 52 14 66
* INDICATES SPECIAL PROVISION
Change #1 Contract Requirements, Volume I, replace page P-5 and P-6 with page P-5R and P-6R (attached). This replacement contains the following revision:
1.1. Revised pay item 42001300 PROTECTIVE COAT.
1.2. Revised pay item 44213200 SAW CUTS.
1.3. Revised pay item JI442863 ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE II, 11 INCHES.
1.4. Revised Pay item JI442905 DOWEL BARS 1 1/2".
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #2 Contract Requirements, Volume II, add page J-3A. This new page contains the following revision:
2.1. Added the following to the list of IDOT Highway Standards:
720001-01 SIGN PANEL MOUNTING DETAILS
720006-04 SIGN PANEL ERECTION DETAILS
720011-01 METAL POSTS FOR SIGNS, MARKERS & DELINEATORS
728001-01 TELESCOPING STEEL SIGN SUPPORT
780001-05 TYPICAL PAVEMENT MARKINGS
Addendum 1 Page 3 of 3 10/27/2023
CHANGES TO THE CONTRACT DRAWINGS
Change #3 Contract Plans, Drawing 3. Index of Drawings & List of Standards. This drawing contains the following revision (attached):
3.1. Added 720001-01 SIGN PANEL MOUNTING DETAILS, 720006-04 SIGN PANEL ERECTION DETAILS, 720011-01 METAL POSTS FOR SIGNS, MARKERS & DELINEATORS, 728001-01 TELESCOPING
STEEL SIGN SUPPORT, 780001-05 TYPICAL PAVEMENT MARKINGS to the list of IDOT Highway Standards.
Change #4 Contract Plans, Drawing 6. Summary of Quantities. This drawing contains the following revision (attached):
4.1. Revised pay item 42001300 PROTECTIVE COAT
4.2. Revised pay item 44213200 SAW CUTS
4.3. Revised pay item JI442863 ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE II, 11 INCHES
4.4. Revised pay item JI442905 DOWEL BARS 1 1/2"
Change #5 Contract Plans, Drawings 20A and 20B. Maintenance of Traffic, Genoa Rd - Ramp C. These drawings contain the following revision (attached):
5.1. Added maintenance of traffic for the additional patch along Ramp C.
Change #6 Contract Plans, Drawing 30. Roadway Plan, Genoa Rd – Ramp C&D. This drawing contains the following revision (attached):
6.1. Added an additional patch using pay item ACCELERATED PORTLAND CEMENT CONCRETE
PATCHING, CLASS B, TYPE II, 11 INCHES along Ramp C.
END OF ADDENDUM CHANGES
42001300 PROTECTIVE COAT SQ YD 49
44000157 HOT-MIX ASPHALT SURFACE REMOVAL, 2" SQ YD 15,257
* 44213200 SAW CUTS FOOT 146
45200300 JOINT OR CRACK FILLING POUND 91
72800100 TELESCOPING STEEL SIGN SUPPORT FOOT 153
* JI406035 TEST STRIP (STONE MATRIX ASPHALT) EACH 1
* JI406037 MATERIAL TRANSFER DEVICE TON 1,152
* JI406048
STONE MATRIX WARM MIX ASPHALT SURFACE
FRICTION COURSE, IL12.5 N80
TON 1,152
* JI406108 ASPHALT TACK COAT (NON-TRACKING) POUND 7,519
* JI406510
WARM-MIX ASPHALT SURFACE COURSE, MIX
"D", N70
TON 622
* JI406900
CONSTRUCTING WARM MIX ASPHALT TEST
STRIP
EACH 1
* JI420906 LONGITUDINAL JOINT SEALANT FOOT 5,532
* JI442863
ACCELERATED PORTLAND CEMENT
CONCRETE PATCHING, CLASS B, TYPE II, 11
INCHES
SQ YD 32
DESIGNATION UNIT QUANTITY
SCHEDULE OF PRICES
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
CONTRACT NO. RR-23-4915
Addendum No. 1 P-5R October 27, 2023
DESIGNATION UNIT QUANTITY
SCHEDULE OF PRICES
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
* JI442864
ACCELERATED PORTLAND CEMENT
CONCRETE PATCHING, CLASS B, TYPE III, 11
INCHES
SQ YD 17
* JI442905 DOWEL BARS 1 1/2" EACH 66
* JI481050 AGGREGATE SHOULDERS, TYPE B CU YD 154
* JI701001 DETOUR SIGNING, LOCATION 1 L SUM 1
* JI701002 DETOUR SIGNING, LOCATION 2 L SUM 1
* JI701003 DETOUR SIGNING, LOCATION 3 L SUM 1
** JS120100
TRAILER MOUNTED FULL MATRIX PORTABLE
CHANGEABLE MESSAGE SIGNS
EACH 4
** JS280210
FILTER FABRIC INLET PROTECTION, BASKET
TYPE
EACH 21
** JS670A00 FIELD OFFICE, TYPE A CAL MO 8
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS701050
TEMPORARY INFORMATION SIGNING-GROUND
MOUNT, 24 SQ FT IN AREA OR LESS
SQ FT 72
** JS720100 SIGN INSTALLATION, TYPE 1 SQ FT 155
Addendum No. 1 P-6R October 27, 2023
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
** JS720110 SIGN INSTALLATION, TYPE 2 SQ FT 56
** JS780JA1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 5" GROOVE
FOOT 53
** JS780JC1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 7" GROOVE
FOOT 11,583
** JS780JE1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 11" GROOVE
FOOT 1,853
* JT780300 MULTI-POLYMER PAVEMENT MARKING - LINE 4" FOOT 53
* JT780310 MULTI-POLYMER PAVEMENT MARKING - LINE 6" FOOT 11,950
* JT780320
MULTI-POLYMER PAVEMENT MARKING - LINE
10"
FOOT 379
* JT780325
MULTI-POLYMER PAVEMENT MARKING - LINE
12"
FOOT 599
* JT780330
MULTI-POLYMER PAVEMENT MARKING - LINE
24"
FOOT 44
* JT780340
MULTI-POLYMER PAVEMENT MARKING -
LETTERS (8 FT.)
SQ FT 62
* JT780355
MULTI-POLYMER PAVEMENT MARKING -
SYMBOLS (LARGE)
SQ FT 140
TOTAL AMOUNT OF CORE WORK
Addendum No. 1 P-7 October 27, 2023
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $24,000.00 $24,000.00
* JT154008
UNFORESEEN ADDITIONAL MAINTENANCE OF
TRAFFIC
UNIT 10,000 $1.00 $10,000.00
* JT154016
ALLOWANCE FOR UNFORESEEN EROSION
CONTROL MEASURES
UNIT 10,000 $1.00 $10,000.00
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
UNIT 25,000 $1.00 $25,000.00
999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.08(a)
INC/DAY ($2,500.00)
999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR ($2,500.00)
999NEG07
LOSS OR DAMAGE TO TOLLWAY OWNED
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(d)
SQ. FT. ($100.00)
999NEG08
FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC
PER TOLLWAY SUPPL. SPEC. 701.08(e)(a)
15 MINUTES ($3,000.00)
999NEG09
FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC
PER TOLLWAY SUPPL. SPEC. 701.08(e)(b)
15 MINUTES ($5,000.00)
999NEG21
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - JANE
ADDAMS MEMORIAL WEST
OCCUR ($4,000.00)
999NEG30
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - ALL
ROADWAYS OFF-PEAK
OCCUR ($2,000.00)
Addendum No. 1 P-8 October 27, 2023
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30(b)
INC/DAY ($1,000.00)
999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE PER
TOLLWAY SUPPL. SPEC. 108.02(e)
DAY ($300.00)
999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY FOR
CONSTRUCTION HAULING EQUIPMENT PER
TOLLWAY SUPPL. SPEC. 105.15
DAY ($1,000.00)
999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY SUPPL.
SPEC. 280.02 (2) (2)
OCCUR ($25,000.00)
999NEG36
FAILURE TO COMPLY WITH OCCUPANCY DATE
OR PROVIDE COMPLETE FACILITIES. FIELD
OFFICE OR LAB PER TOLLWAY SUPPL. SPEC.
670.01 (b)
DAY ($500.00)
999NEG44
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.1
CAL DAY ($9,000.00)
999NEG45
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.2
CAL DAY ($9,000.00)
999NEG46
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.3
CAL DAY ($7,500.00)
999NEG47
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.4
CAL DAY ($7,500.00)
999NEG48
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.5
CAL DAY ($7,500.00)
999NEG53
NON-COMPLIANCE WITH CONTRACTOR
QUALITY PROGRAM SPECIAL PROVISION
OCCUR ($1,000.00)
ADJUSTMENTS
* 999ADJ45
CONSTRUCTIONWORKS APPRENTICES WAGE
RATE
HOUR $15.00
Addendum No. 1 P-9 October 27, 2023
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
* 999ADJ46 ARROW BOARD EACH $13.32
* 999ADJ47 ARROW BOARD (WINTER RATE) EACH $19.98
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $1.00
* 999ADJ49 TYPE I OR TYPE II BARRICADE (WINTER RATE) EACH $1.50
* 999ADJ50 TYPE III BARRICADE EACH $2.35
* 999ADJ51 TYPE III BARRICADE (WINTER RATE) EACH $3.53
* 999ADJ52 PLASTIC DRUM EACH $1.25
* 999ADJ53 PLASTIC DRUM (WINTER RATE) EACH $2.34
* 999ADJ54 FLASHER LIGHT EACH $0.20
* 999ADJ55 FLASHER LIGHT (WINTER RATE) EACH $0.30
* 999ADJ56 STEADY BURN LIGHT EACH $0.30
* 999ADJ57 STEADY BURN LIGHT (WINTER RATE) EACH $0.45
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH $1.70
Addendum No. 1 P-10 October 27, 2023
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
* 999ADJ59
HI-INTENSITY LIGHT, SIGN MOUNTED (WINTER
RATE)
EACH $2.55
* 999ADJ60 CMS, SOLAR POWERED EACH $45.70
* 999ADJ61 CMS, SOLAR POWERED (WINTER RATE) EACH $68.55
* 999ADJ62 SIGNS, WORK ZONE EACH $2.00
* 999ADJ63 SIGNS, WORK ZONE (WINTER RATE) EACH $3.00
* 999ADJ64
TEMPORARY MODULAR GLARE SCREEN (12.5
FT. SECTION)
UNIT $0.60
* 999ADJ65
TEMPORARY CONCRETE BARRIER (12.5 FT.
SECTION)
UNIT $0.83
* 999ADJ66
TEMPORARY CONCRETE BARRIER (10.0 FT.
SECTION)
UNIT $0.50
* 999ADJ67
TEMPORARY CONCRETE BARRIER, CROSS
BOLT CONNECTION (12.5 FT. SECTION)
UNIT $1.47
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, NARROW), TEST LEVEL 3
EACH $18.33
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, WIDE), TEST LEVEL 3
EACH $18.33
* 999ADJ71
TEMPORARY INFORMATION SIGNING-GROUND
MOUNTED, 24 SQ FT IN AREA OR LESS
SQ FT $0.25
* 999ADJ72
TEMPORARY INFORMATION SIGNING-GROUND
MOUNTED, GREATER THAN 24 SQ FT IN AREA
SQ FT $0.25
Addendum No. 1 P-11 October 27, 2023
AT GENOA ROAD
MILE POST 25.0
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
JANE ADDAMS MEMORIAL TOLLWAY (I-90)
RAMP PAVEMENT REPAIRS
CONTRACT RR-23-4915
* 999ADJ73
TEMPORARY INFORMATION SIGNING-
OVERHEAD, 24 SQ FT IN AREA OR LESS
SQ FT $0.25
* 999ADJ74
TEMPORARY INFORMATION SIGNING-
OVERHEAD, GREATER THAN 24 SQ FT IN AREA
SQ FT $0.25
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) $69,000.00
* INDICATES SPECIAL PROVISION
** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS
AWARD CRITERIA
BID CREDIT
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +
CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID
Addendum No. 1 P-12 October 27, 2023
Addendum No. 1 October 27, 2023
J-3A
720001-01 SIGN PANEL MOUNTING DETAILS
720006-04 SIGN PANEL ERECTION DETAILS
720011-01 METAL POSTS FOR SIGNS, MARKERS & DELINEATORS
728001-01 TELESCOPING STEEL SIGN SUPPORT
780001-05 TYPICAL PAVEMENT MARKINGS
PROJECT JURISDICTIONS
PROJECT FEATURE DESCRIPTION OVER / UNDER JURISDICTION COUNTY
INDEX OF SHEETS IDOT HIGHWAY STANDARDSILLINOIS TOLLWAY STANDARD DRAWINGS
OVER I-90GENOA ROADCROSS ROAD CITY OF BELVIDERE NORTH OF I-90 BOONE
OVER I-90GENOA ROADCROSS ROAD BOONEBOONE COUNTY SOUTH OF I-90
PAVEMENT MARKING & EROSION CONTROL
ROADWAY PLAN
MAINTENANCE OF TRAFFIC
TYPICAL SECTIONS
SCHEDULE OF QUANTITIES
SUMMARY OF QUANTITIES
SUGGESTED PROGRESS SCHEDULE
GENERAL NOTES & ASPHALT MIX TABLE
INDEX OF DRAWINGS & LIST OF STANDARDS
PROFESSIONAL SEALS & SIGNATURES
TITLE SHEET
DESCRIPTION
701901-08
701456-05
701451-05
420001-10
001006
001001-02
000001-08
STD. NO.
TRAFFIC CONTROL DEVICES
PARTIAL EXIT RAMP CLOSURE FREEWAY/EXPRESSWAY
RAMP CLOSURE FREEWAY/EXPRESSWAY
PAVEMENT JOINTS
DECIMAL OF AN INCH AND OF A FOOT
AREAS OF REINFORCEMENT BARS
STANDARD SYMBOLS, ABBREVIATIONS AND PATTERNS
DESCRIPTION
---GENOA ROADRAMP A, B, C, D TOLLWAY
---U.S. ROUTE 20DETOUR ROUTE IDOT
---IRENE ROADDETOUR ROUTE FLORA TOWNSHIP
BOONE
BOONE
BOONE
32-35
28-31
12-27
9-11
7-8
DRAWING NO.
PMK-01 TO PMK-04
RDY-01 TO RDY-04
MOT-01 TO MOT-16
TYP-01 TO TYP-03
SCH-01 TO SCH-02
SOQ-01
PS-01
GN-01
IN-01
PSS-1
TTL-1
SHEET NO.
K1-12
SECTION K - TEMPORARY EROSION & SEDIMENT CONTROL
F9-07
SECTION F - SIGN STRUCTURE
E5-10
E3-09
E2-10
E1-07
SECTION E - MAINTENANCE OF TRAFFIC
D6-11
D4-08
D2-04
SECTION D - ROADWAY APPURTENANCES
A7-06
A5-07
A4-05
A1-09
SECTION A - ROADWAY PAVEMENT
STD. NO.
EROSION CONTROL & LANDSCAPE
BREAKAWAY SIGN SUPPORT DETAILS
TEMPORARY GORE DETAILS
SHOULDER CLOSURE DETAILS
LANE CLOSURE DETAILS
CONSTRUCTION SIGNS
PERMANENT PAVEMENT MARKINGS RAMPS
ROADWAY DELINEATORS AND REFLECTORS
SYMBOLS AND PATTERNS
PAVEMENT JOINTS
J.P.C. PAVEMENT
BUTT JOINTS AND TEMPORARY ASPHALT WEDGE
CONCRETE PAVEMENT REPAIR FULL DEPTH
DESCRIPTION
TYPICAL PAVEMENT MARKINGS780001-05
TELESCOPING STEEL SIGN SUPPORT728001-01
METAL POSTS FOR SIGNS, MARKERS & DELINEATORS720011-01
SIGN PANEL ERECTION DETAILS720006-04
SIGN PANEL MOUNTING DETAILS720001-01 1
KRH 5/5/23
9/12/23MTH
INDEX OF DRAWINGS &
LIST OF STANDARDS
IN-01
3 35
RR-23-4915
C Copyright Hanson Professional Services Inc.2023
KRH 5/5/23
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.
DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE:
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT NO.
PAGE SIZE:PLOT SCALE: 0.1667 ' / in. 17x11 (in.)
REVISIONS
P L O
T T
IM
E
P L O
T D
A T E p w h a n s o n in c -p w .b e n tl e y .c o m :h a n s o n -p w -0
D o c u m e n ts Jo b s
H
A T
O -1
C
A D C
A D S h e e ts C -S h t\
-1
-C
-s h t-g e n In d e x -H
A N .d g n
F
IL
E N
A M
E
:1
:0
A
M
1 10/27/23 ADDENDUM NO.1
DESCRIPTION UNIT QUANTITY
QUANTITY
RECORD
SP
NO.
PAY ITEM
LEGEND FOR SP COLUMN
QUANTITY
RECORD
QUANTITYUNITDESCRIPTIONSP
NO.
PAY ITEM
INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS**
INDICATES SPECIAL PROVISION*
KRH 5/5/23
9/12/23MTH
SUMMARY OF QUANTITIES
SOQ-01
6 35
RR-23-4915
C Copyright Hanson Professional Services Inc.2023
KRH 5/5/23
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
PAGE SIZE:PLOT SCALE: 0.1667 ' / in. 17x11 (in.)
P L O
T T
IM
E
P L O
T D
A T E p w h a n s o n in c -p w .b e n tl e y .c o m :h a n s o n -p w -0
D o c u m e n ts Jo b s
H
A T
O -1
C
A D C
A D S h e e ts C -S h t\
-1
-C
-s h t-g e n S
O Q -H
A N .d g n
F
IL
E N
A M
E
:5
:5
P
M
1 10/27/23 ADDENDUM NO.1
JT780355
JT780340
JT780330
JT780325
JT780320
JT780310
JT780300
JT155001
JT154067
JT154016
JT154008
JS780JE1
JS780JC1
JS780JA1
JS720110
JS720100
JS701050
JS701010
JS671020
JS670A00
JS280210
JS120100
JI701003
JI701002
JI701001
JI481050
JI442905
JI442864
JI442863
JI420906
JI406900
JI406510
JI406108
JI406048
JI406037
JI406035
72800100
45200300
44213200
44000157
42001300
SQ FT
SQ FT
FOOT
FOOT
FOOT
FOOT
FOOT
L SUM
UNIT
UNIT
UNIT
FOOT
FOOT
FOOT
SQ FT
SQ FT
SQ FT
L SUM
L SUM
CAL MO
EACH
EACH
L SUM
L SUM
L SUM
CU YD
EACH
SQ YD
SQ YD
FOOT
EACH
TON
POUND
TON
TON
EACH
FOOT
POUND
FOOT
SQ YD
SQ YD
11,950
25,000
10,000
10,000
1,853
11,583
5,532
7,519
1,152
1,152
15,257
MULTI-POLYMER PAVEMENT MARKING - SYMBOLS (LARGE)
MULTI-POLYMER PAVEMENT MARKING - LETTERS (8 FT.)
MULTI-POLYMER PAVEMENT MARKING - LINE 24"
MULTI-POLYMER PAVEMENT MARKING - LINE 12"
MULTI-POLYMER PAVEMENT MARKING - LINE 10"
MULTI-POLYMER PAVEMENT MARKING - LINE 6"
MULTI-POLYMER PAVEMENT MARKING - LINE 4"
CONTRACTOR'S QUALITY PROGRAM
CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS APPRENTICES
ALLOWANCE FOR UNFORESEEN EROSION CONTROL MEASURES
UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC
GROOVING FOR RECESSED PAVEMENT MARKING LINES, 11" GROOVE
GROOVING FOR RECESSED PAVEMENT MARKING LINES, 7" GROOVE
GROOVING FOR RECESSED PAVEMENT MARKING LINES, 5" GROOVE
SIGN INSTALLATION, TYPE 2
SIGN INSTALLATION, TYPE 1
TEMPORARY INFORMATION SIGNING-GROUND MOUNT, 24 SQ FT IN AREA OR LESS
MAINTENANCE OF TRAFFIC
MOBILIZATION, TOLLWAY (MODIFIED)
FIELD OFFICE, TYPE A
FILTER FABRIC INLET PROTECTION, BASKET TYPE
TRAILER MOUNTED FULL MATRIX PORTABLE CHANGEABLE MESSAGE SIGNS
DETOUR SIGNING, LOCATION 3
DETOUR SIGNING, LOCATION 2
DETOUR SIGNING, LOCATION 1
AGGREGATE SHOULDERS, TYPE B
DOWEL BARS 1 1/2"
ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE III, 11 INCHES
ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE II, 11 INCHES
LONGITUDINAL JOINT SEALANT
CONSTRUCTING WARM MIX ASPHALT TEST STRIP
WARM-MIX ASPHALT SURFACE COURSE, MIX "D", N70
ASPHALT TACK COAT (NON-TRACKING)
STONE MATRIX WARM MIX ASPHALT SURFACE FRICTION COURSE, IL12.5 N80
MATERIAL TRANSFER DEVICE
TEST STRIP (STONE MATRIX ASPHALT)
TELESCOPING STEEL SIGN SUPPORT
JOINT OR CRACK FILLING
SAW CUTS
HOT-MIX ASPHALT SURFACE REMOVAL, 2"
PROTECTIVE COAT
JT780355
JT780340
JT780330
JT780325
JT780320
JT780310
JT780300
JT155001
JT154067
JT154016
JT154008
JS780JE1
JS780JC1
JS780JA1
JS720110
JS720100
JS701050
JS701010
JS671020
JS670A00
JS280210
JS120100
JI701003
JI701002
JI701001
JI481050
JI442905
JI442864
JI442863
JI420906
JI406900
JI406510
JI406108
JI406048
JI406037
JI406035
72800100
45200300
44213200
44000157
42001300
SQ FT
SQ FT
FOOT
FOOT
FOOT
FOOT
FOOT
L SUM
UNIT
UNIT
UNIT
FOOT
FOOT
FOOT
SQ FT
SQ FT
SQ FT
L SUM
L SUM
CAL MO
EACH
EACH
L SUM
L SUM
L SUM
CU YD
EACH
SQ YD
SQ YD
FOOT
EACH
TON
POUND
TON
TON
EACH
FOOT
POUND
FOOT
SQ YD
SQ YD
11,950
25,000
10,000
10,000
1,853
11,583
5,532
7,519
1,152
1,152
15,257
MULTI-POLYMER PAVEMENT MARKING - SYMBOLS (LARGE)
MULTI-POLYMER PAVEMENT MARKING - LETTERS (8 FT.)
MULTI-POLYMER PAVEMENT MARKING - LINE 24"
MULTI-POLYMER PAVEMENT MARKING - LINE 12"
MULTI-POLYMER PAVEMENT MARKING - LINE 10"
MULTI-POLYMER PAVEMENT MARKING - LINE 6"
MULTI-POLYMER PAVEMENT MARKING - LINE 4"
CONTRACTOR'S QUALITY PROGRAM
CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS APPRENTICES
ALLOWANCE FOR UNFORESEEN EROSION CONTROL MEASURES
UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC
GROOVING FOR RECESSED PAVEMENT MARKING LINES, 11" GROOVE
GROOVING FOR RECESSED PAVEMENT MARKING LINES, 7" GROOVE
GROOVING FOR RECESSED PAVEMENT MARKING LINES, 5" GROOVE
SIGN INSTALLATION, TYPE 2
SIGN INSTALLATION, TYPE 1
TEMPORARY INFORMATION SIGNING-GROUND MOUNT, 24 SQ FT IN AREA OR LESS
MAINTENANCE OF TRAFFIC
MOBILIZATION, TOLLWAY (MODIFIED)
FIELD OFFICE, TYPE A
FILTER FABRIC INLET PROTECTION, BASKET TYPE
TRAILER MOUNTED FULL MATRIX PORTABLE CHANGEABLE MESSAGE SIGNS
DETOUR SIGNING, LOCATION 3
DETOUR SIGNING, LOCATION 2
DETOUR SIGNING, LOCATION 1
AGGREGATE SHOULDERS, TYPE B
DOWEL BARS 1 1/2"
ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE III, 11 INCHES
ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE II, 11 INCHES
LONGITUDINAL JOINT SEALANT
CONSTRUCTING WARM MIX ASPHALT TEST STRIP
WARM-MIX ASPHALT SURFACE COURSE, MIX "D", N70
ASPHALT TACK COAT (NON-TRACKING)
STONE MATRIX WARM MIX ASPHALT SURFACE FRICTION COURSE, IL12.5 N80
MATERIAL TRANSFER DEVICE
TEST STRIP (STONE MATRIX ASPHALT)
TELESCOPING STEEL SIGN SUPPORT
JOINT OR CRACK FILLING
SAW CUTS
HOT-MIX ASPHALT SURFACE REMOVAL, 2"
PROTECTIVE COAT
BB 10/16/23
10/18/23BB
MAINTENANCE OF TRAFFIC
GENOA RD - RAMP C
MOT-09A
20A 35
RR-23-4915ORI 10/16/23
0 50 100 150
SCALE IN FEET
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
PAGE SIZE:PLOT SCALE: 100.00 ' / in. 17x11 (in.)
P L O
T T
IM
E
P L O
T D
A T E p w h a n s o n in c -p w .b e n tl e y .c o m :h a n s o n -p w -0
D o c u m e n ts Jo b s
H
A T
O -1
C
A D C
A D S h e e ts C -S h t\
-1
-C
-s h t-m o tP ln -0 a -O
R I.
d g n
F
IL
E N
A M
E
:0
:5
P
M
1 10/27/23 ADDENDUM NO.1 - NEW SHEET
TS
TS
EM
OFF 43.76' LT
STA 1285+95.76
STA 1284+64.83
G20-2(O)-2618
1279 1280+00 1281 1282 1283 1284 1285+00 1286 1287 1288 1289 1290+00 1291 1292 1293 1294
1000+00 1001 1002 1003 1004 1005+00 1006 1007 1008 1009
6 7 8 9 10+00 11 12 13 14 15+00 16 17 18
33 34 35+00 36 37 38 39 40+00 41 42 43 44 45+00 46 47
6 7 8 9 10+00 11 12 13 14 15+00 16 17 18
DIRECTION OF TRAFFIC FLOW
MOT PLAN LEGEND:
CONSTRUCTION SIGN
WORK AREA
BARRICADES
TAPERS SHALL BE DIRECTION INDICATOR
NOTE: BARRICADES WITHIN LANE-CLOSURE
(UNLESS OTHERWISE NOTED)
BURNING LIGHT AT 25' (MAX.) CTRS.
TYPE II BARRICADE OR DRUM WITH STEADY
TRUCK MOUNTED ATTENUATOR
WB I-90
EB I-90
RAMP D
RAMP C
N
M A
T C
H
L I N
E
S T
A
R A
P
S T
A
R A
A
R
B
M A
T
A
(I
M A
T
SIGNING LEGEND
6 5
1100'
1000' 1600'
1000'
5 764
W4-2(0)-48 W20-5F(0)-R-48W20-5E(0)-R-48
W20-5F(0)-R-48
500'
1 MILE
CLOSED
LANE
RIGHT
MILE
CLOSED
LANE
RIGHT
CLOSED
LANE
RIGHT
LIMIT
SPEED
PHOTO
ENFORCED
ZONE
WORK
R2-1-3648
W21-I115(0)-3618
R10-I108-3618
MINIMUM
$250 FINE
R2-I106P-3618
ADVANCE SIGN SEQUENCE
STA 37+26.72
END WORK AREA
STA 1303+15
STA 36+98.78
END WORK AREA
W4-1 (0)
OFF 56.33' LT
STA 1292+57.03
(PLACED ON BOTH SIDES OF WESTBOUND I-90)
LIMIT
SPEED
IN THE MOT SP.
CLOSED DURING THE ALLOWABLE HOURS LISTED
2 FEET OF LANE 3, LANE 3 SHALL BE TEMPORARILY
WHEN WORKERS OR EQUIPMENT ENCROACH WITHIN
NOTE:
1:10
1:50
ROAD WORK
END
BB 10/16/23
10/18/23BB
MAINTENANCE OF TRAFFIC
GENOA RD - RAMP C
MOT-09B
20B 35
RR-23-4915ORI 10/16/23
0 50 100 150
SCALE IN FEET
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
P L O
T T
IM
E
P L O
T D
A T E p w h a n s o n in c -p w .b e n tl e y .c o m :h a n s o n -p w -0
D o c u m e n ts Jo b s
H
A T
O -1
C
A D C
A D S h e e ts C -S h t\
-1
-C
-s h t-m o tP ln -0 b -O
R I.
d g n
F
IL
E N
A M
E
:0
:1
P
M
1 10/27/23 ADDENDUM NO.1 - NEW SHEET
DRUMS AT 50' CTRS.
STA 32+67.79
R1-2-48
STA 27+68.76
W3-2
STA 22+10.93
W20-I(0)-48
STA 1298+13
W4-1 (0)OFF 44.68' LT
STA 1297+7.23'
OFF 22.80' LT
STA 27+46.82
OFF 15.05' LT
STA 30+21.26
OFF 0.16' LT
STA 30+20.62
OFF 44.23' LT
STA 1294+65.80
YIELD
1294 1295+00 1296 1297 1298 1299 1300+00 1301 1302 1303 1304 1305+00 1306 1307 1308 1309
18 19 20+00 21
30+00 31 32 33
18 19 20+00 21 22
25+
30+
DIRECTION OF TRAFFIC FLOW
MOT PLAN LEGEND:
CONSTRUCTION SIGN
WORK AREA
BARRICADES
TAPERS SHALL BE DIRECTION INDICATOR
NOTE: BARRICADES WITHIN LANE-CLOSURE
(UNLESS OTHERWISE NOTED)
BURNING LIGHT AT 25' (MAX.) CTRS.
TYPE II BARRICADE OR DRUM WITH STEADY
TRUCK MOUNTED ATTENUATOR
WB I-90
R A
A
M P
D
N
M A
T
A
R A
B
M A
T
A
R A
OFF 65.81' LT
STA 1308+15.54
SEE SIGNAGE DETAIL AND LEGEND
OFF 9.85' RT
STA 27+49.34
AHEAD
WORK
ROAD
1:50
GL 5/12/23
9/12/23BB
ROADWAY PLAN
GENOA RD - RAMP C & D
RDY-03
30 35
RR-23-4915ORI 5/12/23
0 50 100 150
SCALE IN FEET
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
P L O
T T
IM
E
P L O
T D
A T E p w h a n s o n in c -p w .b e n tl e y .c o m :h a n s o n -p w -0
D o c u m e n ts Jo b s
H
A T
O -1
C
A D C
A D S h e e ts C -S h t\
-1
-C
-s h t-rd y P ln -0
-O
R I.
d g n
F
IL
E N
A M
E
:0
:1
A
M
1 10/27/23 ADDENDUM NO.1
TS
TS
EM
P O
T
S ta
.5
P O
T
S ta
.5
1279 1280+00 1281 1282 1283 1284 1285+00 1286 1287 1288 1289 1290+00 1291 1292 1293 1294
1000+00 1001 1002 1003 1004 1005+00 1006 1007 1008 1009
6 7 8 9 10+00 11 12 13 14 15+00 16 17 18
33 34 35+00 36 37 38 39 40+00 41 42 43 44 45+00 46 47
6 7 8 9 10+00 11 12 13 14 15+00 16 17 18
REMOVAL LEGEND PROPOSED LEGEND
CLASS B PATCHES, TYPE II, 6 INCH (44200905)
5 JOINT OR CRACK FILLING (45200300)
WARM-MIX ASPHALT SURFACE COURSE, MIX "D", N70 (JI406510), 2" 6
ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE II, 11 INCHES (JI442863)
ACCELERATED PORTLAND CEMENT CONCRETE PATCHING, CLASS B, TYPE III, 11 INCHES (JI442864)
STONE MATRIX WARM MIX ASPHALT SURFACE FRICTION COURSE, IL-12.5, N80 (JI406048), 2"
HOT-MIX ASPHALT SURFACE REMOVAL, 2" (44000157), SHOULDER
HOT-MIX ASPHALT SURFACE REMOVAL, 2" (44000157), RAMP LANE
AGGREGATE SHOULDERS, TYPE B (JI481050), 2"
ASPHALT TACK COAT (NON-TRACKING) (JI406108)
WB I-90
EB I-90
RAMP D
RAMP C
N
M A
T
A
R A
S T
A
R A
D
M A
T
A
(I
M A
T
G
N O
O
A D
EX £ RAMP C
EX £ RAMP C
EX £ RAMP D
RAMP D, STA 6+3.39
PROJECT LIMIT
RAMP C, STA 6+44.14
PROJECT LIMIT
STA 11+52.59 TO STA 11+96.52
RESURFACING OMISSION
RAMP C/D, STA 6+18.55
PROJECT LIMIT
EX £ GENOA ROAD
2 3
1 3
2 3
2 3
UNDERNEATH THE SMA SURFACE AT THE LONGITUDINAL JOINT.
LONGITUDINAL JOINT SEALANT (JI420906) SHALL BE PLACED
IF LONGITUDINAL JOINTS ARE INTRODUCED IN RAMP SMA PAVING,
NOTE:
RAMP C, STA 6+71.01
PROJECT LIMIT
Addendum No. 1 1 of 6 10/27/2023
Capital Program
PRE-BID MEETING MINUTES
MEETING PURPOSE: Optional Pre-Bid Meeting - Contract RR-23-4915
MEETING DATE: October 4, 2023
MEETING TIME: 2:00 pm
CHAIRPERSON: Kathi Hacking – Senior Contract Negotiator
LOCATION: Illinois Tollway WebEx
TOPICS TO BE DISCUSSED:
1.0 Open: Welcome; Self-introduction by Procurement Representative
2.0 Self-Introduction of Presenters
2.1 Tollway Procurement – Contract Services – Kathi Hacking
2.2 Tollway Procurement – Contract Compliance – Michelle Gross
2.3 Tollway – Diversity – Tim Coleman
2.4 Tollway – Engineering Project Manager – Don Wittmer
2.5 Design Section Engineer – Mark Heaton
3.0 Brief Project Description
The improvements to be constructed under this contract will be performed along the Jane Addams Memorial Tollway (I-90) at Genoa Road, Mile Post 25.0 in Boone County, Illinois.
The work under this contract includes ramp pavement repairs, hot-mix asphalt removal, PCC patching, asphalt overlay, warm-mix asphalt shoulder, aggregate shoulder improvements, permanent pavement marking, maintenance of traffic, and other miscellaneous work.
4.0 Advertisement Schedules
4.1 Plan Holder questions should be provided to 4564D.4915_Questions@docs.e-builder.net as identified on Page A-1
4.2 Final Date for Plan Holder Questions – October 13, 2023, at 2:00 pm.
4.3 Bid Opening Date – November 3, 2023
4.4 See construction contract book Volume I sections CONSTRUCTION BID CHECKLIST and INSTRUCTION AND INFORMATION TO BIDDERS for more information regarding required documents to be submitted with the bid.
4.5 The system will not accept late submittals.
Addendum No. 1 2 of 6 10/27/2023
Capital Program
PRE-BID MEETING MINUTES
5.0 Compliance Goals
5.1 Disadvantaged Business Enterprise Program (DBE) – 24%
5.2 Veteran-Owned Small Business Program (VOSB) – 3%
5.3 Workforce
5.3.1 Equal Employment Opportunity (EEO)
Minority 6.3% Female 6.9%
6.0 Diversity Programs – Overview of Available Programs
To assist the contracting community, the Tollway has the following programs available.
6.1 Bid Credit Programs. This contract has a bid credit cap of $30,000. The prime must own and submit a bid credit certificate in order to use a subcontractor’s certificate.
6.2 This is very important! Primes cannot submit the bid credits of a subcontractor without also submitting their own bid credits.
6.2.1 ConstructionWorks Program – Provides pre-apprenticeship training and support to prepare diverse individuals for heavy highway construction careers.
6.2.2 Earned Credit Program (ECP) – Encourages contractors to hire and retain low income eligible individuals in the heavy highway construction workforce.
6.2.3 Partnering for Growth (P4G) – Encourages established contractors and consultants to mentor small, diverse and veteran businesses.
6.3 Resources
6.3.1 Technical Assistance Program – Provides customized business development for small, diverse and veteran firms.
7.0 Project Schedule
7.1 SP104 Anticipated Notice-to-Proceed – February 13, 2024
The Illinois Tollway will not issue the Notice to Proceed until all documents required by the Contract, including bonding and insurance requirements, are submitted by the Contractor, and approved by the Illinois Tollway.
7.2 SP 103.3 Interim Completion Date (Ramp A: EB I-90 Exit Ramp to Genoa Road) – Maximum of one (1) overnight closure.
7.3 SP 103.4 Interim Completion Date – (Ramp C: WB I-90 Entrance Ramp from Genoa Road) – Maximum of three (3) overnight closures.
7.4 SP 103.5 Interim Completion Date – (Ramp D: WB I-90 Exit Ramp to Genoa Road) – Maximum of three (3) overnight closures.
7.5 SP 103.2 Substantial Completion Date – June 17, 2024
7.6 SP 103.1 Contract Completion Date – July 29, 2024
8.0 Special Items to Note
8.1 Ramp Closures and Detour Coordination.
The contract includes various short duration ramp detours requiring coordination with several different jurisdictions as noted in the plans and special provisions.
Addendum No. 1 3 of 6 10/27/2023
Capital Program
PRE-BID MEETING MINUTES
9.0 Responses to Plan Holder Questions
9.1 No questions have been received to date.
9.2 Addendum No 1 scheduled to be published the week of October 23, 2023.
10.0 Open Discussion / Questions
10.1 As a reminder, any questions need to be sent to 4564D.4915_Questions@docs.e-builder.net by October 13, 2023, at 2:00 pm.
Addendum No. 1
10/27/2023
Addendum No. 1
Webinar Name Webinar Start Time Webinar End Time Display Name Attendee Email Join Time Leave Time 2023-10-04 13:45:41 2023-10-04 14:09:38 Andre Hammel ahammel@icutechassist.net 2023-10-04 14:00:24 2023-10-04 14:09:43 2023-10-04 13:45:41 2023-10-04 14:09:38 Belynzia Coleman bcoleman@getipass.com 2023-10-04 14:00:53 2023-10-04 14:09:43 2023-10-04 13:45:41 2023-10-04 14:09:38 Call-in User_2 (630204****) 2023-10-04 13:56:22 2023-10-04 14:09:43 2023-10-04 13:45:41 2023-10-04 14:09:38 Call-in User_3 (847456****) 2023-10-04 14:03:47 2023-10-04 14:09:25 2023-10-04 13:45:41 2023-10-04 14:09:38 Don Wittmer dwittmer@getipass.com 2023-10-04 13:58:42 2023-10-04 14:09:27 2023-10-04 13:45:41 2023-10-04 14:09:38 Evangeline esanchez@currancontracting.com 2023-10-04 14:02:59 2023-10-04 14:09:27 2023-10-04 13:45:41 2023-10-04 14:09:38 Gregory Pipkin gpipkin@getipass.com 2023-10-04 13:57:02 2023-10-04 14:09:43 2023-10-04 13:45:41 2023-10-04 14:09:38 John Harling jharling@rockroads.com 2023-10-04 13:59:04 2023-10-04 14:09:38 2023-10-04 13:45:41 2023-10-04 14:09:38 Kathi Hacking khacking@getipass.com 2023-10-04 13:45:56 2023-10-04 14:09:37 2023-10-04 13:45:41 2023-10-04 14:09:38 L MYERS lmyers@getipass.com 2023-10-04 13:55:26 2023-10-04 14:09:43 2023-10-04 13:45:41 2023-10-04 14:09:38 Marcita Hinton mhinton@getipass.com 2023-10-04 14:01:37 2023-10-04 14:09:31 2023-10-04 13:45:41 2023-10-04 14:09:38 Mark Heaton mheaton@hanson-inc.com 2023-10-04 13:55:51 2023-10-04 14:09:27 2023-10-04 13:45:41 2023-10-04 14:09:38 Michelle Gross mgross@getipass.com 2023-10-04 13:59:10 2023-10-04 14:09:24 2023-10-04 13:45:41 2023-10-04 14:09:38 Ruth Howe rahowe@getipass.com 2023-10-04 13:50:04 2023-10-04 14:09:38 2023-10-04 13:45:41 2023-10-04 14:09:38 Sherita Kelly skelly@getipass.com 2023-10-04 13:59:12 2023-10-04 14:09:43 2023-10-04 13:45:41 2023-10-04 14:09:38 Timothy Coleman tjcoleman@getipass.com 2023-10-04 13:46:50 2023-10-04 14:09:24 2023-10-04 13:45:41 2023-10-04 14:09:38 Vanessa Ramos vramos@getipass.com 2023-10-04 13:59:35 2023-10-04 14:09:43
RR-23-4915 Optional Pre-Bid Attendance
Optional Pre-Bid Meeting RR-23-4915 Jane Addams Memorial Tollway (I-90)
Ramp Pavement Repairs at Genoa Road Mile Post 25.0
Illinois State Toll Highway Authority Contract No. RR-23-4915 Addendum No. 1
File details come from the government source that posted it. Updated .