This document is an Addendum No. 1 to Contract Requirements for Contract No. RR-22-4865 issued by the Illinois State Toll Highway Authority. The contract involves the Systemwide Signing Improvements project, which includes the removal of existing sign panels, sign panel installation, construction of new foundations and supports, temporary erosion control measures, grading, and maintenance of traffic. The addendum includes revisions to the Schedule of Prices, such as the addition of a new pay item for "Allowance for Utility Potholing for Unforeseen Utility Relocation." It also includes revised contract drawings, new special provision pages, and responses to questions received from plan holders. The bid opening date for this contract is December 6, 2022.
The contract includes various allowances and contingency work items, totaling $295,000. The contract also includes Disadvantaged Business Enterprise (DBE) and Veteran-Owned Small Business (VOSB) participation goals of 25% and 3%, respectively. Additionally, the contract has workforce goals for minority (16.7%) and female (6.9%) participation. The Illinois Tollway will not issue the Notice to Proceed until all required documents, including bonding and insurance, are submitted and approved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Electronic Submissions~2.pdf | ||
| RR-22-4865 Bid Opening Announcement_12062022.pdf | ||
| RR-22-4865_Volume1_10202022.pdf | ||
| Certifications-Disclosures_Forms A_V.23.1~2.docx | DOCX document | |
| Certifications-Disclosures_Forms B_V.20.1~2.docx | DOCX document | |
| NOA_4865_WesternRemac_01262023_Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. RR-22-4865 Addendum 1 Page 1 of 2 11/29/2022
ADDENDUM NO. 1
TO
CONTRACT REQUIREMENTS
FOR CONTRACT RR-22-4865
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 11/29/2022
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, December 6, 2022
NOTICE OF REVISION TO CONTRACT
NOTES:
1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-6R and P-9R which have been revised and included as part of the Schedule of Prices.
2. The following new Special Provision pages are included in the Contract with this Addendum: J-35A.
3. The following revised Contract Drawings are included in this Addendum: Drawing 4
4. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on October 27, 2022 are included in this
Addendum.
5. Response to questions received from the Plan Holders are included in this Addendum.
Illinois State Toll Highway Authority
Addendum 1 Page 2 of 2 11/29/2022
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE SCHEDULE OF PRICES
SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES
SP
PAY ITEM
NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY
CHANGE
NEW
QUANTITY
* JT154119
ALLOWANCE FOR
UTILITY POTHOLING
FOR UNFORESEEN
UTILITY RELOCATION
UNIT 0 15,000 15,000
* INDICATES SPECIAL PROVISION
Change #1 Contract Requirements, Volume I, replace page P-6 with page P-6R (attached). This replacement contains the following revision:
1.1. Add pay item JT154119 ALLOWANCE FOR UTILITY POTHOLING FOR UNFORESEEN UTILITY
RELOCATION.
Change #2 Contract Requirements, Volume I, replace page P-9 with page P-9R (attached). This replacement contains the following revision:
2.1. Revised TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR’S QUALITY PROGRAM (CQP) to $295,000.00.
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #3 Contract Requirements, Volume II, add page J-35A. This addition contains the following revisions (attached):
3.1. Add ALLOWANCE FOR UTILITY POTHOLING FOR UNFORESEEN UTILITY RELOCATION.
CHANGES TO THE CONTRACT DRAWINGS
Change #4 Contract Plans, Volume 1, Drawing 4. Summary of Quantities. This drawing contains the following revision (attached):
4.1. Added pay item JT154119 ALLOWANCE FOR UTILITY POTHOLING FOR UNFORESEEN
UTILITY RELOCATION.
END OF ADDENDUM CHANGES
** 25000400 NITROGEN FERTILIZER NUTRIENT POUND 7
** 25000600 POTASSIUM FERTILIZER NUTRIENT POUND 19
25100630 EROSION CONTROL BLANKET SQ YD 1,020
* 50800205 REINFORCEMENT BARS, EPOXY COATED POUND 11,760
72400330 REMOVE SIGN PANEL - TYPE 3 SQ FT 3,072
72700100
STRUCTURAL STEEL SIGN SUPPORT -
BREAKAWAY
POUND 59,254
73400100 CONCRETE FOUNDATIONS CU YD 152.4
* JI724003 REMOVE SIGN PANEL ASSEMBLY, TYPE C EACH 1
** JS250220 SEEDING, CLASS 2E ACRE 0.25
** JS670A00 FIELD OFFICE, TYPE A CAL MO 11
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS720120 SIGN INSTALLATION, TYPE 3 SQ FT 10,320
TOTAL AMOUNT OF CORE WORK
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $35,000.00 $35,000.00
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
SYSTEMWIDE
SIGNING IMPROVEMENTS
CONTRACT RR-22-4865
SCHEDULE OF PRICES
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
CONTRACT NO. RR-22-4865
Addendum No. 1 P-5 November 29, 2022
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
SYSTEMWIDE
SIGNING IMPROVEMENTS
CONTRACT RR-22-4865
SCHEDULE OF PRICES
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
* JT154008
UNFORESEEN ADDITIONAL MAINTENANCE OF
TRAFFIC
UNIT 75,000 1.00 75,000.00
* JT154016
ALLOWANCE FOR UNFORESEEN EROSION
CONTROL MEASURES
UNIT 5,000 1.00 5,000.00
* JT154023
CONTRACT ALLOWANCE FOR
EROSION/LANDSCAPE RESTORATION
UNIT 10,000 1.00 10,000.00
* JT154051 CONTRACT ALLOWANCE FOR UNSUITABLE SOIL UNIT 50,000 1.00 50,000.00
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
UNIT 25,000 1.00 25,000.00
* JT154119
ALLOWANCE FOR UTILITY POTHOLING FOR
UNFORESEEN UTILITY RELOCATION
UNIT 15,000 1.00 15,000.00
* JT154167 ALLOWANCE FOR GRADING AND SHAPING UNIT 50,000 1.00 50,000.00
* JT154181 ALLOWANCE FOR ADDITIONAL SIGNAGE WORK UNIT 20,000 1.00 20,000.00
* JT154202
ALLOWANCE FOR UNFORESEEN STORAGE OF
STRUCTURAL STEEL
UNIT 10,000 1.00 10,000.00
999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.08(a)
INC/DAY (2,500.00)
999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR (2,500.00)
999NEG06
FAILURE TO REPAIR IMPACT ATTENUATORS,
TEMPORARY PER TOLLWAY SUPPL. SPEC.
701.08(c)
OCCUR (2,500.00)
999NEG07
LOSS OR DAMAGE TO TOLLWAY OWNED
DEVICES PER TOLLWAY SUPPL. SPEC. 701.08(d)
SQ. FT. (100.00)
999NEG08
FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC
PER TOLLWAY SUPPL. SPEC. 701.08(e)(a)
15 MINUTES (3,000.00)
999NEG09
FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC
PER TOLLWAY SUPPL. SPEC. 701.08(e)(b)
15 MINUTES (5,000.00)
999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - TRI-
STATE
OCCUR (10,000.00)
Addendum No. 1 P-6R November 29, 2022
SIGNING IMPROVEMENTS
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
999NEG21
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - JANE
ADDAMS MEMORIAL WEST
OCCUR (4,000.00)
999NEG22
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - JANE
ADDAMS MEMORIAL EAST
OCCUR (9,000.00)
999NEG23
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
REAGAN MEMORIAL WEST
OCCUR (4,000.00)
999NEG24
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
REAGAN MEMORIAL EAST
OCCUR (9,000.00)
999NEG25
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
VETERANS MEMORIAL
OCCUR (5,000.00)
999NEG26
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
ELGIN O'HARE
OCCUR (2,000.00)
999NEG30
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - ALL
ROADWAYS OFF-PEAK
OCCUR (2,000.00)
999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30(b)
INC/DAY (1,000.00)
999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE PER
TOLLWAY SUPPL. SPEC. 108.02(e)
DAY (300.00)
999NEG33
NON-COMPLIANCE WITH EROSION AND
SEDIMENT CONTROL PER TOLLWAY SUPPL.
SPEC 280.02 (2) (1)
INC/DAY See Note 1
999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY FOR
CONSTRUCTION HAULING EQUIPMENT PER
TOLLWAY SUPPL. SPEC. 105.15
DAY (1,000.00)
999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY SUPPL.
SPEC. 280.02 (2) (2)
OCCUR (25,000.00)
999NEG36
FAILURE TO COMPLY WITH OCCUPANCY DATE
OR PROVIDE COMPLETE FACILITIES. FIELD
OFFICE OR LAB PER TOLLWAY SUPPL. SPEC.
670.01 (b)
DAY (500.00)
999NEG37
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.01 (b)(1)
INC/DAY (2,500.00)
999NEG44
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.1
CAL DAY (9,000.00)
999NEG45
LIQUIDATED DAMAGES FOR NON-COMPLETION
PER S.P. 105.1.2
CAL DAY (9,000.00)
Addendum No. 1 P-7 November 29, 2022
SIGNING IMPROVEMENTS
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
999NEG53
NON-COMPLIANCE WITH CONTRACTOR
QUALITY PROGRAM SPECIAL PROVISION
OCCUR (1,000.00)
ADJUSTMENTS
* 999ADJ45
CONSTRUCTIONWORKS APPRENTICES WAGE
RATE
HOUR 15.00
* 999ADJ46 ARROW BOARD EACH 13.32
* 999ADJ47 ARROW BOARD (WINTER RATE) EACH 19.98
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH 1.00
* 999ADJ49 TYPE I OR TYPE II BARRICADE (WINTER RATE) EACH 1.50
* 999ADJ50 TYPE III BARRICADE EACH 2.35
* 999ADJ51 TYPE III BARRICADE (WINTER RATE) EACH 3.53
* 999ADJ52 PLASTIC DRUM EACH 1.25
* 999ADJ53 PLASTIC DRUM (WINTER RATE) EACH 2.34
* 999ADJ54 FLASHER LIGHT EACH 0.20
* 999ADJ55 FLASHER LIGHT (WINTER RATE) EACH 0.30
* 999ADJ56 STEADY BURN LIGHT EACH 0.30
* 999ADJ57 STEADY BURN LIGHT (WINTER RATE) EACH 0.45
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH 1.70
Addendum No. 1 P-8 November 29, 2022
SIGNING IMPROVEMENTS
CONTRACT RR-22-4865
SCHEDULE OF PRICES
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
* 999ADJ59
HI-INTENSITY LIGHT, SIGN MOUNTED (WINTER
RATE)
EACH 2.55
* 999ADJ60 CMS, SOLAR POWERED EACH 45.70
* 999ADJ61 CMS, SOLAR POWERED (WINTER RATE) EACH 68.55
* 999ADJ62 SIGNS, WORK ZONE EACH 2.00
* 999ADJ63 SIGNS, WORK ZONE (WINTER RATE) EACH 3.00
* 999ADJ64
TEMPORARY MODULAR GLARE SCREEN (12.5
FT. SECTION)
UNIT 0.60
* 999ADJ65
TEMPORARY CONCRETE BARRIER (12.5 FT.
SECTION)
UNIT 0.83
* 999ADJ66
TEMPORARY CONCRETE BARRIER (10.0 FT.
SECTION)
UNIT 0.50
* 999ADJ67
TEMPORARY CONCRETE BARRIER, CROSS
BOLT CONNECTION (12.5 FT. SECTION)
UNIT 1.47
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, NARROW), TEST LEVEL 3
EACH 18.33
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, WIDE), TEST LEVEL 3
EACH 18.33
* 999ADJ71
TEMPORARY INFORMATION SIGNING-GROUND
MOUNTED, 24 SQ FT IN AREA OR LESS
SQ FT 0.25
* 999ADJ72
TEMPORARY INFORMATION SIGNING-GROUND
MOUNTED, GREATER THAN 24 SQ FT IN AREA
SQ FT 0.25
* 999ADJ73
TEMPORARY INFORMATION SIGNING-
OVERHEAD, 24 SQ FT IN AREA OR LESS
SQ FT 0.25
* 999ADJ74
TEMPORARY INFORMATION SIGNING-
OVERHEAD, GREATER THAN 24 SQ FT IN AREA
SQ FT 0.25
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) 295,000.00
Addendum No. 1 P-9R November 29, 2022
SIGNING IMPROVEMENTS
AMOUNT
DOLLAR
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
* INDICATES SPECIAL PROVISION
** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS
*** INDICATES IDOT RECURRING SPECIAL PROVISION
BDE INDICATES IDOT BDE SPECIAL PROVISION
GBSP INDICATES IDOT GUIDE BRIDGE SPECIAL PROVISION
Note 1: The deduction will be according to Article 280.02(2)(1) Table A, The Contractor should leave the unit price value blank.
AWARD CRITERIA
BID CREDIT
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +
CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID
Addendum No. 1 P-10 November 29, 2022
Addendum 1 J-35A November 29, 2022
CONTRACT ALLOWANCE FOR UTILITY POTHOLING FOR UNFORSEEN UTILITY
RELOCATION
Description. This Special Provision establishes a budgetary allowance for completion utility potholing, any unforeseen utility relocation, and any additional work that may be required to be performed by the Contractor, the scope of which cannot be determined at the time of submittal of the Proposal.
The work to be completed under this item will be as directed by the Engineer. This item will provide a line item against which payment will be made.
Payment will only be made for the work completed which is directed by the Engineer in writing.
Method of Measurement. This work will not be measured for payment.
Basis of Payment. Payment for this work will be made to the Contractor as specified in Illinois Tollway Supplemental Specifications Article 109.04 using a force account basis. Payment for this work will not exceed the costs incurred by the Contractor and approved by the Engineer.
Pay Item Number
Designation Unit of Measure
JT154119 ALLOWANCE FOR UTILITY POTHOLING FOR
UNFORESEEN UTILITY RELOCATION
UNIT
DESCRIPTION UNIT QUANTITY
QUANTITY
RECORD
SP
NO.
PAY ITEM
DESCRIPTION UNIT QUANTITY
QUANTITY
RECORD
SP
NO.
PAY ITEM
INDICATES IDOT GUIDE BRIDGE SPECIAL PROVISIONGBSP
INDICATES IDOT BDE SPECIAL PROVISIONBDE
INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS**
INDICATES SPECIAL PROVISION*
LEGEND FOR SP COLUMN
MTH 7/29/22
8/4/22AAP
SUMMARY OF QUANTITIES
SOQ-01
4 94
RR-22-4865
C Copyright Hanson Professional Services Inc.2022
MTH 9/23/22
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.
DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE:
CONTRACT NO.
P L O
T D
A T E p w h a n s o n in c -p w .b e n tl e y .c o m :h a n s o n -p w -0
D o c u m e n ts Jo b s
H
A T
O -6 C
A D C
A D S h e e ts -6 -g e n S
O Q -H
A N .d g n
F
IL
E N
A M
E
P L O
T T
IM
E
:1
:4
A
M
PAGE SIZE:PLOT SCALE: 0.1667 ' / in. 17x11 (in.)
REVISIONS
1 11/29/22 ADDENDUM NO. 1
JT155001
JT154202
JT154181
JT154167
JT154067
JT154051
JT154023
JT154016
JT154008
JS720120
JS701010
JS671020
JS670A00
JS250220
JI724003
73400100
72700100
72400330
50800205
25100630
25000600
25000400
CONTRACTOR'S QUALITY PROGRAM
ALLOWANCE FOR UNFORESEEN STORAGE OF STRUCTURAL STEEL
ALLOWANCE FOR ADDITIONAL SIGNAGE WORK
ALLOWANCE FOR GRADING AND SHAPING
CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS APPRENTICES
CONTRACT ALLOWANCE FOR UNSUITABLE SOIL
CONTRACT ALLOWANCE FOR EROSION/LANDSCAPE RESTORATION
ALLOWANCE FOR UNFORESEEN EROSION CONTROL MEASURES
UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC
SIGN INSTALLATION, TYPE 3
MAINTENANCE OF TRAFFIC
MOBILIZATION, TOLLWAY (MODIFIED)
FIELD OFFICE, TYPE A
SEEDING, CLASS 2E
REMOVE SIGN PANEL ASSEMBLY, TYPE C
CONCRETE FOUNDATIONS
STRUCTURAL STEEL SIGN SUPPORT - BREAKAWAY
REMOVE SIGN PANEL - TYPE 3
REINFORCEMENT BARS, EPOXY COATED
EROSION CONTROL BLANKET
POTASSIUM FERTILIZER NUTRIENT
NITROGEN FERTILIZER NUTRIENT
L SUM
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
SQ FT
L SUM
L SUM
CAL MO
ACRE
EACH
CU YD
POUND
SQ FT
POUND
SQ YD
POUND
POUND
10,000
20,000
50,000
25,000
50,000
10,000
5,000
75,000
10,320
.25
152.4
59,254
3,072
11,760
1,020
ALLOWANCE FOR UTILITY POTHOLING FOR UNFORESEEN UTILITY RELOCATION* JT154119 UNIT 15,000
Contract RR-22-4865 1 of 3 November 29, 2022 Addendum No. 1
Capital Program
PRE-BID MEETING AGENDA
MEETING PURPOSE: Optional Pre-Bid Meeting - Contract RR-22-4865 Systemwide Signing Improvements
MEETING DATE: October 27, 2022
MEETING TIME: 2:00 pm
CHAIRPERSON: Kathi Hacking – Senior Contract Negotiator
LOCATION: Illinois Tollway WebEx
TO:
Names Initials Organization / Title
Eric Occomy EO Procurement / Chief of Contract Services Maria Campuzano MC Procurement/Deputy Chief of Procurement Kathi Hacking KH Procurement/Senior Contract Negotiator Carrie Williamson CW Procurement / Contract Analyst Angela Arrington-Jones AAJ Procurement / Chief of Contract Compliance Sainey Jobe SJ Procurement / Deputy Chief of Contract Compliance Don Wittmer DW Engineering / Project Manager Mo Faraj Mark Heaton
MF
MH
Engineering / Deputy Program Manager DSE / Hanson Project Manager
TOPICS TO BE DISCUSSED:
1.0 Open: Welcome; Self-introduction by Procurement Representative
2.0 Self-Introduction of Attendees
(Attendees asked to sign-in in chat)
2.1 Tollway Procurement – Contract Services
2.2 Tollway Procurement – Contract Compliance
2.3 Tollway- Diversity
2.4 Tollway- Engineering Project Manager
2.5 Design Section Engineer
3.0 Brief Project Description
The work under this contract includes removal of existing sign panels, sign panel installation, construction of new foundations and supports, breakaway steel post length design, temporary erosion control measures, grading, and maintenance of traffic.
4.0 Advertisement Schedules
4.1 Plan Holder questions should be provided to 4564D.4865_Questions@docs.e-builder.net as identified on Page A-1
4.2 Final Date for Plan Holder Questions – November 15, 2022 at 2:00 pm.
4.3 Bid Opening Date – December 6, 2022
Contract RR-22-4865 2 of 3 November 29, 2022
Capital Program
PRE-BID MEETING AGENDA
5.0 Compliance Goals
5.1 Disadvantaged Business Enterprise Program (DBE) – 25%
5.2 Veteran-Owned Small Business Program (VOSB) - 3%
5.3 Workforce
5.3.1 Equal Employment Opportunity (EEO)
Minority (16.7%) Female (6.9%)
6.0 Diversity Programs – Overview of Available Programs
6.1 Earned Credit Program (ECP) - Bid Credit Cap of $30,000
6.2 Technical Assistance Program
6.3 Partnering for Growth (P4G)
6.4 Construction Works
7.0 Project Schedule
7.1 S.P. 104 Anticipated Notice-to-Proceed – March 20, 2023
The Illinois Tollway will not issue the Notice to Proceed until all documents required by the Contract, including bonding and insurance requirements, are submitted by the Contractor and approved by the Illinois Tollway.
7.2 S.P. 103.2 Substantial Completion Date – November 17, 2023
7.3 S.P. 103.1 Contract Completion Date – December 21, 2023
8.0 Special Items to Note
8.1 All proposed “STATE LAW - MOVE OVER – SLOW DOWN” sign panels will be furnished by the Illinois Tollway and shall be obtained by the Contractor from the Illinois Tollway sign shop at 4S496 Naperville Rd, Naperville, IL. 60563.
8.2 Sign removals shall be delivered to the Illinois Tollway sign shop.
8.3 The size, dimensions, and quantities shown in the plans for concrete foundations, reinforcement bars, and posts for the signs on steel breakaway posts were provided for bidding estimates only. The exact design and sign location shall be determined by the Contractor after field verification of existing conditions.Exact placement will be dependent on, but not limited to, existing utilities, grading, or other site obstructions.
The Contractor shall provide the final foundation and post design information to the engineer for approval prior to fabrication.
8.4 Existing utilities are not shown on the plans.The Contractor shall identify existing utilities within the proposed sign location that may cause a conflict and contact the Engineer to determine a new location.
9.0 Responses to Plan Holder Questions (by Design Section Engineer)
9.1 No questions were received as of this pre-bid meeting.
9.2 Addendum #1 scheduled to be published on November 29, 2022
9.2.1 Will include these meeting minutes, responses to any plan holder questions, and other plan clarifications as needed.
Contract RR-22-4865 3 of 3 November 29, 2022
Capital Program
PRE-BID MEETING AGENDA
Attendees:
Contract No. RR-22-4865 Page 1 of 1 November 29, 2022
RR-22-4865 Systemwide Signing Improvements
Re: Request for Information Received from Plan Holders
QUESTION #1
“THERE ARE NO PAY ITEMS CONTAINED IN THE BID DOCUMENTS FOR EXPLORATORY
EXCAVATION. THESE FOUNDATIONS ARE QUITE OFTEN IN THE VICINITY OF ISTHA POWER AND
FIBER. WILL THE ISTHA CONSIDER ADDING PAY ITEMS AND QUANTITY FOR EXPLORATORY
EXCAVATION BOTH HAND EXCAVATING AND VACUUM EXCAVATING? THANK YOU.
ANSWER #1:
The intent via General Note 9 was for the Contractor to identify the general location of the utilities in the immediate area of a proposed sign via J.U.L.I.E and the Tollway’s utility locate process. It is anticipated this information would be sufficient to determine if the sign location would need to be modified to avoid any nearby utilities, without the need for subsurface exploration. In the rare instance utilities are in close proximity and a modified location cannot be identified clear of these utilities, the pay item JT154119 “Allowance for utility potholing for unforeseen utility relocation” has been added in the addendum. An associated special provision has also been added.
QUESTION #2
WHAT IS THE MAXIMUM ECP BID CREDIT THAT CAN BE APPLIED TO THIS BID?
ANSWER #2:
The Bid Credit Cap for this contract is $30,000.00 as shown on page P-4 of the Volume I Required Documents.
QUESTION #3
“PAY ITEM 50800205 IS FOR REINFORCEMENT BARS, EPOXY COATED HOWEVER IN VOLUME 2
SPECIFICATION PAGE J-17, ARTICLE 1006.10 IS REVISED TO ADD STAINLESS STEEL
REINFORCEMENT BARS. PLEASE CONFIRM IF EPOXY COATED REINFORCEMENT BARS OR
STAINLESS STEEL REINFORCEMENT BARS SHALL BE USED ON THIS CONTRACT.”
ANSWER #3:
Article 1006.10 is shown revised on J-17 because the Tollway’s REINFORCEMENT BARS special provision is meant to be used for everything with reinforcement bars, regardless of if they are stainless or not. The IDOT Standard Specifications doesn’t have any material requirements for stainless steel in it, so the Tollway added material requirements in this special provision for projects that use it. The Basis of payment section on J-19 clearly states that the item being used on this contract is “Reinforcement Bars, Epoxy Coated”.