RP005_24 Ad 1.pdf

PDF 289 KB Posted

Attached to
RP005-24, Provision of Engineering Design Services and Construction Document Development
Solicitation number
PE-77023-NONST-2024-000000155
Issued by
Gwinnett County, Georgia

About this file

This document is an Addendum to Request for Proposal (RFP) No. RP005-24 issued by Gwinnett County, Georgia for the Provision of Engineering Design Services and Construction Document Development for a Loop Trail from Sugarloaf Parkway to Saint Ives Court. The addendum addresses several questions raised by potential bidders, including the correct termination point of the proposed multi-use path, the engagement of right-of-way and utility consultants, street light requirements, required certifications for sub-consultants, and the inclusion of additional billing categories in the fee schedule. The addendum also clarifies the submission requirements for the area class table, resumes, and insurance certificates. Additionally, it provides details on the pre-bid conference attendees.

The document outlines the scope of services, which includes engineering design and construction document development for a multi-use trail. The project has a specific focus on improving the existing Ride Gwinnett bus stops along the trail. The RFP requires the selected consultant team to be prequalified by the Georgia Department of Transportation (GDOT) in various area classes.

View the file

Other files

File Type Posted
RP005_24 Ad 2.pdf PDF
RP005_24 INV.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 30, 2024 Addendum No. 1

RP005-24

Provision of Engineering Design Services and Construction Document Development for Loop Trail from

Sugarloaf Parkway to Saint Ives Court.

The following addition/changes modify Proposal No. RP005-24 " Provision of Engineering Design Services and Construction Document Development for Loop Trail from Sugarloaf Parkway to Saint Ives Court” Contract Documents, dated April 2024, as first advertised on April 17, 2024.

I. Questions:

Q1. What is correct ending of proposed multi-use path on Suwanee Creek Road - Project overview on page 2 of RFP it is at St. Ives Court while Figure below shows proposed Multi- Use Path past Rising Fawn Trail.

A1. The project ends approximately 560 feet west of Rising Fawn Trail. This is also labeled on the aerial image as “Segment Termini” on page 102 of the Loop Trail Feasibility Study.

Q2. Page 5- Concept Item 3b- Conceptual Right of Way Cost using Prequalified Right of Way

Contractor- Is this only a one time engagement of Right of Way Contractor, or is it throughout the life of Contract at various stages of project completion?

A2. GCDOT’s technical management team will act as the Right of Way contractor. The selected designer will need to coordinate with them for the conceptual right-of-way cost. This coordination engagement will last throughout the life of the contract.

Q3. Page 5- Concept Item 3k- Conceptual utility Cost using Prequalified Utility Consultant -

Is this only a one-time engagement of a Utility Consultant or is it throughout the life of Contract at various stages of project completion?

A3. GCDOT’s technical management team will act as the Utility Consultant. The selected designer will need to coordinate with them for the conceptual utility cost. This coordination engagement will last throughout the life of the contract.

Q4. Street light requirements – Is this only at Mid-Block Crossing or for the total length of project?

A4. For the total length of the project (locations where streetlights are currently not present).

Q5. What Certifications are required from Sub-Consultants?

A5. Page 4 of the RFP states “The team (either the Prime Consultant and/or one or more of their sub-consultant team members) must be prequalified by GDOT in the area classes listed below.”

Q6. Proposal Fee Schedule Sheet – Can additional Billing Categories be included in the Fee

Schedule. Proposal requires various Area Classes in different disciplines (i.e. Traffic, Bridge, Lighting) that are not included in the Fee Sheet. (Page 12)

A6. No. All fees must be within the billable rates on the fee schedule.

Q7. Are any improvements anticipated on the existing Trail on Satellite Blvd. from just north of Old Peachtree Road to Wildwood Road except providing improvement to Ride Gwinnett Bus Stops?

A7. No improvements are anticipated on the existing multi-use path.

Q8. Per Page 4 of the RFQ, "Respondents should submit a copy of the approval of the pre-qualification by GDOT for the area classes identified below. The area classes must be listed on the organizational chart with the prime and sub-consultants on a single 11”x17” page." Would the county allow the area class table to be included on a separate sheet from the org chart? And does the county want the GDOT prequals included in B.

Qualifications or attached to the package with the required forms? Page 8 says, “Required proof of prequalification should be submitted as indicated in Section VI.B.4.,” but there is no Section VI.B.4. included in the RFQ.

A8. Yes, you can include a separate sheet with area classes. You can include the pre-qualifications in the Qualifications section. Note that the reference to section VI.B.4 has been removed as indicated below.

Q9. The County has outlined the required Key Team Leaders for this project. Is it acceptable that a separate resume is included for a Project Manager, or should the PM be in a dual role with an outlined KTL position?

A9. The project manager is considered a Key Team Leader. Yes, a resume should be included.

Q10. Would the County like sample insurance certificates to be included in the respondents' package?

A10. Sample COIs are not required for the submittal package. However, proposers should review the insurance requirements included in the solicitation to ensure the requirements can be met if the County requests a COI prior to award.

Q11. Could you please clarify if the projects used on the reference form are required to be completed or if 'similar work completed' is in reference to work being done on the project within five years?

A11. Yes, the projects used on the reference form are required to be completed.

Q12. Is there a page limit in place for the schedule?

A12. The schedule should not be more than two pages.

Acknowledge receipt of this addendum on the firm information page of the request for proposal.

Sincerely, Michael Milstein Purchasing Associate II

PRE-BID CONFERENCE

RP#005-24

Representative Name Company Name Phone # E-Mail Address

(DEPARTMENT REPRESENTATIVES SIGN-IN AT BOTTOM)

1.

Cori Barnes

Willmer Engineering

678-617-7978 marketing@willmerengineering.com

2.

Jon Doherty

Kimley Horn jonathan.doherty@kimley-horn.com

3.

Cody Zanni

Kimley Horn

404-419-8700

4.

Breck Smith

Moffatt & Nichol

925-357-9691 bsmith@moffattnichol.com

5.

Kurt Walcott II

Holt Consulting

470-493-7073 kwalcott@holtconsultingco.com

6.

Kerrie Boyette

KCI Technologies

470-299-1385 kerrie.boyette@kci.com

7.

8.

9.

10.

11.

12.

13.

Department Representative Name

Department

Department Representative Name

Department

Kaley Ivins Purchasing Michelle Arnold DOT

Michael Milstein Purchasing Yilian Kebede DOT

RP005-24 Addendum No 1 (1)
RP005-24 Pre-Proposal Conference

File details come from the government source that posted it. Updated .