RP004_27 Inv.pdf

PDF 1 MB Posted

Attached to
RP004-27 Gwinnett County 2050 Unified Plan, Comprehensive Mobility Plan, and Parks and Recreation M
Solicitation number
PE-77023-NONST-2027-000000832
Issued by
Gwinnett County, Georgia

About this file

Summary

This is a Request for Proposal (RFP) issued by the Gwinnett County Board of Commissioners for consultant services to develop three coordinated planning documents: the 2050 Unified Plan, Comprehensive Mobility Plan, and Parks and Recreation Master Plan Update for the Department of Planning and Development. Proposals must be submitted in sealed containers by 2:50 P.M. local time on December 16, 2026, at the Gwinnett County Financial Services - Purchasing Division in Lawrenceville, Georgia. Proposals will be publicly opened at 3:00 P.M. (virtual only), with a list of submitting consultants available the following business day. A virtual pre-proposal conference is scheduled for November 19, 2026, and questions must be directed to Casey Beauston by 3:00 P.M. EST on November 20, 2026. Consultants may propose on any combination of the three plans, and if multiple teams are selected, they will function as a Joint Planning Group with coordinated technical work, shared public engagement, and cross-team workshops. Submission requirements include one original unbound copy, seven identical bound copies, and an electronic version on a flash drive. The successful consultant(s) must meet specific insurance requirements, including an A.M. Best rating of A-10 or higher from a Georgia-authorized insurance company. The County anticipates project initiation in Q1 2027, with bulk technical work completed by Spring 2028 and plan adoption targeted for Q1 2029.

Proposals are evaluated on a 120-point scale across three phases: Phase I (90 points) scores Experience (20 points), Qualifications (20 points), Understanding and Approach (35 points), Schedule (5 points), and References (10 points); Phase II (10 points) evaluates the Cost Proposal submitted in a separate sealed envelope; and Phase III (optional, 0-20 points) consists of interviews at the County's discretion. The County reserves the right to reject any or all proposals, waive technicalities, and make awards based on its sole discretion. Cost proposals must be broken down by overarching project task, with separate sealed envelopes required for each scope if multiple scopes are proposed. Direct expenses such as software licenses, travel, and public engagement materials should be itemized separately. The RFP does not identify a set-aside program, incumbent contractor, or specific funding sources beyond references to the County's 2029 Special Purpose Local Option Sales Tax (SPLOST) program for capital project funding. Award notification will be posted on the County website and communicated to proposers via email.

View the file

Other files

File Type Posted
RP004_27 Exhibit A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RP004-27 Page 1

November 13, 2026

REQUEST FOR PROPOSAL

RP004-27

The Gwinnett County Board of Commissioners is soliciting competitive sealed proposals from qualified consultants for the Gwinnett County 2050 Unified Plan, Comprehensive Mobility Plan, and Parks and Recreation Master Plan Update for the Department of Planning and Development.

Proposals must be returned in a sealed container marked on the outside with the Request for Proposal number and Company Name. Proposals will be received until 2:50 P.M. local time on December 16, 2026, at the Gwinnett County Financial Services - Purchasing Division – 2nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046. Any proposal received after this date and time will not be accepted. Proposals will be publicly opened and only names of submitting consultants will be read at 3:00 P.M.

The proposal opening will be virtual ONLY. To access the proposal opening virtually, visit the following link.

A list of consultants submitting proposals will be available the following business day on our website www.GwinnettCounty.com.

A virtual pre-proposal conference is scheduled for 10:00 A.M. EST on November 19, 2026. The pre-proposal conference can be attended using the following link. All consultants are urged to attend. Questions regarding proposals should be directed to Casey Beauston, Purchasing Associate III, at Casey.Beauston@GwinnettCounty.com or by calling 770-822-7995, no later than 3:00 P.M. EST on November 20, 2026. Proposals are legal and binding upon the consultant when submitted. One (1) unbound original, seven (7) identical bound copies, and an electronic version on a flash drive should be submitted.

Successful consultant will be required to meet insurance requirements. The Insurance Company should be authorized to do business in Georgia by the Georgia Insurance Department and must have an A.M. Best rating of A-10 or higher.

Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or activities. Any requests for reasonable accommodations required by individuals to fully participate in any open meeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator at the Gwinnett County Justice and Administration Center, 770-822-8165.

The written proposal documents supersede any verbal or written prior communications between the parties.

Selection criteria are outlined in the Request for Proposal documents. Gwinnett County reserves the right to reject any or all proposals, to waive technicalities, and to make an award deemed in its best interest.

Award notification will be posted after award on the County website, www.gwinnettcounty.com, and consultants submitting a proposal will be notified via email.

We look forward to your proposal and appreciate your interest in Gwinnett County.

Casey Beauston, CPPB Purchasing Associate III

The following pages should be returned with your proposal:

Cost Proposal (submitted in a separate sealed envelope), Pages 40-42 Consultant Information, Page 43 References, Page 44 Code of Ethics, Page 45 Contractor Affidavit & Agreement, Page 46 List of Subcontractors, Page 47 Contract Provisions (Grant Forms), Pages 48-90 https://teams.microsoft.com/meet/2729777258716978?p=UnUxDj032LU3YUD3Fw http://www.gwinnettcounty.com/ https://teams.microsoft.com/meet/2551051980691380?p=i4Q9gbtu0A8QrUa5nn mailto:%20Casey.Beauston@GwinnettCounty.com mailto:%20Casey.Beauston@GwinnettCounty.com http://www.gwinnettcounty.com/

RP004-27 Page 2

I. INTRODUCTION

Gwinnett County is pleased to announce an invitation for sealed proposals to complete a coordinated, county-wide effort to update its 2045 Unified Plan, Comprehensive Transportation Plan, and Parks and Recreation Master Plan. These plans will be essential to guiding Gwinnett County’s development over the next 20 years and will help identify priority projects for inclusion in the County’s 2029 Special Purpose Local Option Sales Tax (SPLOST) program along with other funding sources for capital projects. This effort will be a truly collaborative, multi-disciplinary process to update all three plans and ensure that Gwinnett County’s policies and work program are aligned.

While each planning process will serve different statutory and operational purposes, they will be developed through a coordinated planning process with common vision, shared community engagement, consistent mapping, aligned recommendations, and mutually reinforcing implementation strategies.

Broadly, the plans will work together to improve quality of life, promote stewardship of resources, encourage innovation, and strengthen partnerships. By integrating these three efforts, Gwinnett County will provide enhanced service to our residents and businesses and improve implementation. The overall intent of combining these processes is to ensure that intentional land use planning drives future infrastructure investment. To fully reflect this integration, one of the main deliverables will be a consolidated, highly graphic and engaging document for the public that clearly communicates the big ideas of each plan and summarizes each.

The Daily Community Framework established through the Gwinnett County 2045 Unified Plan serves as a primary organizing framework for coordination among the three plans.

However, each planning process will have its own areas of focus and exhibit different levels of update from its predecessor plan.

• 2050 Unified Plan: The 2050 Unified Plan is envisioned as a “light” update to the Gwinnett County 2045 Unified Plan. The 2045 Unified Plan established the Daily Community Framework, in which the goal is for all residents of unincorporated Gwinnett County to be able to meet their daily needs within a 15-minute trip from home. This framework, coupled with a unique program of engagement, factored heavily in the plan winning the Daniel Burnham Award for a Comprehensive Plan from the American Planning Association, the highest national award for this plan type. The County wishes to build on the success of the 2045 Unified Plan and use this update process to provide additional detail and implementation strategies for key components.

• Comprehensive Mobility Plan. The Comprehensive Mobility Plan will take the place of the County’s previous Comprehensive Transportation Plan (CTP) – Destination 2050. The County envisions the Comprehensive Mobility Plan effort to be a major

RP004-27 Page 3 overhaul of the existing CTP, and incorporate key trail and transit elements for the planning horizon. In addition to creating a data-based, prioritized list of projects for SPLOST consideration, the County seeks a plan that will shift its mobility infrastructure to address regional mobility needs in balance with a local-serving, context-based complete streets network to support the Daily Community Framework.

• Parks and Recreation Master Plan Update. The Parks and Recreation Department has consistently and extensively updated its system-wide master plan. These plans provide a rich baseline of data and information. Building on the 2020 Gwinnett Comprehensive Parks & Recreation Master Plan, this update will re-align recommendations in support of the Daily Community Framework.

The County expects the final three plans to read as three complementary components of one countywide planning strategy, while remaining independently usable documents.

Consultant teams may propose on any one plan, any combination of two plans, or all three plans. If proposing on more than one category, consultants must submit a separate proposal package for each category. The County will select the combination of teams that, together, offers the best overall fit. If more than one consultant team is selected, Gwinnett County Department of Planning and Development (P&D) will provide overall project management coordinating across teams. The County reserves the right to make an award as deemed in its best interest, which may include awarding to a single consultant or multiple consultants; or to award the whole solicitation agreement, only part of the agreement, or none of the agreement, based on its sole discretion of its best interest.

The Joint Planning Group

In the event that more than one consultant team is selected, each team will be expected to coordinate and collaborate with the other members of the joint planning group (defined as all the project teams working on the three plans) as tasks require.

Consultant teams should be prepared to work collaboratively as the Joint Planning Group throughout the project to establish a common understanding of Gwinnett County’s needs and opportunities, translating that understanding into mutually reinforcing recommendations. This will be accomplished through consistent project coordination across teams, several shared public engagements, and cross-team workshops at key technical junctures. Through this approach, the Joint Planning Group will:

• Establish a coordinated planning framework and management structure for the three planning efforts;

• Ensure that the three plans are based on consistent assumptions, data, mapping, terminology, and geographic frameworks;

• Establish a common understanding of existing conditions, needs, opportunities, and trends;

RP004-27 Page 4

• Use the Daily Community Framework as a common lens for evaluating policies, projects, and investments;

• Identify relationships and dependencies among land use, mobility, parks and recreation, housing, economic development, infrastructure, and community resources;

• Coordinate recommendations so that projects and policies identified in one plan support and reinforce recommendations in the other plans; and

• Identify potential conflicts, gaps, redundancies, and opportunities for multiple-benefit investments across the three plans.

Engagement

Each of three plans will have joint engagement opportunities and engagement that is plan-specific and separate. The County is committed to providing significant engagement support, including:

• A full-time assigned County staff member to serve as the single point of contact for engagement across all three efforts

• Scheduling and booking all engagement locations/venues

• Outreach for events (advertising, posting on social media, etc)

• At least two County staff members available to assist at every event

The role of consultant teams in engagement efforts will be:

• Coordination with County staff on scheduling/booking

• Preparation and printing of outreach materials

• Design/development/printing of activities/content

• Preparation and purchase of all event materials

• Lead facilitation of all events

• Documentation, summarization, and analysis of the engagement and its results

II. BACKGROUND

Spanning over 437 square miles, Gwinnett County is home to over 1 million residents, making it the second most populous county in Georgia and one of the most diverse counties in the eastern United States.

As the County continues to grow and evolve, there is a need to shift away from traditional suburban policies and planning to an approach that embraces flexibility, redevelopment, and maximizes multiple benefits from investments and infrastructure. In updating three of our largest County-wide planning efforts together, the intent is to have a truly integrated, multi-disciplinary approach that reflects the increasing complexity of the County and embraces the Daily Community Framework established in the Gwinnett County 2045 Unified Plan.

RP004-27 Page 5

III. SCOPES OF WORK

There are three separate scopes of work to reference: 2050 Unified Plan, Comprehensive Mobility Plan, and Parks and Recreation Master Plan.

A. Scope A: 2050 Unified Plan

The 2050 Unified Plan will serve as the lead document for land use, housing, economic development, infrastructure, and community resources, driving the recommendations of the Mobility Plan and the Parks and Recreation Master Plan.

The plan should build upon the adopted Gwinnett County 2045 Unified Plan and its Daily Community Framework while providing additional detail regarding where and how Gwinnett County should grow, redevelop, invest, and coordinate infrastructure.

The geographic focus is unincorporated Gwinnett County. Specific objectives include:

• Meet State of Georgia requirements for Comprehensive Planning

• Update critical information to reflect changes in the past five years

• Build upon the Daily Community Framework by addressing targeted topical areas that require additional guidance (see specific scope items)

• Update the Future Development Map and typologies

• Update and streamline the Community Work Program

• Coordinate closely with the Comprehensive Mobility Plan and Parks and

Recreation Master Plan teams for integration of policies, strategies, and projects

• Create the public-facing 2050 Unified Plan document and a supplemental technical manual for internal County use

• Provide graphic support for a highly visual, summary-level document that encompasses all three planning processes

Task A.1 Joint Coordination

1. Joint Monthly Project Management Team (PMT) meetings: Participate in a virtual meeting (up to one hour) with the County and joint planning group members.

2. Data collection and sharing: Upload and contribute data to a centralized location to be accessed by joint planning group members.

3. Joint Project Kickoff and Engagement Strategy Session: Attend a two-day, in-person meeting with all project teams to jointly kick off the planning process, create a coordinated plan for engagement, and tour the County. This will also include a smaller, Unified Plan-focused kick-off meeting with staff.

4. Gwinnett County Brand training: Attend a virtual brand training session.

5. State of the System Workshop: Attend and jointly facilitate an in-person, full-day workshop with the joint planning group and County staff to present findings from initial phases.

RP004-27 Page 6

6. Joint Partner Coordination Workshop: Attend and jointly facilitate an in-person, half-day workshop with representatives from the County’s major partners, such as the Community Improvement Districts (CIDs) and Partnership Gwinnett. The workshop will occur early in the process to understand any concerns from the partners and discuss common goals and needs.

7. Joint Vision and Recommendations Workshop: Attend and jointly facilitate an in-person, full day workshop with the joint planning group and County staff to present draft visions and recommendations to improve alignment between the planning efforts.

8. Joint Vision Graphic: Create a single compelling, conceptual vision graphic that illustrates the major ideas from all three planning efforts into an integrated visual.

9. Joint Implementation Framework: The consultant teams shall jointly develop a framework for implementation across all three plans to identify shared priorities, projects, policies and initiatives. This framework should include plan-specific actions (those implemented through one plan) and coordinated actions (implemented through two or more plans.

10. Cross-Plan Quality Assurance/Quality Control (QA/QC): Prior to finalization, the teams will jointly review the three plans for alignment across priorities, projects, and assumptions, as well as identify potential inconsistencies and conflicts.

Key Deliverables: Task A.1 Joint Coordination

• Materials for joint workshops

• Meeting minutes

• Joint Vision Graphic

• Joint Implementation Framework content

• Cross-Plan QA/QC Comments

Task A.2 Unified Plan Foundations

1. Project management: Provide a consistent project manager to oversee and lead the development of the 2050 Unified Plan and submit monthly invoices and progress reports.

2. Bi-weekly PMT meetings: On opposite weeks of the Joint PMT meeting, facilitate a virtual PMT meeting focused on the Unified Plan.

3. Unified Plan 2045 Review: Review the current Unified Plan in depth and recommend preliminary areas for update/modification.

4. Basemap creation: Develop a basemap to be jointly used by all three planning efforts.

5. Summary of Accomplishments: Develop a highly graphic summary highlighting major accomplishments since adoption of 2045 Unified Plan.

The report should emphasize policies, programs, and projects that have been initiated, funded, completed, or substantially advanced. The report

RP004-27 Page 7 should rely on graphics and infographics to communicate overall progress and should not exceed six pages Note: the County will provide the state-required Report of Accomplishments table as a starting point.

Key Deliverables: Task A.2 Unified Plan Foundations

• PMT meeting agendas and minutes

• Unified Plan 2045 Review comments

• Basemap

• Summary of Accomplishments

Task A.3 Joint Engagement

1. Statistically Valid Survey: Develop and administer a statistically valid survey that will serve all the 2050 Unified Plan, the Comprehensive Mobility Plan, and the Parks and Recreation Master Plan. The County would like input on the selection of this vendor, which will occur after this contract is awarded.

2. Technical Advisory Committee (TAC): Attend and jointly facilitate up to four

(4) TAC workshops. The TAC will be comprised of County staff and will be a shared committee across all three planning efforts.

3. Community Advisory Committee (CAC): Attend and jointly facilitate up to three (3) joint CAC workshops. The CAC will be comprised of community members identified by the County; the full CAC will serve all three planning efforts, but members will also be part of a sub-committee specific to each plan. Additional CAC meetings for the sub-committees are part of Scopes A, B, and C.

4. Commissioner Interviews: Consultant teams will meet with the five Board of Commissioners as a single project team at two points during the process.

These ten (10) meetings may be virtual or in person and will be scheduled by the County.

5. Stakeholder Interviews: Consultant teams will virtually attend up to two days of joint stakeholder interviews to be scheduled by the County.

6. Open Houses: Attend and jointly facilitate four (4) County-wide open houses or similar meetings.

7. Website content: The County will build and maintain a joint project website.

Each consultant team will be expected to provide content for the website a minimum of once per month over the course of the two-year project schedule.

8. Board of Commissioner (BOC) Presentations: Attend and present at up to two BOC meetings to brief Commissioners on project progress and answer questions.

Key Deliverables: Task A.3 Joint Engagement

• Engagement materials and meeting summaries

• Survey content

• Website content

RP004-27 Page 8

Task A.4 Unified Plan Focused Engagement

The following tasks are in addition to Joint Engagement tasks from Task A.3.

1. Public Hearing #1 presentation: The consultant team will create a presentation for Public Hearing #1; County staff will conduct the presentation to the Board of Commissioners. The consultant team is not required to attend.

2. Planning Commission Presentation: The consultant team will introduce the project at a regularly scheduled Planning Commission meeting.

3. In-person engagement events: Facilitate up to three (3) in-person engagements focused on the Unified Plan. The format of these is to be determined once the project starts. For scoping and budget purposes, consultant teams can assume the following:

- Engagements will average about 4 hours of active “hands-on” event time

- At least one engagement will be pop up style at an existing event or high-visibility location

- The consultant team is expected to provide staff for the engagement and produce all materials

- The County will:

o Provide a minimum of two staff members to actively assist at each engagement o Be responsible for outreach to get the word out about the opportunity o Will conduct any other needed engagements beyond the three scoped here, and will provide the results to the consultant team within a week of the event

4. Online engagement: Create at least two (2) online activities. The format of these is to be determined once the project starts but should not be a simple survey.

5. Community Advisory Committee (CAC) sub-group meetings: Engage the Unified Plan sub-committee of the Joint CAC for up to two (2) Unified Plan-focused workshops.

6. Stakeholder Interviews and Focus Groups: Conduct up to 8 hours (in addition to task A.3.5) of virtual stakeholder interviews/focus groups. Participants will be identified and scheduled by the County.

7. Public Hearing #2: The consultant will prepare a presentation of the draft plan and present at a regularly scheduled BOC public hearing.

8. Additional presentations: The consultant team will modify the BOC Public Hearing presentation up to three times for County staff to present at the Planning Commission and a later adoption hearing to be handled by County staff.

9. Engagement summary: Prepare a report documenting points of engagement and major themes/findings for the Unified Plan.

RP004-27 Page 9

Key Deliverables: Task A.4 Unified Plan Focused Engagement

• Public Hearing and BOC Work Session Presentations

• Materials for in-person engagement events

• Online activities (2) and results

• CAC meeting materials and summaries

• Stakeholder interview/focus group questions and minutes

• Engagement summary

Task A.5 Unified Plan Technical Analysis

1. State of the Systems and Trends Report: In lieu of updating the 2045 Unified Plan existing conditions sections, the consultant team will develop a succinct State of the Systems and Trends Report that focuses on changes in the past five years and trends. This document should be highly graphic, engaging, and no more than 30 pages in length. Assume three rounds of revisions.

2. Engagement Results Analysis: Analyze the results of the engagement opportunities, with an emphasis on the Statistically Valid Survey. Based off the results, the County will select three themes and the consultant will prepare issue papers of up to 10 pages each that clarify the challenge and provide reality-based options for addressing them.

3. Land Use Assessments:

- Future Development Typology Review: The consultant team will study the current future development typology, analyze its effectiveness, and provide recommendations for revisions in a memo

- Rural lands and natural areas assessment: Assess the rural and natural areas of the County; create a recommended framework for protection/conservation; and identify high-priority areas for conservation. Particular attention should be paid to transitional areas in eastern Gwinnett County. A summary of the process and recommendations should be submitted to the County as a memo.

- Future development map areas for update: The Future Development Map covers over 200,000 parcels. The County does not expect (nor desire) for the consultant to check and update every parcel; instead, the intent is for the consultant team to work with County staff to identify the areas that require change and update. The County will provide information on known areas for revision, as well as future development model results that identify parcels most likely to develop or redevelop in the next twenty years. In addition to the areas already identified by the County, the consultant should identify parcels that may require revision as a result of other assessments. The deliverables should be a memo outlining the methodology for identifying these parcels and a GIS layer of these parcels.

4. Economic Development Assessments

- Village Center redevelopment white paper: Document the current market and policy barriers to Village Centers (see 2045 Unified Plan)

RP004-27 Page 10 redeveloping and identify strategies to achieve incremental improvement and development into true community activity centers.

The final deliverable will be a white paper of no more than 10 pages in length.

- Access to jobs assessment: Conduct an analysis of job types and their locations; identify the residential areas that do not have access to job centers within a 15-minute trip; and identify preliminary strategies for closing those access gaps that may span policy and land use recommendations. This final deliverable will be a white paper in Word and no more than 10 pages of text with additional pages for accompanying maps.

- Small business support white paper: Develop a white paper for specific, reality-based mechanisms the County can use to support small businesses in the context of desired redevelopment, commercial affordability, and impactful investment. The final deliverable will be a white paper in Word and no more than 10 pages in length.

- Economic development opportunities analysis: Identify areas that may be “next” for economic development and housing investment and summarize findings in a memo

5. Housing Assessments

- Housing production and market assessment: Evaluate changes in

Gwinnett County's housing market since 2023. Assess housing production by tenure, affordability level, housing type, and geography, and identify gaps between projected housing demand and actual production. The assessment should also evaluate the need for housing for all income levels. The deliverable should be a Word document no more than 20 pages in length.

- Cross-departmental housing development barriers memo: Conduct a quantitative analysis of development review, as well as interviews with County staff, design professionals and housing developers to identify stakeholder perspectives on site development requirements and permitting challenges. Recommend legal and policy changes that reduce unnecessary barriers, including identifying specific areas of change needed in the Unified Development Ordinance (UDO).

- Public land for housing assessment: Identify county-owned land suitable for development and establish a process to regularly update the list of developable parcels. Final deliverable would be a memo in Word of no more than 10 pages (not including maps), a GIS layer, and an Excel database.

6. Community Facilities

- Parks and Land Use Coordination Analysis: Working with the Parks and

Recreation Master Plan team, identify areas where parks and recreation can support desired development, housing, economic

RP004-27 Page 11 development, daily community centers, new development, community revitalization, and natural resource conservation.

Key Deliverables: Task A.5 Unified Plan Technical Analysis

• State of the Systems and Trends Report

• Engagement results analysis and issue papers (3)

• Future Development Typology Review memo

• Rural lands and natural areas assessment memo

• Future development map areas for update (memo and GIS layer)

• Village Center redevelopment white paper

• Access to jobs white paper

• Small business support white paper

• Economic development opportunities analysis (memo)

• Housing production and market assessment (report)

• Cross-departmental housing development barriers memo

• Public land for housing assessment (report, map and Excel database)

Task A.6 Vision and Recommendations

1. Vision graphics: Create a high-quality set of up to eight (8) vision graphics (in addition to the joint vision graphic in A.1.8). At a minimum these will include:

- An illustrative map of the County’s overall land use vision

- At least two “before and after” morphs illustrating intended outcomes of key policies, programs, or projects

2. Local Network Build-Out Coordination: In collaboration with the

Comprehensive Mobility Plan team (see Task B.7.2), identify new local roadway segments that are realistic to implement given land use constraints.

The consultant should anticipate participation in a workshop or meeting to discuss the new desired corridors and create a methodology for determining feasibility from a land use perspective.

3. Future Development Map and Land Use Element Updates

- Revise the Future Development typology according to the earlier evaluation of the overall effectiveness of the current typologies, results of the white papers/memos, and public engagement

- Revise the Future Development map

- Revise/update Land Use Element policies as needed

4. Economic Development Element

- Revise/update policies as needed based off outcomes from the technical analyses and engagement opportunities

5. Housing Element

- Revise/update policies as needed based off outcomes from the technical analyses and engagement opportunities

RP004-27 Page 12

6. Infrastructure Element

- Revise/update policies as needed based off outcomes from the technical analyses and engagement opportunities

7. Community Resources Element

- Revise/update policies as needed based off outcomes from the technical analyses and engagement opportunities

Notes:

- Transportation policy updates will be produced by the Comprehensive

Mobility Plan team

- Parks and Recreation policy updates will be produced by Parks and

Recreation Master Plan team

Key Deliverables: Task A.6 Vision and Recommendations

• Vision graphics

• Future development section revisions

• Updated future development map

• Revised policies for Land Use, Economic Development, Housing, Infrastructure and Community Services Elements

Task A.7 Daily Community Charrettes

1. Daily Community Charrettes: Working with the Comprehensive Mobility Plan and Parks and Recreation Master plan teams, co-lead two (2) three-day charrettes that apply the policy changes and pertinent projects at a smaller scale. One three-day charrette will be focused on a Village-type Daily Community, and the other three-day charrette will be focused on a Corridor type. At least three key members of the consultant team (including the project manager and an economic development/market expert) are expected to attend.

These are intended to be in-person workshops that test policy changes for applicability and soundness at a finer grained scale. The bulk of the workshop is intended to be internal to the joint project team, with one evening open to the public to see the work in progress. The County will manage all logistics of the workshops including identifying and booking locations. The County will also compile the deliverables across the project teams to create small area plans from this task.

2. Small Area Plan Guidance: For future use by County staff, develop guidelines for developing small area plans in the future. These guidelines should contain direction on translating the future development map to more detailed land uses, appropriate economic development strategies, housing considerations, and community facilities.

RP004-27 Page 13

Key Deliverables: Task A.7 Daily Community Charrettes

• Charrette materials (maps and boards for discussion relating to land use, economic development, housing, infrastructure, and community resources (excluding parks and recreation)

• Detailed land use plan

• One site plan concept for a key catalytic site

• A photo-morph or similar graphic illustrating a key project/recommendation

• Land use, economic development, housing, infrastructure, and community resources recommendations

• Detailed implementation strategies

• Small area plan guidance

Task A.8 Implementation

1. Implementation Strategies: For each element, develop implementation strategies to address the challenges and opportunities identified through engagement and technical assessments.

2. Small Area Plan Guide and Prioritization: Compile the small area plan guidance from all three teams into a cohesive guide, and create a prioritized list of future small area plans.

3. SPLOST Projects: Identify projects (not part of the Mobility or Parks and Recreation Master Plans) that should be considered for SPLOST funding.

4. Community Work Program: Update and streamline the Community Work Program. Note that the County will provide the Report of Accomplishments from the 2045 Plan, the Comprehensive Mobility Plan consultant will provide transportation-related policies and projects, and the Parks and Recreation Master plan team will provide parks-related policies and projects.

5. Detailed Project/Initiative Implementation Plans: For up to ten projects not included in the SPLOST list, provide a detailed, step-by-step implantation strategy with actions for the first 90 days, within 1 year, within 3 years, and 3+ years. These strategies should be about three or four pages in length each, with needed resources (both staff time, partners, costs, and funding sources) identified. These will be internal facing documents and should be in Word and/or Excel format.

Key Deliverables: Task A.8 Implementation

• Implementation strategies (by element, in Word)

• Small Area Plan Guide and Prioritization

• SPLOST projects (Excel database with geographic coordinates where applicable)

• Updated Community Work Program (Excel database)

• Project/Initiative Implementation Plans (Word documents, Excel)

RP004-27 Page 14

Task A.9 Final Documentation

1. 2050 Unified Plan Document: This document will be the public-facing version of the plan and should be highly graphic, emphasize the “big ideas” over excessive detail, and written in an accessible style.

- Updated “Front Matter”: cover, acknowledgments, table of contents, and brief introduction.

- Diagram of relationship to the other two plans

- Engagement summary

- Graphic vision and brief narrative

- Updated elements (Land Use, Economic Development, Housing, Infrastructure, Community Resources); transportation and parks and recreation content will be provided by Comprehensive Mobility Plan and Parks and Recreation Master Plan teams respectively

- Community Work Program

- Implementation Strategies and Priorities

- Broadband element (Appendix)

- Report of Accomplishments (provided by the County)

The desire is to have a succinct, engaging document that is less than 100 pages in length.

The consultant team will be expected to prepare a Preliminary Draft, a Second Draft, and a Final Draft. The review and revision process from start to finish is expected to take three months. The County will manage the submittal process with the Atlanta Regional Commission and the State of Georgia. One final, light update is expected as a result of these agencies’ reviews.

2. Unified Plan Technical Manual: To supplement the public-facing graphic plan, the consultant team will compile final versions of previous deliverables and all supporting data as requested.

3. GIS data delivery: Final GIS datasets should be provided in Esri-compatible formats. Deliverables may include, but are not limited to, ArcGIS Pro map or project packages, file geodatabases, tabular data, PDFs, and supporting documentation. Data and associated documentation should be delivered using an organized format with consistent layer names, coordinate systems, and basic metadata or data descriptions. Deliverables should include basic data dictionary describing the fields, data sources, and any known limitations.

Key Deliverables: Task A.9 Final Documentation

• 2050 Unified Plan Document (InDesign and raw files, and 20 professionally printed and bound copies)

• Technical Manual Materials

• GIS data

RP004-27 Page 15

B. Scope B: Comprehensive Mobility Plan

Gwinnett County Department of Planning & Development (P&D), in coordination with the Gwinnett County Department of Transportation (GCDOT), seeks consultant services to prepare the Gwinnett County Comprehensive Mobility Plan, which must comply with Atlanta Regional Commission (ARC) guidelines for Comprehensive Transportation Plans (CTP).

The County envisions the Comprehensive Mobility Plan as a comprehensive overhaul of the existing CTP that redefines how transportation investments are planned, prioritized, and implemented.

An important component is developing a data-driven, prioritized list of projects to support future Special Purpose Local Option Sales Tax (SPLOST) programs and other funding opportunities. The Comprehensive Mobility Plan will shift the County's transportation strategy from a traditional roadway-focused approach toward a comprehensive mobility framework that balances regional mobility needs with a local-serving, context-sensitive, Complete Streets network in support of the County's Daily Community Framework.

Objectives:

• Overhaul existing Comprehensive Transportation Plan (CTP) to align with the Daily Community framework

• Integrates all modes including walking, bicycling, rolling, and public transit where appropriate

• Develop a data-driven list of SPLOST projects, balancing need with infrastructure expansion and maintenance costs

• Establish a reality-based Complete Streets framework

• Address congestion and safety issues from a systems perspective

• Integrate the Trails Vision Plan and sidewalk analysis

• Revisit the future transit strategy

• Evaluate opportunities for arts and placemaking through mobility improvements

The Comprehensive Mobility Plan will utilize a solve-in-system approach that evaluates how transportation investments improve overall system performance rather than focusing solely on individual roadway segments or intersections. Recommendations will integrate roadway, transit, bicycle, pedestrian, freight, operations, technology, transportation demand management, and land use considerations into a coordinated mobility strategy.

The Consultant should build upon and integrate previous planning efforts including the Comprehensive Transportation Plan: Destination 2050; 2045 Unified Plan; Safety Action Plan – Safe Travels, Gwinnett; Transit Development Plan; Draft Trails Vision Plan, Parks and Recreation Master Plan, 2017 and 2023 SPLOST programs, adopted small area plans, and other applicable local plans, e.g., city, community improvement district (CID), Atlanta Regional Commission, and State of Georgia plans.

https://www.gwinnettcounty.com/static/departments/PlanningDevelopment/pdf/1-the-daily-community-framework.pdf https://www.gwinnettcounty.com/static/departments/PlanningDevelopment/pdf/1-the-daily-community-framework.pdf

RP004-27 Page 16

Task B.1 Joint Coordination

1. Joint Monthly Project Management Team (PMT) meetings: Participate in a virtual meeting (up to one hour) with the County and joint planning group members.

2. Data collection and sharing: Upload and contribute data to a centralized location to be accessed by joint planning group members.

3. Joint Project Kickoff and Engagement Strategy Session: Attend a two-day, in-person meeting with all project teams to jointly kick off the planning process, create a coordinated plan for engagement, and tour the County. This will also include a smaller, Mobility Plan-focused kick-off meeting with staff

4. Gwinnett County Brand training: Attend a virtual brand training session.

5. State of the System Workshop: Attend and jointly facilitate an in-person, full-day workshop for the joint planning group and County staff to present findings from initial phases.

6. Joint Partner Coordination Workshop: Attend and jointly facilitate an in-person, half-day workshop with representatives from the County’s major partners, such as the Community Improvement Districts (CIDs) and Partnership Gwinnett. The workshop will occur earlier in the process to understand any concerns from the partners and discuss common goals and needs.

7. Joint Vision and Recommendations Workshop: Attend and jointly facilitate an in-person, full day workshop for the joint planning group staffs and County to staff to present draft visions and recommendations to improve alignment between the planning efforts. Joint Implementation Framework. The consultant teams shall jointly develop a framework for implementation across all three plans to identify shared priorities, projects, policies and initiatives. This framework should include plan-specific actions (those implemented through one plan) and coordinated actions (implemented through two or more plans.

8. Cross-Plan Quality Assurance/Quality Control (QA/QC): Prior to finalization, the teams will jointly review the three plans for alignment across priorities, Key Deliverables: Task B.1 Joint Coordination

• Support materials for joint workshops

• Meeting minutes

• Joint Implementation Framework

• Cross-Plan QA/QC Comments

Task B.2 Mobility Plan Foundations

1. Project management: The Consultant shall provide overall project management, coordination, quality assurance/quality control (QA/QC), schedule management, communication, and document control throughout

RP004-27 Page 17 the duration of the project. The Consultant must assign a Project Manager who will serve as the County's primary point of contact throughout the project. The Consultant will also submit monthly progress reports.

2. Bi-weekly PMT meetings: The Consultant shall facilitate regular project coordination meetings, including bi-weekly virtual Project Management Team (PMT) meetings focused specifically on the Comprehensive Mobility Plan during the weeks when Joint PMT meetings are not held.

3. Mobility Plan Kickoff Meeting: Before the Joint Project Kickoff and Engagement Strategy Session, the Consultant will facilitate a virtual project kickoff meeting with ARC to review the project scope, schedule, communications, expectations, and overall approach.

4. Project Management Plan: Following the kickoff meeting, the Consultant will finalize the Project Management Plan (PMP) per ARC’s guidelines. This should establish the project schedule, staffing, communication protocols, QA/QC procedures, decision-making process, and coordination with concurrent planning efforts. The PMP should define administrative and invoicing procedures, which will follow ARC’s provided templates and procedures for collecting invoices monthly.

5. Basemap coordination: Work with 2050 Unified Plan and Parks and Recreation Master Plan consultant teams to develop a basemap to be used for mapping.

Key Deliverables: Task B.2 Comprehensive Mobility Plan Foundations

• Kickoff meeting summary notes

• Meeting agendas and minutes

• Project Management Plan (draft and final)

• Monthly invoices with progress reports

Task B.3 Joint Engagement

1. Technical Advisory Committee (TAC): Attend and jointly facilitate at least four (4) TAC workshops. The TAC will be comprised of County staff and will be a shared committee across all three planning efforts.

2. Community Advisory Committee (CAC): Attend and jointly facilitate up to three (3) joint CAC workshops. The CAC will be comprised of community members identified by the County; the full CAC will serve all three planning efforts, but members will also be part of a sub-committee specific to each plan. Additional CAC meetings for the sub-committees are part of Scopes B, C, and D.

3. Commissioner Interviews: Consultant teams will meet with the five Board of Commissioners as a single project team at two points during the process.

These ten (10) meetings may be virtual or in person and scheduled by the County.

4. Stakeholder Interviews: Consultant teams will virtually attend up to two days of joint stakeholder interviews to be scheduled by the County.

RP004-27 Page 18

5. Open Houses: Attend and jointly facilitate four (4) County-wide open houses or similar meetings.

6. Website content: The County will build and maintain a joint project website, per ARC’s guidelines. Each consultant team will be expected to provide content for the website a minimum of once per month over the course of the two-year project schedule.

7. Board of Commissioner (BOC) Presentations: Attend and present at up to

Key Deliverables: Task B.3 Joint Engagement

• TAC and CAC Membership lists

Task B.4 Mobility Plan Focused Engagement

1. Public Engagement Plan: The exact process, schedule, and methods of community engagement should be defined in the Public Engagement Plan (PEP). The PEP is subject to ARC review and should comply with their standards.

2. Tracking Sheet: A template will be provided by ARC to use to track all public engagement touchpoints. The tracking sheet will be submitted back to ARC after all engagement is complete.

3. In-Person Engagement: The Consultant team will facilitate two separate rounds of public engagement with up to ten (10) in-person engagement events focused specifically on mobility. This outreach is intended to occur as small popups at multiple locations throughout the county that utilize places where people are already gathering, such as public libraries, festivals, and other popular destinations. For budgeting purposes, the Consultant may assume:

- Engagements will average about 4 hours of active “hands-on” event time

- Engagements will be “pop up” style at an existing event or high-visibility location

- The consultant is expected to provide staff to facilitate/attend the events, as well as produce all materials

- The County will:

Provide two staff members to actively assist at each engagement Be responsible for outreach to get the word out about the opportunity Will conduct any other needed engagements beyond the ten scoped here, and will provide the results to the consultant team within a week of the event

RP004-27 Page 19

4. Online Engagement: The Consultant should propose innovative online engagement strategies in addition to the joint project survey. Per ARC guidelines, online methods should be utilized during the initial phase to identify issues from members of the public (joint survey) and a second time after recommendations have been formed to get feedback on the proposed recommendations.

5. Statistically Valid Survey Participation: Coordinate with the Unified Plan team on -related questions for the statistically valid survey, and analyze the results.

6. Community Advisory Committee sub-group meetings: The Consultant will conduct three (3) CAC sub-group meetings focused on the Comprehensive Mobility Plan. Members will be chosen in compliance with ARC guidelines.

7. Stakeholder Interviews/Focus Groups: The Consultant will conduct up to 8 hours (in addition to task B.3.4) of virtual stakeholder interviews and focus groups. Participants will be identified and scheduled by Gwinnett County.

8. County Leadership Presentation: The Consultant will prepare a presentation of findings, to be modified up to three times for County staff to use at leadership meetings, Board meetings, or other public presentations. The consultant should plan to attend a meeting with the Board of Commissioners for final adoption.

9. Engagement Results Report: Analyze the results of the engagement opportunities. For the top three mobility issues that emerge (and approved by the County), prepare issue papers of up to 10 pages each that clarify the challenge and provide reality-based options for addressing them.

Key Deliverables: Task B.4 Comprehensive Mobility Plan Focused Engagement

• Public Engagement Plan (draft and final)

• Engagement tracking sheet

• Public engagement meeting/workshop materials

• Public engagement photos

• Online engagement activities

• Presentations

• Engagement Results Report and Issue Papers (3)

Task B.5 Mobility Plan Existing Conditions Assessment

1. Inventory of Existing Plans and Regionally Significant Studies: Prepare an inventory of transportation plans, studies, and policy documents relevant to the Comprehensive Mobility Plan. The inventory should briefly describe how each document will inform development of the Comprehensive Mobility Plan and should not exceed five pages.

2. State of the System and Trends Report: A synthesized, succinct assessment that establishes a common understanding of current conditions and identifies transportation issues requiring additional evaluation through the Comprehensive Mobility Plan. This report should produce an analysis

RP004-27 Page 20 consistent with the requirements of the ARC’s Inventory of Existing Conditions task.

3. Summary of Accomplishments: Use the ARC template to complete the Report of Accomplishments, then produce a highly graphic summary highlighting major transportation accomplishments since adoption of the previous CTP. The report should emphasize transportation-related policies, programs, and projects that have been initiated, funded, completed, or substantially advanced. The report should rely on graphics and infographics to communicate overall progress and should not exceed four pages.

4. SPLOST Project Selection Process Review: Analyze the County’s current process for selecting SPLOST projects and provide recommendations for improvement; compile findings as part of the Review of Programs Report

5. Outstanding SPLOST Project and Program Review: Review 2017 and 2023 SPLOST transportation programs to identify projects that are incomplete, and update/reprioritize as needed. Review the SPLOST programs, such as the Spot Safety/Quick Fix, Pavement Management, and others. Determine the capacity of these programs to deliver projects and determine future funding requirements. Compile findings as part of the Review of Programs Report.

6. Universe of Projects Review: The Consultant will also evaluate the County's Consolidated Project List - an inventory maintained by GCDOT of transportation recommendations from previous County plans and studies, as well as staff or resident-submitted transportation requests. This evaluation should recommend an approach for evaluation and potential incorporation into the Comprehensive Mobility Plan. Compile findings and recommendations as part of the Review of Programs Report.

Key Deliverables: Task B.5 Existing Conditions Assessment

• Inventory of Existing Plans and Regionally Significant Studies

• State of the System and Trends Report (Draft and Final)

• ARC Report of Accomplishments

• Graphic Summary of Accomplishments

• Spreadsheet of outstanding projects

• Review of Programs Report (B5.4, 5, and 6).

Task B.6 Mobility Plan Technical Analysis

1. Origin and Destination Analysis: Conduct an analysis determining traffic patterns that are regional in nature versus local. The result should include desire line diagrams, heat maps, and other highly visual methods of communicating findings.

2. Road Classification Analysis: Conduct a review of current County roadway classifications and provide any recommendations for adjustment.

3. Network Analysis: Consultant shall identify gaps in the transportation network, highlighting key gaps in network redundancy in the areas

RP004-27 Page 21 surrounding priority corridors, as well as confluences that are creating bottlenecks in the system. The analysis should focus on the road network surrounding corridors with annual delay costs exceeding $1 million, per the ARC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .