Roof_Scope_for_RFP.pdf

PDF 113 KB Posted

Attached to
Roof Replacement, City of Fort Myers Fire Station #15, 9700 Treeline Ave. , Ft. Myers, FL 33913
Solicitation number
25-027-Quote
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This document is a Replacement Roof Scope for the City of Fort Myers Fire Station 15, located at 9700 Treeline Avenue in Fort Myers, Florida. The scope of work involves a comprehensive roof replacement project that includes removing and disposing of existing roofing materials down to the original decking, with specific requirements for both the main roof and flat roof areas. The project calls for replacing the current barrel clay tile roof with a 1" standing seam metal roof in a standard color, and addressing two existing EIFS or modified bitumen flat roof areas. The contractor will be responsible for re-nailing decking per code, replacing compromised roof sheeting, and installing new roofing systems with specific material specifications, including 24 GA metal panels with a Kynar finish, self-adhered underlayment, and new gutters.

The scope includes provisions for a contingency of 20 roof decking sheets in the base bid, time and material rates for replacing rotten decking, and detailed installation requirements for metal panels, flashings, and roof penetrations. The proposal must include pricing for a standard color roof and an alternate line item for bond issuance. Additional requirements include identifying and documenting any replaced decking with photographs, installing new 7" K-Style white gutters around the entire building, and providing comprehensive material and labor warranties. The contact for this project is Deputy Fire Chief James Hayden, who can be reached at 239-707-8443 or Jhayden@CityFtMyers.com.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Fort Myers Fire Station 15

9700 Treeline Ave

Fort Myers, FL 33913

35-44-25-P4-00001.0000

Contact: Deputy Fire Chief James Hayden

239-707-8443

Jhayden@CityFtMyers.com

Replacement Roof Scope

CoFM Fire Station 15 roof is currently barrel clay tile with two EIFS or modified bitumen flat roof areas. The scope shall be to remove and dispose of all existing roofing material to the original decking, including applicable flashing, re-nail decking as needed per code. Time and material for rotten or compromised roof sheeting shall be listed as an hourly rate to include material. All decking that is replaced shall be identified and communicated to the owner with photographs.

The contractor shall determine the most appropriate application to replace the existing EIFS. The replacement for tile shall be a 1” standing seam metal roof. The proposal shall include pricing for any ‘standard’ color. The proposal shall include an alternate line item for bond issuance.

Flat Roof Areas (2)

Remove to decking and replace as necessary and re-nail per code.

Install material at a minimum ¼” per foot to scuppers and/or drains as designed.

Include all new scuppers, copings (including covering foam bands) and drain modifications.

Install new modified Bitumen roof system per material specification, list material used.

Identify material and labor warranties.

Main Roof Material

Self-adhered underlayment applicable for metal panels.

Metal panels shall be 24 GA, 1” standing seam, Kynar finish, standard color, 16” between seams.

Panel clips shall be 22 GA with 24 GA trim flashings color matched with Kynar finish including

2 ½” aluminum drip edge color matched.

Fasteners should be #10 x 1 ½” pancake heads penetrating roof deck a minimum ¾” verified. All fasteners shall be non-corrosive.

New lead pipe flashings.

Gooseneck flashings only where applicable or needed.

Main Roof Installation

Remove all existing roofing material to the decking and re-nail per code.

Replace all compromised roof decking from rot or other damage. Include 20 sheets in base bid as a separate line-item contingency.

Replace spray in insulation areas where decking was replaced (T & M).

Install new self-adhered underlayment beginning at eves working toward peaks.

Broom clean decking for proper adhesion.

Mitigate any areas in underlayment not flat to the decking.

Eave material at drip edge fastened every 6” with 3” overlap.

Valley material fastened every 6” on center and minimum 1” in from the edge

Prime all valleys with asphalt primer and self-adhered membrane over the edges.

Metal panels installed from the eves to highpoints, installed with clips 12” on center with two fasteners per clip.

Z-bar and valley clips installed with 4 fasteners per 16”.

Hip edge/ridge flashing installed with 3” overlap minimum.

Headwall and sidewall flashing to be fabricated with a caulk flashing. Install the flashing to the Z

Bar and fasten with compatible fasteners 12” on center.

All other roof penetrations examined for condition prior to reinstallation and replaced as needed.

Identify all material and labor warranties.

Gutters

Remove existing 6” K-Style gutters, re-use 3” X 4” downspouts where able to.

Install new 7” K-Style Gutter around the entire building, add downspouts where needed and tie-in to existing drains where able to.

Color White.