ROM--9 OSS (Base Ops) B1060 CarpetFurnitureAsbestos.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
9 OSS (Base Ops) B1060 Carpet/Furniture/Asbestos
Solicitation number
FA4686269OSSB1060
Issued by

About this file

This is a Rough Order of Magnitude (ROM) cost estimate spreadsheet for a U.S. Air Force Base Operations project at 9 OSS (Ninth Operations Support Squadron), Building 1060, involving carpet installation, furniture handling, and asbestos abatement services. The ROM is prepared for market research purposes only and is not an official request for quote. The Point of Contact is Teresa Romig at teresa.romig@us.af.mil, (530) 634-3405.

The project is structured across three priority levels with multiple Contract Line Items (CLINs). Priority 1 (base requirement) includes carpet tile materials (373 square yards), carpet tile installation labor, adhesive materials (25 gallons), cove base materials (1,900 linear feet), cove base installation labor, miscellaneous installation materials, asbestos abatement services, and furniture removal and storage for approximately 1,530 square feet. Priority 2 and Priority 3 are optional CLINs covering reduced quantities of the same services across additional areas (177 and 86 square yards of carpet, respectively). Asbestos abatement services include removal of asbestos-containing materials (ACM), concrete subfloor preparation, EPA notification and regulatory submissions, air clearance sampling and reporting, and hazardous waste manifest submission. All cost fields are currently blank (marked as $-0), indicating this is a template awaiting vendor pricing inputs. Contractors are invited to provide cost estimates and may suggest appropriate NAICS codes and PSC codes with their responses.

View the file

Other files

File Type Posted
CONTRACTOR EAL.xlsx XLSX spreadsheet
SON-B1060 Asbestos Removal- Carpet Replacement-Furniture Move_FINAL Aug2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

9 CONS
Rough Order Magnitude (ROM)
9 OSS (Base Ops) B1060 Carpet/Furniture/Asbestos
*Disclaimer: Information below is a cost estimate. This does not depict actual cost of work to be performed. It is an estimate ONLY.
POC: Teresa Romig / PKB
Email/Phone: teresa.romig@us.af.mil / (530) 634-3405
Priority 1
CLINSITEM/SERVICEUNIT OF MEASUREQTYCOSTTOTAL
CLIN 0001Carpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON)Square Yard373$ - 0
CLIN 0002Carpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs.Square Yard$ - 0
CLIN 0003Adhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standardsGallon25$ - 0
CLIN 0004Cove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON).Linear Foot1900$ - 0
CLIN 0005Cove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costsLinear Foot$ - 0
CLIN 0006All other materials needed to complete carpetremoval/installation.Lot1$ - 0
CLIN 0007Asbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmissionLot1$ - 0
CLIN 0008Furniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration.Lot1$ - 0
Overall Total$ - 0
Priority 2
CLINSITEM/SERVICEUNIT OF MEASUREQTYCOSTTOTAL
CLIN 1001 Optional CLINCarpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON)Square Yard177$ - 0
CLIN 1002 Optional CLINCarpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs.Square Yard$ - 0
CLIN 1003 Optional CLINAdhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standardsGallon12$ - 0
CLIN 1004 Optional CLINCove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON).Linear Foot1100$ - 0
CLIN 1005 Optional CLINCove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costsLinear Foot$ - 0
CLIN 1006 Optional CLINAll other materials needed to complete carpetremoval/installation.Lot1$ - 0
CLIN 1007 Optional CLINAsbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmissionLot1$ - 0
CLIN 1008 Optional CLINFurniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration.Lot1$ - 0
Overall Total$ - 0
Priority 3
CLINSITEM/SERVICEUNIT OF MEASUREQTYCOSTTOTAL
CLIN 2001 Optional CLINCarpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON)Square Yard86$ - 0
CLIN 2002 Optional CLINCarpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs.Square Yard$ - 0
CLIN 2003 Optional CLINAdhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standardsGallon6$ - 0
CLIN 2004 Optional CLINCove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON).Linear Foot600$ - 0
CLIN 2005 Optional CLINCove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costsLinear Foot$ - 0
CLIN 2006 Optional CLINAll other materials needed to complete carpetremoval/installation.Lot1$ - 0
CLIN 2007 Optional CLINAsbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmissionLot1$ - 0
CLIN 2008 Optional CLINFurniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration.Lot1$ - 0
Overall Total$ - 0