This is a Rough Order of Magnitude (ROM) cost estimate spreadsheet for a U.S. Air Force Base Operations project at 9 OSS (Ninth Operations Support Squadron), Building 1060, involving carpet installation, furniture handling, and asbestos abatement services. The ROM is prepared for market research purposes only and is not an official request for quote. The Point of Contact is Teresa Romig at teresa.romig@us.af.mil, (530) 634-3405.
The project is structured across three priority levels with multiple Contract Line Items (CLINs). Priority 1 (base requirement) includes carpet tile materials (373 square yards), carpet tile installation labor, adhesive materials (25 gallons), cove base materials (1,900 linear feet), cove base installation labor, miscellaneous installation materials, asbestos abatement services, and furniture removal and storage for approximately 1,530 square feet. Priority 2 and Priority 3 are optional CLINs covering reduced quantities of the same services across additional areas (177 and 86 square yards of carpet, respectively). Asbestos abatement services include removal of asbestos-containing materials (ACM), concrete subfloor preparation, EPA notification and regulatory submissions, air clearance sampling and reporting, and hazardous waste manifest submission. All cost fields are currently blank (marked as $-0), indicating this is a template awaiting vendor pricing inputs. Contractors are invited to provide cost estimates and may suggest appropriate NAICS codes and PSC codes with their responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONTRACTOR EAL.xlsx | XLSX spreadsheet | |
| SON-B1060 Asbestos Removal- Carpet Replacement-Furniture Move_FINAL Aug2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 9 CONS |
| Rough Order Magnitude (ROM) |
| 9 OSS (Base Ops) B1060 Carpet/Furniture/Asbestos |
| *Disclaimer: Information below is a cost estimate. This does not depict actual cost of work to be performed. It is an estimate ONLY. |
| POC: Teresa Romig / PKB |
| Email/Phone: teresa.romig@us.af.mil / (530) 634-3405 |
| Priority 1 | |||||
| CLINS | ITEM/SERVICE | UNIT OF MEASURE | QTY | COST | TOTAL |
| CLIN 0001 | Carpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON) | Square Yard | 373 | $ - 0 | |
| CLIN 0002 | Carpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs. | Square Yard | $ - 0 | ||
| CLIN 0003 | Adhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standards | Gallon | 25 | $ - 0 | |
| CLIN 0004 | Cove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON). | Linear Foot | 1900 | $ - 0 | |
| CLIN 0005 | Cove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costs | Linear Foot | $ - 0 | ||
| CLIN 0006 | All other materials needed to complete carpetremoval/installation. | Lot | 1 | $ - 0 | |
| CLIN 0007 | Asbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmission | Lot | 1 | $ - 0 | |
| CLIN 0008 | Furniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration. | Lot | 1 | $ - 0 | |
| Overall Total | $ - 0 |
| Priority 2 | |||||
| CLINS | ITEM/SERVICE | UNIT OF MEASURE | QTY | COST | TOTAL |
| CLIN 1001 Optional CLIN | Carpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON) | Square Yard | 177 | $ - 0 | |
| CLIN 1002 Optional CLIN | Carpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs. | Square Yard | $ - 0 | ||
| CLIN 1003 Optional CLIN | Adhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standards | Gallon | 12 | $ - 0 | |
| CLIN 1004 Optional CLIN | Cove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON). | Linear Foot | 1100 | $ - 0 | |
| CLIN 1005 Optional CLIN | Cove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costs | Linear Foot | $ - 0 | ||
| CLIN 1006 Optional CLIN | All other materials needed to complete carpetremoval/installation. | Lot | 1 | $ - 0 | |
| CLIN 1007 Optional CLIN | Asbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmission | Lot | 1 | $ - 0 | |
| CLIN 1008 Optional CLIN | Furniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration. | Lot | 1 | $ - 0 | |
| Overall Total | $ - 0 |
| Priority 3 | |||||
| CLINS | ITEM/SERVICE | UNIT OF MEASURE | QTY | COST | TOTAL |
| CLIN 2001 Optional CLIN | Carpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON) | Square Yard | 86 | $ - 0 | |
| CLIN 2002 Optional CLIN | Carpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs. | Square Yard | $ - 0 | ||
| CLIN 2003 Optional CLIN | Adhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standards | Gallon | 6 | $ - 0 | |
| CLIN 2004 Optional CLIN | Cove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON). | Linear Foot | 600 | $ - 0 | |
| CLIN 2005 Optional CLIN | Cove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costs | Linear Foot | $ - 0 | ||
| CLIN 2006 Optional CLIN | All other materials needed to complete carpetremoval/installation. | Lot | 1 | $ - 0 | |
| CLIN 2007 Optional CLIN | Asbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmission | Lot | 1 | $ - 0 | |
| CLIN 2008 Optional CLIN | Furniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration. | Lot | 1 | $ - 0 | |
| Overall Total | $ - 0 |