Road Limits Tier III Project Addendum _ 4.pdf

PDF 160 KB Posted

Attached to
Resurfacing of High Occupancy Corridors and Tier III Projects
Solicitation number
PE-66020-NONST-2026-000000077
Issued by
Fulton County, Georgia

About this file

This is a Tier III Projects Addendum for road improvement work, detailing specific street segments requiring pavement patching and topping services. The project encompasses eight road segments across the jurisdiction, including Binford Road, Easton Drive, Elva Drive, Herndon Road, Hillside Road, John Rivers Road, Koweta Road, and Washington Road. The total project scope covers approximately 7.09 miles of roadway with widths ranging from 20 to 48 feet, affecting a combined road area of 109,782.93 square yards. Work requirements include an estimated 5,313.49 tons of 19mm patching material (4-inch depth), application of tack coat at 9,375.46 gallons (0.07 gallons per square yard), and 9,057.09 tons of 1.5-inch topping using 9.5mm material.

The addendum provides detailed unit specifications and quantities for each road segment to facilitate accurate bidding and project costing. Individual road segments range from 0.23 miles on Hillside Road to 3.25 miles on Koweta Road, with estimated material requirements calculated based on road length, width, and specified depth of materials. The subtotals provided represent the aggregate quantities across all eight segments, establishing the baseline for contractor proposals and project budgeting. No additional information regarding pricing, award timelines, funding sources, or contract terms is included in this addendum document.

View the file

Other files

File Type Posted
Addendum 3 RFP26_13R.pdf PDF
Road Limits High Occupancy Corridors Project .pdf PDF
Addendum 4 Quantities HO Corridors .xlsx XLSX spreadsheet
ITB 26_13 Standby Resurfacing Projects 02232.pdf PDF
Addendum 1 RFP26_13R.pdf PDF
Addendum4RFP26_13R1.pdf PDF
Addendum 5 ITB 26_13R.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TIER III PROJECTS

Street Name From To Road Length

(Miles)

Road Width

(Feet)

Total Road

Area (SY)

Net Estimated

Patching 19 mm (Tons/4")

Estimated

Tack(0.07/SY)

=Gln

Estimated

Topping

1.5"(Tons) 9.5 mm

BINFORD ROAD Boat Rock Road Easton Drive

0.60 22 7,744 375 661 639

EASTON DRIVE

Elva Drive Boat Rock Rd 0.60

7,744 374.81 661.34 638.88

ELVA DRIVE

Bruce Place Easton Drive

0.37 27 5,861 283.66 500.51 483.52

HERNDON RD Hobgood Rd Fairburn City limits 1.02 24 14,362 695.10 1,226.48 1,184.83

HILLSIDE ROAD Old National Highway Camp Valley Rd 0.23 20 2,699 130.62 230.47 222.64

JOHN RIVERS RD Rivertown Road City Limits 0.75 24 10,560 511.10 901.82 871.20

KOWETA RD Campbellton-Fairburn Rd Jolly Lane 3.25 22 41,947 2,030.22 3,582.25 3,460.60

WASHINGTON ROAD Roosevelt Hwy City limits 0.67 48 18867.2

913.17 1,611.26 1,556.54

Subtotals: 109,782.93 5,313.49 9,375.46 9,057.09