About this file

This file is a Construction Specifications Bid Proposal Worksheet (Exhibit E) for the USACE Recruiting Facilities Program that contractors must complete when bidding on military recruiting facility construction or renovation projects. The worksheet is a comprehensive pricing template requiring detailed cost breakdowns across multiple construction categories including HVAC/mechanical systems, plumbing (general, water fountains, restrooms, janitorial closets, wet pantry), electrical systems (general, interior/exterior lighting, emergency lighting, roller shades), communications infrastructure (conduit, CAT-6 wiring), and safety/fire equipment.

The worksheet includes extensive architectural finishes and fixtures with military branch-specific requirements for paint, carpet, and signage for Army, Navy, Marines, Air Force/Space Force, Air Force Reserve, Air National Guard, and Army National Guard facilities. Additional categories cover porcelain and vinyl tile, luxury vinyl tile, base cove, fragment retention film, windows, doors, trim work, restroom fixtures, and perforated window wraps for each military branch. Security systems requirements include video intercom entry control systems with door stations and desk stations, CCTV systems with cameras and monitors, plus a security closet. The worksheet also requires costs for permits, architectural/design fees, overhead and profit, insurance, taxes, and lessor management. All contractors must complete the entire worksheet with actual pricing (currently showing placeholder $1.00 values) and include all requirements from the construction specifications appendix, with failure to complete the worksheet potentially resulting in offer rejection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Recruiting Facilities Program
Construction Specifications Bid Proposal Worksheet
Version: 2021-10-15 (REV 1)
IMPORTANT NOTES:
1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative.
2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE.
Bid CategoryQuantity$ - EachSub-TotalComments
HVAC / Mechanical1$ 1.00$ 1.00
Plumbing:
General1$ 1.00$ 1.00
Water Fountain1$ 1.00$ 1.00
Restroom (1)1$ 1.00$ 1.00
Restroom (2)1$ 1.00$ 1.00
Janitorial Closet1$ 1.00$ 1.00
Wet Pantry (if applicable)1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Electrical:
General1$ 1.00$ 1.00
Interior Lighting1$ 1.00$ 1.00
Exterior Lighting1$ 1.00$ 1.00
Exterior Signage1$ 1.00$ 1.00
Emergency Lighting1$ 1.00$ 1.00
Roller Shades1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Communications:
General1$ 1.00$ 1.00
Conduit1$ 1.00$ 1.00
CAT-6 Wiring1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Safety & Fire Equipment1$ 1.00$ 1.00
Archetectural Finishes-Fixtures-Supplies:
Ceilings1$ 1.00$ 1.00
Walls1$ 1.00$ 1.00
Soundproofing1$ 1.00$ 1.00
Paint:
Common Area (Gov't Controlled)1$ 1.00$ 1.00
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Porcelain Tile (wall / floor)1$ 1.00$ 1.00
Vinyl Composition Tile (VCT)1$ 1.00$ 1.00
Luxury Vinyl Tile (Air & Army Natl Guard)1$ 1.00$ 1.00
Carpet:
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Base Cove (to include tiled areas)1$ 1.00$ 1.00
Fragment Retention Film1$ 1.00$ 1.00
Mini-Blinds1$ 1.00$ 1.00
Windows1$ 1.00$ 1.00
Doors1$ 1.00$ 1.00
Trim Work (chair rail, etc.)1$ 1.00$ 1.00
Roller Shades1$ 1.00$ 1.00
Fixed Panel Shade(s)1$ 1.00$ 1.00
Secondary Exit Door Security Hardware1$ 1.00$ 1.00
Restroom Fixtures1$ 1.00$ 1.00
Perforated Window Wrap(s):
JRFC (Joint) Graphic1$ 1.00$ 1.00
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Shelving1$ 1.00$ 1.00
Desk-Top(s)1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Signage:
Interior Signage:
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Restroom(s)1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Exterior Signage:
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Video Intercom Entry Control System1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Marquee / Pylon Signage1$ 1.00$ 1.00
Security Systems:
Video Intercom Entry Control System:
General/System (main parts/wiring/etc.)1$ 1.00$ 1.00
Door Station(s)1$ 1.00$ 1.00
Desk Stations (master + sub-masters)1$ 1.00$ 1.00
CCTV System:
General/System (NVR /Wiring / Etc.)1$ 1.00$ 1.00
Cameras1$ 1.00$ 1.00
TV Monitor(s) - (office displays)1$ 1.00$ 1.00
Security Closet1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Permits Fees (all necessary, including low voltage if applicable)1$ 1.00$ 1.00
Architectural / Design Costs1$ 1.00$ 1.00
Other Items (define):
Overhead and Profit1$ 1.00$ 1.00
Insurance1$ 1.00$ 1.00
Tax1$ 1.00$ 1.00
Lessor Management (if applicable)1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
BID PROPOSAL - GRAND TOTAL1$ 1.00$ 116.00
Offeror POC Name:
Offeror Company Name:
Address:
Phone:
Email:
Date:
Signature: