RLP.pdf

PDF 438 KB Posted

Attached to
General Services Administration Office Space Baton Rouge, Louisiana
Solicitation number
3LA0267
Issued by

About this file

This is a GSA Request for Lease Proposals (RLP) for office space in Baton Rouge, Louisiana. The solicitation seeks 3,296-3,790 square feet of Rentable Square Foot (RSF) office space, with 13 total reserved parking spaces, to be occupied by a law enforcement agency. The lease term is 180 days with a 90-day termination right, and the space must meet government requirements for fire safety, accessibility, seismic, and sustainability standards.

The lease is fully serviced, with a Building Specific Amortized Capital (BSAC) amount of $12.00 per ABOA square foot for security-related improvements. Offers are due by January 28, 2026, and will be evaluated based on price, with a present value price evaluation methodology. The space must be located in an office, research, technology, or business park outside the city center, with parking at a ratio of one space per 400 RSF. The government will award the lease to the lowest-priced technically acceptable offer, with potential preference for HUBZone small businesses.

View the file

Other files

File Type Posted
B.pdf PDF
A.pdf PDF
F.PDF PDF
D.pdf PDF
E.pdf PDF
C.pdf PDF
SLAT Lease.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA TEMPLATE R100A (5/25)

GSA REQUEST

FOR LEASE

PROPOSALS

NO. 3LA0267

Baton Rouge/LA

Offers due by 01/28/2026

In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 5:00pm CST on the date above. See “Receipt of Lease Proposals” herein for additional information.

This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.

The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No.

3090-0086.

SLAT RLP

TABLE OF CONTENTS

SLAT RLP

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (SLAT) (OCT 2023)

1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SLAT) (OCT 2020)

1.03 NEIGHBORHOOD AND PARKING (SLAT) (OCT 2021)

1.04 LIST OF RLP DOCUMENTS (SLAT) (OCT 2023)

1.05 LEASE DESCRIPTION (SLAT) (MAY 2025)

1.06 AUTHORIZED REPRESENTATIVES (OCT 2020)

1.07 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020) INTENTIONALLY DELETED

1.08 PRICING OF SECURITY REQUIREMENTS (OCT 2022)

1.09 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE

STANDARD (OCT 2023)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (SLAT) (OCT 2020)

2.02 FLOOD PLAINS (OCT 2022)

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED

2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025) INTENTIONALLY DELETED

2.05 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)

2.06 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)

INTENTIONALLY DELETED

2.07 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (SMALL) (OCT 2023) INTENTIONALLY

DELETED

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (SLAT) (OCT 2020)

3.02 RECEIPT OF LEASE PROPOSALS (SLAT) (OCT 2024)

3.03 STEP 1: OFFER SUBMITTAL (SLAT) (OCT 2023)

3.04 STEP 2: DUE DILIGENCE - ADDITIONAL SUBMITTALS (SLAT) (OCT 2024)

3.05 BUILDING TOUR (SLAT) (OCT 2020)

3.06 TENANT IMPROVEMENTS INCLUDED IN OFFER (SLAT) (OCT 2020)

3.07 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)

3.08 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (JUN 2012) INTENTIONALLY DELETED 12

3.09 SECURITY IMPROVEMENTS INCLUDED IN OFFER (OCT 2022)

SECTION 4 METHOD OF AWARD

4.01 NEGOTIATIONS (SLAT) (OCT 2023)

GSA FORM R100A (5/25)

4.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (SLAT) (OCT 2023)

4.03 AWARD BASED ON PRICE (OCT 2023)

4.04 PRESENT VALUE PRICE EVALUATION (OCT 2024)

4.05 AWARD (SLAT) (OCT 2023)

SECTION 5 ADDITIONAL TERMS AND CONDITIONS

5.01 MODIFIED RLP PARAGRAPHS (OCT 2016) INTENTIONALLY DELETED

5.02 SWING SPACE - RLP (OCT 2022) INTENTIONALLY DELETED

RLP NO. 3LA0367, PAGE 1 GSA TEMPLATE R100A (10/24)

REQUEST FOR LEASE

PROPOSALS NO. 3LA0267

October 15, 2025 SLAT RLP GSA TEMPLATE R100A (October 2024)

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (SLAT) (OCT 2023)

A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.

The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.

B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” shall apply to the terms of this RLP.

C. Do not attempt to complete the lease template. GSA will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal shall be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).

D. The Offeror's executed Lease shall constitute a firm offer. No Lease shall be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.

E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., General Services Administration, GSA, in the entity name that owns and/or leases the Space to GSA.

1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SLAT) (OCT 2020)

A. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization, or adaptive reuse for the Space with modern conveniences. Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.

CITY, STATE BATON ROUGE, LA

AREA OF CONSIDERATION THE INTERSECTION OF CLAYCUT ROAD AND

SOUTH ACADIAN THRUWAY, THE NORTHERN

BOUNDARY EXTENDS EASTWARD ALONG CLAYCUT

ROAD UNTIL IT MEETS JEFFERSON HIGHWAY. THE

EASTERN EDGE THEN RUNS SOUTH ALONG JEFFERSON

HIGHWAY TO OLD HAMMOND HIGHWAY, WHERE IT

TURNS EAST AGAIN, FOLLOWING OLD HAMMOND

HIGHWAY TO AIRLINE HIGHWAY. THE BOUNDARY

CONTINUES SOUTH ALONG AIRLINE HIGHWAY TO

COURSEY BOULEVARD, PROCEEDING EAST ALONG

COURSEY BEFORE VEERING SOUTHWEST ALONG

SOUTH SHERWOOD FOREST BOULEVARD BACK TO

AIRLINE HIGHWAY. FROM THERE, IT CONTINUES

SOUTH ALONG AIRLINE HIGHWAY UNTIL IT INTERSECTS

WITH HIGHLAND ROAD. THE SOUTHERN BOUNDARY

STRETCHES WESTWARD ALONG HIGHLAND ROAD

FROM ITS INTERSECTION WITH AIRLINE HIGHWAY TO

STARING LANE. THE WESTERN BOUNDARY BEGINS BY

HEADING NORTH ALONG STARING LANE TO DAWSON

CREEK, THEN FOLLOWS DAWSON CREEK NORTHWEST

TO KENILWORTH PARKWAY. IT PROCEEDS NORTHEAST

ALONG KENILWORTH PARKWAY TO PERKINS ROAD,

THEN NORTHWEST ALONG PERKINS ROAD TO THE I-10

OVERPASS. IT THEN BRIEFLY RUNS SOUTH ALONG I-10

TO SOUTH ACADIAN THRUWAY, BEFORE FINALLY

HEADING NORTH ALONG SOUTH ACADIAN THRUWAY

BACK TO THE STARTING POINT AT THE CLAYCUT ROAD

INTERSECTION.

RLP NO. 3LA0267, PAGE 2 GSA TEMPLATE R100A (4/25)

SPACE TYPE(S) OFFICE

MINIMUM SQ. FT. (ABOA) 3,296

MAXIMUM SQ. FT. (ABOA) 3,790

RESERVED PARKING SPACES (TOTAL) 13

RESERVED PARKING SPACES (SURFACE) 10

RESERVED PARKING SPACES (STRUCTURE, SURFACE FENCED) 3

INITIAL FULL TERM 204

INITIAL FIRM TERM 180

TERMINATION RIGHTS 90 DAYS AFTER FIRM TERM

OPTION TERM N/A

ADDITIONAL REQUIREMENTS “THE SPACE WILL BE OCCUPIED BY A LAW

ENFORCEMENT AGENCY.” EX: DOJ: DEA, ATF, FBI,

USMS; DHS: ICE, CBP, USSS; ETC. AGENCIES

WITH AGENTS THAT CARRY GUNS; SEIZE

DRUGS/WEAPONS; HAVE DETAINEES ETC.

OFFERED SPACE MUST MEET GOVERNMENT

REQUIREMENTS FOR FIRE SAFETY, ACCESSIBILITY,

SEISMIC, AND SUSTAINABILITY STANDARDS PER THE

TERMS OF THE LEASE. A FULLY SERVICED LEASE IS

REQUIRED. OFFERED SPACE SHALL NOT BE IN THE [1-

PERCENT-ANNUAL FLOOD CHANCE/0.2-PERCENT-

ANNUAL CHANCE] FLOODPLAIN (FORMERLY REFERRED

TO AS [“100-YEAR”/“500-YEAR”] FLOODPLAIN).

1.03 NEIGHBORHOOD AND PARKING (SLAT) (OCT 2021)

A. Neighborhood and Parking: Outside City Center. Space shall be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The parking-to-square-foot ratio available on site shall at least meet current local code requirements, or, in the absence of a local code requirement, onsite parking shall be available at a ratio of one (1) space for every 400 RSF of Space.

1.04 LIST OF RLP DOCUMENTS (SLAT) (OCT 2023)

A. The following documents are attached to and included as part of this RLP package:

DOCUMENT NAME

NO. OF PAGES

EXHIBIT

Lease No. GS-07P-LLA01770 (Template L100A) 24 A Agency’s Requirements 14 B Security Requirements for Level 2 10 C GSA 3516A, Solicitation Provisions 6 D GSA 3517A, General Clauses 10 E Proposal to Lease Space (GSA Form 1364) N/A In RSAP GSA Form 1217, Lessor's Annual Cost Statement N/A In RSAP GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)

24 F

Security Unit Price List 10 G FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

4 H

B. In addition to the documents identified above, this RLP package includes additional agency requirements containing sensitive information that is only available to Offerors upon request to the LCO or Alternate Government Contact as listed under Section 1 of this RLP.

1.05 LEASE DESCRIPTION (SLAT) (MAY 2025)

A. Offeror shall examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.

B. The Lease contemplated by this RLP includes:

1. The term of the Lease, and renewal option, if any.

2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.

RLP NO. 3LA0267, PAGE 3 GSA TEMPLATE R100A (4/25)

3. Building Shell standards and requirements.

4. Information concerning the tenant agency's buildout requirements, to be supplemented after award.

5. Security Requirements.

6. A description of all services to be provided by the Lessor.

C. Should the Offeror be awarded the Lease, the terms of the Lease shall be binding upon the Lessor without regard to any statements contained in this RLP.

D. The Lease contemplated by this RLP is a fully serviced, turnkey Lease with rent that covers all Lessor costs, including all shell upgrades, TIs, operating costs, real estate taxes, and security upgrades. Rent shall be based upon a proposed rental rate per Rentable Square Foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor shall be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor shall design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease.

After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased Space conforming to the Agency Specific Requirements.

The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.

E. The security pricing process is described in a separate paragraph.

F. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence. In instances involving an incumbent Lessor where the Government commences the lease term pending completion of TI and/or BSAC alterations, the Government shall withhold TI and/or BSAC rent pursuant to Section 1 of the Lease until such time as the TI and/or BSAC is completed and accepted by the Government. During the term of the Lease, rent will be adjusted for changes to the Lessor's operating costs and real estate taxes, pursuant to paragraphs set forth in the Lease.

G. Offerors are advised that doing business with the Government carries special responsibilities with respect to sustainability, fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template and in the GSA 3517A, Solicitation Provisions, and will be made part of the Lease.

1.06 AUTHORIZED REPRESENTATIVES (OCT 2020)

With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.

Lease LCO:

Stephen Love

(405) 482-9936 Stephen.love@gsa.gov

As to all other matters, Offerors may contact the Alternate Government Contact designated below.

Alternate Government Contact: N/A

1.07 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020) INTENTIONALLY DELETED

1.08 PRICING OF SECURITY REQUIREMENTS (OCT 2022)

A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.

B. The security requirements attached to this Lease includes a general list of countermeasures that may be installed in the leased Space as part of the Building Specific Amortized Capital (BSAC). The final list of security countermeasures will be determined during the design phase and identified in the design intent drawings and construction documents. After completing the construction documents, the Lessor shall submit a list of the itemized costs. Such costs shall be subject to negotiation. The Lessor shall design and build the BSAC and will be compensated for BSAC costs, together with design and project management fees to be set under the Lease.

C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.

1.09 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)

A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).

RLP NO. 3LA0267, PAGE 4 GSA TEMPLATE R100A (4/25)

B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.

RLP NO. 3LA0267, PAGE 5 GSA TEMPLATE R100A (4/25)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (SLAT) (OCT 2020)

In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO. To demonstrate potential for efficient layout, GSA may request the Offeror to provide a test fit layout at the Offeror’s expense.

2.02 FLOOD PLAINS (OCT 2022)

A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.

In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED

2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025) INTENTIONALLY DELETED

2.05 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)

A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.

B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:

1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;

2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;

3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or

4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.

C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR®

Label if:

1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;

2. The agency will remain in a Building it currently occupies;

3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places; or

4. The Lease is for 10,000 RSF or less.

RLP NO. 3LA0267, PAGE 6 GSA TEMPLATE R100A (4/25)

D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:

1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)

/Monitoring/Control System (EMCS).

2. Lighting Improvements.

3. Building Envelope Modifications.

E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.

F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-

OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual HTTPS://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/) and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.

G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).

H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.

I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.

J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.

K. As part of the cost effective upgrades specified under sub-paragraph D above, existing lighting systems must be upgraded to meet or exceed the stated lighting specifications in the Lease unless, with respect to upgrades otherwise in excess of the minimum stated requirements, Offeror can demonstrate, using the Building Upgrade Value Calculator discussed above, that such additional upgrades are not cost effective over the Firm Term of the Lease.

2.06 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023) INTENTIONALLY DELETED

2.07 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (SMALL) (OCT 2023) INTENTIONALLY DELETED

RLP NO. 3LA0267, PAGE 7 GSA TEMPLATE R100A (4/25)

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (SLAT) (OCT 2020)

Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the Government as indicated below. The Government will evaluate the offers received as outlined below and further described in this section.

Step 1: Offer Submittal Offeror shall submit an offer using the instructions in paragraph 3.02 Receipt of Lease Proposals (SLAT) and 3.03 Step 1: Offer Submittal (SLAT).

The LCO will evaluate the offers that are received by the due date identified for submission of offers in this RLP. The LCO may elect to proceed based on initial offers or to conduct negotiations in accordance with paragraph 4.01 Negotiations (SLAT). The Offeror whose offer is identified as the apparent lowest priced offer and is otherwise responsive to the terms identified in the solicitation will proceed to step 2. Proceeding to step 2 does not constitute award of a contract.

Step 2: Due Diligence The Offeror with the apparent lowest priced offer shall be notified by the LCO and requested to submit the information requested in paragraph 3.04 Step 2: Due Diligence - Additional Submittals (SLAT), in addition to signing the Lease form which will be completed with the details of the Offeror’s price submittal. No further discussions will occur between the Government and the apparent lowest priced offeror regarding the Additional Submittals.

Should the Offeror submitting the apparent lowest priced offer fail to complete any of the requirements of the solicitation or, upon further review be found to not meet the requirements of the solicitation during any part of the evaluation process, the LCO will consider other offers received in response to the solicitation.

Building Tour As part of the Government’s due diligence review of the offer, the LCO may notify the Offeror of the date and time for the Government to physically tour the building.

Award Upon completion of the Government’s review of the apparent lowest priced offer’s Due Diligence – Additional Submittals and a determination that the offer meets the requirements of the solicitation, the LCO will counter-sign the Lease document and furnish notification of execution to the Offeror. This execution and notification by the LCO shall constitute award of a contract.

3.02 RECEIPT OF LEASE PROPOSALS (SLAT) (OCT 2024)

Online method - Submission through the Requirement Specific Acquisition Platform (RSAP):

A. Unless otherwise authorized by the LCO or his/her designated representative, offers may only be submitted electronically to GSA using the Requirement Specific Acquisition Platform (RSAP) located at https://leasing.gsa.gov. RSAP enables Offerors to electronically offer space for lease to the Federal Government. The offer submission process is web-enabled, allowing all registered participants to submit and update offers to lease space to the Government in response to a single RLP for a specific space requirement.

B. In order to be considered for award, offers conforming to the requirements of the RLP shall be submitted through LOP/RSAP no later than

28 January 2026, 5:00 pm, CST.

C. Offerors must submit all documentation identified in this RLP using RSAP. RSAP generates the Lessor's Annual Cost Statement (GSA

Form 1217) and Proposal to Lease Space (GSA Form 1364) based on the Offeror’s inputs to the online workflow. These auto-populated forms are available for review on the attachments page of the RSAP workflow and are automatically included as part of the offer upon submission; there is no need for the Offeror to manually complete the attached blank version of these two forms. Offerors can revise the auto-generated GSA Form 1217 and/or GSA Form 1364 by changing the inputs to the online workflow. Any subsequent revisions to offer documents must be submitted through RSAP. There is no paper-based submission process under this RLP and paper submissions will not be considered, unless otherwise authorized by the LCO.

3.03 STEP 1: OFFER SUBMITTAL (SLAT) (OCT 2023)

Offeror shall provide the following information:

A. Price Offer

1. GSA Form 1217, Lessor’s Annual Cost Statement. Complete all sections of the 1217.

2. GSA Form 1364, Proposal to Lease Space. Complete all sections of the 1364, including, but not limited to:

a. A fully serviced Lease rate (gross rate) per ABOA and RSF, clearly itemizing the total Building shell rental, TI rate, Building Specific Amortized Capital (BSAC) rate, operating costs, and parking (itemizing all costs of parking above base local code requirements or otherwise already included in shell rent).

RLP NO. 3LA0267, PAGE 8 GSA TEMPLATE R100A (4/25)

b. Improvements. All improvements in the base Building, lobbies, common areas, and core areas shall be provided by the

Lessor, at the Lessor’s expense. This Building shell rental rate shall also include, but is not limited to, property financing (exclusive of TIs and BSAC), insurance, taxes, management, profit, etc., for the Building. The Building shell rental rate shall also include all basic Building systems and common area buildout, including base Building lobbies, common areas, core areas, etc., exclusive of the ABOA Space offered as required in this RLP.

c. The annual cost per ABOA and rentable square foot (RSF) for the cost of services and utilities for ABOA and RSF, respectively. This equals line 27 of GSA Form 1217, Lessor’s Annual Cost Statement, divided by the Building size (shown on the top of both GSA Form 1364, Proposal to Lease Space, and Form 1217) for ABOA and RSF, respectively.

d. The annual rent to amortize the Tenant Improvements. Such amortization shall be expressed as a cost per ABOA and RSF per year. This shall be all alterations for the Space above the Building shell and BSAC build-out. Such alterations shall be described and identified in the drawings used to construct the Space. If the Offeror chooses to amortize the TI for a period exceeding the Firm Term of the Lease, the Offeror shall indicate the extended time in the offer. If the Government terminates the Lease after the Firm Term or does not otherwise renew or extend the term beyond the Firm Term, the Government shall not be liable for any unamortized TI costs resulting from an extended amortization period.

e. The annual rent to amortize the Building Specific Amortized Capital (BSAC) costs, if any. Such amortization shall be expressed as a rate per ABOA and RSF per year. Refer to the security requirements attached to the Lease.

f. A shell rate per ABOA and RSF for that portion of the lease term extending beyond the Firm Term. The rate proposed for this portion of the term shall not reflect any TIs or BSAC as they will have been fully amortized over the Firm Term.

g. Overtime use of heating and cooling, and, if applicable, Adjustment for Reduced Services. NOTE: Refer to the Lease document for additional guidance.

h. Adjustment for Vacant Leased Premises. NOTE: Refer to the Lease document for additional guidance.

i. Rent concessions being offered. Indicate either on the GSA Form 1364 Proposal to Lease Space or in separate correspondence.

j. If the Offeror requests any deviations, all deviations must be documented on Form 1364 in block labeled “Additional

Remarks or Conditions with Respect to this Offer.” If the Offeror requests any deviations, GSA at its sole discretion will make the decision whether to accept the deviation.

3. Security Unit Price List. The Offeror shall use the Security Unit Price list to provide a cost breakdown of the security countermeasures, which were outlined in the security requirements attachment. The Security Unit Price list includes various improvements and services to be provided by the Lessor. Each item is classified as part of the shell, tenant improvements, or BSAC. There shall be no charge to the Government for any items that already exist in the offered Building or facility.

4. TI Unit Price List

B. Initial Documentation. As part of the Step 1 offer submission process, Offerors must submit the following:

1. Scaled floorplans of the offered Space(s)

2. A plan and short narrative as necessary to explain how the Offeror will meet the parking requirements.

3. Authorization from the ownership entity to submit an offer on the ownership entity’s behalf, if the offeror is not the owner of the

Property.

4. If the Offeror does not yet have a vested interest in the Property, but rather has a written agreement to acquire an interest, then the

Offeror shall submit a fully executed copy of the written agreement with its offer, together with a statement from the current owner that the agreement is in full force and effect and that the Offeror has performed all conditions precedent to closing, or other form of documentation satisfactory to the LCO prior to award. These submittals must remain current. The Offeror is required to submit updated documents as required.

5. Additional offeror attachments, such as the Acknowledgements of Multiple Representation (by broker or agent).

6. Riders, Clarifications to Offer, Exceptions to Offer and other additions, deletions, or changes to the terms of the RLP may not be accepted by the Government and may cause the Offeror to be excluded from further consideration.

7. If applicable, evidence of seismic safety compliance as required in Section 2 of this RLP.

RLP NO. 3LA0267, PAGE 9 GSA TEMPLATE R100A (4/25)

STEP 1: PRICE SUBMITTAL LIST OF DOCUMENTS

Proposal to Lease Space (GSA Form 1364) Lessor’s Annual Cost Statement (GSA Form 1217) Scaled Floorplan showing the offered Space Parking Plan Authorization to submit offer on behalf of ownership (if Offeror is not the owner) Fully executed copy of contract to acquire an interest in the Property (if Offeror is not the owner) Security Unit Price List TI Unit Price List

3.04 STEP 2: DUE DILIGENCE - ADDITIONAL SUBMITTALS (SLAT) (OCT 2024)

If identified as the apparent lowest priced Offeror, the LCO will request the following items which shall be submitted in a timely manner as determined by the LCO:

A. Satisfactory evidence of at least a conditional commitment of funds in an amount necessary to prepare the Space, including Shell, TI, and

BSAC improvements. Such commitments shall be signed by an authorized bank officer, or other legally authorized financing official, and at a minimum shall state: amount of loan, term in years, annual percentage rate, and length of loan commitment. Alternatively, if the Offeror is self-financing, Offeror must demonstrate, to the satisfaction of the LCO, that it has adequate financial resources to self-finance the necessary improvements, e.g., income statements, cash flow statements, balance sheets, three (3) months of bank statements showing sufficient on hand stable cash reserves to fund the improvements, letter from the entity’s financial officer.

B. Evidence that the Property is zoned in compliance with local zoning laws, including evidence of variances, if any, approved by the proper local authority.

C. Evidence of ownership or control of Building or site. If the Offeror owns the Property being offered or has a long- term leasehold interest, the deed or lease must be submitted to the LCO evidencing the Offeror's stated interest in the Property and any encumbrances on the Property.

D. Required Proof of Signing Authority: As a condition of lease award, the Government will require one of the following forms of proof of signing authority before the Government executes the Lease:

1. Corporation. Copy of Articles of Incorporation and bylaws. In addition, a copy of the resolution, signed by the necessary directors of the corporation authorizing the corporate officer who will sign the lease to bind the corporation to the Lease.

2. Partnership. Copy of Partnership Agreement, Statement of Partnership, or Statement of Limited Partnership and evidence of authority of signatory to bind the partnership if not expressly authorized by the Partnership Agreement.

3. Limited Liability Company. Copy of the Articles of Organization and Operating Agreement. Also, evidence of the authority of the signing manager (if company is manager owned) or member (if the company is member managed) to sign, if not expressly authorized by the Articles of Organization and/or Operating Agreement.

4. Joint Venture. Copy of Joint Venture Agreement and evidence of authority of signatory to bind the Joint Venture to the Lease.

E. If claiming an historic preference in accordance with the Historic Preference paragraph in RLP Section 2, Eligibility and Preferences for

Award, Offeror must submit one of the following as documentation that the Property is historic or the site of the offered Property is within a Historic District: a letter from the National Park Service stating that the Property is listed in the National Register of Historic Places (NRHP) or eligible for listing, with a date of the listing/decision; a letter from the State Historic Preservation Office stating that the Property is listed in the(NRHP, or on a statewide register, or eligible for inclusion, with a date of the listing/decision; or, the NRHP Identification Number and date of listing available from the NRHP Database found at WWW.NPS.GOV/NR.

F. If there is a potential for conflict of interest because of a single agent representing multiple owners, present evidence that the agent disclosed the multiple representation to each entity and has authorization from each ownership entity offering in response to this RLP package.

Owners and agents in conflicting interest situations are advised to exercise due diligence with regard to ethics, independent pricing, and Government procurement integrity requirements. In such cases, the Government reserves the right to communicate with the owner directly.

G. The Offeror must submit the Fire Protection and Life Safety (FPLS) Submittal Information in sub-paragraph 1, unless the Building meets either exemption in sub-paragraph 2 or 3 below.

1. FPLS Submittal Information.

a. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable).

b. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72

(if a system is installed in the Building).

RLP NO. 3LA0267, PAGE 10 GSA TEMPLATE R100A (4/25)

c. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building).

d. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, a report prepared by a licensed fire protection engineer with their assessment of the Building regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances must be provided.

2. If the Space offered is 10,000 RSF or less in area and is located on the 1st floor of the Building, Offeror is not required to submit to GSA the FPLS Submittal Information listed in sub-paragraph 1 above.

3. If the Offeror provides a Building C of O obtained under any edition of the International Building Code (IBC), and the offered Space meets or will meet all the requirements of the Lease with regard to Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System prior to occupancy, then Offeror is not required to submit to GSA the FPLS Submittal Information in sub-paragraph 1 above.

H. The legal description of the Property and tax ID number associated with the Property, copies of prior year tax notices and prior year tax bills, as well as any other information (such as a fact sheet, 5” wide x 3” high or larger color photograph, site plan, location map, and tax parcel map) in case of multiple tax parcels for an offered Building, or multiple buildings on a tax parcel, and any other information that may affect the assessed value, in order for the Government to perform a complete and adequate analysis of the offered Property. The Offeror is to provide a detailed overview and documentation of any Tax Abatements on the Property as outlined in the “Real Estate Tax Adjustment” paragraph of the Lease.

I. The architectural plans for modernization if the offered Building is not a modern office Building.

J. A current asbestos management plan or operations and management plan, along with a current reinspection report (performed within the past 5 years), if the offered Building contains asbestos-containing materials.

K. Computer generated plans set to 1/8" = 1'-0" (preferred meeting sub-paragraphs a through e noted below:

1. All plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government. In addition, where Building exit stairs are interrupted or discontinued before the level of exit discharge, additional floor plans for the level(s) where exit stairs are interrupted or discontinued must also be provided.

2. All plans submitted for consideration shall have been generated by a Computer Aided Design (CAD) program which is compatible with the latest release of AutoCAD. The required file extension is .DWG. Plans shall include a proposed corridor pattern for typical floors and/or partial floors. The CAD file showing the offered Space should show the Poly-Line utilized to determine the square footage on a separate and unique layer. All submissions shall be accompanied with a written matrix indicating the layering standard to verify that all information is recoverable. All architectural features of the Space shall be accurately shown.

3. All architectural features of the Space shall be accurately shown. If conversion or renovation of the Building is planned, alterations to meet this RLP shall be indicated.

4. Plans shall reflect corridors in place or the proposed corridor pattern for both a typical full (single tenant) floor and/or partial

(multi-tenant) floor. The corridors in place or proposed corridors shall meet local code requirements for issuance of occupancy permits.

5. GSA will review all plans submitted to determine if an acceptable level of safety is provided. In addition, GSA will review the common corridors in place and/or proposed corridor pattern to determine whether these achieve an acceptable level of safety as well as to verify that the corridors provide public access to all essential Building elements. The Offeror will be advised of any adjustments that are required to the corridors for determining the ABOA Space. The required corridors may or may not be defined by ceiling-high partitions. Actual corridors in the approved layout for the successful Offeror's Space may differ from the corridors used in determining the ABOA square footage for the lease award. Additional egress corridors required by the tenant agency’s design intent drawings will not be deducted from the ABOA square footage that the most efficient corridor pattern would have yielded.

L. A statement as to whether there are existing vending facilities in the offered Building which have exclusive rights in the Building.

M. No later than the Lease Award Date, the Offeror must submit to the LCO:

1. The Offeror must have an active registration in the System for Award Management (SAM) via the internet at

HTTPS://WWW.SAM.GOV. Offerors must be registered for purposes of “All Awards,” including completion of all required representations and certifications within SAM. This registration service is free of charge.

2. Energy Star Documentation.

a. Evidence of an Energy Star® label obtained within the 12 months prior to the Lease Award Date, RLP NO. 3LA0267, PAGE 11 GSA TEMPLATE R100A (4/25)

b. Offerors falling under a statutory exception must also indicate prior to the Lease Award Date what cost effective energy efficiency and conservation improvements they are proposing to make.

c. If no cost-effective improvements can be made, the Offeror must demonstrate to the Government using the ENERGY

STAR® Online Tools referenced in the RLP paragraph, entitled “ENERGY INDEPENDENCE AND SECURITY ACT,” why no energy efficiency and conservation improvements are cost effective. This explanation will be subject to review by the LCO. If the explanation is considered unreasonable, the offer may be considered technically unacceptable.

d. If the Offeror is claiming eligibility for additional time to obtain the Energy Star® label per sub-paragraph B of the RLP paragraph entitled “Energy Independence and Security Act,” then the Offeror shall provide such indication with its initial offer and also must provide by the due date for final proposal revisions evidence substantiating their claim for additional time to obtain the Energy Star® label and substantiating their capability of earning the Energy Star®.

N. If applicable, information required under paragraph entitled “DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT

REQUIREMENTS - RLP.”

O. If applicable, information required under paragraph entitled “NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS.”

R. FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment, as applicable.

STEP 2: DUE DILIGENCE LIST OF DOCUMENTS

Evidence of funds Evidence of zoning compliance Evidence of ownership or control of the building Required proof of signing authority Evidence of historic preference eligibility (if applicable) Agent disclosure representation (if applicable) FPLS submittals as required above Legal description of property Architectural Modernization Plan (if applicable) Asbestos Management Plan (if applicable) CAD floor plans Exclusive vending facilities statement Building Operating Plan (if applicable) Energy Star documentation (if applicable) Environmental submittals (if applicable) NHPA submittals (if applicable) Telecommunication/Video-Surveillance representation (as applicable)

3.05 BUILDING TOUR (SLAT) (OCT 2020)

As part of its due diligence process, the Government may elect to conduct building tour(s) of any offered Property. Offerors should not construe, assume, or otherwise infer anything with respect to whether or not their Property is under consideration for Lease Award solely as a result of such tour(s).

3.06 TENANT IMPROVEMENTS INCLUDED IN OFFER (SLAT) (OCT 2020)

A. Tenant Improvement Turnkey Pricing.

An Agency Specific Requirements (ASR) package is provided with this RLP to all Offerors upon which to base their TI pricing. (TIs are the finishes and fixtures that typically take Space from the “shell” condition to a finished, usable condition.) All TIs required by the Government for occupancy shall be performed by the successful Offeror as part of the rental consideration and all improvements shall meet the quality standards and requirements of this RLP and its attachments.

B. The Tenant Improvements shall include all the Offeror’s administrative costs, general contractor fees, subcontractor’s profit and overhead costs, Offeror's Project Management fee, design costs, and other associated project fees necessary to prepare construction documents and to complete the TIs. It is the successful Offeror’s responsibility to prepare all documentation (working/construction drawings, etc.)

required to receive construction permits. NO COSTS ASSOCIATED WITH THE BUILDING SHELL SHALL BE INCLUDED IN THE TI

PRICING.

RLP NO. 3LA0267, PAGE 12 GSA TEMPLATE R100A (4/25)

3.07 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)

The Government requires a fully serviced Lease to include overtime utilities as part of the rental consideration. The base for the operating costs adjustment will be established during negotiations based upon rentable SF. The proposed methodology for operating costs adjustment shall include all items specified in the attached Lease document. The minimum requirements for normal hours, utilities, and janitorial services are specified in the attached Lease document. The offer shall clearly state whether the rental is firm throughout the term of the Lease or if it is subject to annual adjustment of operating costs as indicated above. If operating costs will be subject to adjustment, those costs shall be specified in the proposal.

3.08 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (JUN 2012) INTENTIONALLY DELETED

3.09 SECURITY IMPROVEMENTS INCLUDED IN OFFER (OCT 2022)

A. Building Specific Amortized Capital Pricing.

The Building Specific Amortized Capital (BSAC) amount is $12.00 per ABOA SF. The BSAC shall be used for the build-out of security-related improvements in the Building in accordance with the Government-approved design intent drawings, if applicable. All security countermeasures required by the Government for occupancy shall be performed by the successful Offeror as part of the rental consideration, and all improvements shall meet the quality standards and requirements of this RLP package and its attachments.

B. The BSAC shall include all the Offeror’s administrative costs, general contractor fees, subcontractor’s profit and overhead costs, Offeror's

Project Management fee, design costs, and other associated project fees necessary to prepare construction documents and to complete the security countermeasures. It is the successful Offeror’s responsibility to prepare all documentation (working/construction drawings, etc.) required to receive construction permits. No costs associated with the building shell or TI shall be included in the BSAC pricing.

RLP NO. 3LA0267, PAGE 13 GSA TEMPLATE R100A (4/25)

SECTION 4 METHOD OF AWARD

4.01 NEGOTIATIONS (SLAT) (OCT 2023)

A. The Government will evaluate offers and may award a Lease without discussions with Offerors. Therefore, the Offeror’s initial offer should contain the Offeror’s best price and other terms. The Government reserves the right to conduct discussions after the receipt of initial offers during Step 1: Offer Submittal if it is determined by the LCO to be necessary. Discussions with offerors, if they occur, will only take place during Step 1: Offer Submittal.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .