PWS-ALAM Shelter2_JWB v2.docx
DOCX document 308 KB Posted
- Attached to
- Aircraft Launch and Maintenance (ALAM) shelter
- Solicitation number
- RIVPAN040713
About this file
This is a Performance Work Statement (PWS) for non-personal services to repair and provide climate-control support for an Aircraft Lightweight Maintenance Shelter (ALAM) located at Cooperative Support Location (CSL) Kismayo, Somalia. The ALAM is a mission-essential maintenance facility supporting MQ-1C Gray Eagle UAS operations, and requires repairs due to degradation from sustained high temperatures, coastal humidity, airborne dust, salt exposure, and storm damage that have compromised the shelter's ability to maintain the required sub-95°F environment for sensitive aircraft and avionics maintenance.
The contractor shall provide all equipment, supplies, transportation, tools, and materials necessary to repair the shelter structure and install HVAC systems, replacement fabric panels for full-width doors, common replacement/maintenance parts, and generators with power distribution to operate the HVAC systems. Work shall be performed at CSL Kismayo with contractor support hours of 0900-1700 Monday through Sunday, excluding U.S. federal holidays observed on the normal workweek. The contractor must develop and submit a Quality Control Plan within ten days of contract award and a Work Plan within fourteen days, both requiring Contracting Officer approval. Key requirements include security compliance per DD Form 254, background checks (NCIC III), installation access authorization, maintenance of organizational structure and staffing qualifications, inventory tracking of government-provided equipment, and documentation retention for the contract period plus five years. Contractor personnel must attend post-award conferences and periodic progress meetings at no additional cost to the Government, and the Contracting Officer's Representative will monitor technical compliance and performance standards.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
15th Military Intelligence Battalion (FAD EA) ALAM Shelter Repair 116th Military Intelligence Brigade (AI) Fort Gordon, GA 30905
PART 1
General Information
1. GENERAL: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: The requirement is a non-personal services (s) contract to provide ALAMS HVAC, replacement fabric panels for the full-width doors, common replacement/maintenance parts, and generators/power distribution to power the HVAC.
1.2 Background: The requirement for Aircraft Lightweight Maintenance Shelter (ALAM) repair and climate-control support services is driven by the operational and environmental conditions supporting MQ-1C Gray Eagle UAS missions at CSL Kismayo. The ALAM is a mission-essential maintenance facility designed to provide a controlled, climate-regulated, and contaminant-free environment for conducting aircraft maintenance, troubleshooting, operational checks, and avionics diagnostics in accordance with applicable technical manuals. Current environmental conditions, including sustained high temperatures, coastal humidity, airborne dust, salt exposure, and recent storm-related shelter damage, have degraded the shelter’s operational capability and reduced the effectiveness of existing cooling systems. As a result, aircraft and sensitive avionics components are exposed to thermal and environmental stressors that accelerate component degradation, increase maintenance requirements, and contribute to premature payload failures. Technical guidance requires maintenance operations involving powered aircraft systems to be conducted below 95°F utilizing active cooling capability to ensure equipment protection and safe operational conditions. Restoration of the ALAM structure and associated Environmental Control Unit (ECU) capability is necessary to maintain compliance with maintenance standards, reduce unforecasted repair and replacement costs, preserve aircraft operational readiness, and sustain continuous mission support in the forward operating environment.
1.3 Scope: The Contractor shall provide all equipment, supplies, transportation, tools, materials, and other items necessary to perform repair and ECU/generator installation services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.4 Objective: The requirement contract aims to provide repairs and climate-control support services for the Aircraft Lightweight Maintenance Shelter (ALAM) at Kismayo to ensure compliant, safe, and uninterrupted MQ-1C Gray Eagle UAS maintenance operations while protecting aircraft systems from environmental degradation and sustaining mission readiness.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have ten (10) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than ten (10) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided Equipment/Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
Regular working hours will consist of a 10 1/2-hour period, between 7 a.m.
and 5:30 p.m., Monday through Friday excluding Government holidays.
1.5.3.1 U.S. Holidays: At CSL Kismayo work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan
Presidents Day 3rd Monday in February Memorial Day last Monday in May
Juneteenth June 19th Independence Day July 4th
Labor Day 1st Monday in September Columbus Day 2nd Monday in October
Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November
Christmas Day December 25th
1.5.3.2 Host Nation Holidays: Work shall be performed on local Host Nation holidays occurring during the normal work week unless otherwise directed by the Contracting Officer.
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office operates 24/7. Mayor cell and other administrative functions are primarily available 0800-1700, but specific office hours may differ for each section.
1.5.4.2 Government Facility Operating Hours: The Government facility operates 24/7.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0900-1700 Monday through Sunday. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) and, if applicable, how the Contractor intends to address and meet increased operations tempo (e.g. Contractor’s need for overtime or extended work hours). If the need for overtime is anticipated, the Contractor must receive approval from the Contracting Officer at a minimum seven (7) calendar days prior to execution. The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within fourteen (14) days after date of contract award. The Government will review and either accept or return their comments to the Contractor within fourteen (14) days. The Contractor shall then have three (3) days is used to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance of proposed changes.
1.5.5 Training Holidays: Not applicable.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at Cooperative Support Location (CSL) Kismayo, Somalia.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Contractor personnel performing work under this contract must not have a been denied access to military installations for security related concerns in the past at time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are IAW with the DoD Contract Security Classification Specification (DD Form 254), which is currently accessible at the following link: http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf
1.6.2 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
The following information will be provided to the security office for vetting of individuals requiring access to the site;
Full name:
Date/Place of Birth:
Nationality/Citizenship:
Address:
Phone number:
Email address:
Tribe:
Father's full name:
Government identification card number/Expiration (to include photocopy or scan):
Passport number/Expiration (to include photocopy or scan):
1.6.3 One-Day Passes: Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred.
1.6.4 Background Checks: Personnel requesting access to base must undergo the National Crime Information Center Interstate Identification Index (NCIC III) check. Once the background check is completed and favorably adjudicated by the base security office, the contractor is issued a pass and instructions in order to perform the services.
1.7 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.7.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.8 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
PART 2
DEFINITIONS & ACRONYMS
2.1. DEFINITIONS: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVELLIANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of a product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters a contract with a prime contractor. The Government does not have a contract with the subcontractor.
2.1.12. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
| ACOR | Alternate Contracting Officer's Representative | |
| AFARS | Army Federal Acquisition Regulation Supplement | |
| AR | Army Regulation | |
| CCE | Contracting Center of Excellence | |
| CCTV | Closed Circuit TV | |
| CFR | Code of Federal Regulations | |
| CONUS | Continental United States (excludes Alaska and Hawaii) | |
| COR | Contracting Officer Representative | |
| COTR | Contracting Officer's Technical Representative | |
| COTS | Commercial-Off-the-Shelf | |
| DA | Department of the Army | |
| DD250 | 0-Department of Defense Form 250 (Receiving Report) | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DOD | Department of Defense | |
| FAR | Federal Acquisition Regulation | |
| HIPAA | Health Insurance Portability and Accountability Act of 1996 | |
| KO | Contracting Officer | |
| OCI | Organizational Conflict of Interest | |
| ODC | Other Direct Costs | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program |
3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
3.1 General: The contractor shall provide all equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract.
3.2. Materials: ALAMS HVAC, replacement fabric panels for the full-width doors, common replacement/maintenance parts, generators/power distribution to power the HVAC, other parts, and components of current system in place will be considered all-inclusive to repair or replacement of, by the contractor to ensure integrity of structure in place.
4. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
AR 380-6 Personnel Security Program 24 Jan 2014 AR 380-67 Army Information Security Program 22 Oct 2019 AR 525-27 Army Emergency Management Program 20 Mar 2019 AR 190-51, Physical Security, 15 Jun 2018
5. ATTACHMENTS/TECHNICAL EXHIBIT LIST:
Exhibit A: Packing List/Proposal
Exhibit A
Packing List/Proposal image1.png
File details come from the government source that posted it. Updated .