RIPD E4000-23-9-49 - Shot Peen System.pdf

PDF 180 KB Posted

Attached to
SHOT PEEN BOOTH MODIFICATIONS Federal contract opportunity
Solicitation number
W519TC-23-Q-2370
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This purchase description outlines requirements for modifications to an existing shot peen system located at Rock Island Arsenal. The retrofit aims to allow for dual media peening of larger parts up to 90 inches in length using shot sizes from S70 to S460. Key requirements include replacing the media delivery system and control panel with a Fanuc servo control system, adding fixtures to accommodate longer parts, replacing the classifier, and performing preventative maintenance annually. The contractor must visit the site, develop installation plans, and execute the retrofit while ensuring all relevant safety, security and regulatory standards are followed. The contractor is also responsible for training operators and maintenance personnel on the upgraded system. The contractor must demonstrate service and repair capabilities to support the system within the specified response times.

View the file

Other files for this federal contract opportunity

Other files attached to SHOT PEEN BOOTH MODIFICATIONS, newest first.
File Type Posted
23-Q-2370 Solicitation.pdf PDF
23-9-49 CDRL Shot Peen Booth Modifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL RIPD: N4000-23-9-49

PURCHASE DESCRIPTION DATE: 28-Aug-23

SHOT PEEN SYSTEM

1. GENERAL SYSTEM DESCRIPTION

2. STANDARDS AND PUBLICATIONS

2.1 Clarification

2.2 National Standards and Specifications

3. DESIGN

3.1 Ownership

3.2 General Design Standards

3.3 Security, Safety and Environmental

3.4 Responsibilities

4. COMPONENT SPECIFICATION

4.1 Cabinet Specifications

4.2 Control Panel:

4.3 Shot Separator:

4.4 Offline Shape Classifier:

4.5 Offline Classifier:

4.6 Extended Wear Components

4.7 Dust Collector

4.8 Dimensions:

5. APPROVAL/SHIPPING

5.1 Shipping

5.2 Installation

5.3 Completion

6. TRAINING

6.1 Schedule

6.2 Location

6.3 Type

7. SERVICE

7.1 Service/Support Requirements

1. GENERAL SYSTEM DESCRIPTION

This request for proposal will consist of a retrofit to an existing blast cabinet, to accommodate a new product for JMTC, a torsion bar approximately 3” in diameter and 90” long and provide for the addition of dual media while not losing existing capability to our existing shot peen booth which provides an adjustable blast nozzle, with a power X axis, shot reclaimer, and offline shot classifier. This system will be in its existing location, in BLDG. 212 in the plate shop blast area.

2. STANDARDS AND PUBLICATIONS

2.1 Clarification

Any ambiguities, questions, requests for clarification or discrepancies between sections of this purchase description, drawings, national or industry standards discovered by the contractor in reviewing this purchase description shall be reported by the bidder in writing to the contracting officer BEFORE THE DATE SCHEDULED FOR CLOSE OF BIDDING/receipt of proposal.

Submission of a proposal or bid shall be construed as evidence that such examination has been made. Therefore, later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.

2.2 National Standards and Specifications

The following specifications in effect on the Date of Invitation for Bid/Request for Proposal form a part of this purchase description. In the case of conflicting requirements, the more stringent shall apply.

2.2.1 Occupational Safety and Health Act of 1970 (OSHA).

2.2.2 American Society of Testing and Materials (ASTM).

2.2.3 American National Standards Institute (ANSI).

2.2.4 National Electrical Manufacturers Association Standards (NEMA).

2.2.5 American Welding Society (AWS).

2.2.6 American Gear Manufacturers Association (AGMA).

2.2.7 National Fire Protection Association (NFPA).

2.2.7.1 NFPA-70 National Electrical Code

2.2.7.2 NFPA-79 Electrical Standard for Industrial Machinery.

2.2.8 American Material Specification (AMS) 2432.

3. DESIGN

3.1 Ownership

This equipment is a standard product of the manufacturer and shall require major design changes to meet requirements of these specifications. Therefore, ownership of the design will remain with the manufacturer.

3.2 General Design Standards

3.2.1 DEVIATION FROM PRODUCT: Modifications to the manufacturer’s standard design to achieve requirements as specified in this document are only permissible as dictated by good design practice. For example, mounting a 20-hp motor in a power train designed and normally using a 10-hp motor would not be acceptable.

3.2.2 UNITS OF MEASURE: Dimensions and capacities in this purchase description are given in the English-US (in-lb) system. All dials, gauges, and drawings shall be in the English- US system or both the English-US and the metric systems, unless otherwise specified in this document.

3.2.3 ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable): Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the governments Unique Identification Program

(UID).

3.2.4 DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering.

Lettering shall be permanent and have a contrasting background.

3.2.5 UTILITY CONNECTION: Equipment supplied to the Rock Island Arsenal will have single point shut-off for each utility supplied to a system. This means that equipment constituting a single system shall be wired to a single main electrical disconnect point, plumbed to a single pneumatic shut-off valve, etc… This will be referred to as the “point of first connection”. Each type of power source may have only one point of first connection. E.g. (1) pneumatic shut-off valve, (1) water supply shut-off valve, (1) electrical disconnect, etc… Each point of first connection shall be clearly labeled on the system and shown in the safety lockout portion of the documentation package. These points must be located on a stationary component and positioned such that they will not create a hazard to personnel during normal operation of the system. The first connection points shall be accessible from the shop floor without the use of ladders, steps, or stools. Access cannot be hampered by operation of the system.

3.2.6 UTILITY CONNECTION LABOR: Rock Island Arsenal shall provide only such labor and materials as will be needed to connect facility utilities to each point of first connection of the system. The supplier will be responsible for all connections beyond the point of first connection for each utility.

3.2.7 UTILITIES AVAILABLE: Rock Island Arsenal shall be responsible for providing the following:

3.2.7.1 Connection of 460-V, 60-Hz, 3-Ph AC electrical power to the fused or breaker type disconnect switch required in the ELECTRICAL DISCONNECT paragraph of this purchase description. Connection does not include filters, surge protection, or any peripheral equipment necessary to make the equipment functional.

3.2.7.2 Connection of approximately 90-psi compressed air to a single point for each system, if needed. Connection does not include filters, dryers, or any peripheral equipment necessary to make the equipment functional.

3.2.7.3 If, due to contractor caused problems, the equipment or components of the equipment must be moved or removed and replaced, by RIA after initial placement, the contractor shall be billed for such work at current RIA labor and overhead rates.

3.2.8 ELECTRICAL DISCONNECT: The equipment shall be equipped with a manual, fused or breaker type disconnect switch, readily accessible to the operator, which will deactivate the entire equipment. It shall be located no more than 6-ft 7-in from the floor to the highest point the control device. It shall be capable of being locked in the de-energized state (OFF) only.

3.2.9 CONDUIT: Flexible conduit is not permitted in exposed areas. All wires, cables, and hoses will be enclosed by rigid, oil-proof protection, except where flexibility is necessary for operation of the equipment. Flexible wires, cables and hoses shall be arranged to prevent draping or tripping hazards.

3.2.10 SERVICE ACCESS: Components subject to periodic adjustment, replacement, or servicing shall be readily accessible. Meaning that experienced personnel can access the part after no more than 30-min of labor. If any special tools or equipment are necessary to access these components, said equipment will be supplied as part of the system and provided with a proper storage location within the system.

3.2.11 DEFLECTION: The system shall recover from distortion and deflection at no load. The machine and its components shall be sufficiently rigid that work piece finish and tolerances are not impaired by machine vibration.

3.2.12 NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.

3.2.13 COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.

3.2.14 REPLACEMENT COMPONENTS: All replaceable components shall be manufactured to definite standards for tolerance, clearance, and finish, enabling components to be field installed without further machining.

3.2.15 CASTINGS AND FORGINGS: All castings and forgings shall be free of defects, scale, and mismatching. No process such as welding, peening, plugging, or filling shall be used for reclaiming any defective part for use in this equipment without the prior written consent of the contracting officer.

3.2.16 SURFACE BUILDING AND COATINGS: Welding, brazing, soldering, coating or plating shall be employed only where specified in the original design. These operations may not be employed as a means of reclaiming a defective part.

3.2.17 FASTENING DEVICES: All screws, pins, bolts, and similar parts shall be installed in such a manner as to prevent change in tightness. Those devices subject to removal or adjustment shall not be swaged, peened, staked, or otherwise permanently deformed. They shall not be installed using permanent bonding adhesives.

3.2.18 CLEANING AND DEBURRING: All surfaces of castings, forgings, molded parts, stampings, and welded components shall be cleaned and free from sand, dirt, fins, flash, scale, flux, and other harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. Except as specified herein, the condition and finish of all surfaces shall be commensurate with the manufacturer’s commercial practice.

3.2.19 PAINTING: All unfinished surfaces of the equipment shall be painted with a lead free and chromium free commercial grade of metal primer and a minimum of one finish coat. The color shall be in accordance with the manufacturer’s standard commercial practice, or as necessary to maintain compliance with OSHA regulations, as applicable.

3.2.20 LUBRICATION: Components specified as requiring lubrication by the original manufacturer shall have an appropriate means of providing said lubrication included in the design of the machine.

3.2.20.1 The lubrication points will be labeled on the lubrication drawing provided as part of the maintenance documentation and will also be labeled on the machine at the lubrication point and on any access panel covering the lubrication point. These labels will include as a minimum standard, the specific type of lubricant, the quantity to be used, the frequency for change, and the maintenance manual reference for detailed instructions. The lettering shall be English and the units shall be English standard (i.e. pints, quarts, and gallons)

3.2.20.2 If an automatic circulation system is used, it shall be complete, including, but not limited to the following: reservoir, valves, nozzles, filters, pumps, sight gages, and other components as necessary to make the system completely functional.

3.2.20.2.1 A system allowing blockages or inadequacies to go undetected is unacceptable. The system shall be interlocked to the machine control, providing an alarm that lubrication failure has occurred. The system shall not initiate immediate shutdown of the affected function during a cutting cycle. It shall allow completion of the cycle and shutdown in an orderly sequence.

3.2.20.2.2 The reservoir shall be sized to allow no less than 80-hrs of machine run time before requiring refill. It shall also have a means provided for draining and cleaning. A means shall be provided to enable the operator to determine the fluid level.

3.2.20.2.3 All filters shall be either cleanable or replaceable.

3.2.20.2.4 All pumps shall be self-priming.

3.2.21 FILTRATION/REGULATION: Equipment requiring filtered or regulated energy sources shall be supplied with the components necessary to perform this function. E.g. the equipment shall be supplied with a Filter, Regulator, Lubricator (FRL) device, if filtered, lubricated, regulated pressurized air is required for the efficient, proper operation of the equipment. These devices shall be located on the equipment side of the lockout devices at the points of first connections.

3.2.22 MOTORS:

3.2.22.1 All motors shall be rated for continuous duty.

3.2.22.2 Motors shall not operate in an overload condition during normal operation of the equipment and shall be equipped with overload protection.

3.2.22.3 Each motor shall bear an identification plate containing the identity of the manufacturer, model number, serial number, input voltage, amperage, horsepower, phase, frequency, duty cycle, and frame size or mounting identification.

3.2.22.4 Motor starters and controls shall operate at no greater than 120-VAC. It is preferred that they operate at 24-VDC.

3.2.22.5 Motor starters shall provide drop-out protection. This means that, in the event of a loss of power, the equipment shall be re-energized only by the deliberate action of the operator. Manual or mechanical motor starters shall not be deemed acceptable.

3.2.23 DIALS AND GAUGES: All scales, dials, and gauges shall be manufactured of corrosion and oil resistant material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.

3.2.24 CONTROL LEVERS: Control levers shall move in the same direction as the motion of the controlled component.

3.3 Safety, Security and Environmental

3.3.1 SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.

3.3.1.1 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.

3.3.1.1.1 Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The COR shall provide guidance to complete the

Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.

3.3.1.1.2 Random Antiterrorist Measures Program (RAMP) participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with any, and all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti- Terrorism Training.

3.3.1.1.3 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.

3.3.1.1.4 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.

3.3.1.2 Security Training: The contractor shall complete the following training:

3.3.1.2.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete.

The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.

3.3.1.2.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.

3.3.2 FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.

3.3.3 REAL ID: Starting 03-May-2023 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.

3.3.4 INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.

3.3.5 MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.

3.3.6 SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including conforming to confined space work requirements when applicable.

3.3.7 SAFETY LOCKOUTS: Each point of first connection shall be designed and constructed to allow the utility to be completely isolated from the equipment. This isolation shall be insured by application of a standard key locking padlock. The device(s) shall only be lockable in the de-energized (OFF) condition.

3.3.8 LOSS OF PRESSURE: Hydraulic and pneumatic circuits shall be designed such that loss of pressure, or pressure surges, shall not cause a hazard. Means shall be provided to prevent operation of the equipment with insufficient pressure, if such operation could cause a hazard.

3.3.9 TRAPPED ENERGY: Devices in which energy is contained, e.g. air reservoir tanks, shall be equipped with a means to manually drain the energy to a safe condition. E.g. drain hydraulic fluid back to the reservoir, or vent trapped air to atmosphere.

3.3.10 WORKING RANGE: Hydraulic and pneumatic components shall be selected, which cannot be adjusted outside the safe working range of the circuit and/or equipment.

3.3.11 ACCUMULATORS: Gas charged accumulators operating above 200-psi charging pressure shall be charged with inert gas.

3.3.12 BRAKES: Braking systems shall be designed to “fail-on”. This means, energy supplied to the brake shall be used to disengage the brake. Loss of energy shall therefore cause the brake to activate.

3.3.13 EMERGENCY STOP: The system will incorporate a clearly identified, red, mushroomed, control button with a yellow backing plate at every operator work station. Upon momentary operation, any emergency stop button shall de-energize all machine motions and override all other controls without creating additional hazards. All motion stopped shall be restarted by the deliberate action of the operator. No other red mushroomed buttons shall be allowed on the equipment. It is preferred that there is no other red buttons of any type.

3.3.14 CONTROL GUARDS: Controls shall be guarded against accidental operation.

3.3.15 OPERATOR REACH: Controls shall be within reach and located such that the operator, when in the normal operating position, is not required to reach past moving parts, which may cause injury.

3.4 Responsibilities

3.4.1 SITE INSPECTION: A site inspection must be performed prior to bidding. It is not possible to responsibly bid on this retrofit project without first examining the existing equipment and determining the existence of other potential obstacles. All site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing any and all equipment necessary for this process.

4. COMPONENT SPECIFICATION

All design, labor, and materials are the sole responsibility of the contractor. The supplier shall furnish all equipment normally considered by him to be standard for his machine unless identified in this requirement to be of specific manufacture. The following equipment modifications shall be provided in addition to the equipment specified in other sections of this purchase description, which may not be standard. The inclusion of standard equipment in this paragraph is inadvertent and should not be construed to allow duplication.

This RIPD will provide for a system retrograde upgrade of JMTC’s existing shot peen machine. The purpose of this upgrade is to allow for larger length bars to be peened with 2 media types in the existing machine. This retrofit would allow parts up to 90” in length to be peened, parts exceeding 72” in length will require the part to be flipped and peened a second time to provide full coverage.

This modified system will be able to accommodate shot sizes from S70 up to S460. The addition of Fanuc servo controls will allow for a programable stroke and dual media peening within a single process per AMS2432.

4.1 Initial Site Visit Specifications to Size Up Modifications:

4.1.1 The contractor shall make a site visit to measure and inventory the current existing entire shot peen system as a minimum. JMTC shall allow for this site visit with up to four hours of machine down time as a maximum.

4.1.2 The existing media delivery system stand shall be replaced with a dual media delivery stand system to include the following components as a minimum:

4.1.2.1 Provide for an additional pressure vessel, approximately eight cubic feet to match existing pressure pot as a minimum.

4.1.2.2 Provide for an additional media hopper to accommodate the addition of new shot media sizes of S70 up to and including S460 and shredded wire, addition of four MegaValves and the addition of all plumbing and valves needed for proper operation after the retrofit as a minimum.

4.1.2.3 Provide for an additional electronic regulator, two additional screening layers to the existing classifier for the added media sizes and duck work between existing reclaim and dust collector as a minimum.

4.1.3 The contractor shall replace the current control system with a Fanuc 35i-B controls, provide a new servo motor control for the “X” axis and part rotation speed to our current existing shot peen system as minimums.

4.1.4 The contractor shall provide for four additional shot flow controllers, modify the existing part fixture system to allow change over capabilities with new fixtures and add fixture to hold and rotate parts 65 inches up to 90 inches between centers to our current existing shot peen system as minimums.

4.1.5 The cabinet shall be equipped with a media regulator that is adjustable to assure precise media flow Steel Shot will be used with sizes of 70 – 460.

4.1.6 The cabinet shall be equipped with four properly sized carbide lined nozzles, the nozzles will have a variable X axis feed from 0 to 75 inches per, and adjustable up and down in the Y axis as a minimum.

4.1.7 The cabinet shall be equipped with a clean out screen assembly to capture large pieces of debris as a minimum.

4.1.8 The cabinet shall be equipped with a sound attenuator mounted over the air inlet to suppress blasting noise as a minimum.

4.1.9 The cabinet shall have a 6’ wide X 3’ long flat work table with a removable set of powered rollers 6’ long capable of rotating a .500” to 12” bar, from 5 RPM to 25 RPM. The cabinet shall a work table height from ground to mounting surface of 36”. Cabinet will be capable of adding at a later date, a 24” diameter rotating table, plus an I.D. lance to shot peen I.D. surfaces from 1” to 10” as a minimum.

4.1.10 The contractor shall perform annual PM on the entire system to include dust collectors, filters, pinch valves, screens, hoses, missing valves, QD (quick disconnect) couplings, nozzle holders, nozzles, classifier screens and calibrate existing MagnaValves to our current existing shot peen system as minimums.

4.1.11 The contractor shall provide all programming as part of the commissioning to the retrofitted existing shot peen system as a minimum.

4.2 Control Panel:

The control panel will have all the same performance functions of the old machine but updated to include a PLC panel with touch screen to perform operations such as but not limited to blast time, storage of programs, nozzle X axis feed, roller table, lance and rotary table speeds as minimums.

4.3 Shot Separator:

Shot separator shall be designed to include main components such as Shot Recovery System, Shot separator, Storage Bin, Blast Tank, and mixing chamber air supply as minimums.

4.4 Offline Shape Classifier:

Classifier is used to allow media to be classified for round shot steps and a loading platform will allow media to be poured into the storage hopper. Media is then metered down the classifier to be spun down to the classified shot hopper, broken or misshaped shot will fall into a reject duct as a minimums.

4.5 Offline Classifier:

The screening system will be equipped with a self-cleaning unit which removes any media trapped in the stainless steel screens undersize and oversize shot will be deposited in drums for disposal as a minimum.

4.6 Extended Wear Components

4.6.1 The media reclaimer walls shall be lined with an ultra-wear type of lining to prolong the service life as a minimum.

4.6.2 The chamber shall also be equipped with rubber curtains to further protect the chamber walls and doors as a minimum.

4.7 Dust Collector

4.7.1 The system shall include the existing dust collector that is housed in a separate cabinet with cartridge type filters and air pulse cleaning system to extend cartage filter service life. This dust collector must be sized to the new dual media Shot Peen System as minimums.

4.7.2 The dust collector shall be equipped with a fan sound attenuator installed that shall reduce noise levels below 85 db (A) in accordance with OSHA standards as a minimum.

4.8 Dimensions:

4.8.1 DOOR ACCESS: The equipment shall be shipped either assembled or disassembled to pass through a door 12-ft wide by 12-ft high, and shall not exceed 25-ft in length as a maximum.

4.8.2 COMPONENT WEIGHT: The maximum weight of any one piece shall not exceed 15,000-lbs as a maximum.

4.8.3 INSTALLED FLOORSPACE: When installed complete, the equipment shall be contained in an area 11-ft wide and 10-ft deep, excluding the operator’s area. Maximum height shall not exceed 20-ft. Width is defined as front to back from the operator’s normal operating position as a maximum.

5. APPROVAL/SHIPPING

5.1 Shipping

5.1.1 RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.

5.1.2 SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 7:00 am and 12:00 am (noon), local time on Mondays through Fridays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.

5.1.3 RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN:

Mr. Dale Roseman, TARA-OPF”. Items not correctly marked are subject to being returned at the vendor’s expense.

5.1.4 ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.

5.2 Installation

5.2.1 SITE PREPARATION REQUIREMENTS: The contractor shall be solely responsible for any necessary site inspections required for determining the specifications of work that must be completed prior to final system installation. The contractor will then provide detailed information of any preparation work that must be performed prior to system installation to Rock Island Arsenal.

5.2.2 PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will support the preparation portion of the installation by providing utilities to the points of first connection.

5.2.3 LABOR AND MATERIAL: The supplier is solely responsible for providing all labor, materials, hardware, tools, and equipment necessary for complete installation of this system except as specifically listed in this document as being provided by the Rock Island Arsenal.

5.2.4 SUPERVISION: Supervision of the installation process will be the responsibility of the contractor. Rock Island Arsenal shall retain the right to periodic inspection and evaluation of the process, as it deems necessary.

5.2.5 OFF-LOADING/PLACEMENT: Off-loading of the equipment from the delivery vehicle, and placement of the equipment in position for the installation is the responsibility of the contractor. The contractor shall not be allowed to use government equipment to accomplish this work.

5.2.6 OFF-LOADING/PLACEMENT OPTION: At the request of the contractor, Rock Island Arsenal will perform the off-loading and placement of the equipment.

5.2.6.1 Any special requirements or precautions to be observed shall be the responsibility of the contractor to provide.

5.2.6.2 The contractor or his representative may be present during this process; however, such person will be responsible for being present upon arrival of the equipment at Rock Island Arsenal. Off-loading and placement shall not be delayed to allow arrival of the contractor or his representative.

5.2.6.3 If, due to contractor caused difficulties, the equipment or components of the equipment must be moved, removed or replaced by Rock Island Arsenal after initial placement, the contractor shall be billed for such work at current Rock Island Arsenal labor and overhead rates.

5.2.7 LIABILITY: In any case, the equipment remains the property of the contractor, and the contractor shall assume all responsibility and liability for the equipment and the work performed upon it. The government shall be held harmless for any damage done to the equipment at any time up until final acceptance of the equipment by Rock Island Arsenal, except in the case of intentional damage and/or gross negligence on the part of Rock Island Arsenal personnel.

5.2.8 SET-UP: The contractor shall be responsible for set-up and connection of the equipment beyond connections of the utilities to the points of first connection.

5.3 Completion

5.3.1 Final acceptance of the equipment shall occur after the following:

5.3.1.1 Set-up completion by the contractor.

5.3.1.2 Successful completion of performance testing at Rock Island Arsenal.

5.3.1.3 Final inspection approval by the government representative or inspector. This is to verify full compliance with this description to include amendments and modifications to the final contract. The government representative shall perform any and all tests he deems necessary to insure compliance with this description and industry standards to include, but not limited to ease of control, convenience of operation, safe operation, and adequacy of lubrication devices.

5.3.1.4 All required training is complete.

5.3.1.5 Complete documentation packages are delivered.

6. TRAINING

The contractor shall provide instruction in proper operation and maintenance of the equipment without additional cost to the government. Training shall be of sufficient duration that the recipients are able to demonstrate a reasonable level of competence as determined by the equipment installer and/or the inspector. Acceptance may be delayed as a result of inadequate training.

6.1 Schedule

Training shall training shall be coordinated with the Rock Island Arsenal. Daily training shall begin no later than 6:30 a.m. CST and shall continue until at least 2:15 p.m. CST. This is required to get full coverage of the 1st shift of operation at RIA-JMTC. If training does not begin until after the stated time, RIA-JMTC may at its option require additional training at a different time to compensate for the loss of training caused by the late start. This may include more time than what is represented by the delay (e.g. a 1-hr delay may require 2-hrs later to impart the knowledge lost).

6.2 Location

All training shall be performed at the Rock Island Arsenal. It shall be performed using the equipment purchased in this description.

6.3 Type

Each type of training shall be given independently. Rock Island Arsenal shall coordinate with the contractor to provide the proper personnel for each type of training. The following types of training shall be provided by the contractor.

6.3.1 OPERATOR: Training shall be provided by the contractor for (5) operators. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by RIA-JMTC shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment. (E.g. for a new CNC lathe, the operator will be familiar with CNC lathe operation, but may have no experience with a Fanuc control system.)

6.3.2 MAINTENANCE: Mechanical and electrical control and diagnostic maintenance training shall be provided by the contractor. This shall include information on troubleshooting and preventive maintenance procedures. This shall be provided for (2) personnel.

6.3.3 ENGINEER AND PROGRAMMER: Training shall be provided by the contractor for (2) engineers and up to 5 programmers. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by RIA-JMTC shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment.

(E.g. for a new CNC lathe, the operator will be familiar with CNC lathe operation, but may have no experience with a Fanuc control system.)

7. SERVICE

7.1 Service/Support Requirements

The contractor shall have as a minimum, a verifiable service/repair capability which meets or exceeds the following requirements:

7.1.1 STAFF: Staffed by qualified, English speaking personnel fully knowledgeable in the service/repair of the equipment offered.

7.1.2 TELEPHONE ACCESS: Telephone access to service/repair personnel shall be available for consultation during Rock Island Arsenal normal working hours. Rock Island Arsenal normal working hours are 8:00 am CST to 3:00 pm CST, Monday through Friday, except legal federal holidays.

7.1.3 ON-SITE RESPONSE: Physical, on-site response shall be possible within 48-hrs of notification that service/repair of the equipment is necessary.

7.1.4 MAINTENANCE PARTS: Parts necessary for periodic replacement such as belts, hoses, filters, and other parts normally considered as spare parts, by the manufacturer, shall be stocked and available for shipment.

7.1.5 PRIOR HISTORY: Said service/repair capability shall have been available to the general public prior to the issue date of this purchase description. Adequate proof of prior availability shall be provided upon request.