23-9-49 CDRL Shot Peen Booth Modifications.pdf

PDF 118 KB Posted

Attached to
SHOT PEEN BOOTH MODIFICATIONS Federal contract opportunity
Solicitation number
W519TC-23-Q-2370
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This Contract Data Requirements List (CDRL) outlines documentation requirements for modifications to a shot peen booth under solicitation number W519TC-23-Q-2370 from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. The contractor must provide three copies of an operator's manual and maintenance manual with delivery of the equipment, including two paper copies and one electronic copy in PDF, DXF or IGS format. The operator's manual must include safe operation procedures and information to perform all listed operations and functions. The maintenance manual must include daily checklists, inspection and maintenance schedules, component replacement procedures and schedules, and schematics for hydraulic and electrical systems. Copies must be delivered to the Rock Island Arsenal attention program office.

View the file

Other files for this federal contract opportunity

Other files attached to SHOT PEEN BOOTH MODIFICATIONS, newest first.
File Type Posted
RIPD E4000-23-9-49 - Shot Peen System.pdf PDF
23-Q-2370 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TARA‐IFF Project E4000‐23‐9‐49 Shot Peen Booth Modifications

Contract Data Requirements List

1. Owners/Operator’s Manual:

Format: The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).

Content: This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.

Delivery: Provide copies, as requested to the following:

Rock Island Arsenal

ATTN: TARA‐LGC

Robert McClure Building 220, Basement E Wing, Planners Rm Rock Island, IL 61299‐6400

2. Maintenance Manual:

Format: The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).

Content: This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Periodic Maintenance Schedule, and materials specifications for most often replaced components or fluids. Procedures and schedules for inspections, adjustments, cleaning, disassembly, and component replacements if required. The manual shall also include major component schematics, or diagrams (for hydraulic, and electrical systems).

Delivery: Provide copies, as requested to the following:

Rock Island Arsenal

ATTN: TARA‐ LGC

Robert McClure Building 220, Basement E Wing, Planners Rm Rock Island, IL 61299‐6400

File details come from the government source that posted it. Updated .