Supplement to Attachment 4 LCOE.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
2021 Distributed Wind Turbine Competitiveness Improvement Project Federal contract opportunity
Solicitation number
RFX-2021-10469
Issued by
Department of Energy Office of Science

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

User Instructions
This spreadsheet contains values and formulas in locked cells that should not be changed. However, should any changes be made, please explain in the note section of the relevant sheet what changes were made and why. The password is Betz.

This tool was developed by the National Renewable Energy Laboratory for use in completing the Levelized Cost of Energy (LCOE) Figure of Merit required in the CIP RFP.

Data should be entered, as appropriate, in the cells highlighted in GREEN. Failure to input the necessay data may result in inaccurate calculations or errors in the LCOE sheet.

Capital Cost

Turbine System CostsBaselineProposalEnd of ProjectNotes
Turbine rotor assembly
Turbine nacelle assembly (includes generator)
Electrical system (inverter/controller and related electronics)
Tower and tower hardware
Shipping and delivery
Extended warranty (define # of years)
Other (difference between costs above and cost to customer)
Total Cost to Consumer$ - 0$ - 0$ - 0
Balance of Station CostsBaselineProposalEnd of ProjectNotes
Wind resource and site assessment, and feasibility studies
Zoning approval, permits and licenses, including environmental assessments
Project engineering and design
Site preparation, including roads, grading and fences
Electrical infrastructure including wire run (labor, materials and equipment)
Foundation cost (labor, materials, and equipment)
Installation including assembly, erection, and commissioning costs (includes crane)
Wind turbine monitoring equipment (if applicable)
Other project construction costs
Sales tax
Construction contingency
Other (difference between costs above and cost to customer)
Total Cost to Consumer$ - 0$ - 0$ - 0
BaselineProposalEnd of ProjectNotes
Turbine Component Costs$ - 0$ - 0$ - 0
Balance of Station Costs$ - 0$ - 0$ - 0
Total Capital Cost to Consumer$ - 0$ - 0$ - 0

Annual Operating Expenses

Annual Operations and Maintenance CostsBaseline ($/yr)Proposal ($/yr)End of Project ($/yr)Notes
Labor, parts and supplies for scheduled turbine maintenance
Labor, parts and supplies for unscheduled turbine maintenance (include expenses covered by warranty)
Labor for administration and support (zero for most small turbines)
Other (define)
Total Cost to Consumer$ - 0$ - 0$ - 0
Project LifetimeBaselineProposalEnd of ProjectNotes
Project Lifetime (yrs)
Baseline LRCMean Time Between replacements (years)Replacement Cost (2017 Dollars)LRC ($/yr)Notes
Item #1$ - 0
Item #2$ - 0
Item #3$ - 0
Item #4$ - 0
Item #5$ - 0
Proposed LRCMean Time Between replacements (years)Replacement Cost (2017 Dollars)LRC ($/yr)Notes
Item #10
Item #2$ - 0
Item #3$ - 0
Item #4$ - 0
Item #5$ - 0
End of Project LRCMean Time Between replacements (years)Replacement Cost (2017 Dollars)LRC ($/yr)Notes
Item #10
Item #2$ - 0
Item #3$ - 0
Item #4$ - 0
Item #5$ - 0
Annual Operating Expenses (AOE)BaselineProposalEnd of ProjectNotes
Annual O&M ($/yr)$ - 0$ - 0$ - 0
Annual LRC ($/yr)$ - 0$ - 0$ - 0
Total AOE to Consumer ($/yr)$ - 0$ - 0$ - 0

Annual Energy Production

BaselineProposalEnd of ProjectNotes
30 m windspeed (m/s)6.006.006.00windspeed in column C is not locked, the default is 6.0
Hub height (m)303030
Power law shear exponent0.2500.2500.250Alpha in column C is not locked, the default is 0.25
Hub height windspeed6.006.006.00
Availability
Soiling Losses
Controls Losses
Grid Availability Losses
Other Non-Drivetrain Losses
BaselineProposalEnd of ProjectNotes
Wind Speed Bin (m/s)Rayleigh ProbabilityTurbine Power Curve (kW)Gross Annual Energy ProductionRayleigh ProbabilityTurbine Power Curve (kW)Gross Annual Energy ProductionRayleigh ProbabilityTurbine Power Curve (kW)Gross Annual Energy Production
0.50.02170.000.02170.000.02170.00
1.50.06230.000.06230.000.06230.00
2.50.09520.000.09520.000.09520.00
3.50.11690.000.11690.000.11690.00
4.50.12620.000.12620.000.12620.00
5.50.12400.000.12400.000.12400.00
6.50.11280.000.11280.000.11280.00
7.50.09590.000.09590.000.09590.00
8.50.07670.000.07670.000.07670.00
9.50.05790.000.05790.000.05790.00
10.50.04130.000.04130.000.04130.00
11.50.02800.000.02800.000.02800.00
12.50.01800.000.01800.000.01800.00
13.50.01110.000.01110.000.01110.00
14.50.00640.000.00640.000.00640.00
15.50.00360.000.00360.000.00360.00
16.50.00190.000.00190.000.00190.00
17.50.00100.000.00100.000.00100.00
18.50.00050.000.00050.000.00050.00
19.50.00020.000.00020.000.00020.00
20.50.00010.000.00010.000.00010.00
21.50.00000.000.00000.000.00000.00
22.50.00000.000.00000.000.00000.00
23.50.00000.000.00000.000.00000.00
24.50.00000.000.00000.000.00000.00
25.50.00000.000.00000.000.00000.00
26.50.00000.000.00000.000.00000.00
27.50.00000.000.00000.000.00000.00
28.50.00000.000.00000.000.00000.00
29.50.00000.000.00000.000.00000.00
30.50.00000.000.00000.000.00000.00
Gross Annual Energy Production (kWh/yr)- 0- 0- 0
Net Annual Energy Production (kWh/yr)- 0- 0- 0

LCOE

LCOE SummaryBaselineProposalEnd of ProjectNotes
Turbine Component ($)000
Balance of Station ($)000
Annual Operating Expenses ($/kWh)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Annual Energy Production (kWh/yr)000
Fixed Charge Rate7.4%7.4%7.4%
LCOE ($/kWh)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!