RFVc.pdf

PDF 193 KB Posted

Attached to
Solicitation, C-5 Drag Strut, NSN 1560-01288-2248UC, SPRWA1-23-R-0001 AMENDMENT 0001
Solicitation number
SPRWA1-23-R-0001
Issued by

View the file

Other files

File Type Posted
AMENDMENT_SPRWA123R0001_______0001.pdf PDF
SPRWA123R0001.pdf PDF
PricingMatrix.xlsx XLSX spreadsheet
IUIDmkplanD.pdf PDF
Pkg.pdf PDF
SPI.pdf PDF
IUIDMarkingActivityValidE.pdf PDF
FirstArticle.pdf PDF
StatusReportA.pdf PDF
EDL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A003
title: Request for Variance (RFV)
sub: Deviation from Source Data
auth: DI-SESS-80640D
ref: Pending Contract Award
req_ofc: 409 SCMS/GUMAC
dd250: See Blk 16
appcode: See Blk 16
dist: D
freq: See Blk 16
asof: See Blk 16
firstsub: See Blk 16
subsub: See Blk 16
addressee1: Contracting Office
draft1: 1
reg1: 1
repro1: 0
addressee2: Logistics Manager
draft2: 1
reg2: 1
repro2: 0
addressee3: Supply Planner
draft3: 1
reg3: 1
repro3: 0
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3
total_reg: 3
total_repro: 0
remarks: DI-SESS-80640D, as reflected at https://quicksearch.dla.mil/qsSearch.aspx, shall be followed as appropriate.

Block 7. DD 250 REQ and Block 8. APP Code: Inspection and Acceptance will occur at Destination. WAWF submission for this Data item is not required. A Letter of Transmission (LT) in the form of email correspondence, as detailed in Block 14, shall be utilized for Inspection and Acceptance proceedings. If DCMA is assigned to the contract, the Contractor shall coordinate the submission of the RFV with the assigned DCMA Office for review and recommendation,. Upon completion of DCMA coordination, the Contractor shall send the Draft and Final Reports to the addressees as detailed in Block 14, who will coordinate with C5 Engineering (409 SCMS/GUEA and AFLCMC/WLSE) on review actions. When necessary, final approval of the RFV shall come from the AFLCMC/WLSE C5 Configuration Control Board (CCB), at which time that final decision will be provided back to the Contractor. Due to the potential coordination cycle required for an RFV, the Government has up to 45 calendar days to provide a response or final decision back to the Contractor.

Block 9. Distribution Statement Required: Distribution authorized to U.S. Government agencies and DoD Contractors only as it pertains to Administrative or Operational Use, Critical Technology and Technical Data marked for Export Control, as of 6 Jan 2022. Other requests for this document shall be referred to the 409 SCMS/GUMAC (per DoDI5230.24).

Block 10. Frequency, Block 12. Date of First Submission, & Block 13. Date of Subsequent Submission: This requirement for RFV shall be followed on an as needed basis. As detailed in Data Item No, A002, the need may arise during the Tech Data Package (TDP) Review process of this contract. The need for RFV may also arise during the post TDP process as well. If during manufacturing an unforeseen deviation from source data scenario is encountered, this RFV requirement shall be followed.

Block 11. As of Date: This requirement goes into effect upon contract order award.

Remarks continued on Page 2 of 2.

group: IV
total_price:
prep_name: Tim Elliott, 409 SCMS/GUMAC
line_item: TBD
exhibit: A
xtdp: Off
xtm: Off
othercat: Configuration Control
system: C5 Drag Strut
ctr_no: FD20602200113
contr: TBD
remarksb:

Block 14.a. Addressee: The DD Form 1694 and any accompanying RFV documentation shall be delivered by email, or in cases where files are larger than 5MB in size by the DoDSAFE file exchange website (https://safe.apps.mil/) to the Addressee list that follows. In the event that a Drop Off Request code is needed, notify the below addressees for assistance.

Block 14.b. Copies: Initial contract submission shall be considered a Draft pending approval by the Requiring Office. Upon approval, subsequent submissions shall be considered as Final Regular submissions.

Notes:

1. This requirement is also referenced as potentially needed to accompany Data Item No. A002 Technical Data Package Review Report.

2. The DD Form 1694, a DD Form 1694 Continuation Sheet, and DD Form 1694 Instructions can be found at https://www.dtic.mil/whs/directives/forms/index.htm and https://www.esd.whs.mil/DD/.

Addressees shall include:

DLA-WR/DLR Post Award Workflow dla.dlr.proc@us.af.mil

409 SCMS/GUMAC Logistics Management Specialist:

Tim Elliott timothy.elliott@us.af.mil

409 SCMS/GUMAC Supply Planner Booker O'Brien booker.obrien@us.af.mil

(Addressees may change over contract's life)

Page2: 2
Reset:
2022-02-07T15:21:25-0500
ELLIOTT.TIMOTHY.W.1239541972
prep_date: 7 Feb 2022
app_by: Anthony Cheatham, 409 SCMS/GUEA
2022-02-08T14:13:24-0500
CHEATHAM.ANTHONY.M.1104871018
app_date: 8 Feb 2022
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .