RFTP 33-6018 001 Ships.pdf

PDF 677 KB Posted

Attached to
RFTP-33-6018-001, Ships
Solicitation number
RFTP-33-6018-001-Ships
Issued by

About this file

This is a two-step Invitation for Bid (IFB) and Request for Technical Proposal (RFTP) for the removal, dismantling, and recycling of four decommissioned Navy vessels located in Philadelphia, Pennsylvania. The RFTP (33-6018-001) publishes March 24, 2026, and closes May 22, 2026, initiating a 60-day technical evaluation phase. The subsequent IFB (33-6018-002) will follow with a 30-day bidding period; both publication and closing dates for the IFB are listed as TBD. The contract is a 36-month term sale awarded to the highest responsive and responsible bidder on a sealed bid basis, with pricing calculated per unit price per lot (36 total lots). The Government will not pay purchasers to accept material; instead, the purchaser submits a bid price for all 36 lots of scrap material. The four vessels consist of one Ticonderoga Class Cruiser (ex-Vicksburg, CG 69, approximately 7,142 LWT) and three Oliver Hazard Perry Class Frigates (ex-Carr FFG 52, ex-Elrod FFG 55, and ex-Kauffman FFG 59, each approximately 3,100+ LWT), all containing hazardous materials including Passive Countermeasures Tiles (PCMS), Tributyltin Oxide (TBTO), and Aqueous Film Forming Foam (AFFF) requiring specialized removal and disposal procedures.

Bidders must submit detailed technical proposals addressing operational plans for vessel pre-arrival management, towing operations, arrival management, ship dismantling methodology, hazardous materials management, worker safety and health compliance, and environmental compliance. The technical proposal must demonstrate at least 10 years of shipbreaking experience with U.S. Navy vessels and include organizational structure, key personnel resumes, facility information with current permits for ship dismantling, financial capacity documentation, and past performance references from the last ten years. The Government will conduct a pre-award survey of the apparent high bidder, including Environmental Responsibility Determination (ERD) of all downstream facilities, and all personnel handling PCMS tiles must be U.S. citizens. The purchaser is responsible for all towing preparations (surveys, insurance, emergency oil spill response plan with qualified individual available 24/7), maintaining vessel stability and security during dismantling, complying with OSHA standards and all Federal and state environmental regulations (RCRA, TSCA, EPA), obtaining necessary permits and licenses, managing hazardous waste manifests, and providing monthly reports including towing status reports every 12 hours, environmental remediation reports with weekly progress updates, and incident reporting. Payment is monthly at $1.00 USD minimum per lot, billed upon removal, with full prepayment required prior to property removal; late payment penalties include interest and potential collection actions. DLA Disposition Services represents the Government; the official contact is Anthony Osborn at NAVSEA Inactive Ship Maintenance Office PA.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Details:

RFTP Number & Title RFTP 33-6018-001 RFTP Publish Start Date RFTP – 3/24/2026 RFTP Closing Date RFTP – 5/22/2026 Sales Type Term Sale IFB Number & Title IFB 33-6018-002 IFB Publish Start date TBD IFB Closing Date TBD Target Group/Business Partners Yes Bid Type Sealed Bid Auction Duration Step 1 - RFTP 60 days, Step 2 IFB bidding 30 days Start Price 1.00 USD Pricing Method Per unit price - LOT

1. Product Information (for each line):

a. Thirty-six (36) lots

b. Material: Scrap material derived from ship dismantling, scrapping, mutilation, and demilitarization operations as described in " TERMS AND CONDITIONS OF SALE”

Summary:

Department of Defense (DOD) agencies have the responsibility to identify property that requires demilitarization/mutilation (DEMIL/MUT) by assigning the applicable demilitarization code. Due to changes in requirements, these codes are subject to change without notice. Method and degree of demilitarization will be IAW with DoDM 4160.28 Vol 2. The appointed Government Verifier will have final say in the DEMIL/MUT of property.

All DEMIL/MUT operations will be witnessed and verified by a government employee and a Demil Certificate will be completed and signed. The Purchaser is responsible for providing certifiers for demilitarization (DEMIL) operations. The SCO will provide the training materials to the Purchaser during the pre-award process to ensure adequate time is allotted to train Purchaser certifiers. Purchaser must complete training and submit an appointment letter with the certifiers name and signature on it to the SCO before work can begin. Training certificates are to be held by the Purchaser and made available to the SCO within 24-hours if requested. Purchaser certifiers will be re-trained annually and must provide to the SCO a new appointment letter with the date refresher was taken for each certifier. All demilitarization/mutilation (DEMIL/MUT) operations will be conducted at purchasers approved facility. Government verifier(s) must be present for all DEMIL/MUT operations. If the Government verifier is unavailable for any reason, operations are to be shut down until the verifiers return. A minimum of 10 years experience in shipbreaking of US Navy ships is required for RFTP submission.

STEP ONE:

2. Request for Technical Proposal (RFTP):

The RFTP is for the removal, dismantling, and recycling of four Navy vessels located in Philadelphia, PA. This is step one of a two-step process. This is not an invitation for bid. RFTP must be in the possession of the Agency’s Public Sales Contracting Division by the closing date and time specified in this RFTP. If the RFTP is not submitted on time, it shall be considered non-responsive. The vessels are in the custody of NAVSEA Inactive Ship Maintenance Office PA and are located at the Philadelphia Reserve Basin, Naval Business Center, Philadelphia, PA.

Official to be contacted by prospective bidders:

Name: Anthony Osborn Address: 4701 S. 16th Street, Philadelphia, PA 19112-5095 Telephone Number: (215) 897-6773 E-Mail Address: anthony.t.osborn2.civ@us.navy.mil

1. Ticonderoga Class Cruiser, ex-Vicksburg (CG 69), Approximate Weight 7,142 LWT

2. Oliver Hazard Perry Class Frigate, ex-Carr (FFG 52), Approximate weight 3,167 LWT

3. Oliver Hazard Perry Class Frigate, ex-Elrod (FFG 55), Approximate weight 3,121 LWT

4. Oliver Hazard Perry Class Frigate, ex-Kauffman (FFG 59), Approximate weight 3,154 LWT

NOTE: All three (3) frigates have passive countermeasures tiles (PCMS) installed topside which require removal and special handling, access material control and disposal. PCMS tiles are not installed on the ex-Vicksburg (CG 69.)

NOTE: Tributyltin Oxide (TBTO) may exist both on interior and exterior of the sonar dome. The vessels have an installed Aqueous Film Forming Foam (AFFF) system that was emptied but not flushed. Toxic hydrogen sulfide (H2S) gas can build up in stagnant AFFF solution piping (mixture of AFFF concentrate and seawater). Gas concentrations can reach lethal levels when the gas escapes into a confined or enclosed space through AFFF hoses or sprinklers.

NOTE: All potential bidders/purchasers will physically inspect each vessel prior to submission of their Technical Proposal and bid. Failure to inspect the vessels will result in a disqualification from further participation in the two-step process.

The vessels are owned by and are in the custody of NAVSEA Inactive Ship Maintenance Office PA. Office is located at the Philadelphia Reserve Basin, Naval Business Center, Philadelphia, PA. The Navy maintains ownership and will initiate a transfer of custody, for each ship being towed, to the contractor performing the work. Title will pass to Purchaser when the DEMIL or Mutilation has been completed and the Certificate of DEMIL or Mutilation has been signed by both the Purchaser certifier and the Government verifier.

a. Submit un-priced Technical Proposal to DLA Disposition Services (hereafter referred to as the

Agency). The U.S. Navy will evaluate received RFTPs and identify all qualified Bidders. These qualified Bidders will be invited to participate in step two of this two-step process. In the second step, only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. And each bid in the second step must be based on the bidder’s own technical proposal.

b. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted; and the Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

c. A notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.

d. All acceptable Request for Technical Proposals (RFTP) will be valid for five (5) years.

e. Firms shall submit their RFTP in accordance with the format provided below. It is believed that sufficient latitude is provided such as not to prejudice or limit the comprehensiveness of the proposal.

RFTPs can be emailed to dla.sales@dla.mil OR mailed to the following address:

DLA Disposition Services J7, Contracting Directorate Sales Contracting Officer mailto:dla.sales@dla.mil

ATTN: IFB 33-6018_001

74 N. Washington Ave Battle Creek, MI 49017

f. Each firm shall submit only one RFTP subject to the following requirements and limitations in this RFTP. The technical proposal shall include:

i. Title page, Un-priced Technical Proposal - The title page of the technical proposal shall include (1) the company name of the firm; (2) the firm shall identify those portions of its technical proposal that contain copyrighted or proprietary or similar proposal data with a restrictive legend indicating the protected type of data contained therein.

ii. A table of contents, identifying the major sections of the total proposal as set forth below, by volume (if applicable) and by page, shall be placed in the front of each proposal.

iii. The un-priced technical proposal shall be bound in a notebook(s), if submitted in print copy, to permit removal of sections for the purpose of separate evaluation. The company name of the Bidder shall appear at the top of the first page. Each page of the proposal that contains company proprietary data shall be so stated.

g. The technical proposal is the primary basis for the evaluation of: (a) the degree to which a firm’s claim of performance capacity is supported, and (b) the ability of the firm to perform in accordance with the requirements and complete all work within the thirty-six (36) month contract performance period. The technical factors to be considered are those discussed herein.

h. When preparing the technical proposal, firms are cautioned to pay particular attention in providing sufficient detail to demonstrate their complete understanding of the scope of the work involved, including the requirement to comply with all Federal, state, and local laws and regulations.

i. The technical proposal shall be detailed, specific, and complete to enable Government personnel to make a thorough evaluation and a sound determination that the proposal will have a reasonable likelihood of meeting the requirements and objectives set forth by the Government.

j. These objectives are to ensure that firms understand the logistics of towing a naval vessel, identification and compliant disposal of all hazardous materials, the safe dismantling of a naval vessel in the United States, the ability to meet reporting requirements while complying with the terms of the contract. General statements such as “standard procedures will be used,” or “well- known techniques will be utilized,” and generalities of textbook theories and techniques, will not constitute compliance with these requirements concerning the content of the technical proposal. Part of the purpose of this requirement is to ascertain the level of the firm’s knowledge of compliantly performing under the terms of this contract.

k. The following technical proposal organization is required to facilitate the technical evaluation:

1. Title Page

2. Table of Contents

3. Executive summary:

The executive summary should highlight the firm’s approach and should summarize the key capabilities and general features of the firm’s resources, experience and understanding of the business and the operational efforts required by this solicitation.

4. Operational plan:

The Operation Plan shall demonstrate the proposed reduction methods for performing the dismantling of four vessels at the recycling facilities during the thirty-six (36) month performance period. The plan shall include the dismantling process for the vessels such that no considerable part of the ship is left intact or undisturbed to the extent that it can be reconstructed or readily identified as an existing portion of the vessel. Dismantling is defined as reducing the vessel such that it has no value except for its basic material content. The Operational Plan shall describe the entire process of ship recycling including, but not limited to:

4.1. Vessel Pre-Arrival Management:

4.1.1. Towing operations: Describe preparation of the vessel for tow including required surveys, tow preparations and underwater cleaning activities.

Towing operations must be in accordance with the Navy Tow Manual and all other applicable laws and regulations. Towing operations should include an anticipated timeline for submitting and gaining approval for commencement of tow.

4.1.2. Vessel afloat monitoring procedures: Describe your procedures for monitoring the vessel under float.

4.2. Vessel Arrival Management:

4.2.1. Mooring: Preparation for the vessels securing and mooring.

4.2.2. Stability and Flood Prevention: Methodologies for vessel stabilization while the vessel is being dismantled while afloat, on dry-dock or on a marine railway.

4.2.3. Security Measures: Describe security systems and procedures.

4.2.4. Severe Weather Measures: Planning for protection during heavy and/or severe weather conditions.

4.2.5. Environmental mitigation: Describe Environmental mitigating strategies necessary to prevent any inadvertent release of oils, PCBs, or other hazardous materials/waste.

4.3. Ship Dismantling Methodology:

4.3.1. Approach to ship dismantling including the entire process of dismantling a vessel, the integration of hazardous material and waste remediation with the vessel, and a description of the methodology and procedures for identifying and segregating all material to include the procedures to prevent commingling of materials from different vessels.

4.3.2. Engineering, technical, production, and management processes including methodologies for hazardous material and waste remediation and vessel recycling.

4.3.3. A description of the methodologies used to monitor the work, including subcontractors.

4.3.4. A description of how recycled materials and salvageable items will be mutilated/demilitarized, sold, and/or disposed.

4.3.5. A description of how electronic assemblies and circuit cards will be mutilated/demilitarized and what equipment/method will be used. The ship recycling facility should detail the proposed environmentally responsible methods that will not contaminate the area of demilitarization operations with residue from these operations. An R2 or eStewards certified facility must be used for electronic waste and recycling.

4.4. Initial Survey and Evaluation: Coordinating the identification, sampling, handling, removal, abatement, transfer, labeling, storage, treatment, transport, and/or disposal of hazardous material and waste IAW EPA and state regulations. Surveys and sampling shall include, but not limited to, hazardous materials, tank soundings, identification of unknowns, safe and unsafe areas, and gas-free certification.

4.5. Cutting Operations and Gas Free for Hot Work Procedures: A description of the procedures for cutting operations including gas free certifications.

4.6. Final Hull Dismantling: Describe the final hull dismantling process.

4.7. Accountability and Reporting: Provide a plan for the reporting and disposal of environmental waste (PCB’s, petroleum products, asbestos, lead, etc.) expected to be found on the vessel.

4.8. Procedures Demonstrating Government Interaction - Describe the plan to work and interact with Government personnel or their representatives at the buyer’s proposed facilities, to include space for on-site Government personnel or their agents, and how the buyer intends to comply with the record keeping and audit requirements of this contract. The procedures should be described in sufficient detail to demonstrate the buyer’s ability to meet the timeframes in the IFB and to demonstrate the buyer’s understanding of the scope of the work effort required and the degree of the difficulty involved.

4.9. Workforce and Training Program: Describe the workforce and include a list of the types and frequencies of training received.

5. Business plan:

The business plan shall provide information regarding the organizational structure and management policies of the company, an overview of the facility, and the dismantling methodologies related to ship recycling. The business plan shall include a narrative that demonstrates a thorough understanding of regulations, production processes, project management, requirements for vessel dismantling in accordance with applicable laws and regulations, and the demonstration of a complete understanding of the true scope of potential problems and risks in ship dismantling.

The Business Plan shall demonstrate the buyer’s ability to manage costs, personnel, subcontractors, and the facility. The Business Plan shall include a description of the facility’s management and organization including names and resumes of all corporate and key personnel. Key Personnel shall have the appropriate level of skill and experience sufficient to accomplish the scope of work.

5.1. Management and Organization: The proposal shall demonstrate that the corporate and project organizations support the level of effort required to meet the terms and conditions of the IFB. The assumptions upon which the plan is based should be explicitly described.

5.2. Project Organization - The firm shall describe its organization plan, to include the quality control processes to manage the contract, including any services to be provided by subcontractors. If the firm is newly formed for the purpose of performing this contract, provide a copy of the joint venture agreement or other organizing documents in an appendix to the technical proposal.

5.3. Key Personnel and Staffing - Provide name and resume of the proposed Chief

Executive Officer (CEO), the Project Manager (if different), the Environmental Safety and Health Manager, and all other key personnel along with their roles and responsibilities. Include experience on similar projects. Provide the number of personnel required, by function, in your plan estimates.

5.4. Facility Information: The Business Plan shall provide evidence of the availability of the proposed dismantling facilities for the duration of the contract performance, either by ownership or existing lease. The Business Plan shall also include evidence that the site-specific permits are currently in effect and shall be for ship dismantling or hazardous material/waste removal, remediation, abatement, or disposal.

5.4.1. Permits, Licenses, and Certifications: Provide a list or description of the permits, licenses, and certifications.

5.4.2. Previous facility Use: Identify the previous use of the facility over the past 10 years.

5.4.3. Security Measures: Describe the security procedures at the dismantling facility for the protection of ships and materials.

5.4.4. Facility Layout: Physical site location including acreage and facility access routes. Include a scaled facility drawing showing the principal recycling and vessel berthing areas, water depth, accessibility, maintenance and dredging, and a narrative describing the proposed sequence of remediation and dismantling actions.

5.5. Performance Schedule and Milestones:

5.5.1. A schedule for each proposed ship showing the progressive order in which the buyer proposes to execute the dismantling work. The schedule should incorporate all towing timeframes and all vessel dismantling timeframes.

5.5.2. Planned completion dates and a timeline for each phase of the project

5.5.3. Identification of critical milestones.

5.5.4. Identification of all milestones such as the final date of sale of materials that must be accomplished for the completion of the Project.

5.6. Financial Plan – Buyer should demonstrate an understanding of the financial requirements of the contract. Buyer should state all assumptions underlying the financial plan clearly, however, no implications or inference as to the buyer’s ultimate bid will be associated with the buyer’s purchase price assumption in the financial plan. Demonstration should be sufficiently detailed to show clearly that the prospective buyer has a sufficient financial capacity to meet all financial requirements and contingencies associated with performing the contract to include documentation to support the availability of the insurance, and Financial Guarantee Bond ($3,000,000).

5.7. Experience - Provide the name, address, phone numbers, contract number (if applicable) and a description of past performance where prior comparable services rendered in the last ten (10) years. Buyer must provide evidence of demonstrable experience in business arrangements involving the ship recycling and reporting requirements.

6. Worker safety and health compliance plan

Provide a plan for compliance to meet the safety procedures required by OSHA standards.

The Worker Safety & Health section shall identify and demonstrate the ship recycling facility’s ability to understand and comply with all applicable local, state, and federal worker safety and occupational health processes, procedures, laws, regulations, and guidance. The Worker Safety & Health section shall provide a concise description of the recycling facility’s plan and procedures for protecting worker health and safety and should demonstrate that the safety and health program supports the level of effort required for ship dismantling.

The Worker Safety Provisions section of the Worker Safety and Health Plan shall include the following information:

6.1. Regulatory Framework and compliance Procedures

6.1.1. Statement of Determination - The Worker Safety & Health Compliance Plan section shall include a statement of determination whether the facility, any parent companies, subsidiaries, or affiliates or proposed subcontractors within the past ten years, has received from any federal, state or local regulatory authority or foreign government, any of the following: Notices of violations;

fines or proposed fines; convictions; citations; or has been or currently is the subject of any judicial or administrative proceeding related to the violation or alleged violation of any applicable law related to worker safety & health compliance.

6.1.2. Further explain incidents noted in 4.1.1 and describe the steps taken to mitigate future incidents.

6.1.3. Job hazard assessment

6.1.3.1. Procedures for job hazard assessments to determine the proper approach to maximize worker safety.

6.1.3.2. Processes and procedures for ensuring that the ship recycling facility will maintain safe conditions, and that safety deficiencies will be frequently evaluated for the need for corrective actions

6.1.4. Safety and Health Training: The Worker Safety & Health Plan shall describe training and safety programs that are or will be in effect, and procedures for documentation of applicable training. The ship recycling facility shall ensure that the implemented training programs:

6.1.4.1. Include the appropriate training for job tasks and operations performed by the employee. Include job hazard assessment that provides for initial and refresher training at appropriate intervals.

6.1.4.2. Are presented in a manner that can be perceived and understood by all workers.

6.1.4.3. Are documented and records are maintained at the ship recycling facility.

6.1.4.4. Procedures for ensuring that any worker at the facility has been provided with appropriate training prior to performing any ship recycling operation.

6.1.5. Incident/Accident Reporting Procedures: Procedures for incident and accident reporting.

6.2. OPERATIONS AND PROCESSES

6.2.1. Diving Operations: Describe diving services to be employed, if any, during ship recycling.

6.2.2. Confined and Enclosed Spaces: Describe procedures for identifying, entering, and working in confined spaces or spaces with dangerous atmospheres.

6.2.3. Welding, Cutting, Grinding, and Heating: Describe procedures for ventilation, personnel monitoring for heavy metals exposure, protection of personnel, training, respiratory protection, torch cutting, permits and inspections (including hot work certification).

6.2.4. Gas Free for Hot Works Program: Describe gas free procedures and certifications.

6.2.5. Scaffolds, Ladders, Working Aloft, Other Working Surfaces: Describe your use of personal flotation devices, guarding of deck openings and deck edges, platforms, personal fall arrest systems, guard rails, and access to ships.

6.2.6. Fall Protection Program: Describe the fall protection program.

6.2.7. Housekeeping and Illumination: Procedures for work areas, such as aisles, passageways, and temporary flooring openings. Describe lighting process in work areas within the ship.

6.2.8. Signage: Procedures for ensuring that unsafe areas are posted with warning signs and labels in a language that all workers understand, and that all previously designated unsafe areas have been appropriately tested and/or verified as safe for workers prior to performing any ship recycling operation in that area.

6.2.9. Personal Protective Equipment

6.2.9.1. Procedures for ensuring the availability, maintenance, and use of personal protective equipment and clothing needed for all ship recycling operations.

6.2.9.2. Personal Protective Equipment - information on procedures and equipment used for the protection of employees from various risks associated with ship recycling (to include a job hazard analysis to determine the required personal protective equipment; respiratory protective equipment; personal protective clothing; and a hearing conservation program)

6.3. EMERGENCY PREPAREDNESS AND RESPONSE

6.3.1. The buyer shall certify and/or verify that the facility has developed, implemented, and maintains an Emergency Preparedness and Response Plan.

6.3.2. Fire Prevention and Protection - The buyer shall certify and/or verify that the facility has developed, implemented, and maintains a Fire

Prevention and Response Plan.

6.3.3. Worker Exposure and Medical Monitoring – Procedures to be used for job hazard analysis, medical surveillance, exposure, and training.

7. Environmental compliance plan

7.1. The Environmental Compliance Plan section shall demonstrate that the ship recycling facility:

7.1.1. Understands the environmental risks associated with ship recycling and provides a mitigation plan. The ship recycling facility should detail the proposed environmentally responsible methods that will not contaminate the area of demilitarization operations with residue from these operations.

7.1.2. Understands and implements the environmental requirements imposed by applicable laws and regulations.

7.1.3. Manages and disposes of all materials generated in the dismantling of the ship, its equipment in an environmentally sound manner.

7.2. Regulatory Framework and Compliance Procedures

7.2.1. Statement of Determination - The Environmental Compliance Plan section shall include a statement of determination whether the facility, any parent companies, subsidiaries, affiliates or proposed subcontractors within the past ten years, have received from any Federal, state or local regulatory authority or foreign government, any of the following:

• Notices of Violations (NOV).

• Fines or proposed fines.

• Convictions.

• Citations; or

• Have been or currently is the subject of any judicial or administrative proceeding related to the violation or alleged violation of any applicable law related to environmental compliance.

7.2.2. Procedures for designating one or more competent person who has the appropriate training, knowledge, license, and/or certification to be capable of recognizing and evaluating environmental conditions and is capable of specifying the necessary protection and precautions to be taken to ensure environmental compliance.

7.2.3. Permits, Licenses, Certifications: The Environmental Compliance Plan section shall identify all authorizations, permits, certificates, approvals, registrations, notifications, plans and/or licenses required by applicable federal, state, and local environmental agencies and issued to the recycling facility to carry out the work, including those required for the management of hazardous materials.

7.2.4. Personnel and Subcontractor Management: The Environmental Compliance

Plan shall identify all entities to be involved with the hazardous materials management process, including subcontractors involved with recycling operations at the site, and those who test, transport, and provide the ultimate disposal location and methodologies. Verification of licenses, approvals, permits, insurance, certifications, and the use of appropriately trained and experience personnel of the subcontractors shall be included.

7.2.5. Incident and Spills Reporting Procedures: Procedures and documentation requirements for incident and spill reporting

7.3. Hazardous Materials Management - The Hazardous Materials Management section of the Environmental Compliance Plan shall demonstrate how the facility will ensure safe and environmentally sound management of all hazardous materials and wastes removed from a ship recycled at the facility. The Hazardous Materials Management section of the Environmental Compliance Plan shall include the following information for Asbestos, PCBs, Fuels and Oils, Bilge/ballast water, Heavy Metals, Paints and coatings, Wastewater/sludge, ozone depleting substances and other potential hazardous materials:

7.3.1. Handling, Removal, Remediation: A description of procedures for the handling, removal, and remediation of all hazardous materials; and the interface of hazardous materials removal with ship dismantling activities.

7.3.2. Storage and Labeling: Provide a description of procedures for the storage of and labeling of hazardous material/hazardous waste. Provide copy of permit authorizing storage of HM/HW.

7.3.3. Transportation, Segregation and Disposal: Provide a list of transporters to be used to transfer HM/HW and a list of Transfer, Storage and Disposal Facilities (TSDF) to be used in the disposal of Hazardous Wastes and/or Hazardous Materials.

7.4. Spill Prevention, Control, and Countermeasures Plan - Discussion of the controls implemented to protect the environment, which include the Spill Prevention Control and Countermeasures Plan.

7.5. Storm Water Pollution Prevention Plan - Discussion of the controls implemented to protect the environment to include a Storm Water Pollution Prevention Plan. Buyer shall certify and/or verify that the facility has developed, implemented and maintains a Spill Prevention, Control and Countermeasures Plan and a Storm water Pollution Prevention Plan.

7.6. Incident/Accident reporting procedures: Describe your ability to report any instance where the fire department, medical response or a regulatory authority has been summoned or notified due to an incident/accident to the SCO within twenty-four hours via email. How do you use incident/accident reports as a learning experience to prevent re-occurrence?

8. Appendices

STEP TWO:

BIDDING; BID EVALUATION AND CONTRACT AWARD

INTRODUCTION

Defense Logistics Agency (DLA) Disposition Services (hereinafter, the “Agency”) is offering a contract for scrap through this Invitation for Bid (IFB). This is a 36-month term sale.

Only those qualified bidders as determined in Step One will be invited to bid on the vessels offered for sale in this IFB. The Bidder(s) are invited, urged, and cautioned to inspect the property prior to submitting their bid.

Property will be available for inspection by appointment only.

Base Access Requirements:

All locations where property is located may have strict rules that may prohibit access to some individuals. To access our facilities, an apparent high bidder or their agent shall be required to obtain base access through the host installation. The local location will be able to provide information on how to obtain base access. Purchaser is solely responsible for determining installation access requirements and complying accordingly. If necessary, the SCO can confirm that Purchaser is performing requirements under this IFB and the resulting contract.

Applicant must show vehicle registration, proof of current vehicle insurance and identification that meets the requirements of the REAL ID ACT of 2005 in order to register for enrollment in the Defense Biometric Identification System (DBIDS).

Useful Websites:

DLA Disposition Services: https://www.dla.mil/DispositionServices.aspx DLA Auction Site: https://www.sales.dla.mil/dlab2b/init.do System for Award Management: https://sam.gov/ Bureau of Industry and Security: https://www.bis.doc.gov/ U.S. Department of the Treasury: https://home.treasury.gov/ Consolidated Screening List Search Engine: https://legacy.export.gov/csl-search

The following is for reference only and does not indicate endorsement of the information provided.

Commercial Scale Locator: https://catscale.com/cat-scale-locator/

Item Description:

Lot (36) consisting of scrap derived from the dismantling and demilitarization of four ships to be towed from Philadelphia, PA. A lot sale is a group of similar or identical items that are sold together to one buyer. All vessels are available for inspection by appointment, Monday through Friday, excluding holidays, between the hours of 0700-1530 local time. Appointments must be made at least five (5) days in advance. Declassified Booklets of General Plans, Damage Control Plates, Tank Conversion Tables, and Docking Plans, if existing, will be available for viewing at the Inactive Ships On-Site Maintenance Office, and will be released to the Purchaser upon contract award.

https://www.dla.mil/DispositionServices.aspx https://www.sales.dla.mil/dlab2b/init.do https://sam.gov/ https://www.bis.doc.gov/ https://home.treasury.gov/ https://legacy.export.gov/csl-search https://catscale.com/cat-scale-locator/

The product being offered is defined as thirty-six (36) Lots consisting of scrap derived from the following vessels:

1. Ticonderoga Class Cruiser, ex-Vicksburg (CG 69), Approximate Weight 7,142 LWT

2. Oliver Hazard Perry Class Frigate, ex-Carr (FFG 52), Approximate weight 3,167 LWT

3. Oliver Hazard Perry Class Frigate, ex-Elrod (FFG 55), Approximate weight 3,121 LWT

4. Oliver Hazard Perry Class Frigate, ex-Kauffman (FFG 59), Approximate weight 3,154 LWT

NOTE: All three (3) Frigates have passive countermeasures tiles (PCMS) installed topside which require removal and special handling, access material control and disposal. PCMS tiles are not installed on the ex-Vicksburg (CG 69.)

The vessels are owned by and are in the custody of NAVSEA Inactive Ship Maintenance Office PA. Office is located at the Philadelphia Reserve Basin, Naval Business Center, Philadelphia, PA. The Navy maintains ownership and will initiate a transfer of custody, for each ship being towed, to the contractor performing the work. Title will pass to Purchaser when the DEMIL or Mutilation has been completed and the Certificate of DEMIL or Mutilation has been signed by both the Purchaser certifier and the Government verifier.

Official to be contacted by prospective bidders:

Name: Anthony Osborn Address: 4701 S. 16th Street, Philadelphia, PA 19112-5095 Telephone Number: (215) 897-6773 E-Mail Address: anthony.t.osborn2.civ@us.navy.mil

Packing:

Scrap residue derived from the dismantling, scrapping, mutilation and demilitarization of the vessels and related parts, components and dunnage will be packaged or containerized to facilitate safe handling, storage, transport and ultimate disposal to protect personnel and the environment.

Removal:

The NAVSEA 21I on-site representative. will coordinate and direct removals. Purchaser is responsible for all packaging, crating, containerizations, loading, securing, blocking and bracing of material prior to removal. The Purchaser will remove the vessels in the following order:

(1) ex-Vicksburg (CG 69)

(2) ex-Carr (FFG 52)

(3) ex-Elrod (FFG 55)

(4) ex-Kauffman (FFG 59)

Inspection:

The Purchaser will physically inspect each vessel prior to submission of their Technical Proposal and bid. Failure to inspect the vessels will result in a disqualification from further participation in the two-step process.

All vessels are available for inspection by appointment, Monday through Friday, excluding holidays, between the hours of 0700-1530 local time. Appointments must be made at least five (5) days in advance.

Declassified Booklets of General Plans, Damage Control Plates, Tank Conversion Tables, and Docking Plans, if existing, will be available for viewing at the Inactive Ships On-Site Maintenance Office, and will be released to the Purchaser upon contract award.

mailto:anthony.t.osborn2.civ@us.navy.mil

Loading:

The USG will not assist in packaging, containerization, or loading but will inspect containers and conveyance to ensure they appear to be safe to handle the load in transit.

TERMS AND CONDITIONS OF SALE

Certain contents and provisions of this IFB, including Appendices, Attachments and Schedules, are described in general. Any historical data provided in support of this IFB was derived using existing sources and is presented for general reference only.

FAR Provision 52.204-24:

FAR Provision 52.204-24 is applicable.

PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

Full clause text included in attachment. The provision at FAR 52.204-24 requires an offeror to represent, on an Offer-by-offer basis, whether it will or will not provide any “covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.” The Representation must be marked, signed and returned with the bid.

The Representation that must be signed will be sent at the same time the Statement of Intent (SOI) is sent to apparent high bidder as part of the pre-award process.

Full clause text included in attachment.

FAR Provision 52.204-25:

FAR Provision 52.204-25 is applicable.

FAR Provision 52.204-25 titled, “Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment” is incorporated by reference from the Federal Acquisition Regulation.

https://www.acquisition.gov/far/52.204-25

Full clause text included in attachment.

SALE BY REFERENCE (SBR)

The following general information, instructions and special conditions of sales contained in DLA Disposition Services pamphlet entitled the “Sale by Reference Instructions, Terms and Conditions Applicable to Department of Defense (DoD) Personal Property Offered for Sale by DLA Disposition Services”, published July 2012, are hereby incorporated by reference and become a part of this IFB and any contract resulting from acceptance of a bid submitted pursuant to this IFB as fully as though such instructions, terms and conditions had been specifically set forth herein:

The Terms and Conditions of this IFB supersede the Sales by Reference wherever conflicted.

SBR Part 1:

General Information and Instructions: All conditions apply except:

Paragraph 5 Paragraph 12

Modified: Paragraph 4 is amended to Notice of Award (NOA) https://www.acquisition.gov/far/52.204-25

SBR Part 2:

Sale of Government Property General Sale Terms and Conditions: All conditions apply except:

Paragraph 12 Paragraph 13(c) Paragraph 28 Paragraph 29

Paragraph 3(b) Modified bid acceptance period modified from 60 days to 120 days.

Modified Paragraph 33. DISPUTES is changed to read “Any contract awarded as a result of this sale is subject to the Contract Disputes Act 1978 (41 U.S.C. 7101-7109)”

Paragraph 19. (Instead, this clause is replaced with the clause found at 48 CFR 52.203-2)

SBR Part 3:

Sale of Government Property Special Sealed Bid Conditions: All articles apply.

SBR Part 4:

Sale of Government Property Special Sealed – Term Conditions: All conditions apply except:

Paragraph 2 Paragraph 5

SBR Part 5:

Additional Special Circumstance Conditions - Miscellaneous: All articles apply except:

Article A Article E Article G Article H Article L

Article D. Paragraph D(a) is amended to: The Purchaser shall, at no expense to the Government and prior to contract performance, will confirm with the Sales Contracting Officer the following Certificates of Insurance will be effective throughout the term of the contract or any extensions thereof.

SBR Part 6:

Additional Special Circumstance Conditions - Demilitarization and Mutilation: All articles apply except::

Article A

Article B sentence 1 Modified. Property requiring demilitarization or mutilation will not be shipped in sealed container to the processing site where demilitarization or mutilation will be accomplished by the Purchaser.

SBR Part 7:

Additional Special Circumstance Conditions - Hazardous and Dangerous Property: All articles apply except:

Article F Article G Article H Article P Article Q Article W

SBR Part 8:

Additional Special Circumstance Conditions - Foreign Excess Personal Property: Does not apply.

SBR Part 9:

Special Spot Bid Conditions of Sale of Government Property: Does not apply.

SBR Part 10:

Sale of Government Property Special Auction Conditions: Does not apply.

BID EVALUATION AND CONTRACT AWARD

Bidding Process:

The bid shall consist of an amount per unit of issue specified in U.S. currency. Be advised certain risk factors could affect a bidder’s assessment of this contract and the calculations supporting the resulting bid. Under no circumstances is the Agency or the Government responsible for any assumptions, planning factors, or decisions related to determining the bid.

The Government expects all the terms and conditions of the contract to be met at the bid price submitted. At no time will the Government pay the Purchaser to take material offered. There shall be no reimbursement to the Purchaser under this contract except for the limited circumstances related to reimbursement of actual expenses incurred for return of property directed by the Government. This is not a service contract administered in accordance with the Federal Acquisition Regulations (FAR). This is a contract for the sale of scrap pursuant to provision in Title 40, US Code, Chapter 5. The Government is not responsible for any indirect expenses related to performance under this contract. The measure of the Government’s liability, in any case where liability of the Government to the Purchaser has been established, shall not exceed refund of such portion of the purchase price as the Government may have received. The Government is not responsible for any indirect, inconsequential, or completeness (through assumption of sales value, act or omission of factors) of expenses related to performance under this contract. The measure of the Government’s liability, in any case where liability of the Government to the Purchaser has been established, shall not exceed refund of such portion of the purchase price as the Government may have received.

How to Bid:

Use the SF114 and SF114A provided with this IFB to submit a bid. Bidder shall enter bid as a price per LOT (36).

Minimum bid is $1.00 USD per LOT (36). Multiply your bid price by the quantity indicated in this IFB, 36 LOTS, to calculate your extended bid amount.

For illustrative purposes, if the item advertised for sale in the IFB is in LOTS and for a total quantity of 36 LOTS and Bidder A’s bid price is $1.00 per LOT, then $1.00 USD times 36 LOTS equals $36.00 USD. The $36.00 USD would be Bidder A’s extended bid amount.

Do not email bids or call-in bids directly to the SCO. Email bid to: dla.sales@dla.mil

A Responsive Bid:

Complies with the terms and conditions of the sales offering and satisfies the requirements as to the method and timeliness of the submission. Only responsive bids will be considered for award. A responsive bid submission shall contain at a minimum:

• SF114 completed and signed.

• SF114A

mailto:dla.sales@dla.mil

When to Send Bid:

Bids must be in the possession of the Agency’s Public Sales Contracting Division by the offer closing date and time specified in this IFB. If the bid is not submitted on time, it shall be considered non-responsive. Late rules are outlined in FAR 52.212-1(f). Pay particular attention to the provisions that relate to the timing of e-mail submissions.

How to Modify/Cancel Bid:

In addition to SBR Part 4, Paragraphs 3 and 4, by submitting a new bid in the same manner as the previous bid.

Separately, without disclosing bid amounts, notify the SCO of the modification. To cancel a bid, submit a zero (0) bid in the same manner as the original bid. Notify the SCO of the bid cancellation (specify date, time and method of bid submission).

Bid Acceptance Period:

The bid must remain valid 120 calendar days from the bid opening unless otherwise modified or cancelled.

Bid Evaluation:

A responsible bidder is one that has the necessary organization, experience, financial resources, accounting process, operational controls, technical equipment and facilities, or the ability to obtain them, to perform the requirements of the sales contract, has no disqualifying factors (i.e., is not suspended, debarred or an ineligible transferee) and able to pass the Agency’s vetting process. A responsive bidder is one that has complied with all instructions for properly submitting a bid. Submitting the highest bid price does not convey any special right nor does it imply that the Purchaser shall be the primary removal company or exclusively allowed to remove throughout the term of this contract. The Government reserves the right to reject any bids that are not in the best interest of the Government.

The general standards in FAR Part 9 on contractor responsibility determinations that are applicable to procurement contracts are not directly applicable to sales contracts awarded under 40 U.S. Code § 545 but may be considered by the Sales Contracting Officer in evaluating bidder responsibility.

The SCO shall determine if each bid is responsive and responsible prior to award of the contract. The contract shall be awarded to the highest responsive, responsible bid. In the event of termination of the original Purchaser, the SCO may award the contract to the next highest responsive, responsible bidder if bids have not expired, and such award is otherwise determined to be in the Government's best interest. The Government intends to make a single contract award to the responsible bidder with the highest priced responsive bid, unless a determination is made to reject the bid under 41 CFR § 102-38.205.

The Government intends to make a single contract award based on the apparent high bid for the lot (36). The Agency intends to award one contract to a responsible bidder with the highest priced, responsive bid.

Ineligible Bidder:

A Bidder will not be eligible for award if they are:

• Excluded from Federal programs by the General Services Administration as identified in the System for Award Management at https://sam.gov/.

• Subject to denial, suspension, debarment, or other sanctions pursuant to export control and related laws, regulations, or orders administered by the DOS, DOC, DHS, or USTD. The DOS, DOC, DHS, and USTD name these entities, individuals, and countries in the Federal Register and at the following website:

Consolidated Screening List Search Engine (https://legacy.export.gov/csl-search).

Pre-Award Survey:

The Agency will conduct a Pre-Award survey of only the Apparent High Bidder. The SCO will provide notification that you are the Apparent High Bidder (AHB), and Statement of Intent (SOI) DLA Form 2536 and DLA Form 1822 End of Use Certificate (EUC) will be included in the notification. The SOI must have parts 1-6 completed and https://sam.gov/ https://legacy.export.gov/csl-search signed. The EUC must be filled out in accordance with EUC Instructions. The Pre-Award survey may be conducted at the AHB’s facility. The Pre-Award survey may include but is not limited to a review of facilities, equipment, financial capability, quality assurance, safety, security, environmental responsibility, and transportation capabilities.

The Apparent High Bidder shall cooperate in the Pre-Award process by assisting in arrangements and/or by providing requested information in a timely manner. Be advised that the Pre-Award survey and providing documents to the Government is part of the evaluation to determine responsibility and is not a guarantee of contract award. To facilitate the Pre-Award Survey, you have five business days to Complete and return SOI and EUC to the

SCO.

The Environmental Support Branch of Disposition Services will conduct an Environmental Responsibility Determination (ERD) on sale destinations to verify if the DoD purchased property will be managed in accordance with the Invitation for Bid, Statement of Intent, Federal, state, and local regulations. List all downstream facilities receiving Government property to be processed in the Statement of Intent. Do not list downstream recipients of processed property.

To facilitate the Pre-Award Survey, you have 15 business days to:

• Complete and return SOI to the SCO.

• Complete and return FAR Provision 52.204-24.

• Complete and return EUC DLA Form 1822.

• Treatment, Storage, and Disposal Facility (TSDF) plan. The TSDF identified in the plan must demonstrate the Bidder’s understanding of the scope of the work effort and the degree of difficulty.

• Identification and description of at least one temporary storage facility meeting the requirements of 40 CFR

761.65 for PCB items removed but not shipped for disposal within 30 day or meeting the requirements of 40 CFR 761.65(c) for PCB items removed but not shipped for disposal within 30 days or meeting the requirements of 40 CFR 761.65(b) for PCB items removed but not shipped for disposal within one year.

• The procedures for identification, removal, treatment and temporary storage of regulated PCB items.

• The EPA identification number of the facility where demilitarization, mutilation, and remediation are to be accomplished.

• The names, locations and EPA identification numbers of all transporters and disposal facilities to be utilized for disposal of regulated PCB waste and other hazardous wastes generated during mutilation and demilitarization.

• Evidence of an established working relationship with the transporters and disposal facilities identified. If an existing working relationship does not exist, the Bidder should provide written evidence of the transporters or disposal facility willingness to provide subcontracting services under this IFB. Provide the Bidder’s procedure for review and selection of transporters and disposal facilities.

Environmental Responsibility Determination (ERD):

The Environmental Support Branch of Disposition Services will conduct an ERD on sale destinations to verify if the DoD purchased property will be managed in accordance with the Invitation for Bid, Statement of Intent, Federal, state, and local regulations. List all downstream facilities receiving Government property to be processed in the Statement of Intent. Do not list downstream recipients of processed property.

ERDs typically take 10 business days to complete. Any findings annotated by the Government during an ERD must be corrected prior to a proposed destination/facility’s use. Purchaser is not authorized to process Government material at a site other than those listed on the SOI.

Transporters:

The Bidder agrees that no transporter other than those listed on the statement of intent will be used without obtaining prior written approval of the SCO.

Contract Award:

When you have successfully completed the pre-award survey you will receive a Statement indicating the amount of payment due. Submit the payment within five business days of the Statement. Full payment must be received prior to the removal of any property.

When payment has posted and is confirmed by the SCO; and all other vetting has been completed, the post-award conference will be scheduled.

Post-Award Conference:

The Government shall conduct a post-award conference within 30 business days after award.