This document is Appendix 1.B of a federal contract solicitation for the Brand-New Air Traffic Control System (BNATCS), which details the supplies, services, and pricing/cost structure for the project. The appendix outlines multiple Contract Line Item Numbers (CLINs) across several key domains: Communications, Surveillance, Automation Systems, Facilities, and Alaska/Airspace. Each domain includes specific subcategories like Voice Switch, Radar, Enterprise Information Display System, Air Route Traffic Control Center Replacement, and Automated Weather Observing System.
The contract is structured as an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a base performance period of 3 years and 3 months, followed by seven potential 1-year continuation periods. The minimum ordering obligation is $10,000, and the contract will use a Cost Plus Award Fee (CPAF) pricing mechanism. The FAA reserves the right to award multiple contracts and issue task orders through a phased delivery method. Pricing details are marked as "TBD" (to be determined) across the various line items, indicating that specific costs will be negotiated during the contract execution phase.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFS Appendix.pdf | ||
| RFS.pdf | ||
| RFS.pdf | ||
| BNATCS Cost_Price Model Attachment J-5.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J Index
J1 - Reserved
J2 - Reserved
J3 - Reserved
J4 – Notional Schedule
J5 – Cost Model (Excel)
J6 – Data Warehouse
J7 – Stipend Agreement
Q2
TDM to IP Total TDM-IP Planned 4640 17 46 70 71 70 70 64 64 64 64 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 31 2 Total TDM-IP Remaining (Planned) 2843 2826 2780 2710 2639 2569 2499 2435 2371 2307 2243 2178 2113 2048 1983 1918 1853 1788 1723 1658 1593 1528 1463 1398 1333 1268 1203 1138 1073 1008 943 878 813 748 683 618 553 488 423 358 293 228 163 98 33 2 0 Total TDM-IP Plan Cumulative 17 63 133 204 274 344 408 472 536 600 665 730 795 860 925 990 1055 1120 1185 1250 1315 1380 1445 1510 1575 1640 1705 1770 1835 1900 1965 2030 2095 2160 2225 2290 2355 2420 2485 2550 2615 2680 2745 2810 2841 2843
% Complete 39% 40% 42% 43% 45% 46% 48% 49% 50% 52% 53% 54% 56% 57% 59% 60% 61% 63% 64% 66% 67% 68% 70% 71% 73% 74% 75% 77% 78% 80% 81% 82% 84% 85% 87% 88% 89% 91% 92% 94% 95% 96% 98% 99% 100% 100% Total TDM-IP Actuals 371 45 110 47 45 57 67 Total TDM-IP Remaining (Actuals) 2843 2798 2688 2641 2596 2539 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472 2472
Total TDM-IP Actual Cumulative 45 155 202 247 304 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 371 TDM to IP Actual % Complete 40% 42% 43% 44% 45% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47% 47%
FENS Transition Planned 4640 FENS Remaining (Planned) 0 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 FENS Plan Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% FENS Actuals 0 FENS Remaining (Actuals) 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 4640 FENS Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
FENS Actual % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Voice Switches Small ATCT Voice Planned 140 0 0 0 0 0 0 2 15 15 15 30 30 20 13 Small ATCT Voice Remaining (Planned) 140 140 140 140 140 140 138 123 108 93 63 33 13 0
Small ATCT Voice Planned Cumulative 0 0 0 0 0 0 2 17 32 47 77 107 127 140 % Complete 0% 0% 0% 0% 0% 0% 1% 12% 23% 34% 55% 76% 91% 100%
Small ATCT Voice Actuals 0 0 0 0 0 0 0 Small ATCT Voice Remaining (Actu 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140
Small ATCT Voice Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Small ATCT Actual % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APC Planned 2522 0 0 0 0 0 0 23 45 46 45 46 46 11 0 71 70 71 70 71 71 70 71 71 70 71 70 71 71 70 71 71 70 71 70 71 71 70 71 71 70 71 70 71 71 70 71 APC Remaining (Planned) 2522 2522 2522 2522 2522 2522 2499 2454 2408 2363 2317 2271 2260 2260 2189 2119 2048 1978 1907 1836 1766 1695 1624 1554 1483 1413 1342 1271 1201 1130 1059 989 918 848 777 706 636 565 494 424 353 283 212 141 71 0
APC Planned Cumulative 0 0 0 0 0 0 23 68 114 159 205 251 262 262 333 403 474 544 615 686 756 827 898 968 1039 1109 1180 1251 1321 1392 1463 1533 1604 1674 1745 1816 1886 1957 2028 2098 2169 2239 2310 2381 2451 2522 % Complete 0% 0% 0% 0% 0% 0% 1% 3% 5% 6% 8% 10% 10% 10% 13% 16% 19% 22% 24% 27% 30% 33% 36% 38% 41% 44% 47% 50% 52% 55% 58% 61% 64% 66% 69% 72% 75% 78% 80% 83% 86% 89% 92% 94% 97% 100%
APC Actuals 0 0 0 0 0 0 0 APC Remaining (Actuals) 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522
APC Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APC Actual % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Medium ATCT Voice Planned 247 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15 20 20 20 20 14 14 14 14 14 14 14 14 11 11 3 Medium ATCT Voice Remaining (Planned) 247 247 247 247 247 247 247 247 247 247 247 247 247 232 217 197 177 157 137 123 109 95 81 67 53 39 25 14 3 0
Medium ATCT Voice Planned Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 15 30 50 70 90 110 124 138 152 166 180 194 208 222 233 244 247 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 6% 12% 20% 28% 36% 45% 50% 56% 62% 67% 73% 79% 84% 90% 94% 99% 100%
Medium ATCT Voice Actuals 0 0 0 0 0 0 0 Medium ATCT Voice Remaining (Ac 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247 247
Medium ATCT Voice Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Medium ATCT Actual % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Large ATC Voice Planned 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 4 5 5 6 7 7 7 4 3 4 2 3 2 2 3 2 2 3 2 Large ATC Voice Remaining (Planned) 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 73 69 64 59 53 46 39 32 28 25 21 19 16 14 12 9 7 5 2 0
Large ATCT Voice Planned Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 6 11 16 22 29 36 43 47 50 54 56 59 61 63 66 68 70 73 75 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3% 8% 15% 21% 29% 39% 48% 57% 63% 67% 72% 75% 79% 81% 84% 88% 91% 93% 97% 100%
Large ATCT Voice Actuals 0 0 0 0 0 0 0 Large ATCT Voice Remaining (Actua 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75
Large ATCT Voice Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Large ATCT Actual % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Enterprise Common Consoles Slatwalls Planned 20 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1 0 1 0 2 0 1 0 1 0 1 0 1 0 2 0 1 0 1 0 1 0 1 0 2 0 1 0 1 0 Slatwalls Remaining (Planned) 20 20 20 20 20 20 20 20 20 20 20 20 20 19 19 18 18 17 17 16 16 14 14 13 13 12 12 11 11 10 10 8 8 7 7 6 6 5 5 4 4 2 2 1 1 0 0
Slatwall Planned Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 1 1 2 2 3 3 4 4 6 6 7 7 8 8 9 9 10 10 12 12 13 13 14 14 15 15 16 16 18 18 19 19 20 20 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 5% 10% 10% 15% 15% 20% 20% 30% 30% 35% 35% 40% 40% 45% 45% 50% 50% 60% 60% 65% 65% 70% 70% 75% 75% 80% 80% 90% 90% 95% 95% 100%
Slatwalls Actuals 0 0 0 0 0 0 0 Slatwalls Remaining (Actuals) 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Slatwalls Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Slatwalls Actual % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Radios V2 Radios @ TCOM & FCOM ARTCC CRMM\V3 Radios @ ECOM Radio Sites Planned 1581 13 18 18 19 17 12 14 31 0 0 0 0 6 26 32 44 47 48 72 48 0 0 0 0 40 32 64 110 88 92 120 48 0 0 0 0 40 32 56 69 80 110 88 47 Radio Sites Remaining (Planned) 1568 1550 1532 1513 1496 1484 1470 1439 1439 1439 1439 1439 1433 1407 1375 1331 1284 1236 1164 1116 1116 1116 1116 1116 1076 1044 980 870 782 690 570 522 522 522 522 522 482 450 394 325 245 135 47 0
Radio Sites Planned Cumulative 13 31 49 68 85 97 111 142 142 142 142 142 148 174 206 250 297 345 417 465 465 465 465 465 505 537 601 711 799 891 1011 1059 1059 1059 1059 1059 1099 1131 1187 1256 1336 1446 1534 1581 % Complete 1% 2% 3% 4% 5% 6% 7% 9% 9% 9% 9% 9% 9% 11% 13% 16% 19% 22% 26% 29% 29% 29% 29% 29% 32% 34% 38% 45% 51% 56% 64% 67% 67% 67% 67% 67% 70% 72% 75% 79% 85% 91% 97% 100%
Radio Site Actuals 83 15 16 8 8 17 19 Radio Site Remaining (Actuals) 1581 1566 1550 1542 1534 1517 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498 1498
Radio Site Actuals Cumulative 15 31 39 47 64 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 83 % Complete 1% 2% 2% 3% 4% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Airport Cable Loop System ACLS Sites Planned 49 ACLS Sites Remaining (Planned) 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Radio Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Radio Site Actuals 0 Radio Site Remaining (Actuals) 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Radio Site Actuals Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Radars Radar Vendor A Sites Planned 256 0 0 0 0 0 0 0 0 0 0 4 2 2 2 2 4 4 2 4 2 0 7 9 0 0 10 10 12 16 20 20 24 24 24 30 22 Radar Vendor A Sites Remaining (Planned) 256 256 256 256 256 256 256 256 256 256 252 250 248 246 244 240 236 234 230 228 228 221 212 212 212 202 192 180 164 144 124 100 76 52 22 0
Radar Vendor A Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 4 6 8 10 12 16 20 22 26 28 28 35 44 44 44 54 64 76 92 112 132 156 180 204 234 256 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 2% 3% 4% 5% 6% 8% 9% 10% 11% 11% 14% 17% 17% 17% 21% 25% 30% 36% 44% 52% 61% 70% 80% 91% 100%
Radar Vendor A Site Actuals 0 0 0 0 0 0 0 Radar Vendor A Site Remaining (Ac 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256
Radar Vendor A Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Radar Vendor B Sites Planned 356 0 0 0 0 0 0 0 0 0 0 7 8 15 15 16 16 16 16 16 17 17 17 17 17 17 17 17 17 13 10 10 9 9 9 9 9 Radar Vendor B Sites Remaining (Planned) 356 356 356 356 356 356 356 356 356 356 349 341 326 311 295 279 263 247 231 214 197 180 163 146 129 112 95 78 65 55 45 36 27 18 9 0
Radar Vendor B Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 7 15 30 45 61 77 93 109 125 142 159 176 193 210 227 244 261 278 291 301 311 320 329 338 347 356 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 4% 8% 13% 17% 22% 26% 31% 35% 40% 45% 49% 54% 59% 64% 69% 73% 78% 82% 85% 87% 90% 92% 95% 97% 100%
Radar Vendor B Site Actuals 0 0 0 0 0 0 0 Radar Vendor B Site Remaining (Ac 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356 356
Radar Vendor B Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Surface Movement Radar SMR Sites Planned 53 0 0 0 0 0 0 0 0 0 0 1 2 1 1 2 1 3 2 2 1 1 2 1 1 2 2 1 2 1 1 2 1 1 2 1 1 2 1 1 2 2 2 1 1 2 1 SMR Sites Remaining (Planned) 53 53 53 53 53 53 53 53 53 53 52 50 49 48 46 45 42 40 38 37 36 34 33 32 30 28 27 25 24 23 21 20 19 17 16 15 13 12 11 9 7 5 4 3 1 0
SMR Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 1 3 4 5 7 8 11 13 15 16 17 19 20 21 23 25 26 28 29 30 32 33 34 36 37 38 40 41 42 44 46 48 49 50 52 53 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 6% 8% 9% 13% 15% 21% 25% 28% 30% 32% 36% 38% 40% 43% 47% 49% 53% 55% 57% 60% 62% 64% 68% 70% 72% 75% 77% 79% 83% 87% 91% 92% 94% 98% 100%
SMR Site Actuals 0 0 0 0 0 0 0 SMR Site Remaining (Actuals) 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53
SMR Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SAI
SAI Sites Planned 219 18 0 0 0 0 0 0 0 0 0 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 7 7 7 7 6 6 6 6 6 6 6 6 SAI Sites Remaining (Planned) 219 201 201 201 201 201 201 201 201 201 201 196 190 184 178 172 166 160 154 148 142 136 130 124 118 112 106 100 94 88 82 76 69 62 55 48 42 36 30 24 18 12 6 0
SAI Sites Planned Cumulative 18 18 18 18 18 18 18 18 18 18 23 29 35 41 47 53 59 65 71 77 83 89 95 101 107 113 119 125 131 137 143 150 157 164 171 177 183 189 195 201 207 213 219 % Complete 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 11% 13% 16% 19% 21% 24% 27% 30% 32% 35% 38% 41% 43% 46% 49% 52% 54% 57% 60% 63% 65% 68% 72% 75% 78% 81% 84% 86% 89% 92% 95% 97% 100%
SAI Site Actuals 31 18 0 0 3 8 2 SAI Site Remaining (Actuals) 201 183 183 183 180 172 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170
SAI Sites Actual Cumulative 18 18 18 21 29 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 % Complete 16% 16% 16% 18% 21% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22% 22%
TFDM
TFDM Sites Planned 89 10 0 0 0 0 1 1 1 0 0 0 2 1 1 0 0 2 2 2 3 1 1 2 3 3 3 3 3 3 3 3 3 1 1 2 3 3 3 3 3 3 3 2 4 1 TFDM Sites Remaining (Planned) 89 79 79 79 79 79 78 77 76 76 76 76 74 73 72 72 72 70 68 66 63 62 61 59 56 53 50 47 44 41 38 35 32 31 30 28 25 22 19 16 13 10 7 5 1 0
TFDM Sites Planned Cumulative 10 10 10 10 10 11 12 13 13 13 13 15 16 17 17 17 19 21 23 26 27 28 30 33 36 39 42 45 48 51 54 57 58 59 61 64 67 70 73 76 79 82 84 88 89 % Complete 11% 11% 11% 11% 11% 12% 13% 15% 15% 15% 15% 17% 18% 19% 19% 19% 21% 24% 26% 29% 30% 31% 34% 37% 40% 44% 47% 51% 54% 57% 61% 64% 65% 66% 69% 72% 75% 79% 82% 85% 89% 92% 94% 99% 100%
TFDM Site Actuals 11 10 0 0 0 0 1 TFDM Site Remaining (Actuals) 89 79 79 79 79 79 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
TFDM Sites Actual Cumulative 10 10 10 10 10 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 % Complete 11% 11% 11% 11% 11% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12% 12%
EIDS
E-IDS Sites Planned 435 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 7 10 9 17 0 30 24 24 0 17 28 21 18 23 28 21 0 27 26 27 0 26 27 21 E-IDS Sites Remaining (Planned) 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 431 424 414 405 388 388 358 334 310 310 293 265 244 226 203 175 154 154 127 101 74 74 48 21 0
E-IDS Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 11 21 30 47 47 77 101 125 125 142 170 191 209 232 260 281 281 308 334 361 361 387 414 435 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 3% 5% 7% 11% 11% 18% 23% 29% 29% 33% 39% 44% 48% 53% 60% 65% 65% 71% 77% 83% 83% 89% 95% 100%
E-IDS Site Actuals 0 0 0 0 0 0 0 E-IDS Site Remaining (Actuals) 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435
E-IDS Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Flow Management Data Services FMDS Sites Planned FMDS Sites Remaining (Planned)
FMDS Sites Planned Cumulative % Complete
FMDS Site Actuals FMDS Site Remaining (Actuals)
FMDS Sites Actual Cumulative % Complete
Common Automation Platform CAP Sites Planned CAP Sites Remaining (Planned)
CAP Sites Planned Cumulative % Complete
CAP Site Actuals CAP Site Remaining (Actuals)
CAP Sites Actual Cumulative % Complete
ARTCC
ARTCC Sites Planned 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 ARTCC Sites Remaining (Planned) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
ARTCC Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%
ARTCC Site Actuals 0 0 0 0 0 0 0 ARTCC Site Remaining (Actuals) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ARTCC Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
TRACON Consolidation TRACON Sites Planned TRACON Sites Remaining (Planned)
TRACON Sites Planned Cumulative % Complete
TRACON Site Actuals TRACON Site Remaining (Actuals)
TRACON Sites Actual Cumulative % Complete
ATCT
ATCT Sites Planned ATCT Sites Remaining (Planned)
ATCT Sites Planned Cumulative % Complete
ATCT Site Actuals ATCT Site Remaining (Actuals)
ATCT Sites Actual Cumulative % Complete
Unstaffed Infrastructure UIS Sites Planned 140 0 0 0 0 0 0 0 0 0 0 1 5 5 5 5 5 5 5 5 5 0 0 2 5 5 5 5 5 5 5 5 5 0 0 2 5 5 5 5 5 5 5 5 5 UIS Sites Remaining (Planned) 140 140 140 140 140 140 140 140 140 140 140 139 134 129 124 119 114 109 104 99 94 94 94 92 87 82 77 72 67 62 57 52 47 47 47 45 40 35 30 25 20 15 10 5 0
UIS Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 1 6 11 16 21 26 31 36 41 46 46 46 48 53 58 63 68 73 78 83 88 93 93 93 95 100 105 110 115 120 125 130 135 140 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 4% 8% 11% 15% 19% 22% 26% 29% 33% 33% 33% 34% 38% 41% 45% 49% 52% 56% 59% 63% 66% 66% 66% 68% 71% 75% 79% 82% 86% 89% 93% 96% 100%
UIS Site Actuals 0 0 0 0 0 0 0 UIS Site Remaining (Actuals) 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140
UIS Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
AWOS, VWOS, WCAM, AAC
Alaska Sites Planned 174 0 0 0 0 0 0 0 0 0 0 4 4 3 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 5 5 5 5 5 5 5 5 5 5 5 Alaska Sites Remaining (Planned) 174 174 174 174 174 174 174 174 174 174 170 166 163 159 155 151 146 141 136 131 126 121 116 111 106 101 96 91 86 81 76 71 66 61 55 50 45 40 35 30 25 20 15 10 5 0
Alaska Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 4 8 11 15 19 23 28 33 38 43 48 53 58 63 68 73 78 83 88 93 98 103 108 113 119 124 129 134 139 144 149 154 159 164 169 174 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 5% 6% 9% 11% 13% 16% 19% 22% 25% 28% 30% 33% 36% 39% 42% 45% 48% 51% 53% 56% 59% 62% 65% 68% 71% 74% 77% 80% 83% 86% 89% 91% 94% 97% 100%
Alaska Site Actuals 0 0 0 0 0 0 0 Alaska Site Remaining (Actuals) 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174
Alaska Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
TSS
TSS Sites Planned 113 0 0 0 0 0 0 0 0 0 0 2 3 2 3 3 3 3 3 3 3 3 3 3 3 3 4 3 4 3 3 4 3 3 3 3 3 3 4 4 4 3 3 4 3 3 3 TSS Sites Remaining (Planned) 113 113 113 113 113 113 113 113 113 113 111 108 106 103 100 97 94 91 88 85 82 79 76 73 70 66 63 59 56 53 49 46 43 40 37 34 31 27 23 19 16 13 9 6 3 0
TSS Sites Planned Cumulative 0 0 0 0 0 0 0 0 0 0 2 5 7 10 13 16 19 22 25 28 31 34 37 40 43 47 50 54 57 60 64 67 70 73 76 79 82 86 90 94 97 100 104 107 110 113 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 4% 6% 9% 12% 14% 17% 19% 22% 25% 27% 30% 33% 35% 38% 42% 44% 48% 50% 53% 57% 59% 62% 65% 67% 70% 73% 76% 80% 83% 86% 88% 92% 95% 97% 100%
TSS Site Actuals 0 0 0 0 0 0 0 TSS Site Remaining (Actuals) 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
TSS Sites Actual Cumulative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Complete 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Q3 Q4 Q1 Q2Q3 Q4 Q1 Q2 Q3 Q4 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2
FY29
# of Sites Planned by Month
FY25 FY26 FY27 FY28
TBD
TBD
TBD
TBD
TBD
TBD
BNATCS_RFS_ Appendix 1.J.6 Data Warehouse
Index Primary Folder Subfolder 1 Subfolder 2 Document Name File Type Document Description GR Glossaries and Reference Documents N/A N/A AMS Glossary PDF AMS Glossary GR Glossaries and Reference Documents N/A N/A SEM Glossary v2 Word SEM Glossary GR Glossaries and Reference Documents N/A N/A Order 7210.3EE PDF Order 7210.3EE Section 5
GR
Glossaries and Reference Documents N/A N/A
Quick_Guide_RMF_Categorization_and_Evaluation_of_ Security_Categorization_Processes_2024-1202.(part
1)_signed PDF ATO Risk Management Framework Quick Guide
GR Glossaries and Reference Documents N/A N/A 1.4 ATO Overview_July 2025 (07-10-25)V1 CLEAN Word Overview of ATO Organization GR Glossaries and Reference Documents N/A N/A Integrator Data Sheet-Systems Excel Program List GR Glossaries and Reference Documents N/A N/A Program List by Site Excel List of active programs by FAA site
LR.CB
Labor Relations CBAs N/A 2016-07-14 NATCA Slate Book_0053_0061_1545 PDF
Labor agreement between FAA and NATCA covering air traffic controllers
LR.CB
Labor Relations CBAs N/A 2025-01-14 PASS_Tech_Ops PDF
Labor agreement between FAA and PASS covering Tech Ops technicians
LR.CL
Labor Relations Controller Labor N/A ALA.CAM.CAF_PP25.16_2025.08.12_v1 Excel
Controller Headcount and YTD attrition by Facility and Academy, through Aug 12 202
LR.CL Labor Relations Controller Labor N/A locality_pay_percentages Excel Locality Pay Rates by Region LR.CL Labor Relations Controller Labor N/A 0061s by facility eofy24 Excel Average controller pay as of end of FY24
LR.CL
Labor Relations Controller Labor N/A pcb AT by fac level FY24 v01 Excel Average PC&B by labor category by ATC facility level
LG Lessons Learned, GAO Reports N/A N/A AAS OIG Report 1998 (1) PDF 1998 GAO Audit on AAS LG Lessons Learned, GAO Reports N/A N/A gao-24-107001 PDF 2024 GAO Report on ATC Modernization
LG
Lessons Learned, GAO Reports N/A N/A gao-25-107917 PDF
2024 GAO Testimony to Congress on ATC Modernization (Kevin Walsh, Director of IT and
Cybersecurity)
LG
Lessons Learned, GAO Reports N/A N/A gao-25-108162 PDF
2024 GAO Testimony to Congress on ATC Modernization (Heather Krause, Managing Director of
Physical Infrastructure) LG Lessons Learned, GAO Reports N/A N/A NAS_safety_review_team_report PDF 2023 NAS Safety Review Team Report to FAA
RM.OR
Safety, Operational Risk Management Operational Risk Management N/A ORM Guidance for Integrator Combined PDF
Operational Risk Management Guidance for Integrators
RM.SR
Safety, Operational Risk Management Safety Risk Management N/A 202212-SMS-Manual PDF Safety Management System Manual December 2022
RM.SR
Safety, Operational Risk Management Safety Risk Management N/A SRMGSA PDF
Safety Risk Management Guidance for Systems Acquisitions
RM.SR
Safety, Operational Risk Management Safety Risk Management N/A
Quick_Guide_RMF_Categorization_and_Evaluation_of_ Security_Categorization_Processes_2024-1202.(part
1)_signed
Standard Operating Procedures for Risk Management Framework
RM.SR Safety, Operational Risk Management Safety Risk Management N/A JO_1000.37C_with_CHG1_and_CHG2_(fixed_link) PDF Order JO 1000.37
TE
Test and Evaluation N/A N/A 20220128 Critical Operational Issue (COI) Guidelines PDF Critical Operational Issue Guidelines
TE Test and Evaluation N/A N/A FC_Row-te PDF Test & Evaluation Phases
TE
Test and Evaluation N/A N/A t_&_e_gold_standard_guide_2.0 PDF
Test & Evaluation Gold Standard and Implementation Guide
TE Test and Evaluation N/A N/A teguidelines Word Test & Evaluation Process Guidelines TE Test and Evaluation N/A N/A tehandbook PDF Test & Evaluation Handbook TE Test and Evaluation N/A N/A tevrtm PDF Verification Requirements Traceability Matrix TE Test and Evaluation N/A N/A VVSPT-A2-PDD-013_TEHandbook_v5-10_2025Apr21 Word Test & Evaluation Handbook
WS.AL.1 Work Streams Alaska omated Weather Observing System (AW FINAL WSTRP ASWON S2 GSIP PDF WSTRP Generic Site Implementation Plan (GSIP) WS.AL.1 Work Streams Alaska omated Weather Observing System (AW FAA-E-2732C AWOS-C PDF AWOS-C System Specification Document (SSD)
WS.AL.1
Work Streams Alaska omated Weather Observing System (AW
BN ATC Program Schedule Information_Alaska Weather (8-12-2025)
Word AWOS-C Questionnaire
WS.AL.1
Work Streams Alaska omated Weather Observing System (AW BNATCS_RFS_Section J-4 Alaska Weather (8-12-2025) Excel Notional Schedule
WS.AL.1 Work Streams Alaska omated Weather Observing System (AW 20250820 - AWOS Notional Schedule Excel AWOS Notional Schedule WS.AL.2 Work Streams Alaska Visual Weather Observing System (VWOS VWOS ConOps Draft_20250730 Word Weather Camera Program ConOps WS.AL.2 Work Streams Alaska Visual Weather Observing System (VWOS VWOS Risk Register_Checkpoint 1 Excel VWOS Risk Tracker WS.AL.3 Work Streams Alaska Weather Camera Program (WCAM) WXCAM ConOps V2.0 - Dec 16 2022_ajr_1169839 PDF Weather Camera Program ConOps
WS.AU.1
Work Streams Automation Alaska Automation Capability (AAC)
Attachment 1 - Alaska GFE Telecomm Parameters by Site
Word Alaska GFE Telecomm Parameters by Site
WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Attachment 2 - Radios and RCO locations Word Radios and RCO locations WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Attachment 3 - AAC Sites Word AAC Sites WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section C-PWS-AAC-Rev.0.3 Word FFSP and AAC Performance Work Statement WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section J-1 P00067 Rev Word Description of Services for FFSP and AAC WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section J-11 P00067 Rev Word FFSP and AAC Labor Category Descriptions WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section J-12 P00067 Rev Word FFSP and AAC Applicable Documents List WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section J-2 P00067 Rev Word FFSP and AAC Transition Constraints
WS.AU.1
Work Streams Automation Alaska Automation Capability (AAC) Section J-6AJ Rev Word
FFSP and AAC Interface Requirements Document (IRD) and System Guides
WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section J-7 P00067 Rev Word FFSP and AAC Contract Data Requirements Listing WS.AU.1 Work Streams Automation Alaska Automation Capability (AAC) Section J-8 P00067 Rev Word FFSP and AAC Data Item Description List (DID) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP SAI GSIP Initial Release 10_15_24 signed PDF SAI Generic Site Implementation Plan (GSIP) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP TFDM GSIP v1.1_Final_20230221 signed PDF TFDM Generic Site Implementation Plan (GSIP) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP 20250815 - CAP Aquisition Timeline Word CAP Phases and Timeline WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP ATOP System Archictecture Document August 2025 PDF ATOP System Architecture Description WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP ATT J-06_SSD_Rev15_20250305_FINAL_signed PDF TFDM System Specification Document (SSD) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP Attachment 3 FMDS SSD v1.3 20250723 Word FMDS System Specification Document (SSD)
WS.AU.2
Work Streams Automation Automation Evolution Acceleration (CAP ERAM_SADD_MISC_230.01_SDR-071 PDF ERAM System Architecture Design Document (SADD)
WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP ERAM SSD V2.0 Rev L_03192025 PDF ERAM System Specification Document (SSD) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP FAA-E-3025 TBFM SSD_Rev C 2019 0501 Word TDFM System Specification Document (SSD) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP J.1 E-IDS SIR Final Draft SSD 6.11.19 PDF E-IDS System Specification Document (SSD) WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP SAI SIR Section J.1 12.27.23 Word SAI Minimum Requirements Document WS.AU.2 Work Streams Automation Automation Evolution Acceleration (CAP STARS FAA-E-2904 Rev F_signed PDF STARS System Specification Document (SSD) WS.AU.3 Work Streams Automation terprise Information Display System (E-ID DRAFT E-IDS GSIP v1.04 Word E-IDS Generic Site Implementation Plan (GSIP)
WS.AU.3
Work Streams Automation terprise Information Display System (E-ID
20250724 BNAS Burndown Chart_updated 08.05.2025
E-IDS
Excel BNAS Burndown Chart
WS.AU.3 Work Streams Automation terprise Information Display System (E-ID BN ATC Program Schedule Information_ E-IDS v2 Word E-IDS Questionnaire WS.AU.3 Work Streams Automation terprise Information Display System (E-ID E-IDS Waterfall 2025-08-07 MSL Excel E-IDS Waterfall WS.AU.3 Work Streams Automation terprise Information Display System (E-ID E-IDS Waterfall by IOC 2025-08-07 Excel E-IDS Waterfall WS.AU.3 Work Streams Automation terprise Information Display System (E-ID FAA-E-37017 - E-IDS SSD PDF E-IDS System Specification Document (SSD)
WS.AU.3
Work Streams Automation terprise Information Display System (E-IDFAA-E-XXXXX - E-IDS Expedited SSD - Draft - Aug072025 Word E-IDS System Specification Document (SSD)
WS.AU.4 Work Streams Automation Services (FMDS) Traffic Flow Manageme Attachment 3 FMDS SSD v1.3 20250723 Word FMDS System Specification Document (SSD) WS.AU.4 Work Streams Automation Services (FMDS) Traffic Flow Manageme FMDS Assumptions 08202025 Word FMDS Assumptions/Constraints
WS.AU.4
Work Streams Automation
Services (FMDS) Traffic Flow Manageme FMDS_BN ATC, Program Schedule
Information_08202025 Word FMDS Questionnaire
WS.AU.4 Work Streams Automation Services (FMDS) Traffic Flow Manageme FMDS Site List_August 2025 Word FMDS Site List
WS.AU.5
Work Streams Automation Terminal Flight Data Manager (TFDM)
20250812_BN ATC Program Schedule Information_TFDM Response v.3
Word TFDM Questionnaire
WS.AU.5 Work Streams Automation Terminal Flight Data Manager (TFDM) 20250306 TFDM SSD-PMO-02-TFDM-14-001 Rev. 15 PDF TFDM System Specification Document (SSD)
WS.AU.5
Work Streams Automation Terminal Flight Data Manager (TFDM)
TFDM Waterfall Replan 89 BBB_20250723_FTI- SWIM_Status_FDIO-TFDM_20250813_V5
Excel TFDM Waterfall
WS.AU.5 Work Streams Automation Terminal Flight Data Manager (TFDM) TFDM Risk Register_2025 08 20 PDF Risk Register
WS.AU.6
Work Streams Automation Tower Simulation System (TSS)
20230601 Attachment A Representative TSS Hardware Components
PDF List of hardware components of TSS
WS.AU.6
Work Streams Automation Tower Simulation System (TSS)
20230601 FINAL PROGRAM REQUIREMENTS for Tower Simulation System (TSS) Enhancement 1 Final Program
Requirements Document Version 1.0 PDF Program Requirements for TSS
WS.AU.6
Work Streams Automation Tower Simulation System (TSS) BN ATC Program Schedule Information_TSS_08142025 Word TSS Questionnaire
WS.AU.6 Work Streams Automation Tower Simulation System (TSS) BNATCS_RFS_Section J-4_TSS_08142025 Excel Nominal Schedule WS.CM.1 Work Streams Communications Airport Cable Loop ACLSS LIFT Survey Prioritization Excel Survey of LIFT Priorities WS.CM.1 Work Streams Communications Airport Cable Loop BN ATC Program Schedule Information_ACLSS Word Airport Cable Loop Questionnaire WS.CM.1 Work Streams Communications Airport Cable Loop M3130 021522 FINAL FOTS-STD-061A Word FOTS Interface Standard WS.CM.1 Work Streams Communications Airport Cable Loop 693KA8-25-D-00006 DNTS Sect J1 - FAA-P-2978e PDF Product Description for DNTS WS.CM.2 Work Streams Communications Air-to-Ground Protocol Converter (APC) APC GSIP Draft v1.1 07212025 PDF APC Generic Site Implementation Plan (GSIP) WS.CM.2 Work Streams Communications Air-to-Ground Protocol Converter (APC) APCS Sect J Att J.1.1_P00002 PDF VoICE APC System Technical Specification
WS.CM.2
Work Streams Communications Air-to-Ground Protocol Converter (APC) APCMS Waterfall Bandwidth - Update - LG SO 7-29-25 Excel
WS.CM.3
Work Streams Communications FAA Enterprise Network Services (FENS)
FENS SIR - Attachment J-1 - FENS Functional and Performance Spec (FFPS) - Amendment 6
Word FENS Performance Specification
WS.CM.4
Work Streams Communications Radios
BN ATC, Program Schedule Information_NEXCOM Radio Replacement
Word NEXCOM Phase 3 Radio Replacement Questionnaire
WS.CM.4
Work Streams Communications Radios
LIFT Radio Replacement Waterfall Schedule-08-14-
Excel Radio Replacement Waterfall
WS.CM.4
Work Streams Communications Radios NEXV3 Sect J_Att J01_PD_v2.6_FAA-E-37021_Amend 2 PDF NEXCOM Version 3 (Radio) Product Description
WS.CM.4
Work Streams Communications Radios
Section J1-FAA-E-3014 Product Description NEX II VHF RXs and TXs, NEX II UHF RXs and TXs_V1.0_092710
PDF NEXCOM II (Radio) Product Description
WS.CM.4
Work Streams Communications Radios NEXCOM Phase 2 GSIP signed 7 Feb 2014 PDF
NEXCOM Phase 2 Generic Site implementation Plan
(GSIP)
WS.CM.4
Work Streams Communications Radios NEXCOM Phase 3 GSIP V0.1_2024_02_15_draft PDF
NEXCOM Phase 3 Generic Site implementation Plan
(GSIP)
WS.CM.4 Work Streams Communications Radios NEXCOM Phase 3 RIO Register_2025_08_20 PDF NEXCOM Phase 3 RIO WS.CM.5 Work Streams Communications Telecommunications 20250805_V2BNAS_Draft Excel
WS.CM.5
Work Streams Communications Telecommunications AT Impacts from System Disruptions Visuals PPT
PPT with visuals that show air traffic impacts of system disruptions
WS.CM.5 Work Streams Communications Telecommunications Complexity of FTI PPT High Level Overview of Complexity of FTI WS.CM.5 Work Streams Communications Telecommunications FTI 101 - Abridged PPT Short FTI Overview WS.CM.5 Work Streams Communications Telecommunications FTI 101 - CY2025 -30 slides PPT Longer FTI Overview
WS.CM.5
Work Streams Communications Telecommunications FTI Central Nervous System of the NAS PPT A visual highlighting FTI's role as the "CNS of the NAS"
WS.CM.5 Work Streams Communications Telecommunications FTI Complexity and Volume 20250724 FINAL PPT High Level Overview of FTI Complexity and Volume WS.CM.5 Work Streams Communications Telecommunications FTI Ring diagrams Blue and Red Core Explained PPT Overview of FTI's "Metro Rings" WS.CM.5 Work Streams Communications Telecommunications FTI Transmission infrastructure Simplified PPT Visuals Showing Key FTI Elements WS.CM.5 Work Streams Communications Telecommunications NAS-101 - Lesson 2 PPT Broad overview of NAS
WS.CM.5
Work Streams Communications Telecommunications
NAS-101 Technical Workshop Student Guide_Part 1_08- 13-2024
PDF Broad overview of and history of NAS
WS.CM.5 Work Streams Communications Telecommunications TDM Metro Ring Replacment with Carrier Ethernet PPT Description of TDM Metro Ring Replacement WS.CM.6 Work Streams Communications Voice Recorder FAA NVR Waterfall 8-14-2025_ Excel NAS Voice Recorder (NVR) Waterfall
WS.CM.6
Work Streams Communications Voice Recorder J-1 Att NVR System Specification v3 PDF
NAS Voice Recorder (NVR) System Specification Document (SSD)
WS.CM.7 Work Streams Communications Voice Switch IPVCS GSIP Draft v0.1.1 07192025 - clean PDF IPVCS Generic Site Implementation Plan (GSIP) WS.CM.7 Work Streams Communications Voice Switch BN ATC Program Schedule Information_VOICE v1 Word VoICE Questionnaire
WS.CM.7
Work Streams Communications Voice Switch
IPVCS Waterfall 7-29-25 LG (NF - Internal Validation Review Draft)
Excel IPVCS Waterfall
WS.CM.7 Work Streams Communications Voice Switch J.1.1_VCS Specification_Draft_20250812_Clean PDF VCS Technical Specification
WS.FA.1
Work Streams Facilities CT Replacement and TRACON Consolidat
AJW-2_BNATCS_ATCT TRACON Program Information_For Review
Word BNATCS Program Overview
WS.FA.2 Work Streams Facilities Campus Campus Briefing 2-23-24 PPT Briefing on Campus Idea WS.FA.2 Work Streams Facilities Campus Campus DEM.v108 ANA WS.FA.3 Work Streams Facilities Real Property Copy of FRAMES Assets July 2025 Excel FRAMES Assets as of July 2025 WS.FA.3 Work Streams Facilities Real Property FSEP Decommisioned LAND Excel List of decommissioned land WS.FA.4 Work Streams Facilities Slat Walls En Route Slat Wall BNATCS Finish 2028 PDF Presentation on Facility Slat Walls WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) Consolidated Files Word WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) 20250812 - UIS Proposed Project List Excel UIS Proposed Project List WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) BN ATC Program Schedule Information_ Word BN ATC Questionnaire WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) 20' Communication Standard Shelter PDF Plans WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) 36' Communications Standard Rev 1 PDF Plans WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) Comm Staired Tower Examples PDF Plans WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) DC BUS Specification PDF DC Bus Specification WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) DCBUS Installation Checklist PDF DC Bus Installation Checklist WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) DupontFinalMobileCommShelterDesign_23070 PDF Plans WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) DVOR 90P Standard with 90P TACAN PDF Plans WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) Exel_Frangible_Approach_Lighting March 2025 PDF WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA Guide to Ground Vehicle Operations PDF FAA Guide to Ground Vehicle Operations WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_Order_6050.32B PDF FAA Order 6050.32B WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_Order_6580.3B PDF FAA Order 6580.3B WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_Order_6750.16E PDF FAA Order 6750.16E WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_Order_6850.2C PDF FAA Order 6850.2C WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_Order_6950.2E_Chg_1 PDF FAA Order 6950.2E WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_Order_6980.24C PDF FAA Order 6980.24C WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA_STD-002H PDF WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) FAA-C-1217h Electrical Work, Interior PDF Electrical Work Specifications
WS.FA.5
Work Streams Facilities Unstaffed Infrastructure (UIS)
FAA-C-1391e Installation, Termination, Splicing, & Transient Surge Protection
PDF Underground Cables Specification
WS.FA.5
Work Streams Facilities Unstaffed Infrastructure (UIS)
FAA-STD-019g Lightning & Surge Protection, Grounding, Bonding, & Shielding
Lightning and Surge Protection, Grounding, Bonding, and Shielding Requirements for Facilities and Electronics Equipment
WS.FA.5 Work Streams Facilities Unstaffed Infrastructure (UIS) Fiber_Typical Installation Information PDF Plans
WS.FA.5
Work Streams Facilities Unstaffed Infrastructure (UIS) NEXGEN-DME-MOBILE-TRAILER-UNIT RWNA-E003-MC PDF Plans
WS.SV.1 Work Streams Surveillance ASR Radar Replacement 2025-07-03 - Surveillance System Traceability Matrix Excel Surveillance System Traceability Matrix
WS.SV.1
Work Streams Surveillance ASR Radar Replacement
Brand New Surveillance Radar System (BNSRS) System Specification Document (SSD) DRAFT
Word Draft specification for ASR replacement program
WS.SV.3 Work Streams Surveillance Surface Movement Radar (SMR) SMR4+Attachment+J-06+-+GSIP+Draft PDF SMR4 Generic Site Implementation Plan (GSIP) WS.SV.3 Work Streams Surveillance Surface Movement Radar (SMR) SMR4+Attachment+J-03+-+SMR4+SSD+Draft PDF SMR4 System Specification Document (SSD) WS.SV.1 Work Streams Surveillance ASR Radar Replacement Radar Site List Excel List of Radar Sites by Radar Type WS.SV Work Streams Surveillance N/A AJM-41 RM Briefing (to CIT) - 2025.07.30 Final PPT Radar Modernization Briefing
WS.SV
Work Streams Surveillance N/A
Brand-New Air Traffic Control System Integrator Surveillance Onboarding Package - jg draft 2025.08.18
Word BNATCS Integrator Surveillance Onboarding Package -jg draft 2025.08.18
WS.SV.2 Work Streams Surveillance Surveillance Awareness Initiative (SAI) BN ATC Program Schedule Information_SAI Word SAI Program Schedule WS.SV.2 Work Streams Surveillance Surveillance Awareness Initiative (SAI) Amendment+1+SAI+SIR+Section+J.1+01.10.24 Word SAI Minimum Requirements Document WS.SV.2 Work Streams Surveillance Surveillance Awareness Initiative (SAI) SAI 250 Site Deployment Plan 8-19-25a PDF SAI Deployment Plan
WS.NA
Work Streams Navigation N/A
J-1 FAA-E-3001 FAA Performance Specification Runway Status Lights System
PDF Runway Status Lights Performance Specification
WS.NA
Work Streams Navigation N/A
J-2 FAA-E-3002 Rev 1 FAA Performance Specification Runway Status Lights Field Lighting System
Runway Status Lights Field Lighting System
Performance Specification
| Appendix 1.B.pdf |
| Appendix 1.D.pdf |
| Appendix 1.E.pdf |
| Appendix 1.G.pdf |
| Appendix 1.H.pdf |
| Appendix 1.I.pdf |
| J Index.pdf |
| Appendix J.4 Schedule.pdf |
| Appendix J.6 Data Warehouse.pdf |
| Appendix J.1.7 Stipend Agreement.pdf |
File details come from the government source that posted it. Updated .