This Request for Qualifications (RFQu-2600020412) is issued by Pima County Procurement Department, Design & Construction Division, seeking Statements of Qualifications from contractors to establish a Job Order Contract for Roofing Services throughout Pima County on an as-needed basis. The County anticipates awarding a shared indefinite delivery/indefinite quantity contract with up to five qualified contractors for roofing services including new roof installation, replacement, maintenance and repair of commercial roofing systems, with emphasis on three-ply built-up roofing systems using self-adhered membranes. The initial contract term is one year from the Board of Supervisors' award date, with options to renew for up to four additional one-year terms at the County's sole discretion. The Statement of Qualifications due date is November 10, 2026, at 4:00 p.m. Tucson Local Time, with a pre-submittal meeting scheduled for October 28, 2026, at 10:00 a.m. via Microsoft Teams. The tentative Board of Supervisors award date is January 19, 2027. Submissions must be made exclusively through the BidNet Direct e-procurement platform. Responses must not exceed 20 pages for the SOQ and 4 pages for the Subcontractor Selection Plan and should be submitted as a single PDF document.
The shared annual contract amount is $2,000,000.00, with individual Job Orders not to exceed $500,000.00 including all change orders. For projects less than $20,000.00 and during emergency situations, the County may select a contractor based on availability or specialty; projects of $20,000.00 or more require competitive bidding among all contractors. All federally funded Job Orders will be competitively bid. Payment and performance bonding per project and/or annually is required as specified in Arizona Revised Statutes §34-610. Due to limited subcontracting opportunities, no Small Business Enterprise goal is established; however, certified SBE firms are encouraged to participate. Evaluation criteria include firm qualifications and project team experience (40 points), success in performing similar construction management projects (40 points), capabilities and performance (30 points), qualifications-based subcontractor selection (9 points), and subcontractor/supplier assistance and development (6 points), for a total of 125 possible points. Contractors must hold proper licenses issued by the Arizona Registrar of Contractors and comply with federal labor standards for federally funded work, including Davis-Bacon wage requirements. No minimum guarantee of work or renewal option exercise is provided.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
RFQu-2600020412
JOB ORDER CONTRACT:
ROOFING SERVICES
October 14, 2026
Pima County Procurement Department Design & Construction Division
(520) 724-9072
TABLE OF CONTENTS Page 2 of 58
Request for Qualifications RFQu-2600020412
JOB ORDER CONTRACT: ROOFING SERVICES
TABLE OF CONTENTS
NOTICE OF REQUEST FOR QUALIFICATIONS (1 PAGE)
GENERAL INFORMATION (5 PAGES)
REQUIRED SUBMITTAL INFORMATION AND EVALUATION CRITERIA (1 PAGE)
PART 1 – EVALUATION CRITERIA (4 PAGES)
PART 2 – SUBCONTRACTOR SELECTION PLAN (1 PAGE)
ATTACHMENT 1 – SAMPLE CONTRACT (13 PAGES)
ARIZONA STATUTORY PERFORMANCE BOND (1 PAGE)
ARIZONA STATUTORY PAYMENT BOND (1 PAGE)
EXHIBIT A - SCOPE OF SERVICES (3 PAGES)
EXHIBIT B - GENERAL CONDITIONS (11 PAGES)
EXHIBIT C - SPECIAL CONDITIONS – MULTIPLE AWARD JOB ORDER CONTRACT (10 PAGES)
ATTACHMENT 1 TO EXHIBIT C – CONTRACTOR EVALUATION FORM (2 PAGES).…………………...54
EXHIBIT D – SUPPLEMENTAL PROVISIONS FOR FEDERAL-AID CONTRACTS (3 PAGES)…….…
NOTICE OF REQUEST FOR QUALIFICATIONS
RFQu-2600020412
JOB ORDER CONTRACT:
Pima County is seeking Statements of Qualifications (SOQ) from contractors qualified to perform a full range of Roofing Services required on an as-needed basis throughout Pima County. See Attachment 1, Exhibit A – Scope of Services for additional scope description.
The intent of this solicitation is to award a shared indefinite delivery/indefinite quantity Job Order Contract in the shared annual amount of $2,000,000.00 with up to 5 qualified Contractors. The initial term of the Job Order Contract will be 1 year from the date of award by the Board of Supervisors. The Agreement will include an option to renew for up to 4 additional one-year terms. There is no minimum guarantee of work or that the renewal options will be exercised.
Individual Job Orders shall not exceed $500,000.00 including all change orders. Appropriate payment and performance bonding per project and/or annually shall be required.
Due to limited subcontracting opportunities, no Small Business Enterprise (SBE) goal is established for this Contract.
Certified SBE firms are encouraged to participate.
Minimum Qualifications: Contractors performing work under the Job Order Contract must hold the proper license issued by the State of Arizona Registrar of Contractors to perform these services.
ONLY RESPONSES THAT ARE SUBMITTED THROUGH THE E-PROCUREMENT PLATFORM, BIDNET DIRECT
WILL BE CONSIDERED.
For assistance, Bidnet Direct’s Vendor Support Team is available Monday through Friday 5am-5pm MST. Please call 800-835-4603 and press option 2 to speak with live customer support.
Pima County reserves the right to reject any and all qualification statements or withhold the award for any reason.
SOLICITATION DOWNLOAD: https://www.bidnetdirect.com/arizona/pimacounty
SOQ DUE DATE/TIME: November 10, 2026 at or before 4:00 PM Local Tucson Time LOCATION: https://www.bidnetdirect.com/arizona/pimacounty
PRE-SUBMITTAL MEETING: October 28, 2026, at 10:00 AM Local Tucson Time LOCATION: Microsoft Teams Meeting
Join the meeting now +1 602-649-0382,,921064655# United States, Phoenix Phone Conference ID: 921 064 655#
INQUIRIES: County will not accept verbal requests for clarifications or interpretations. Offerors must submit any questions or deviation requests through the Bidnet Direct solicitation portal.
PUBLISH: The Daily Territorial: October 14, 15, 16, and 19, 2026 https://www.bidnetdirect.com/arizona/pimacounty https://www.bidnetdirect.com/arizona/pimacounty https://teams.microsoft.com/meet/269110284721647?p=QrJyCVLuFMKeCwUxR5 tel:+16026490382,,649417746
GENERAL INFORMATION Page 4 of 58
GENERAL INFORMATION (5 pages)
SCOPE OF SERVICES: Pima County is seeking Statements of Qualifications (SOQ) from qualified firms or individuals for the establishment of a Job Order Contract for Roofing Services in Pima County on an as-needed basis for various County projects (see Attachment 1 – Sample Contract, Exhibit A – Scope of Services).
REQUIRED SUBCONTRACTOR SELECTION PLAN: The Arizona Revised Statutes, § 34-
604(C)(2)(e)(i) require that Job Order Contractors select subcontractors on the basis of qualifications alone or qualifications and price, but NOT price alone. A qualifications and price selection may be accomplished in a single step considering both qualifications and price or using a two-step process in which the first step is based on qualifications only and the second step may use either qualifications and price or price alone.
The Subcontractor Selection Plan, with any changes that may be negotiated between the Contractor and County, will be incorporated into the Agreement and be an obligation of the Contractor. Please note, failure to provide a Subcontractor Selection Plan shall cause for rejection of the SOQ as non-responsive as submission of a Subcontractor Selection Plan is a requirement under A.R.S. § 34- 604(C)(2)(e)(i).
JOB ORDER CONTRACT: The intent of this solicitation is to award a shared indefinite delivery/indefinite quantity Job Order Contract in the shared annual amount of $2,000,000.00 with up to 5 qualified Contractors. The initial term of the Job Order Supplier Contract (SC) will be 1 year from the date of award by the Board of Supervisors. The Agreement will include an option to renew for up to 4 additional one-year terms. There is no minimum guarantee of work or that the renewal options will be exercised.
The County anticipates awarding individual Job Orders to Contractors pursuant to the requirements of Exhibit C - Special Conditions Multiple Award Job Order Contract. Any firm responding to this Request for Qualifications (RFQu) must agree to perform all work in accordance with the terms and conditions included in the Sample Contract and associated documents, including the General Conditions, Special Conditions and Appendices to the Contract, provided with or referenced by this RFQu.
All respondents shall familiarize themselves with the requirements and processes defined in the Contract and its Exhibits prior to responding to this RFQu.
Job Order Contractors shall file with the County payment and performance bonds, as required by A.R.S. § 34-610, no later than the time of agreement on the price for any construction under this Contract. Bonds may be submitted on an annual basis for the full value of all construction reasonably anticipated during the Contract year or may be provided on a job-order by job-order basis; in the latter case, Contractor may anticipate additional job orders and provide bonds in reasonable increments. At no time shall the cumulative value of the bonds be less than the total value of the construction performed by Contractor under this Agreement, including job orders awarded to Contractor but not yet completed. If bonds are secured on a job-order by job-order basis, County will obtain the appropriate bonds from Contractor upon issuance of a Job Order and release of the Purchase Order.
Job Order Quotes: All quotations for Job Orders must be presented in the format required by the County representative issuing the request for quotation.
4. SMALL BUSINESS ENTERPRISES (SBE) PROVISIONS: Due to limited subcontracting opportunities, no
SBE goal is established for this project. Certified SBE firms are encouraged to participate. The current list of certified SBE firms can be located on the City of Tucson’s Procurement Website, City of Tucson Business Enterprise Program Certification & Compliance System.
https://tucsonaz.diversitycompliance.com/Default.asp
GENERAL INFORMATION Page 5 of 58
5. CONFIDENTIALITY AND DISCLOSURE: Responses to this solicitation shall be considered privileged communications as to technical, financial, and institutional content until award of the Contract. Until that time, pursuant to A.R.S. §34-604(H), only the names of the firms on the short list may be disclosed. In accordance with that section, limited material may be disclosed after award of the Contract; after Contract execution, all material is publicly available. Any material that you consider to be trade secret or proprietary must be clearly identified and marked. Under A.R.S. §34-604(H), the County must agree with your claim of confidentiality before any material may be withheld from disclosure.
The County has initiated a new policy on confidential information that is reflected in the Public Information section of the attached sample contract. Respondents should familiarize themselves with that provision.
6. INTENT TO RESPOND: Firms that intend to submit SOQs should notify the County as soon as possible of their intent through Bidnet Direct.
7. INQUIRIES / QUESTIONS: All questions must be received no later than 7 calendar days in advance of the submittal due date. All questions regarding this RFQu shall be submitted in Bidnet Direct’s “Q&A” tab:
8. CLARIFICATIONS / ADDENDA: Any clarifications or interpretations of this Request for Qualifications
(RFQu) that materially affect or change the scope or intent will be issued via addenda and posted by the County on Bidnet Direct. Oral statements or clarifications not in writing shall be non-binding and without legal effect. The County will make an effort to notify respondents of the posting of addenda; however, it cannot guarantee that every potential respondent will be notified each time. Therefore, it is the responsibility of all respondents to check the website periodically for addenda and to obtain this information in a timely manner. Failure to include acknowledgment of all amendments may be cause for rejection of the SOQ. No oral interpretations shall be made as to the meaning of any of the RFQu documents or be effective to modify any of the provisions of the RFQu documents. Oral interpretations of the RFQu documents are not binding on the County.
9. MICROSOFT TEAMS PRE-SUBMITAL MEETING: The date and time of a pre-submittal meeting, if applicable, is indicated on the Notice of Request for Qualifications page of this document. The purpose of this meeting will be to clarify the contents of this solicitation in order to prevent any misunderstandings of the County’s position. Any questions regarding this solicitation should be presented to County at this meeting.
The meeting will be held via Microsoft Teams, the link to join the meeting can be found on the Notice of Request for Qualifications page.
10. SUBMISSION OF QUALIFICATIONS: The County will receive SOQs at the date, time and location described as follows:
November 10, 2026
4:00 P.M. Tucson Local Time https://www.bidnetdirect.com/arizona/pimacounty.
11. SUBMITTAL: Respondents shall submit their Statement of Qualifications (Parts 1 and 2) in a single document pdf format, as further described in the Required Submittal Information and Evaluation Criteria Section of this document.
ONLY RESPONSES THAT ARE SUBMITTED THROUGH THE E-PROCUREMENT PLATFORM, BIDNET
DIRECT WILL BE CONSIDERED.
SOQs received after the due date and time as noted on the Notice of Request for Qualifications page will not be accepted. The County will not acknowledge or receive SOQs that are delivered by telephone, facsimile (fax), electronic mail (e-mail) or in person. Properly submitted SOQs become the property of Pima County and will not be returned to respondents. Failure to follow RFQu submittal guidelines and instructions shall result in the SOQ rejection.
https://www.bidnetdirect.com/arizona/pimacounty.
file:///%5C%5Ccentral.pima.gov%5CCentralFS%5CProcurement%5C_Shared%20Data%5CDC%5C0JOC%5C2023%5C498949%20-%20Fencing%20Services%5C1SFQDocuments%5CDRAFTS%5CAny%20clarifications%20or%20interpretations%20of%20this%20Request%20for%20Qualifications%20(RFQu)%20that%20materially%20affect%20or%20change%20the%20scope%20or%20intent%20will%20be%20issued%20via%20addenda%20and%20posted%20by%20the%20County%20on%20Bidnet%20Direct%20https:%5Cwww.bidnetdirect.com%5Carizona%5Cpimacounty.%20Oral%20statements%20or%20clarifications%20not%20in%20writing%20shall%20be%20non-binding%20and%20without%20legal%20effect.%20The%20County%20will%20make%20an%20effort%20to%20notify%20respondents%20of%20the%20posting%20of%20addenda;%20however,%20it%20cannot%20guarantee%20that%20every%20potential%20respondent%20will%20be%20notified%20each%20time.%20Therefore,%20it%20is%20the%20responsibility%20of%20all%20respondents%20to%20check%20the%20website%20periodically%20for%20addenda%20and%20to%20obtain%20this%20information%20in%20a%20timely%20manner.%20Failure%20to%20include%20acknowledgment%20of%20all%20amendments%20may%20be%20cause%20for%20rejection%20of%20the%20SOQ.%20No%20oral%20interpretations%20shall%20be%20made%20as%20to%20the%20meaning%20of%20any%20of%20the%20RFQu%20documents%20or%20be%20effective%20to%20modify%20any%20of%20the%20provisions%20of%20the%20RFQu%20documents.%20Oral%20interpretations%20of%20the%20RFQu%20documents%20are%20not%20binding%20on%20the%20County.
https://www.bidnetdirect.com/arizona/pimacounty.
https://www.bidnetdirect.com/pimacounty https://www.bidnetdirect.com/pimacounty
GENERAL INFORMATION Page 6 of 58
12. CONTRACTOR SELECTION PROCESS:
a. The evaluation of the SOQs shall be based on the requirements described in this RFQu and pursuant to A.R.S. §34-604. All properly submitted responsive SOQs will be evaluated and ranked according to the stated selection criteria and relative weight of the selection criteria by the selection committee.
SOQs shall not include any information regarding respondent‘s fees, pricing, person- hours or other cost information.
b. A Contractor Selection Committee will be comprised of Representatives of the Facilities Management Department and a senior management employee of a licensed contractor. A Procurement Officer from the Pima County Procurement Department, Design & Construction Division, will act as the non-scoring Chair of the selection committee. This committee will evaluate submissions and determine a list of the highest ranked firms for recommendation for award.
c. The County does not intend to conduct interviews but reserves the right to short-list firms and conduct interviews and or discussions if determined to be in the best interest of the County. If interviews and or discussions are held, cumulative scores from the written submissions and interviews will be used to arrive at a final evaluation/ranking, with a list of the highest ranked firms for recommendation for award.
d. The respondents to whom awards shall be made will be required to execute the Contract in counterparts and return it to the Pima County Procurement Department, Design and Construction Division, within 10 days after receipt. Failure or neglect to do so may result in withdrawal of Contract Award.
e. An award recommendation will be made to the Board of Supervisors based on the evaluation scores and successful negotiation of a Contract for services. The recommendation will be posted by the County on Bidnet Direct https://www.bidnetdirect.com/arizona/pimacounty at least 5 business days prior to the scheduled date for award. It is the responsibility of the respondents to check https://www.bidnetdirect.com/arizona/pimacounty to obtain the recommendation. Selection of Contractors shall be at the discretion of the County and the County reserves the right to reject any or all SOQ’s.
f. Contractor shall file payment and performance bonds with County, as required by A.R.S. § 34-610 as amended by Laws 2005, Ch. 162, HB2579, no later than the time of agreement on the price (or Guaranteed Maximum Price) for any construction under this Agreement. Bonds may be submitted on an annual basis for the full value of all construction reasonably anticipated during the Agreement year or may be provided on a job-order by job-order basis; in the latter case, Contractor may anticipate additional job orders and provide bonds in reasonable increments sufficient to cover multiple anticipated job orders. At no time shall the cumulative value of the bonds be less than the total value of the construction performed by Contractor under this Agreement, including job orders awarded to Contractor but not yet completed.
13. TENTATIVE SELECTION SCHEDULE: The following represents anticipated milestone dates for the selection. Any known conflicts with the dates such as observed holidays, scheduled vacations, trade seminars, etc. that could interfere with your participation in the selection should be made known to the Procurement Officer immediately.
Pre-Submittal Meeting October 28, 2026, at 10:00 a.m.
Due Date Statements of Qualifications: November 10, 2026, at or before 4:00 p.m.
Award by the Board of Supervisors: Tentatively, January 19, 2027
14. COUNTY’S RESERVATION OF RIGHTS: County may evaluate the SOQs based on the anticipated completion of all or any portion of the Project. County reserves the right to divide the Project into multiple parts, to reject any and all SOQs and re-solicit for new SOQs, or to reject any and all proposals and
GENERAL INFORMATION Page 7 of 58 temporarily or permanently abandon the RFQu. County makes no representations, written or oral, that it will enter into any form of agreement with any respondent to this RFQu for any project and no such representation is intended or should be construed by the issuance of this RFQu.
15. ACCEPTANCE OF METHODOLOGY: By submitting its SOQ in response to this RFQu, respondent accepts the evaluation process and acknowledges and accepts that determination of the most qualified firm(s) will require subjective judgments by the County.
16. COST OF SUBMITTAL PREPARATION: This RFQu does not commit County to pay any costs incurred in the preparation, presentation or return of submittal including interview time.
17. WAIVER OF CLAIMS: Each respondent in submitting an SOQ is deemed to have waived any claims for damage by reason of the selection of another submission and/or the rejection of said respondent ‘s submission.
18. ELIGIBLE RESPONDENTS: Only individual firms or lawfully formed business organizations may apply.
(This does not preclude a respondent from using contractors.) County will contract only with the individual firm or formal organization that submits an SOQ.
19. JOINT VENTURES: Respondents that submit an SOQ as a Joint Venture must include a copy of the Joint
Venture Agreement at the time of submittal naming Pima County as a third-party beneficiary of the Joint Venture Agreement. The Joint Venture must be validly formed as an Arizona corporation, partnership, or other separate legal entity (a “Joint Venture Entity”) with the Joint Venture Entity registered as a Vendor with Pima County at the time of contract award. The SOQ Questionnaire must be executed by all of the Joint Venture participants or by one Joint Venture participant with a letter of authorization from the other Joint Venture participants. The Joint Venture Agreement is NOT included in the suggested 20-page count limitation. In the event the Joint Venture is the highest-ranked bidder and is awarded the project, but the Joint Venture has failed to validly form a Joint Venture Entity with the Joint Venture Entity registered as a Vendor with Pima County at the time of contract award, the Joint Venture participants will execute a single Contract with Pima County with each Joint Venture participant as a separate Contractor under the Contract.
Each such Contractor will be jointly and severally liable for performance under the contract (see Attachment 1 – Sample Contract).
20. SUSPENSION / DEBARMENT: By submitting its SOQ in response to this RFQu and by signing the
Introductory Questionnaire, respondent is certifying that neither it nor any of its principals are currently suspended or debarred, or under consideration for suspension or debarment, by any public agency or entity at the local, state or Federal level as per 2 CFR Parts 180 and 1200, that neither it nor any of its principals are debarred or suspended or under consideration for suspension or debarment by any Federal, State or Local government or agency. If a respondent is not able to certify, the respondent must submit a letter that identifies the agency involved and a contact and explains why respondent is suspended or debarred or being considered for suspension or debarment. County verifies that respondent has no active exclusions in the System for Award Management (SAM) website at time of submittal. Contractor shall not have, nor shall subcontract at any tier to any firm, individual or other entity reported to have, an active exclusion in the System for Award Management (SAM) website.
The Pima County Administrator reserves the right to reject the proposal response of any persons or corporations who have previously defaulted on any contract with Pima County or who have engaged in conduct that constitutes a cause for debarment or suspension as set forth in Pima County Code Chapter
11.28 and 11.32
21. PROTESTS: An interested party may file a protest regarding any aspect of a solicitation, evaluation, or recommendation for award. Protests must be in accordance with the Pima County Procurement Code, Section 11.20.010.
22. VENDOR REGISTRATION: Pima County has implemented Bidnet Arizona Purchasing Group. The internet link for Vendor Registration is Bidnet Direct. All Respondents must register in Bidnet in order to respond to http://www.bidnetdirect.com/arizona/pimacounty
GENERAL INFORMATION Page 8 of 58 the solicitation. Please ensure that the legal entity name in Bidnet matches the legal entity submitting a response. Awarded Contractor must be registered in Pima County’s financial system (Workday) in order to be awarded a contract.
23. NON-COLLUSION: Each respondent, by submitting an SOQ, is certifying that the respondent has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free and open competition in connection with this Solicitation.
24. PIMA COUNTY ONE STOP SYSTEM: Pima County One Stop often has professional and administrative staff, managers, and experienced construction supervisors and workers available for immediate hire. Call
(520) 724-7700 or contact One Stop at Employment Resources (Career One-Stop).
END GENERAL INFORMATION
https://www.pima.gov/208/Vendor-Registration https://www.pima.gov/1059/Job-Assistance
REQUIRED SUBMITTAL INFORMATION Page 9 of 58
REQUIRED SUBMITTAL INFORMATION (1 page)
To aid in the evaluation, it is requested that the SOQ is submitted in a single document pdf format. Responses should be concise, and it is suggested that SOQs not exceed 20 pages in length, SSPs not exceed 4 pages in length, not including the SOQ Questionnaire, front and back covers, table of contents, indexes, resume(s), or joint venture agreements. Clear, concise responses that are under the suggested maximum page limit are preferred to unclear responses that use the maximum number of pages. Failure to follow the outline of required information, exceeding the total allotted page count, or submission of material other than that requested may result in rejection of the proposal.
SOQs and SSPs shall be submitted according to General Information, Paragraph 12 – “Submittal”.
Evaluation Criteria and Relative Weighting of Evaluation Criteria for the Statement of Qualification and Subcontractor Selection Plan. A.R.S. § 34-604(C)(2)(e)(i) states that subcontractor selection plans must select subcontractors based on qualifications alone or on a combination of qualifications and price and shall not select subcontractors based on price alone.
Section Total Points
Part 1 - Statement of Qualifications (SOQ)
1. Qualifications of the Firm and Experience of the Project Team 40 Points
2. Success in Performing Construction Management for Similar Projects 40 Points
3. Capabilities and Performance 30 Points Total Points - SOQ 110 Points
Part 2 - Subcontractor Selection Plan (SSP)
4. Qualifications-Based Selection 9 Points
5. Subcontractor/Supplier Assistance Development 6 Points Total Points - SSP 15 Points
Total Possible Points - SOQ and SSP 125 Points
REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
PART 1 – EVALUATION CRITERIA Page 10 of 58
PART 1 - SOQ EVALUATION CRITERIA (4 pages)
1. Qualifications of the Firm and Experience of the Project Team (40 points)
A. Introductory Questionnaire (10 points)
Complete the following questionnaire and the following qualifications submittal on or before the Submittal Due Date and Time. Typed responses are preferred. Illegible responses may negatively affect the evaluation and scoring.
Company’s Legal Name:
Mailing Address:
Physical Address (if different from mailing address):
Phone: ________________________________________ Email:
Contact Person: _________________________________ Title:
Corporate Headquarters (City/State):
SAM.GOV Unique Entity Identifier (UEI):
Business Type: Sole Proprietorship [ ] Partnership [ ] Corporation [ ] Joint Venture [ ]
Is the Business a Certified Small Business Enterprise? Yes [ ] No [ ]
How many years has this business been in existence under its present ownership? _____
Under what other names have your Company operated and the length of time in business under those names?
Previous Name Length of Time in Business Under Name
In the Appendix include the following information:
• Experience Modification Rate (EMR) for the past 5 years. (If any of the above EMR numbers are greater than 1.0, please describe safety incidents that occurred resulting in a higher-than-average rate and subsequent actions taken to remedy this higher-than-average rate.)
• OSHA Form 300 – Log of Work-Related Injuries and Illnesses and OSHA Form 300A - Summary of Work- Related Injuries and Illnesses for the past 5 completed calendar years. IMPORTANT - Omit all individual’s names on OSHA Form 300 – Log of Work-Related Injuries and Illnesses and Form 300A – Summary of Work-Related Injuries and Illnesses.
• Provide your Total Bonding Capacity - Single Limit and Aggregate Limit, and current backlog.
What was the total amount of remodeling and construction services related work your firm has completed in the following calendar years?
2025: Number of Contracts__________ Total Value $______________________
2024: Number of Contracts__________ Total Value $______________________
2023: Number of Contracts__________ Total Value $______________________
2022: Number of Contracts__________ Total Value $______________________
2021: Number of Contracts__________ Total Value $______________________
PART 1 – EVALUATION CRITERIA Page 11 of 58
By dollar value, approximately what percentage of your work is: Commercial ____ % Public/Government____ %
List the licenses held by your company issued by the Arizona Registrar of Contractors:
License Number Class License Number Class
RESPONDENT SHALL SIGNIFY RECEIPT OF ADDENDA (IF ANY). Failure to Acknowledge Receipt of any Material Addendum may result in rejection of the SOQ as non-responsive.
Addendum # By (Name) Date Addendum # By (Name) Date
SOQ Submitted by (Name) Title
By signing this submittal, the undersigned certifies that all information provided is accurate and valid.
Respondent confirms it has read and agrees to the terms and conditions of the County’s Sample Contract provided in the RFQu. Failure to submit completed and signed Introductory Questionnaire may result in rejection of the SOQ as non-responsive.
Signature: Date:
Company Officer Authorized to Obligate the Company
REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
PART 1 – EVALUATION CRITERIA Page 12 of 58
Qualifications of the Firm and Experience of the Project Team (Cont’d)
B. Provide an organizational chart of the proposed Project Team assignments, lines of authority and communication for each team member. Indicate the estimated percent of time each team member will be involved. Indicate the Firm’s unique qualifications and experience for this Job Order Contract and identify any industry awards the firm has achieved in the last 5 years. (10 points)
C. Identify the Project Manager who will be assigned responsibility for performance of the resulting contract and attach a copy of this individual’s resume demonstrating his/her qualifications, length of time with your firm, length of time in the industry and experience to your submission (resume not included in suggested page count). Identify the Field Superintendent and Safety Manager. Include their qualifications, industry certifications and experience, and number of years with the firm.
Identify similar projects managed, including any JOC projects. (15 points)
D. Provide a brief 1 to 2 paragraph description and background of each of the remaining key team members (include key subcontractors and suppliers) that will be directly involved in the Project. For each key team member, include their unique qualifications, industry certifications and experience (including JOC), and number of years doing business with your firm. (5 points)
2. Success in Performing Construction Management for Similar Projects (40 points)
A. Provide a list of projects (20 maximum) valued from $1,000 to $500,000 that were completed in the last three years where the firm and/or proposed Project Team provided the services requested in this solicitation. State the project name, the client’s name, type(s) of services provided, whether the firm was the prime or a subcontractor, the assigned Project Manager’s name, and project dollar amount. (10 points)
B. From the projects listed above, select 4 projects valued between $1,000 - $20,000 and 1 project valued between $20,000.00 - $500,000.00. None of the projects submitted should be valued over $500,000.00. For each project, submit a narrative including the following information: (30 points, 6 points per project)
• Name of project
• Scope of work
• Project start and end date
• Original and final amount of contract
• Owner’s name and contact information (Pima County reserves the right to contact this reference).
• Provide any unusual or difficult circumstances related to the project and how your firm was able to overcome those obstacles.
• Before and after photos demonstrating the scope and quality of the work
3. Capabilities and Performance (30 points)
A. Describe your company’s method of approach to obtaining background security clearances for staff directly involved at a secure project location, such as local, state, or federal correctional institutes and to ensure proper security protocols are maintained. Provide a list of projects (5 maximum) and list the various restrictions and/or special security protocols that were implemented for each project. (5 points)
B. Indicate if or how Firm utilizes AI including but not limited to how an agency’s data or information may be utilized with AI tools. If AI is utilized, Firm should provide the following: data handling and retention policies, disclosure information of subcontractors and third-party processors with data access, and documentation of compliance with applicable data privacy laws. (5 points)
PART 1 – EVALUATION CRITERIA Page 13 of 58
Capabilities and Performance (Cont’d)
C. Describe your firm’s plan and ability to respond to and manage emergency requests for roofing services, take on multiple Job Orders at the same time, and the commitment to the County to complete these projects in a timely manner. Provide example(s). (10 points)
D. Describe the efforts your firm has taken towards recruitment, education and development to support your Job Order Contracting capabilities. (10 points)
END PART 1 – EVALUATION CRITERIA
PART 2 – SUBCONTRACTOR SELECTION PLAN Page 14 of 58
PART 2 – SUBCONTRACTOR SELECTION PLAN (1 page)
Respondent shall address their method of approach in selecting subcontractors pursuant to A.R.S. § 34- 604(C)(2)(e)(i), subcontractors must be selected on the basis of qualifications or qualifications and price—but not price alone. The assessment of qualifications may include safety, management, capacity, capability, or such other factors as the Contractor deems appropriate. The factors should be identified and discussed. Not all factors need be applied to all trades/specialties. If the selection is based on a combination of qualifications and price, the selection need not be made in one step.
4. Qualifications-Based Selection (9 points)
A. Describe your firm’s method of approach to the qualifications-based selection of subcontractors per A.R.S. § 34-604(C)(2)(e)(i). (3 points)
B. Identify the following to rate subcontractors in your selection. (3 points)
a. The criteria used; what are the 3-5 most important factors to you in selecting a subcontractor and why?
b. The scoring methodology and relative weights used to rate respondents.
c. If price is a factor, how much weight is given to price?
C. Include an example questionnaire(s) and/or form(s), as an appendix, used in your selection process. (3 points)
5. Subcontractor/Supplier Assistance/Development (6 points)
Describe your firm’s approach to the following:
A. Assisting and/or mentoring or training subcontractors to improve skills and support their qualification.
Identify specific instances where your firm has utilized these approaches on past projects. List any assistance/development areas you have preliminarily identified for these services. (2 points)
B. How are subcontractors managed before, during and after the job? When and how are critical performance and risk issues communicated? (2 points)
C. Describe situations in the past where your company mentored subcontractors in meeting your company’s quality standards. (2 points)
END PART 2 – SUBCONTRACTOR SELECTION PLAN
SAMPLE CONTRACT – Rev. 10/13/22 Page 15 of 58
ATTACHMENT 1 – SAMPLE CONTRACT (13 pages)
PIMA COUNTY FACILITIES MANAGEMENT DEPARTMENT
PROJECT: Job Order Contract: Roofing Services
CONTRACTORS: Contractor Name Contractor Address
City, State Zip
CONTRACT NO.:
AMOUNT:
SC27XXXXXXXX
FUNDING:
JOB ORDER SUPPLIER CONTRACT
1. Parties, Background and Purpose.
1.1. Parties. This Agreement is entered into between Pima County, a body politic and corporate of the State of
Arizona, hereinafter called County, and <Contractors>, hereinafter called Contractor in the singular, Contractors in the plural, and collectively referred to as the Parties.
1.2. Authority. County has a need to establish an Agreement with up to 5 Job Order Contractors for Roofing Services.
1.3. Qualifications Based Solicitation. County conducted a competitive qualifications-based procurement pursuant to A.R.S. §34-604, for Job Order Contractors under RFQu-2600020412. Based on an evaluation of the respondents’ representations of their qualifications and necessary due diligence, County selected the X highest qualified Contractors as Job Order Contractors. The Job Order Contractors have agreed to be bound by and adhere to the requirements of this Agreement.
2. Basic Terms, Renewals, Extensions and Revisions.
2.1. Initial Term. This Contract (Agreement), as approved by the Board of Supervisors, commences on
____________, and terminates on _____________, unless sooner terminated or further extended pursuant to the provisions of this Agreement. This Agreement establishes the terms under which the Job Order Contractors will be assigned and perform tasks and projects under this Agreement.
2.2. Extension Options. County, at its sole discretion, may extend up to 4 additional one-year terms or add funding to this Agreement at any time with the acknowledgment of the Contractors and the Board of Supervisors’ or the Procurement Director’s approval pursuant to Board of Supervisor Policy D29.4.
Contract extensions, renewals, or revisions will occur through the issuance by County to Contractor of a revised Agreement document setting forth the requested changes. Failure by Contractor to object in writing to the proposed revisions, terms, conditions, scope modifications and/or specifications within 10 calendar days of issuance by County will signify acceptance of all such changes by Contractor and the revision will be binding upon the Parties.
2.3. Individual Job Orders. Individual job orders will be implemented by issuing a Purchase Order (PO) to the selected Job Order Contractor to perform the work. Each PO will be an independent contract that will incorporate and be subject to the terms of this Agreement. The terms “PO”, “Delivery Order (DO) “, “Job Order”, and “Contract” are used interchangeably in this Agreement.
SAMPLE CONTRACT – Rev. 10/13/22 Page 16 of 58
2.3.1. Competition Thresholds.
2.3.1.1. For projects less than $20,000.00, and during emergency situations, County may select a Contractor based on availability, specialty, or such other basis as County may determine in its sole discretion. During emergency situations requiring immediate attention by County (i.e., Flooding or other disaster prevention) County reserves the right to select a Job Order Contractor on a non-competitive basis for the work. In addition, the requirement that a Job Order Contract be in place prior to the initiation of work is waived during such an event.
During such an emergency, a Contractor may be contacted and given instructions by a County Project Manager to perform the work immediately without an approved Job Order.
It is understood that County will prepare a Job Order as soon as practicable following said instructions.
2.3.1.2. For projects of $20,000.00 or more, all Contractors will compete on the basis of cost or cost and schedule through a request for quotation. Price may be either a fixed cost or a guaranteed maximum price.
2.3.1.3. All federally funded Job Orders will be competitively bid among all Contractors.
2.3.1.4. No individual Job Order may exceed $500,000.00, including change orders.
2.3.2. Small Business Enterprise. These services are subject to the Pima County Code, Title 20, and
Chapter 20.04, pertaining to participation of subcontractors. The Pima County SBE Program is a race and gender neutral program established to encourage contracting with all small businesses.
Due to limited subcontracting opportunities, No Goal has been set for participation by Small Business Enterprises (SBE). The current list of certified SBE firms can be located on the City of Tucson’s Procurement Website, City of Tucson Business Enterprise Program Certification & Compliance System.
2.3.2.1. For projects that are federally funded, a Disadvantaged Business Enterprise (DBE) goal pursuant to Pima County Code Title 20, must be established for the individual Job Order.
2.3.3. Construction Completion Time: Work performed under this Agreement will be as stated in Individual Job Orders issued under this Agreement. County will assess Liquidated damages against Contractor based upon the construction completion time, if so specified in a Job Order.
2.3.4. Subcontractors: Subcontractors will be selected in accordance with A.R.S. 34-604.C.2.(e)(i) and CMAR’s Subcontractor Selection Plan, incorporated and attached hereto as Appendix “E” – Subcontractor Selection Plan (X pages).
3. Scope of Services. Contractor will provide County all labor, materials and equipment necessary to complete the project as described in Exhibit A – Scope of Services (3 Pages), incorporated into this Agreement. All work will be done per specifications called for in the bid documents as contained in Pima County Solicitation Number RFQu-2600020412, Exhibit B - General Conditions to the Contract (11 Pages), Exhibit C - Special Conditions – Multiple Award Job Order Contract (10 Pages), Exhibit D – Supplemental Provisions for Federal-Aid Construction Contracts (3 Pages) and other documents incorporated into this Agreement.
4. Compensation and Payment.
4.1. Compensation. County will pay Contractor as specified.
4.1.1. Invoices. Contractor will provide detailed documentation in support of requested payment. The
Contractor must cite the Purchase Order number on all invoices. Payments will be made in accordance with ARS § 34-609.
SAMPLE CONTRACT – Rev. 10/13/22 Page 17 of 58
4.1.1.1. For the period of record retention required under Section 25, County reserves the right to question any payment made under this Section and to require reimbursement by setoff or otherwise for payments determined to be improper or contrary to the Agreement or law.
5. Federal Funding. County and Contractor understand the Job Orders under this Agreement may be funded partially or entirely through a federal grant or other source of federal funding.
5.1. Federal Labor Standards. Federal Labor Standards are applicable for Job Orders identified as being federally funded.
5.2. Additional Requirements. Federal forms will be attached to the Job Order, and Contractor agrees to be bound by all requirements.
5.2.1. Exhibit D – Supplemental Provisions for Federal-Aid Construction Contracts.
5.2.2. Davis Bacon (AZ. Wage Decision). Minimum wage rate, withholding, payroll, apprentice, subcontracting, and termination provisions, and the Work Hour and Safety Standards Act related to overtime pay and safety.
5.3. Subcontracting. Contractor will not subcontract on any federally funded Job Order with any firm or person listed in the Federal Government’s System for Award Management (SAM) system with an active exclusion.
6. Insurance. The Insurance Requirements herein are minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract.
6.1. Ratings. Contractor’s insurance shall be placed with companies licensed in the State of Arizona and the insureds shall have an “A.M. Best” rating of not less than A- VII. County in no way warrants that the minimum insurer rating is sufficient to protect the Contractor from potential insurer insolvency.
6.2. Insurance Coverages and Limits.
6.2.1. Minimum Scope and Limits of Insurance: Contractor will procure and maintain at its own expense insurance policies (the “Required Insurance”) satisfying the below requirements (the “Insurance Requirements”) until all of its obligations under this Agreement have been met. The below Insurance Requirements are minimum requirements for this Agreement and in no way limit Contractor’s indemnity obligations under this Agreement. County in no way warrants that the required insurance is sufficient to protect the Contractor for liabilities that may arise from or relate to this Agreement. If necessary, Contractor may obtain commercial umbrella or excess insurance to satisfy the Insurance Requirements.
6.2.1.1. Commercial General Liability (CGL) – Occurrence Form with limits of $2,000,000 Each
Occurrence and $2,000,000 General Aggregate. Policy will include bodily injury, property damage, and broad form contractual liability coverage, personal and advertising injury and products – completed operations.
6.2.1.2. Business Automobile Liability – Bodily Injury and Property Damage for any owned, hired, and/or non-owned automobiles used in the performance of this Agreement with a Combined Single Limit (CSL) of $1,000,000 each accident.
6.2.1.3. Workers’ Compensation and Employers' Liability - Statutory requirements and benefits for
Workers’ Compensation. In Arizona, WC coverage is compulsory for employers of one or more employees. Employer’s Liability coverage- $1,000,000 each accident and each person - disease.
6.2.1.4. Builder’s Risk Insurance – Insurance applies to this Agreement, but need not be provided unless required for a particular job order. If Builders Risk Insurance applies to a particular https://www.sam.gov/portal/public/SAM
SAMPLE CONTRACT – Rev. 10/13/22 Page 18 of 58 job order, then Contractor is required to maintain throughout the course of construction Builder’s Risk Insurance in a dollar amount equal to the full insurable value under the job order, which shall include “All Risk” coverage. Pima County shall be named as a “Loss Payee”. Contractor is responsible for equipment, materials, and supplies until completion of the project and acceptance by County.
6.2.1.5. Claims-Made Coverage. Claim-Made Insurance Coverage - If any part of the Required Insurance is written on a claims-made basis, any policy retroactive date must precede the effective date of this Agreement, and Contractor must maintain such coverage for a period of not less than three years following Agreement expiration, termination or cancellation.
6.3. Additional Insurance Requirements:
The policies will include, or be endorsed to include, as required by this written agreement, the following provisions:
6.3.1. Additional Insured: The General Liability and Business Automobile Liability Policies shall each be endorsed to include Pima County, its departments, districts, boards, commissions, officers, officials, agents, and employees as additional insureds with respect to liability arising out of the activities performed by or on behalf of Contractor.
6.3.2. Subrogation: The General Liability, Business Automobile Liability and Workers’ Compensation Policies shall each contain a waiver of subrogation endorsement in favor of County, its departments, districts, boards, commissions, officers, officials, agents, and employees for losses arising from work performed by or on behalf of Contractor.
6.3.3. Primary Insurance: The Contractor’s policies shall stipulate that the insurance afforded the
Contractor shall be primary and that any insurance carried by County, its agents, officials, or employees shall be excess and not contributory insurance.
6.3.4. Insurance provided by Contractor shall not limit Contractor’s liability assumed under the indemnification provisions of this Contract.
6.4. Notice of Cancellation:
Each Required Insurance policy must provide, and certificates specify, County will receive not less than 30 days advance written notice of any policy cancellation, except 10-days prior notice is sufficient when the cancellation is for non-payment of a premium. Notice shall include the County project or Agreement number and project description.
6.5. Verification of Coverage:
Contractor will furnish County with certificates of insurance as required by this Contract. An authorized representative of the insurer will sign the certificates.
6.5.1. All certificates and endorsements, as required by this Agreement, are to be received and approved by County before work commences. Each insurance policy required by this Agreement must be in effect at, or prior to, commencement of work under this Agreement. Failure to maintain the insurance coverages or policies as required by this Agreement, or to provide evidence of renewal, is a material breach of Agreement.
6.5.2. All certificates required by this Agreement shall be sent directly to the appropriate County
Department. The Certificate of Insurance shall include County project or contract number and project description on the certificate. County reserves the right to require complete copies of all insurance policies required by this Contract at any time.
SAMPLE CONTRACT – Rev. 10/13/22 Page 19 of 58
6.6. Approval and Modifications:
The Pima County Risk Manager may modify the Insurance Requirements at any point during the Term of this Contract. This can be done administratively, with written notice from the Risk Manager and does not require a formal Contract amendment. Neither the County’s failure to obtain a required insurance certificate or endorsement, the County’s failure to object to a non-complying insurance certificate or endorsement, nor the County’s receipt of any other information from the Contractor, its insurance broker(s) and/or insurer(s), constitutes a waiver of any of the Insurance Requirements.
7. Indemnification.
7.1. To the fullest extent permitted by law, Contractor will defend, indemnify, and hold harmless Pima County and any related taxing district, and the officials and employees of each of them (collectively, “Indemnitee”) from and against any and all claims, actions, liabilities, losses, and expenses (including reasonable attorney fees) (collectively, “Claims”) arising out of actual or alleged injury of any person (including death) or loss or damage to tangible or intangible property to the extent caused, or alleged to be caused, in whole or in part, by any negligence, recklessness, intentional, or wrongful act or omission of Contractor or any of Contractor’s directors, officers, agents, employees, volunteers, or Subcontractor. This indemnity includes any claim or amount arising or recovered under the Workers' Compensation Law or arising out of the failure of Contractor to conform to any federal, state or local law, statute, ordinance, rule, regulation or court decree. The Indemnitee will, in all instances, except for Claims arising solely from the negligence, recklessness, intentional, or wrongful acts or omissions of the Indemnitee, be indemnified by Contractor from and against any and all Claims. Contractor is responsible for primary loss investigation, defense and judgment costs for any Claim to which this indemnity applies. This indemnity will survive the expiration or termination of this Contract
7.2. All warranty and indemnification obligations under this Agreement shall survive expiration or termination of the Contract, unless expressly provided otherwise. The Parties agree that any indemnification provision inconsistent with A.R.S. § 34-226 is, in all cases, not void, but will be interpreted and applied as if it were consistent with A.R.S. § 34-226.
7.3. Upon request, Contractor may fully indemnify and hold harmless any private property owner granting a right of entry to Contractor for the purpose of completing the project.
8. Bonding Requirements. Contractor will file payment and performance bonds with County, as required by A.R.S.
§§ 34-610 and 34-611, no later than the time of agreement on the price (or Guaranteed Maximum Price) for any construction under this Agreement.
8.1. Bonds will be submitted on an annual basis for the full value of all construction reasonably anticipated during the Agreement year or may be provided on a Job-Order by Job-Order basis; in the latter case, Contractor will anticipate additional Job Orders and provide bonds in reasonable increments.
8.1.1. If bonds are secured on a Job-Order by Job-Order basis, the Contracting Department will obtain the appropriate bonds from Contractor upon issuance of a Job Order and prior to release of the Purchase Order.
8.2. At no time will the cumulative value of the bonds be less than the total value of the construction performed by Contractor under…