This file package contains the Request for Qualifications (RFQu) and related documents for architectural and engineering services for the DeKalb County Board of Education's Miller Grove High School Facade Repair and Replacement project (Project No. 106-30). The RFQu solicits proposals from qualified A/E firms to provide professional design services for facade evaluation and repair/replacement at the high school facility. The project involves multiple design phases including preliminary consultation, schematic design, design development, and construction documents (30%, 80%, and 100% completion stages) with associated design reviews and permits. The RFQu opens on May 7, 2026, with a pre-submittal conference on May 21, 2026, final questions due May 27, 2026, and the final addendum issued June 3, 2026. The Notice to Proceed (NTP) is anticipated for July 1, 2026, with design completion anticipated by January 3, 2027, and construction anticipated to commence September 10, 2026, extending through November 30, 2028.
Compensation for architectural services is structured as a lump sum with allocations across design phases, sub-consultant costs included in the fee, construction administration services comprising a minimum of 15% of the total fee, and reimbursable expenses included. The Stated Cost Limitation for the project is $13,200.00 as noted in the Mandatory Addendum, though this appears to reference only a portion of total project costs. The project is funded in whole or in part with State Capital Outlay Funds provided by the Georgia Department of Education, requiring compliance with GaDOE rules, guidelines, and the Mandatory Addendum to the Owner/Architect Contract. The architect must maintain Professional Liability Insurance with minimum coverage of $1,000,000 per claim and $1,000,000 in aggregate for projects under $20,000,000 stated cost limitation. All design documents become the property of DCSD upon completion, and the architect is responsible for all consultant coordination, cost estimation, schedule management, construction administration, and compliance with applicable federal, state, and local codes and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQu 26_752_003 Attachments Package.pdf | ||
| RFQu 26_752_003 _ AE Services for Miller Grov.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B - Design Review– Minimum Submittal Requirements
(Stated Cost Limitation Value > $2M)
Version 1.28.14 Page 1 of 11
Preliminary Consultation
The purpose of the Preliminary Consultation is to confirm the existing conditions and requirements and to develop a plan for the work.
1. Review Scope as provided within the RFQu
2. Review Facility Assessment Report
3. Review As-built Documentation/Building Space Survey
4. Code Review
5. Utilities Review
6. Program/Planning Work Sessions
7. Preliminary Presentation
8. Final Submission
Schematic Design - Minimum Submittal Requirements:
The purpose of the Schematic Design is to confirm that the design solution meets the client’s functional needs as defined in the Program for the project. Reviewers focus on site use, layout, adjacency requirements, room sizes, and similar issues.
1. Site plans showing:
a) Adjacent building structures
b) Easements and infrastructure/utilities
c) Topographical features and existing plantings
d) Vehicular and pedestrian site access and flow
e) Landscape/ hardscape plan
f) Grading plan
g) Draft of storm meter management plan (as needed)
h) Preliminary site logistics plan
i) Tree protection plan
2. Floor plans showing:
a) Double line room layouts with door swings
b) Public, private and service circulation
c) Vertical circulation through the facility
d) Program room numbers and corresponding program areas on the plans special features
e) Wall ratings and types
3. Elevations:
a) Identify major elements for facility character
Version 1.28.14 Page 2 of 11
b) Graphical identification of proposed materials with shades and shadows to illustrate depth and volume as well as the contextual relationships to the Owner’s site as appropriate.
4. Cost information showing:
a) Preliminary cost comparisons between schemes, if applicable
b) Cost of special features or phasing premiums
5. A statement of probable construction cost. At a minimum, the cost estimate must address the systems shown below. A breakdown into sub-component systems is encouraged but not required. Each component or sub-component must identify the unit, unit cost, cost per square foot, and the percentage of the total construction cost:
a) General conditions, profit and overhead
b) Site work
c) Foundations
d) Superstructures
e) Exterior closures
f) Roofing
g) Interior construction and finishes
h) Conveying
i) Special construction
j) Fire protection
k) Plumbing
l) HVAC
m) Electrical
n) Controls
o) Communications and security
6. Specifications and Other Information:
a) Include the proposed table of contents
b) Provide an outline specification or narrative indicating materials, types of construction, proposed mechanical systems, plumbing systems, fire protection, security systems, and proposed electrical and life cycle analysis investigations
7. A written narrative of the energy and life cycle analysis investigation.
8. An updated project schedule
9. Any special phasing or sequencing
10. Any testing / analysis
11. Any LEED or sustainable design considerations
12. An updated Space and Functional Program specifically identifying any modifications.
13. Life Cycle Cost Analysis.
Version 1.28.14 Page 3 of 11
Design Development - Minimum Submittal Requirements
In the Design Development Phase, reviewers are looking at methods of construction, materials, building support systems, and choice of products. Design Development requirements are in addition to Schematic Design Requirements.
1. All comments from the Schematic Design Review Process must be incorporated into the Design Development design review submittal or a written narrative explaining in detail why specific comments were not incorporated must be included.
2. Civil Discipline
a) Site Grading and Drainage Plan: Show developed drainage concepts, include existing and new contours, drainage structures (numbered for general reference), and spot grade elevations.
b) Site Utilities Plan: Indicate the plan relationships of existing and proposed utilities. Vertical relationship of the utilities will be noted by plan notations and profiles. Site plan including grading and site utilities, utility connection points, and a storm water management design.
c) Planting Plan: Illustrate the center points at desired spacing of major plantings. A key will explain the proposed form and design characteristics of the plants (large shade tree, flowering ornamental tree, low evergreen shrub, etc.). An existing tree to remain will have an “o” for its center point. A proposed tree will have an “x” for its center point or appropriate legend indicators.
d) Design Details: Show the design or detailing to be used in the site development. These details will clarify the relationship of vertical and horizontal surfaces, steps, walls, and pavements, etc., including edge conditions at adjacent surfaces.
3. Architectural Discipline
a) Site Layout and Materials Plan: Illustrate the design forms and materials to be used. Major dimensions will be indicated. All appearance-related design issues should be addressed, resolved, and shown. LEED and sustainable design and construction should be considered.
b) Dimensioned floor plans indicating structural bay sizes and overall building dimensions. Floor Plan should show dimensions of major elements and final partition locations, including all openings.
c) Exterior and core wall sections showing final dimensional relationships, materials, and component relationships.
d) Floor Plan showing all fixed and loose equipment
e) Large-scale plans and sections
f) Room finish schedule identifying all finishes.
g) Interior and exterior finish and color schedule (exposed finished mechanical and electrical items will be clearly addressed)
h) Building sections.
i) Door and hardware schedule showing door, frame, and fire ratings, if any.
j) Window schedule showing types and sizes.
k) Preliminary development of details.
l) Reflected ceiling plan including ceiling grid, light fixtures, and all devices that penetrate or are mounted upon finished ceiling.
m) Interior movable furniture, office equipment, demountable partitions and system furniture, layouts for all departments and floors, including proposed building signage system.
n) Gross and net area calculations by department to determine compliance with Program of Requirements.
o) A thorough outline technical specification, including selected acceptable manufacturers.
Version 1.28.14 Page 4 of 11
4. Structural Discipline
a) Foundation drawings.
b) Floor plan with all structural members located and sized.
c) Footing, beam, column, and connection schedules.
d) Final floor elevations.
5. Plumbing and Mechanical Disciplines
a) Heating and cooling load calculations for each individual space, including cooling requirements for heat loads generated by office equipment, personal computers, etc.
b) Mechanical equipment schedule indicating size and capacity.
c) Plumbing Fixtures Schedule.
d) Floor plans showing mechanical equipment and plumbing fixtures. All equipment and fixtures should be shown and located.
e) Floor plans that show main ductwork distribution, branch ductwork, and plumbing piping. All ductwork and piping should be located and sized to coordinate with structural framing system.
f) All ceiling-mounted devices should be located.
g) Legend showing all symbols used on drawings.
6. Electrical Disciplines
a) Floor plans locating all power-consuming equipment with a description of the equipment load characteristics.
b) Estimate total electric load, confirm Design Manual required excess capacity.
c) Floor plans showing all major electrical equipment (switchgear, distribution panels, emergency generator, transfer switches, UPS system, etc.), which will be dimensioned and drawn to scale.
d) Site plan showing preliminary site lighting design with pole and fixture type designations.
e) Floor plans showing lighting layout, power, telecommunications, and office automation devices and switches with preliminary circuiting.
f) Estimate interior electrical loads for systems furniture, receptacles, lighting, food service equipment and any other special use areas, etc.
g) Preliminary Distribution Panel Schedules.
7. Cost Information Showing:
a) Relocation costs (temporary and permanent)
b) Contingencies
c) Temporary services
d) Confirm scope and budget
e) Proposed V/E items
8. Other Deliverables
a) Schedule of Spaces: Provide a comparative schedule of spaces arranged in tabular form, listing the building’s various spaces and showing the original square footage allotted in the approved Program for each space. Any deviations from the approved Space and Functional Program, involving square footage or otherwise, must be clearly indicated.
b) Survey and geotechnical information are required as part of the Design Development Documents.
Version 1.28.14 Page 5 of 11
c) Project Specification Manual complete with all Division 01: “General Requirements” sections and technical sections. General Requirements sections unique to the project, such as including temporary facilities and Supplementary Conditions, must be fully developed. With each technical specification section, for each product or material specified, include a photocopy of a cut sheet of the basis of design components and at least two acceptable components specified.
d) Final Life Cycle Cost Analysis.
e) Detailed Cost Estimate building on the estimate previously developed in Schematic Design
f) Information provided outside the initial scope of services and based on subsequent written authorization must be clearly noted.
g) Final site logistics plan showing access, laydown area, traffic re-routing, pedestrian access and flow, fencing, construction parking, etc.
30% Construction Document – Minimal Submittal Requirements
30% Percent Completed Construction Documents deliverables are to include, at a minimum, all Design Development information plus the following:
1. All comments from the Design Development review process must be incorporated into the 30% Construction Document design review submittal or a written narrative explaining in detail why specific comments were not incorporated must be included.
2. Cover Sheet(s)
a) Name and address of Owner, Architect, Project Number
b) Vicinity map
c) Location map
d) Index to all drawings
3. Site Plan
e) Abbreviation and symbol glossary
f) A certified plot plan (sealed by a licensed land surveyor)
g) A grading plan 1’-0” or 2’-0” increments with appropriate sections
h) Sediment control and storm water management plans and profiles
i) Local governing utility standards included in all utility details
j) Standard details must be modified to suit project conditions. All non-applicable information must be deleted.
k) Existing and proposed electrical, gas, sewer, water, storm drainage, telephone and TV cable utilities must be identified.
l) Utility designs must show plan, profile, and all fittings and details required by code and local government standards.
4. Landscape
a) An overall site plan showing plantings, irrigation and drainage system, site lighting, and all site development features
5. Architectural
a) A basic floor plan of the entire facility showing minimal detail with a grid or column reference system showing overall building layout dimensions, core spaces, Owner-numbered or named rooms, room square footage, floor opening penetrations, etc. Fire ratings of all partitions, fire doors, etc., should be clearly denoted.
b) A dimensioned floor plan locating all interior partitions and exterior wall partitions from the grid or column reference system. Floor plan should include room workstation designations, interior and exterior door and window designations.
Version 1.28.14 Page 6 of 11
c) Room wall elevations for all non-typical walls.
d) Casework floor plan complete with schedule, details, and elevations.
e) Interior and exterior window, door and frame schedule, complete with elevations and details for all head, jamb, and sill conditions.
f) Interior and exterior finish and color schedule (exposed finished mechanical and electrical items will be clearly addressed).
g) Details to illustrate transitions between finish materials and construction types. Major building sections in at least two directions. A sufficient number of details to clearly indicate the method of construction for all building components and include, but not be limited to: walls, floors, roofing assemblies, waterproofing systems, insulating systems, interior and exterior finishes, architectural details, interior stairs and elevators.
h) Final locations of major equipment must be shown on the floor plan with associated floor loadings being shown on the structural drawings.
i) Partition-type schedule and section details for all interior, exterior, and floor wall conditions.
j) Roof plan showing all roofing material, roof drains, overflows, access hatches, roof walk pads, roof drainage slopes and elevations, scuppers, skylights, and mechanical and plumbing penetrations. Details must be provided for all edge, parapet, and flashing conditions.
k) All exterior building elevations showing finish materials, exterior door and window openings and designations, lights, louvers, grilles, signage, speakers, and other devices.
l) All structural members included in, or enclosed by the architectural details must be closely coordinated and the size verified by the structural engineer. Details must indicate the framing and furring method wherever appropriate.
m) A reflected ceiling plan showing all grid, access doors, drapery tracks, light fixtures, grills, diffusers, sprinkler heads, security devices, fire alarm devices, intercom system, exit devices and acoustic treatment. Ceiling heights and type should be indicated on the reflected ceiling plan.
n) All mechanical/electrical elements included in or enclosed by the architectural details must be closely coordinated and the size verified by the design engineer. Details must indicate the framing and furring method wherever appropriate.
o) Code Analysis Information such as: fire resistance plans and building code construction type and occupancy information
6. Structural
a) A dimensioned foundation plan showing and locating in plan and in elevation all footing, foundations, foundation piers, caissons, grade beams, reinforcement with all layouts for masonry, and anchor bolts.
b) A dimensioned floor plan for each floor, showing all beams, beam sizes, duct and piping penetrations, construction joints, expansion joints, edge conditions, imbedded anchors and frames thickened slabs, recessed slabs stair penetrations, elevator shafts, floor loading, top of structure elevation and reinforcement.
c) Footing, column, grade beam, caissons, piers, reinforcement, and beam schedules.
d) Dimensioned to scale details showing all conditions, connections, and structural sizes.
e) Shear walls clearly shown on plan and schedule if symbol code is used.
f) Abbreviation and symbol glossary.
g) Fastener/connection schedule.
h) Elevations of all footings, elevations to top of all beams, columns, recesses, and floors.
i) Roof beam plan, elevator hoist beams.
7. Mechanical
Version 1.28.14 Page 7 of 11
a) Abbreviation and symbol glossary.
b) Mechanical equipment schedule.
c) Exterior louver schedule, as coordinated with architectural louvers.
d) Floor plans indicating ductwork with sizes, ductwork mechanical devices, beams for floor above with ductwork penetrations.
e) HVAC plan showing final location of all ceiling-mounted mechanical devices, which include but are not limited to:
diffusers, return air grilles, and thermostats.
f) Floor plans should indicate housekeeping pads and weight of concentrated loads.
8. Plumbing
a) Fixture/connection schedule
b) Abbreviations/symbol glossary
c) Floor plans indicating domestic hot and cold water, storm, waste, vent, and gas piping plans, including all valves, unions, fixtures, pipe sizes, and riser diagrams, etc.
d) Areas of concentrated plumbing equipment (hot water heaters, circulating pumps, etc.) must be enlarged from the basic floor plan to not less than ¼-inch = 1’-0” detail in both plan and section views.
9. Electrical
a) Lighting fixture schedule finalized
b) Lighting control schedule, switches, emergency lighting
c) Power riser diagram for interior lighting systems
d) Abbreviations and symbol glossary
e) Panel schedules with panel locations shown on the floor plan started
f) Fan/motor control schedule/diagram
g) Power riser diagram and main distribution panel layout in large enough scale so each run can be clearly seen.
h) Floor plan indicating wire management wiring for power, receptacles, voice, video and data communications, including circuiting and connections to systems furniture, etc. started
i) Separate plans for power, voice, and data must be provided
j) HVAC plan indicating above-ceiling wiring and circuits for lighting/electrical switches, security, fire alarm, emergency exit lighting and intercom controls, etc. started
k) Main service entrance connection diagram as verified and coordinated with the governing power utility; locations of services entrances and transformers must be verified with the Architect
10. Statement of Probable Construction Cost
a) The cost information reported at the conclusion of the 30% Completed Construction Document Stage must be based upon supportive cost information from the updated detailed cost estimate prepared from the Design Development Documents Stage. The detailed estimate must account for the refined information of quantity or product information adjustments required in the development of the details to construct the design and incorporate the Constructability Review comments.
11. Quality Assurance/Quality Control Coordination
a) All drawing submittal packages are expected to be thoroughly reviewed and coordinated between disciplines utilizing a structured review process in an attempt to minimize changes during construction due to the errors and omissions of the design team. If, during construction, excessive changes due to errors and omissions of the design team are required, the Owner reserves the right to seek reparation for said changes.
Version 1.28.14 Page 8 of 11
80% Complete Construction Documents - Minimum Submittal Requirements
80% Percent Completed Construction Documents deliverables are to include, at a minimum, all 30% Submittal information plus the following:
1. All comments from the 30% Construction Document Review Process must be incorporated into the 80% Construction Document design review submittal or a written narrative explaining in detail why specific comments were not incorporated.
2. Civil
a) All civil documents should be 100% complete.
3. Landscape
a) Details and sections of all site development features, sidewalks, curbs, paving stones, bollards, ramps, exterior stairs, lawn areas showing seeding methods, etc.
b) All landscape conditions should be thoroughly detailed.
c) A symbol glossary
d) Planting schedule
e) Seeding schedule
f) Modify standard details to suit project conditions and delete all non-applicable information
4. Architectural
a) Interior signage locations must be shown on the floor plan complete with details and schedules.
b) Casework floor plan complete with schedule, details, and elevations
c) Interior and exterior window, door and frame schedule, complete with elevations and details for all head, jamb, and sill conditions
d) Completion of all wall sections, enlarged toilet plans, enlarged floor plans, wall elevations, finish/color floor plans, finish/color boards (both interior and exterior)
e) Completion of FF&E plans, and vertical circulation plans and sections
f) Completion of all final roofing and waterproofing details
5. Mechanical
a) Floor plan indicating the sprinkler and standpipe riser systems, including all required pumps and control devices.
b) Fire damper schedule and location of dampers on each floor.
c) Ductwork sound attenuation schedule.
d) Vibration isolation schedule.
e) Terminal control box schedule with electrical and air volume requirements.
f) Chilled water, condenser, refrigerant, fuel oil, steam and gas riser piping floor plans and riser diagrams, and schematics, including pipe sizes. Piping schematics must be in large enough scale to clearly indicate all control devices, valves, unions, and miscellaneous appurtenances.
g) Areas of concentrated mechanical equipment must be enlarged from the basic floor plan to not less than ¼-inch = 1’- 0”, illustrating detailed ductwork and equipment within the mechanical room in both plan and section views; coil access and filter access are to be shown to scale as verification of clearance.
h) Access doors – both wall and ceiling, must be called out at each applicable location as coordinated with the architectural drawings (rated where applicable).
Version 1.28.14 Page 9 of 11
i) Duct/piping penetrations of all walls, floors, roofs, beams, columns, and foundations must be coordinated with and verified by the structural engineer. Code complying fire-stopping must be detailed for penetrations through fire-rated assemblies.
j) Locate on the floor plans all controls system equipment and provide a panel and device schedule, indicator and panel graphics complete with sequence of operation and control system program diagram.
6. Plumbing
a) Piping and insulation jacket dimensions are to be coordinated with architectural finishes and casework; all exposed piping is to be verified with the Architect.
b) Plan drawing of all water and sanitary branch piping for installation of interior equipment and fixtures.
c) Typical piping riser schematics for all gravity flow piping systems.
d) Access panels, doors, and provisions in both walls and ceilings are to be shown on floor plans for all valves, cleanouts, and caps, etc.
e) Connections to existing and new building utilities must be clearly shown. Requirements of governing utilities must be determined and clearly detailed and shown. Connection details and elevations must be checked and coordinated with applicable civil drawings.
f) Design details
g) Piping penetrations of all walls, floors, roofs, beams, columns, and foundations must be coordinated with and verified by the structural engineer. Code complying fire-stopping must be detailed for penetrations through fire-rated assemblies.
7. Electrical
a) Lighting fixture schedule completed
b) Lighting control schedule, switches, emergency lighting completed
c) Panel schedules with panel locations shown on the floor plan completed
d) Floor plan showing location of all fire alarm device/panel schedule, indicator graphics, riser diagram including activated hardware and pull stations. Confirm activated hardware with hardware schedule.
e) Floor plan showing location of all intercom devices, panel schedule and location, and program riser diagram.
f) Floor plan showing location of all security devices, panel schedule and locations, and riser diagram.
g) Floor plan showing location of all intercom and TV outlets and devices.
h) Telephone board schedule and riser diagram coordinated to equipment size requirements and connection provisions with the governing telephone utility and Owner requirements.
i) TV terminal/splitter and riser diagram coordinated as to equipment size requirements and connection provisions to antenna and cable TV system.
j) Floor plan indicating wire management wiring for power, receptacles, voice, video and data communications, including circuiting and connections to systems furniture, etc. completed
k) Floor plan indicating power connections to all mechanical equipment.
l) Power and lighting plans indicating above-ceiling wiring and circuits for lighting/electrical switches, security, fire alarm, emergency exit lighting and intercom controls, etc. completed
m) Areas of concentrated electrical equipment, and electric vault rooms in particular, must be enlarged from the basic floor plan to not less than ¼-inch = 1’-0” and must be shown in plan and elevation.
n) Sheet notes must be applicable to each sheet. Standard notes and details must be modified to specific conditions.
Version 1.28.14 Page 10 of 11
o) Access to systems must be verified. Doors, panels or other provisions must be called out in all wall and ceiling locations for junction boxes, controls, or any other device requiring access.
p) Raceway penetrations of all walls, floors, roofs, beams, columns, and foundations must be coordinated with and verified by the structural engineer. Code complying fire-stopping must be detailed for penetrations through fire-rated assemblies.
q) A dimensioned floor plan showing wire management system with openings located for voice data, video and electrical and outlet locations. This is more typically done by the electrical engineer
8. Statement of Probable Construction Cost
a) The cost information reported at the conclusion of the 80% Completed Construction Document Stage must be based upon supportive cost information from the updated detailed cost estimate prepared from the 30% Completed Documents Stage. The detailed estimate must account for the refined information of quantity or product information adjustments required in the development of the details to construct the design and incorporate the Constructability Review comments.
9. Quality Assurance/Quality Control Coordination
a) All drawing submittal packages are expected to be thoroughly reviewed and coordinated between disciplines utilizing a structured review process in an attempt to minimize changes during construction due to the errors and omissions of the design team. If, during construction, excessive changes due to errors and omissions of the design team are required, the Owner reserves the right to seek reparation for said changes.
10. Other Deliverables
a) Commissioning final plan
b) Updated project schedule
100% Complete Construction Documents - Minimum Submittal Requirements
1. Submittal for 100% complete documents will be the same as the 80% submittal requirements with all appropriate 80% review comments from the Owner incorporated within the drawings and specifications.
2. All comments from the 80% Construction Document Review Process must be incorporated into the 100% Construction Document design review submittal or a written narrative explaining in detail why specific comments were not incorporated.
Review, Comment and Approval Submissions to DCSD:
1. Schematic Design Phase (Preliminary Design Submittal for GaDOE)
2. Design Development Phase
3. 30% Construction Documents Phase (Check Set Submittal for GaDOE)
4. 80% Construction Documents Phase
5. 100% Construction Documents Phase (Final Submittal for GaDOE)
Building Permit
1. Submit for Building Permit
2. Submit for L.D. Permit
3. Incorporate Permit Review Comments
Version 1.28.14 Page 11 of 11
Bid Negotiations
1. Bid Period
2. Pre-Bid Conference
3. Negotiations & Award
4. Begin Construction
Phasing (as appropriate)
(List Phasing as appropriate
DeKalb County School District Educational Specifications
High School Grades 9 to 12 Version: 3/30/2018
E20133310 Typewritten Text
APPENDIX C
High School Grades 9 to 12
HS
1 Core Academics 9th to 12th Grade
2 Special Education
3 Performing & Visual Arts
4 Career, Technology & Agricultural Education
5 Media Center (FTE +300)
6 Physical Education
7 Cafeteria & Kitchen (FTE +300)
8 Administration & Counseling
9 Building Services
10 Auditorium
Subtotal
Circulation, common areas, etc. at 35%
Total
11 Outdoor Spaces
12 Parking
IU : Instructional Unit FTE: Full Time Equivalent SF: Square Feet
Space Summary 9-12
94 IU / 1800 FTE
Total
63,650
9,300
16,270
25,800
9,180
47,590
15,970
8,710
9,470
11,010
IU
72,079
278,019
113 IU / 2200 FTE 119 IU / 2300 FTE
48,250
18,225
25,800
10,700
342,610
129 IU / 2500 FTE
Proposed Spaces
IU
Total
79,350
10,900
Total
82550
11,300
Total
88650
13,300
IU
328,529
IU
9,710
11,310
11,010
243,355
85,174
18,100
18,775
205,940
NOTE: This document outlines the DeKalb County School District's intended designs for its high schools. These Educational Specifications address core size standards (i.e., physical education, kitchen, cafeteria, and media center), the program or distribution of classroom types (i.e., general classrooms, special education spaces, career tech labs, etc.), the size of the classrooms and other spaces, provision of athletic facilities, and parking requirements, etc. for a new high school. Please note that these educational specifications are for the construction of a new high school. For other improvements, such as an addition to an existing high school, these educational specifications will provide general guidance or “targets” to the architects of record for these type of projects.
374,807
10,760
13150
11,010
277635
97,172
23,550
33,100
11700
52,690
19,725
10,160
12230
11,010
253785
88,825
21,030
25,800
11100
49,830
Operations Division, Design Construction Department 1 of 7 VERSION: 3/30/2018
IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total
1.1 9th to 12th Grade Classroom 41 41 800 32,800 49 49 800 39,200 52 52 800 41,600 58 58 800 46,400
1.2 Science Lab 11 11 1,300 14,300 13 13 1,300 16,900 14 14 1,300 18,200 16 16 1,300 20,800
1.2a Science Prep Room / Storage 6 200 1,100 7 200 1,300 7 200 1,400 8 200 1,600
1.3 World Language Classroom 4 4 800 3,200 5 5 800 4,000 6 6 800 4,800 7 7 800 5,600
1.4 Other Classroom 6 6 800 4,800 11 11 800 8,800 9 9 800 7,200 4 4 800 3,200
1.5 In School Suspension 1 1 800 800 1 1 800 800 1 1 800 800 1 1 800 800
1.6 Teacher/Team Planning 7 400 2,800 9 400 3,600 9 400 3,600 11 400 4,400
1.7 Flexible Learning Area / "Break-out" Space 14 200 2,800 17 200 3,400 18 200 3,600 21 200 4,200
1.8 Instructional Materials/ Secured Storage 7 150 1,050 9 150 1,350 9 150 1,350 11 150 1,650
Core Academics 9-12 Subtotal 63 63,650 79 79,350 82 82,550 86 88,650
IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total
2.1 Special Ed Classroom 8 8 800 6,400 9 10 800 8,000 10 10 800 8,000 11 11 800 8,800
2.1a Bathroom (assisted toileting) 2 100 200 2 100 200 3 100 300 3 100 300
2.2 Home Living Center / Life Skills / Independent Living
2 2 1,200 2,400 2 2 1,200 2,400 2 2 1,200 2,400 3 3 1,200 3,600
2.3 Small Group / Tutor / Resource Room 1 150 150 1 150 150 2 150 300 2 150 300
2.4 Storage / Book Room 1 150 150 1 150 150 2 150 300 2 150 300
Special Education 9-12 Subtotal 10 9,300 11 10,900 12 11,300 14 13,300
Proposed Spaces
129 IU / 2500 FTE
Special Education 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Core Academics 9-12 94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE
Operations Division, Design Construction Department 2 of 7 VERSION: 3/30/2018
IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total
3.1 Band classroom 1 1 2,200 2,200 1 1 2,200 2,200 2 2 2,200 4,400 2 2 2,200 4,400
3.1a Office 1 150 150 1 150 150 2 150 300 2 150 300
3.1b Storage 1 400 400 1 400 400 2 400 800 2 400 800
3.2 Orchestra classroom 1 1 2,200 2,200 1 1 2,200 2,200 1 1 2,200 2,200 1 1 2,200 2,200
3.2a Office 1 150 150 1 150 150 1 150 150 1 150 150
3.2b Storage 1 400 400 1 400 400 1 400 400 2 400 800
3.3 Choir classroom 1 1 1,800 1,800 1 1 1,800 1,800 1 1 1,800 1,800 1 1 1,800 1,800
3.3a Office 1 150 150 1 150 150 1 150 150 1 150 150
3.3b Storage 1 150 150 1 200 200 1 200 200 1 200 200
3.4 Keyboarding Classroom 1 1 800 800 1 1 800 800 1 1 800 800 1 1 800 800
3.5 Practice Room 4 80 320 5 80 400 6 80 480 7 80 560
3.6 Dance Classroom 1 1 2,000 2,000 1 1 2,000 2,000 1 1 2,000 2,000 2 2 2,000 4,000
3.7 Drama Classroom (Black Box)* 1 2,000 2,000 1 1 2,000 2,000 1 1 2,000 2,000 1 1 2,000 2,000
3.8a Visual Arts Classroom 2D 2 2 1,600 3,200 3 3 1,600 4,800 3 3 1,600 4,800 3 3 1,600 4,800
3.8b Visual Arts Storage / Workroom 1 200 200 1 300 300 2 200 400 2 220 440
3.8c Kiln Room 1 150 150 1 150 150 1 150 150 1 150 150
Visual & Performing Arts 9-12 Subtotal 7 16,270 9 18,100 10 21,030 11 23,550
IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total
4.1 Business and Computer Science Lab 2 2 1,650 3,300 2 2 1,650 3,300 2 2 1,650 3,300 2 2 1,650 3,300
4.1a Office 1 150 150 1 150 150 1 150 150 1 150 150
4.1b Storage 1 150 150 1 150 150 1 150 150 1 150 150
4.2 Family and Consumer Science Lab 2 2 2,250 4,500 2 2 2,250 4,500 2 2 2,250 4,500 2 2 2,250 4,500
4.2a Multi-Use room 1 150 150 1 150 150 1 150 150 1 150 150
4.2b Storage 1 150 150 1 150 150 1 150 150 1 150 150
4.3 Engineering and Technology Lab 2 2 2,600 5,200 2 2 2,600 5,200 2 2 2,600 5,200 3 3 2,600 7,800
4.3a Classroom 2 800 1,600 2 800 1,600 2 800 1,600 3 800 2,400
4.3b Workroom 2 400 800 2 400 800 2 400 800 3 400 1,200
4.3c Storage 2 200 400 2 200 400 2 200 400 3 200 600
4.4 Jr. ROTC Classroom 2 2 1,250 2,500 2 2 1,250 2,500 2 2 1,250 2,500 3 3 1,100 3,300
4.4a Office 2 150 300 2 150 300 2 150 300 2 150 300
4.4b Storage 1 200 200 1 200 200 1 200 200 1 200 200
4.4c Range 1 1,400 1,400 1 1,400 1,400 1 1,400 1,400 1 1,400 1,400
4.5 Optional CTAE Pathways (average size) 2 2 2,500 5,000 2 2 2,500 5,000 2 2 2,500 5,000 3 3 2,500 7,500
CTAE 9-12 Subtotal 10 25,800 10 25,800 10 25,800 13 33,100
Career, Technology & Agriculture Education 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Visual & Performing Arts 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Operations Division, Design Construction Department 3 of 7 VERSION: 3/30/2018
IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total
5.1 Reading Room 1 1 5,200 5,200 1 1 6,400 6,400 1 1 6,600 6,600 1 1 6,900 6,900
5.1a Office with Shared Restroom 2 150 300 2 150 300 2 150 300 2 150 300
5.1b Conference (seat 12) 2 200 400 2 200 400 3 200 600 3 200 600
5.1c A. V. Production & Storage 1 900 900 1 900 900 1 900 900 1 900 900
5.1d Small Group Project Rooms / Tutoring 4 120 480 5 120 600 5 120 600 5 120 600
5.1e Projects Laboratory / Maker Space 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000 1 1,100 1,100
5.1f Workroom / Storage 1 500 500 1 500 500 1 500 500 1 500 500
5.1g Secure Storage 2 200 400 3 200 600 3 200 600 4 200 800
Media Center 9-12 Subtotal 1 9,180 1 10,700 1 11,100 1 11,700
IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total
6.1 Gymnasium with raised track/mezannine 1 1 22,000 22,000 1 1 22,000 22,000 1 1 22,000 22,000 1 1 22,000 22,000
6.1a Auxiliary Gymnasium 1 8,000 8,000 1 8,000 8,000 1 8,000 8,000 1 8,000 8,000
6.1b Locker Rooms 2 1,400 2,800 2 1,450 2,900 2 1,500 3,000 2 1,600 3,200
6.1c Student restrooms and showers 2 800 1,600 2 850 1,700 2 900 1,800 2 950 1,900
6.1d Office / Bathroom: PE teachers & Coaches 9 180 1,620 11 180 1,980 12 180 2,160 14 180 2,520
6.1e Storage (multiple space, not broken out) 1 2,000 2,000 1 2,100 2,100 1 2,200 2,200 1 2,400 2,400
6.1f Laundry 1 170 170 1 170 170 1 170 170 1 170 170
6.1g Training 1 400 400 1 400 400 1 400 400 1 400 400
6.2 Multipurpose/Fitness Room 1 2,400 2,400 1 2,400 2,400 1 2,400 2,400 1 2,400 2,400
6.2a Multipurpose/Wrestling Room 1 2,400 2,400 1 2,400 2,400 1 2,400 2,400 1 2,400 2,400
6.2b Weight Room 1 2,000 2,000 1 2,000 2,000 1 2,000 2,000 2 2,000 4,000
6.3 Health Classroom 2 2 1,100 2,200 2 2 1,100 2,200 3 3 1,100 3,300 3 3 1,100 3,300
Physical Education 9-12 Subtotal 3 47,590 3 48,250 4 49,830 4 52,690
Media Center 9-12 (FTE + 300)
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Physical Education 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
DCSD Standard SF Target = 1.25 x GaDOE Minimum
Operations Division, Design Construction Department 4 of 7 VERSION: 3/30/2018
IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total
7.1 Cafeteria/Student seating area 1 9,800 9,800 1 11,700 11,700 1 12,200 12,200 1 13,100 13,100
7.1b Table & Chair Storage 2 300 600 2 325 650 2 350 700 2 375 750
7.2 Kitchen 1 2,000 2,000 1 2,100 2,100 1 2,100 2,100 1 2,100 2,100
7.2a Serving Area 1 1,400 1,400 1 1,500 1,500 1 1,500 1,500 1 1,500 1,500
7.2b Dry Goods Storage 1 500 500 1 500 500 1 500 500 1 500 500
7.2c Cooler/Freezer 1 900 900 1 900 900 1 900 900 1 900 900
7.2d Dish Wash Area 1 350 350 1 350 350 1 350 350 1 350 350
7.2e Kitchen Mgr. Office 1 200 200 2 150 300 2 150 300 2 150 300
7.2f Restroom/ Locker Room 1 200 200 1 200 200 1 200 200 1 200 200
7.2g Exterior Can Wash 1 20 20 1 25 25 1 25 25 1 25 25
School Nutrition 9-12 Subtotal 15,970 18,225 18,775 19,725
IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total
8.01 Reception Lobby 1 600 600 1 700 700 1 800 800 1 900 900
8.02 Principal's Office with conference space,closet, restroom
1 460 460 1 460 460 1 460 460 1 460 460
8.03 Assistant Principal Office 4 300 1,200 5 300 1,500 5 300 1,500 5 300 1,500
8.04 Conference Room 2 300 600 3 300 900 3 300 900 3 300 900
8.05 Office (Bookkeeper, Secretary, Attendance) 3 150 450 3 150 450 3 150 450 3 150 450
8.06 Mail/Work/Copy Room 1 500 500 1 500 500 1 500 500 1 500 500
8.07 Administrative Storage (Supplies,General Storage) 2 200 400 2 200 400 2 200 400 2 200 400
8.08 Faculty Lounge with two restrooms 1 900 900 1 900 900 1 900 900 1 900 900
8.09 Health Clinic with supply closet and rest room 1 500 500 1 500 500 1 500 500 1 500 500
8.10 Records /Testing Vault Storage 1 150 150 1 150 150 1 150 150 1 150 150
8.11 Guidance Counselor's Office 6 150 900 7 150 1,050 8 150 1,200 9 150 1,350
8.11a Reception / Waiting for Counseling / Library 1 250 250 1 250 250 1 300 300 1 350 350
8.12 SRO Office 1 150 150 1 150 150 1 150 150 2 150 300
8.13 Flex Offices 11 150 1,650 12 150 1,800 13 150 1,950 14 150 2,100
Administration & Counseling 9-12 Subtotal 8,710 9,710 10,160 10,760
DCSD Standard SF Target = Cafeteria :1.4 x GaDOE Minimum; Kitchen: 1.3 x GaDOE
Cafeteria & Kitchen 9-12 (FTE + 300)
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Administration & Counseling 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Operations Division, Design Construction Department 5 of 7 VERSION: 3/30/2018
IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total IU Quan. SF Total
9.1 Battery Restrooms 10 650 6,500 12 650 7,800 13 650 8,450 14 650 9,100
9.2 Custodial Closet 11 70 770 13 70 910 14 70 980 15 70 1,050
9.3 Storage 11 200 2,200 13 200 2,600 14 200 2,800 15 200 3,000
Building Services 9-12 Subtotal 0 9,470 0 11,310 0 12,230 0 13,150
IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total
10.1 Auditorium with area for band 1 6,200 6,200 1 6,200 6,200 1 6,200 6,200 1 6,200 6,200
10.1a Stage 1 1,500 1,500 1 1,500 1,500 1 1,500 1,500 1 1,500 1,500
10.1b Dressing Room with Restroom 2 250 500 2 250 500 2 250 500 2 250 500
10.1c Costume Storage 2 250 500 2 250 500 2 250 500 2 250 500
10.1d Scene Shop and Storage (exterior loading access) 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000
10.1e Control Room / Panel Room 1 250 250 1 250 250 1 250 250 1 250 250
10.2 Lobby 1 660 660 1 660 660 1 660 660 1 660 660
10.2a Ticketing 1 100 100 1 100 100 1 100 100 1 100 100
10.2b Concessions 1 300 300 1 300 300 1 300 300 1 300 300
Auditorium 9-12 Subtotal 0 11,010 0 11,010 0 11,010 0 11,010
Building Services 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTEAuditorium 9-12
Proposed Spaces
94 IU / 1800 FTE
Operations Division, Design Construction Department 6 of 7 VERSION: 3/30/2018
IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total IU Quantity SF Total
11.1 Outdoor Classroom 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000
11.2 Art patio 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000 1 1,000 1,000
11.3 Softball with Dugout 1 65,000 65,000 1 65,000 65,000 1 65,000 65,000 1 65,000 65,000
11.4 Baseball with Dugout 1 160,000 160,000 1 160,000 160,000 1 160,000 160,000 1 160,000 160,000
11.5 Turf Practice Field for football, soccer; 8 lane track
with shot, discus, long jump
1 140,000 140,000 1 140,000 140,000 1 140,000 140,000 1 140,000 140,000
11.6 Tennis 4 4,800 19,200 4 4,800 19,200 4 4,800 19,200 4 4,800 19,200
11.7 JROTC Pad 1 10,000 10,000 1 10,000 10,000 1 10,000 10,000 1 10,000 10,000
11.8 Marching Band practice area (in parking lot) 1 1 1 1
11.9 Additional grassed field (if site permits) 1 84,240 84,240 1 84,240 84,240 2 84,240 84,240 2 84,240 84,240
Outdoor Physical Education 9-12 Subtotal
Target : 6 spaces per IU
Minimum: 4 spaces per IU
Parking 9-12
Outdoor Spaces 9-12
Proposed Spaces
94 IU / 1800 FTE 113 IU / 2200 FTE 119 IU / 2300 FTE 129 IU / 2500 FTE
Operations Division, Design Construction Department 7 of 7 VERSION: 3/30/2018
DCSD Design Guidelines
VERSION 2018.04.04
Design Guidelines for Facility Construction
VERSION 2018.04.04
Department of Design and Construction Operations Division
Sam Moss Service Center 1780 Montreal Road
Tucker, GA 30084
E20133310 Typewritten Text Appendix D
These Design Guideline requirements reflect DeKalb County
School District’s (DCSD) experience in building and operating schools. They are provided to assist Design Professionals in preparing contract documents for new schools, additions, and renovation projects.
The aim is to balance the need for instructional functionality with aesthetics, accessibility, operability, sustainability, and security so that all students, staff, and community members feel welcome and safe.
The Design Guideline requirements are organized in sixteen (16) divisions similar to the Master Format industry standard specification divisions. Technical specifications for each DCSD project shall be prepared by and be the legal responsibility of the Design Professional of Record. This document serves as a guideline to the project designer of minimum performance standards and expectations the District has for school construction. They are not intended to be complete technical specifications. The Design
Professional shall be responsible for incorporating these requirements into the appropriate contract documents. Any deviation from these guidelines must be approved in writing by DCSD staff.
All requirements noted shall be assumed to apply to every school type, unless specifically noted. DCSD or its designee shall be solely responsible for establishing and maintaining the DeKalb County School
District Design Guidelines.
Design Professionals shall coordinate use of these Design Guideline requirements with related documents and regulations, including, but not limited to:
Georgia Department of Education (GaDOE) Architectural Review Documents: GaDOE requires that Construction Documents for DCSD projects comply with GaDOE standards and be submitted for formal review. These standards and review requirements are posted on the
GADOE Facilities Services Resources website: http://www.GaDOE.org/Finance‐and‐Business‐
Operations/Facilities‐Services/Pages/Facilities‐Services‐Resources.aspx. Drawing submittals require coordination with the current GADOE “Curriculum and Space Needs” form for each project. These forms will be provided by GADOE through the DCSD Program Manager.
Georgia Department of Education (GDOE) Grants Administration Documents: At projects where
GADOE will provide funding, additional documentation is required. These documents are also posted on the GADOE Facilities Services Resources website.
The following DeKalb County School District (DCSD) guiding documents are posted on the DCSD website
(www.dekalbschoolsga.org):
Local Five‐Year Facilities Plan
DeKalb County School District (DCSD) Educational Specifications: Educational Specifications provide descriptions of typical programmed spaces for each of the three main types of schools:
Elementary, Middle and High. These Design Guidelines describes construction requirements applicable to all types of schools.
DIVISION 1 – GENERAL
01.01 Facility Planning
1. Grades to be Housed: Typical new schools in the DeKalb County School District shall be designed to house the following grade levels:
a. Elementary: Kindergarten (K), First (1st), Second (2nd), Third (3rd), Fourth (4th) and
Fifth (5th) grades.
b. Middle: Sixth (6th), Seventh (7th) and Eighth (8th) Grades.
c. High: Ninth (9th), Tenth (10th), Eleventh (11th) and Twelfth (12th) Grades.
2. Building Capacity: The District’s Planning Department will determine the Full Time Equivalent
(FTE) Capacity for new schools in the DeKalb County School District.
3. Building Core: The “core” consists of ancillary spaces that support the classroom instructional spaces. These include the Cafeteria, Kitchen and Media Center. The GADOE has issued rules setting forth minimum floor areas for such spaces, based upon FTE. Thus, provision for expansion must begin with planning for a “core” large enough to support the largest practical
FTE contemplated for a given site. Typical new schools in the DeKalb County School District shall be designed with the following core capacity:
a. Elementary Future FTE: plan for minimum 40% increase
b. Middle Future FTE: plan for minimum 30% increase
c. High Future FTE: plan for minimum 25% increase
4. Future Expansion: Any new design for DCSD facilities should be configured with future growth in mind, to allow for expansion with a minimum amount of alteration of the original structure or site. For new buildings or major additions, indicate area for future expansion on the architectural site plan.
01.02 Room Numbers
DeKalb County School District requires incorporation of a single room numbering system for all drawings, schedules and signage installed on the building, including: All architectural submittal drawings
1. GADOE Inventory Drawings
2. Door and Finish Schedules
3. HVAC Equipment, Automated Temperature Controls and Energy Systems
4. Signage on the building
To achieve this, the Architect shall develop a logical building and room numbering system at the
Schematic Planning stage. The sequence of room numbers shall be assigned based on ease of locating rooms in the completed building. In order to direct students, staff and visitors, the sequence shall start at the Main Entrance and progress in a logical sequence throughout the building. Random numbering of rooms is not acceptable.
Room numbers shall be all numeric as required for GADOE Inventory. Major room numbers at multi‐ story buildings shall be 4 digits starting with the floor level, and progress around the building in sequence (Room number 1211 indicates 1st floor, 2nd wing or Corridor, 11th room). Small spaces within major rooms or suites shall be identified with the major room number plus numeric suffix (# 1211.1).
VERSION 2018.04.04
Where possible use whole thousands for wings or corridors (1200) and use postal odd‐even progressive numbers down corridors (odd on right (1211), even on left (1212). All spaces must be numbered including corridors, stairs, elevators, and service rooms. Stairs, elevator and service rooms may be numbered as a suffix of the corridor leading to them. One story buildings shall be similar, but may use 3 digits when identification of the story is not needed. Room numbers at additions shall extend existing
Inventory Drawing numbers without repeats.
Architect shall present building and room numbering system to DCSD for review and approval before incorporating them into the construction documents. After room numbers are approved they shall not be casually altered without specific approval of DCSD Facilities Services Department. See Division 10 ‐
Room Signage.
01.03 GADOE Inventory Drawings
For all new buildings and additions, the Architect shall prepare Inventory Drawings. These documents are required by the GADOE for the Local Facility Plan, and are used by DCSD for convenient reference.
Inventory Drawing standards include:
Deliver the Inventory Drawings to DCSD, formatted and saved in AutoCAD 2010.
The following layer list should be used:
1. Building walls shall be drawn in a simplified 2‐D drawing format using Auto CAD and show only the net exposed surface of walls. (i.e., no hatching or interior chases)
2. Show windows as a single Cyan Line without spandrels or sills.
3. Show doors and swing as single lines similar to walls without thresholds or heads.
4. Eliminate unnecessary detail features which may interfere with the readability of text at the prescribed sheet size.
5. Identify all spaces, including corridors, stairs, elevators, and service rooms, with room name, room number and net area.
6. Standard sheet size = 11” x 17” without border
7. Do not use more than one sheet per floor level.
VERSION 2018.04.04
8. All text must be readable without magnification when printed on 11” x 17 sheet. Use following Fonts and colors to better distinguish room identification:
Font styles:
9. Net Room Areas shall be calculated based on the inside face of walls.
10. Gross building areas shall be calculated to the exterior surface of exterior walls. Do not include overhangs.
11. Provide separate area calculations for mechanical mezzanines and canopies.
12. Text shall be individually positioned for each space for best readability.
13. Additions shall be identified with a yellow phantom line border and a title box showing
GADOE Building Number, Year when first occupied, and Gross Area.
14. Refer to typical existing Inventory Drawings for required Schedules, Tables and overall
Format.
01.04 Fire Evacuation Plans
For all new buildings and additions, the Design Professional shall prepare evacuation plans in accordance with DeKalb County Fire Marshal regulations. Upon construction completion, these plans will be mounted on interior walls throughout the facility to direct building occupants to exits.
1. For phased projects, intermediate evacuation plans are required for each phase.
2. Plans shall show simplified floor plan in black, with exit routes in red, on white background.
3. Deliver the Fire Evacuation Plans to DCSD in .pdf format at 11” X 17”.
4. To properly mount the plans, the Design professional shall specify a protective acrylic frame, and locate mounting locations for contractor to install.
01.05 Proprietary Specifications
1. Technical Specifications shall generally be performance‐based and include a minimum of 3 acceptable manufacturers actively bidding in Georgia. These shall be reviewed by DCSD or its designee in order to confirm acceptability.
2. It is the desire of DeKalb County School District to utilize proprietary specifications for items for which there are less than three acceptable manufacturers or for items for which new purchases must be of the same manufacturer as existing to achieve…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .