BioEPIC CM-GC RFQ SH1018-2018 Add 03.doc
DOC document 47 KB Posted
- Solicitation number
- RFQSH1018-2018
- Issued by
-
Department of Energy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BioEPIC CM-GC RFQ SH1018-2018 Add 04.doc | DOC document | |
| BioEPIC CM-GC Pre-Q Response Form_01.29.20.xlsx | XLSX spreadsheet | |
| BioEPIC CM-GC RFQ SH1018-2018 Add 02.doc | DOC document | |
| BioEPIC CM-GC RFQ SH1018-2018 Add 01.doc | DOC document | |
| BioEPIC CM-GC Pre-Qualification Notice_01.15.20.docx | DOCX document | |
| BioEPIC CM-GC Rep-Cert.docx | DOCX document | |
| BioEPIC CM-GC Pre-Q Response Form_01.15.20.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ No. SH1018-2018 Addendum No. 03 Lawrence Berkeley National Laboratory 01/29/20 RFQ No. SH1018-2018 Addendum No. 03 Lawrence Berkeley National Laboratory 01/29/20
ADDENDUM NO. 03
GENERAL
The following information, changes, modifications, corrections, clarifications, additions and/or deletions as set forth herein shall apply to the above referenced Request For Qualification (RFQ) package and shall be made a part thereof and be subject to all of the requirements as though originally specified and/or shown.
You must acknowledge receipt of all RFQ Addenda received by itemizing them by number and date on your Prequalification Response form.
1. Is it permissible to include more than two (2) relevant projects under Factor 7? If so, what is the maximum number of projects we are allowed to include?
Answer: Yes. Potential Offerors should provide information and details on at least two (2) but not more than ten (10) Relevant Projects (as defined in the Prequalification Notice) successfully completed by the offeror within the last eight years. The attached BioEPIC CM-GC Prequalification Response form revised 01/29/20 is expanded to allow potential Offerors to complete a separate block for up to ten (10) Relevant Projects. Potential Offerors may submit the Prequalification Response form dated 01/15/20 unless they submit information and details on more than two (2) Relevant Projects.
Desirable Performance Features and Supplier Attributes Factor 7 is deleted in its entirety and replaced with the following:
Factor 7 - The Offeror should have successfully completed at least two new construction contracts as the General Contractor (Relevant Projects) defined as:
· Completed within the last eight years, and
· Similar in type, scope, size, and complexity as the proposed subcontract, and
Similar in type, scope, size, and complexity shall mean a facility at least 50,000 GSF, including:
· Both wet and dry laboratory space,
· Warm and cold rooms for research, and
· Office and support space for researchers and program managers and administrators
Successfully completed shall mean the Owner’s Representative of the Relevant Projects would attest that the Offeror’s performance met or exceeded the Owner’s requirements and objectives with respect to:
· Schedule,
· Safety,
· Cost,
· Quality,
· Lower-tier subcontractor management, and
· Small business subcontracting
The Offeror should include in its Prequalification Response information and details of at least two but not more than ten (10) Relevant Projects successfully completed by the Offeror, and include current contact information for owner’s representative(s) knowledgeable of and authorized and willing to disclose and discuss details of the Relevant Projects, including achievement of schedule, safety, cost, quality, lower-tier subcontractor management, and small business subcontracting requirements and objectives, and the overall performance of the Offeror on that Relevant Project. The Offeror should also provide information on problems encountered on the identified contracts and the corrective action taken.
Attachments: BioEPIC CM-GC Pre-Q Response Form_01.29.20
END OF ADDENDUM NO. 03