BioEPIC CM-GC Pre-Q Response Form_01.15.20.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- RFQSH1018-2018
- Issued by
-
Department of Energy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BioEPIC CM-GC RFQ SH1018-2018 Add 04.doc | DOC document | |
| BioEPIC CM-GC RFQ SH1018-2018 Add 03.doc | DOC document | |
| BioEPIC CM-GC Pre-Q Response Form_01.29.20.xlsx | XLSX spreadsheet | |
| BioEPIC CM-GC RFQ SH1018-2018 Add 02.doc | DOC document | |
| BioEPIC CM-GC RFQ SH1018-2018 Add 01.doc | DOC document | |
| BioEPIC CM-GC Pre-Qualification Notice_01.15.20.docx | DOCX document | |
| BioEPIC CM-GC Rep-Cert.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Q Response Form
| PREQUALIFICATION RESPONSE FORM |
| (Enter information only in the green cells.) |
Subcontract Information
| Title and Location of Subcontract | BioEPIC CM-GC |
| One Cyclotron Road | |
| Berkeley, California | |
| Solicitation No. | PREQUALIFICATION SH1018-2018 |
| OFFEROR's Point of Contact (representative of firm that is empowered to speak on contractual and policy matters and that the University can contact for additional information) |
| Name and Title of Contact | Name and Title | |
| Name of OFFEROR | OFFEROR name | |
| Address | address 1 | |
| Address | address 2 | |
| Telephone No. of Contact | XXX-XXX-XXXX | |
| Fax No. | ###-###-#### | |
| E-Mail Address of Contact | E-Mail Address | |
| DUNS Number | ######### | |
| OFFEROR's Permanent Local Office (if different from Point of Contact information above) |
| Name and Title of Local Office Officer | Name and Title | |
| Name of OFFEROR | OFFEROR name | |
| Address | address 1 | |
| Address | address 2 | |
| Telephone No. of Local Office Officer | XXX-XXX-XXXX | |
| Fax No. | ###-###-#### | |
| E-Mail Address of Local Office Officer | E-Mail Address | |
| DUNS Number | ######### | |
| RFQ ADDENDA ACKNOWLEDGEMENT |
Addenum No. Addendum Name Addendum Date
MINIMUM REQUIREMENTS
1 OFFEROR's current and active California Contractors State License Board (CSLB) Class B Contractor’s License No. (See attached CA CSLB license abstract screenshot) No. ###### Class B
2 Offeror's evidence of Payment and Performance Bonding Capacity See attached evidence from Offeror's surety
3 Offeror's compliant Injury and Illness Prevention Program (IIPP) See attached IIPP
4 Offeror's evidence of ability to provide compliant Insurance Coverage See attached letter or sample certificate from insurance carrier
5 Offeror's eligibility for receiving new federal government prime contracts or subcontracts; Determination by LBNL that the Offeror is not on a restricted, sanctioned, or denied party list for export controls through a search performed via Descartes Visual Compliance See attached completed and signed Representations and Certifications form
6 Offeror's permanent local office within a 75-mile radius of the project site See OFFEROR's Permanent Local Office information above
Factor 7 - PAST PERFORMANCE
Provide information and details on at least two (2) Relevant Projects (as defined in the Prequalification Notice) successfully completed by the offeror within the last eight years. Complete a separate block for each Relevant Project.
| OFFEROR name | |||
| 7.a | [Period of Performance] [Year Completed] | 4.b Relevant Project Name and Location | Size (SF and $) and Description of Project -- Building Systems, LEED accreditation, Special Features, etc. |
| Project Owner Name | Project Owner Contact Name, Title | name@email.com | |
| 123-456-7890 | |||
| Discuss the degree to which the following owner's requirements and objectives were met on this Relevant Project: | |||
| a | Schedule |
b Safety c Cost d Quality e Lower-tier subcontractor management f Small business subcontracting g Discuss problems encountered and corrective actions taken:
| OFFEROR name | |||
| 7.b | [Period of Performance] [Year Completed] | 4.c Relevant Project Name and Location | Size (SF and $) and Description of Project -- Building Systems, LEED accreditation, Special Features, etc. |
| Project Owner Name | Project Owner Contact Name, Title | name@email.com | |
| 123-456-7890 | |||
| Discuss the degree to which the following owner's requirements and objectives were met on this Relevant Project: | |||
| a | Schedule |
b Safety c Cost d Quality e Lower-tier subcontractor management f Small business subcontracting g Discuss problems encountered and corrective actions taken:
| OFFEROR name | |||||
| 8 | OFFEROR's Satisfactory Safety Record (enter YES or NO in green box, unless otherwise indicated) | ||||
| (a) See attached written substantiation from the Offeror's Workers Compensation agent of Offeror's EMR for the past three years. | Year | Year | Year | ||
| EMR | EMR | EMR | |||
| (b) See attached written explanation satisfactory to the University of the circumstances associated with any EMR greater than 1.0 | YES | NO |
(c) Has the Offeror been cited for any Cal-OSHA violations over the past five years? See attached for any YES responses. YES NO
(d) Has the Offeror been cited for any Serious, or Willful, or Repeated, or Failure to Abate violations over the past 5 years? See attached for any YES responses. YES NO
9 Does the Offeror have experience developing and implementing a successful and effective Construction Jobsite Safety Incentive Program? See attached example of its successful and effective Construction Jobsite Safety Incentive Program. YES NO
| Discuss: | |
| a | It's elements… |
b What specific behavior, actions, conditions, and results the program was intended to incentivize… c How the incentive helped achieve the desired results… d How the program was monitored and evaluated, and how well the program achieved the desired results… e Price of the program…
10 Does the Offeror have experience developing and successfully implementing a Small Business Subcontracting Plan (SBSP) containing the elements, goals, and assurances set forth in Paragraph (d) of FAR Clause 52.219-9, Small Business Subcontracting Plan, and FAR Clause 52.219-8, Small Business Utilization? See two attached printed examples of Offeror's semi-annual Individual Subcontracting Report (ISR) and semi-annual Summary Subcontracting Report (SSR) submitted via the on-line Electronic Subcontracting Reporting System (eSRS) for one or more of its Relevant Projects YES NO
11 Does the Offeror have adequate financial resources to perform the potential resulting subcontract, or the ability to obtain them? See attached description of the Offeror’s current financial condition and its financial ability to fully support performance of the proposed subcontract. YES NO
| 12 | (a) Work completed by a surety last 5 years | See attached for any YES responses. | YES | NO |
| (b) Termination for default notices last 5 years | YES | NO | ||
| (c) Contract performance current litigation | YES | NO |
&"-,Bold"&20PROCUREMENT SENSITIVE LAWRENCE BERKELEY NATIONAL LABORATORY Prequalification SH1018-2018 - BioEPIC CM-GC rev 01.15.20 &A page &P of &N mailto:name@email.commailto:name@email.com
File details come from the government source that posted it. Updated .