This document is a Questions and Answers record from a pre-bid conference for Construction Services related to the U.S. Embassy's Chancery-Annex Connectivity Line project at Natun Bazar Metro Station. The conference occurred on August 24, 2024, with key discussions covering technical specifications for a connectivity infrastructure project. Significant details include: the Metro Rail Transit (MRT) authority will handle road excavation, contractors must use mild steel conduits with specific joining methods, and a pit will be 2100 mm deep with a cover capable of withstanding 7 metric tons of load.
Critical project requirements include: contractors will pull cables through provided conduits, conduct cable continuity tests, remove old cables from existing pits, use a sump pump during construction for groundwater drainage, and increase sand filling quantity to 200 cubic meters. The proposal submission deadline remains unchanged, and contractors must separately mention VAT/Tax in their submissions. The Embassy will supply all cables, and the project involves connectivity infrastructure installation between the Chancery and Annex facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mod. RFQ PR15426539_Construction for Chancery-Annex Connectivity Relocation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Questions and Answers Addressed during the pre-bid conference on August 24, Here are the questions and answers addressed during pre-bid conference and site visit on the
Construction Services for the relocation of U.S. Embassy’s Chancery-Annex Connectivity Line located at Natun Bazar Metro Station Construction Site which was scheduled for August 24, 2025
1. Will the contractor excavate the road?
Ans: No. MRT authority will excavate road and walkway and will redo.
2. How will the conduit / pipe sections be joined?
Ans: Mild steel conduits must be fitted using sockets, unions, and necessary accessories and painted.
Protective mild steel pipe sections must be joined end-to-end using welding and painted.
3. Availability of union and socket for conduit joining?
Ans: Contractors should do a market survey for this. Those fittings can be fabricated in the workshop.
4. Should contractors provide a sump pump for the pit?
Ans: Contractor should use sump pump to drain out ground water during construction period. A permanent sump pump in the pit is not required.
5. How much will be depth of the Pit?
Ans: 2100 mm
6. Where will the pit location be?
Ans: Physically shown to the contractors.
7. Quantity of sand filling in line item #8 Back filling the trenches with fine sand is 50 cubic meter which is too small.
Ans: Line item #8 is to prepare bed to install conduit infrastructure. Complete back filling will be carried out by the Metro Authority. Quantity is increased to 200 cubic meters which is reflected in the amended solicitation.
8. Should the contractor need to supply any cable?
Ans: No. Embassy will supply all cables. Contractor will pull the cable through the conduits.
9. Should the contractor provide confirmation about cable continuity after completion?
Ans: Yes. There will be tests of continuation of the cables before and after installation.
10. How strong should the pit cover be?
Ans. Inner pit cover will be lock and key system and upper / outer pit cover will be capable to withstand 7 metric tons of load at the middle.
11. Can proposal submission deadlines be extended?
Ans: No. proposal submission due date will remain unchanged.
12. Should contractors need to include VAT/Tax?
Ans: Yes. This should be separately mentioned.
13. Can the contractor use HDD method for road cutting?
Ans: MRT authority will handle road excavation work. It is up to them how they will do it.
14. Should contractors pull out old cables from the pit inside Annex and Chancery?
Ans: Yes.