This is a Request for Qualifications (RFQ) issued by the Lake Winnipesaukee Alliance in collaboration with the Town of Tuftonboro and the New Hampshire Department of Environmental Services (NHDES) for engineering design services related to stormwater management and erosion control at Melvin Wharf Road in Tuftonboro, New Hampshire. The project seeks qualified engineering firms to develop comprehensive stormwater management designs, including a topographic survey, drainage system analysis, permitting documentation, conceptual designs, and final bid-ready design packages with plans, specifications, and construction cost estimates. The primary objective is to mitigate beach erosion caused by road drainage runoff through installation of a trench drain system, bioretention area, and replacement of an existing culvert, with anticipated environmental benefits of reducing sediment and nutrient loading to Melvin Bay by 154 pounds per year of total suspended solids and 0.3 pounds per year of total phosphorus. The RFQ was released on April 4, 2025, with questions due by April 14, 2025, proposals due by April 30, 2025 at 5:00 p.m. ET, and an anticipated final selection and firm notification by May 12, 2025. The project is expected to be completed by August 1, 2025, and no site visit or bidder's conference is mentioned in the documentation.

No specific budget amount or pricing terms are stated in the RFQ. No set-asides, incumbent contractors, or renewal options are identified. The project is funded through grant mechanisms requiring selected firms to certify compliance with State and Federal rules related to grant-funded projects and to be eligible to receive federal funding. The RFQ represents Phase 1 of the Moultonborough Bay Watershed Management Plan Implementation, which is part of over ten years of watershed improvement efforts by the Lake Winnipesaukee Alliance to address nutrient loading that currently exceeds 300 percent of natural background levels and has resulted in Lake Winnipesaukee being listed on the NHDES 303(d) list as impaired for aquatic life use. Selection will be based on qualifications packages evaluated according to three criteria: specialized experience of the project team (50 percent weight), project personnel qualifications and experience (25 percent weight), and project approach (25 percent weight). The top two to three ranked firms may be invited for interviews at the review committee's discretion before final selection.

View the file

Other files

File Type Posted
RFQL DES 2025-11.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P.O. Box 1624, Meredith, NH 03253 (603) 581-6632 www.winnipesaukee.org mail@winnipesaukee.org

Request for Qualifications Issued by the Lake Winnipesaukee Alliance for

Moultonborough Bay Watershed Management Plan Implementation Phase 1:

Stormwater Management and Control Designs for Melvin Wharf Road, Tuftonboro

April 8, 2025 http://www.winnipesaukee.org/

Table of Contents Table of Contents I. Required Qualifications Suubmissions II. Project Team and Level of Participation III. Project Approach/Scope of Work IV. Project Schedule V. Selection CriteriaA VI. Request for Qualifications (RFQ) Inquiries VII. Time Line VIII. Disclaimer Attachment I - Scope of Work Guidance Introduction and Background Scope of Sercvice ......................................................................................... Error! Bookmark not defined.7 Melvin Wharf Road BMP Concepts 8

Moultonborough Bay WMP Implementation Phase 1 RFQ Page 3 of 7

REQUEST FOR QUALIFICATIONS

Stormwater Management and Control Designs for

Melvin Wharf Road, Tuftonboro, NH April 8, 2025

The Lake Winnipesaukee Alliance is seeking proposals from qualified engineering firms to provide design services for stormwater management and erosion control measures at Melvin Wharf Road, Tuftonboro to reduce polluted stormwater runoff and nutrient loading to Lake Winnipesaukee.

I. Required Qualifications Submissions

Each engineering firm will submit a qualifications package to the Lake Winnipesaukee Alliance (LWA) that will include the following components as described in detail below:

• Cover letter indicating a primary contact for the qualifications package and that person's title, address, phone number, and email address. The cover letter should include relevant professional certifications (e.g., Professional Engineer, Certified Wetland Scientist, etc.).

• Description of the firm and qualifications, and a summary of directly-relevant work experience of the respondent. Responses must address how the respondent meets the desired qualifications;

please consult Section V - SELECTION CRITERIA (below) for additional guidance.

• List of references including names, titles, contact information. These will preferably be clients for whom similar work has been performed within the past five (5) years.

• The project team, including project team organization, team member qualifications and the anticipated level of involvement of key team members.

• A technical proposal that describes the firm’s scope of work, estimated costs and proposed schedule.

Complete and timely submittal of all required documents is mandatory for the qualifications package to be considered.

Each firm will submit the qualifications package as a PDF via email to Pat Tarpey at ptarpey@winnipesaukee.org by close of business on April 30, 2025.

The Lake Winnipesaukee Alliance (LWA), Town of Tuftonboro, and NHDES will review the submitted qualification packages. After the qualifications-based ranking is complete, the top two to three ranked engineering firms may be invited for an interview if desired by the review committee. After the interview process, the LWA and Town of Tuftonboro will select the engineering firm, and the LWA will proceed with drafting a contract with the firm.

mailto:ptarpey@winnipesaukee.org

Moultonborough Bay WMP Implementation Phase 1 RFQ Page 4 of 7

II. Project Team and Level of Participation

The qualifications package will identify the individuals responsible for managing the project and conducting specific project tasks. The qualifications package will also include an estimate for the expected level of participation in the project tasks and in the overall project.

III. Project Approach/Scope of Work

Attachment I provides Scope of Work Guidance to assist in the development of the scope of work, and demonstration of qualifications.

IV. Project Schedule

The respondent will provide a schedule to complete the work. The schedule will include project tasks as identified in the Scope of Work. It is expected that this project will be completed by August 1, 2025.

V. Selection Criteria

Selection will be based on the qualifications package. Respondents will be assessed based on the following criteria.

1. Specialized Experience of the Project Team (50 Percent)

(a) overall experience directly related to the successful implementation of similar projects that include planning, drainage analysis, engineering, and working with diverse stakeholders to achieve project goals

(b) demonstrated ability to work with municipal government (town boards, public works officials, etc.), state government (NHDES, etc.), local residents, nonprofit groups, universities, and other stakeholders in New Hampshire

(c) experience and willingness to work with existing data, such as municipal GIS layers, LIDAR, etc.

(d) demonstrated ability to complete the work within the required schedule

(e) demonstrated ability to effectively solicit, assess, and use comments and suggestions from stakeholders during project development

(f) experience designing structural stormwater BMPs

2. Project Personnel (25 Percent) The respondent will be rated on the principal team member’s role and participation level, project management effectiveness, and the qualifications and experience of key personnel, their communication abilities, and availability during the project.

• Project Manager 15 Percent

• Task Managers 10 Percent

3. Project Approach (25 Percent) The respondent will be rated on the approach to the project scope outlined in this RFQ, the understanding of the project scope and schedule of work and the interfacing of tasks.

VI. Request for Qualifications (RFQ) Inquiries The LWA will not respond to telephone inquiries about the RFQ. Questions concerning this RFQ must be submitted via email to LWA at: ptarpey@winnipesaukee.org (Pat Tarpey) mailto:ptarpey@winnipesaukee.org

Moultonborough Bay WMP Implementation Phase 1 RFQ Page 5 of 7

Questions must be submitted by 5:00pm ET April 14, 2025, and must have the Subject Line: "Melvin Wharf Road Stormwater Control Measures RFQ Question". If you have a question, please follow this procedure so as to ensure consistency of answers. Any information obtained by speaking one-on-one with a project partner is not considered an official response for the purposes of this process.

A digest version of all questions and answers will be emailed to everyone that submits a question.

Additional persons wishing to receive the digest version of all questions and answers should request a copy via email by contacting Pat Tarpey, ptarpey@winnipesaukee.org (Subject: "Melvin Wharf Road Stormwater Control Measures RFQ Digest Request"). The LWA shall distribute the Q&A Digest by April 16, 2025.

Upon completion of ranking qualifications packages, the LWA, in consultation with the project team will negotiate with the top-ranked firm for contract scope and price. The negotiated contract will be based on fair and reasonable compensation for the services required.

VII. Timeline

April 4, 2025 RFQ Release April 14, 2025 Deadline for submittal of questions on RFQ (5:00pm ET) April 16, 2025 Q&A Digest emailed to those requesting a copy April 30, 2025 Deadline for receipt of proposals to RFQ (5:00pm ET) May 12, 2025 Final selection of engineering firm and notification (anticipated) to all firms

VIII. Disclaimer

This Request for Qualifications does not commit the Lake Winnipesaukee Alliance (LWA) to award a contract or pay any costs incurred during the preparation of the qualifications package. The LWA and Town of Tuftonboro reserve the right to reject any or all of the proposals for completing this work for any reason allowable by law.

The LWA and Town of Tuftonboro also reserve the right to eliminate the need for the selected firm to complete one or more tasks, pending the outcome of preceding related tasks or issues.

To participate in the project and receive payment, the selected firm will be required to enter into a contract which stipulates that the contractor is eligible to receive federal funding, and certifies compliance with State and Federal rules related to grant funded projects.

Moultonborough Bay WMP Implementation Phase 1 RFQ Page 6 of 7

Attachment I – Scope of Work Guidance

Melvin Wharf Road Stormwater Management and Control Designs

April 4, 2025

Introduction and Background

This project builds on more than ten years of effort by the Lake Winnipesaukee Alliance to improve, protect and restore the water resources within Lake Winnipesaukee's watershed. Nutrient loading to Lake Winnipesaukee is over 300% natural background levels, which has led to the lake being listed on the NHDES 303(d) list as impaired for aquatic life use. A direct relationship exists between increased levels of nutrients in the lake and aquatic plant and algal growth, and cyanobacteria abundance. Only through continued implementation of watershed management practices to reduce sediment and nutrient loading to the lake, will we succeed in the long-term protection of Winnipesaukee.

Sources of pollution in the watershed impacting the lake’s water quality include stormwater runoff from developed areas, shoreline erosion, gravel roads, improperly functioning septic systems, and more. The 2020 Moultonborough Bay and Winter Harbor Watershed Management Plan identified 107 sites contributing excess nutrient loading to Lake Winnipesaukee. This project will implement stormwater control measures at one of the sites identified in the plan, resulting in a reduction of sediment and nutrient loading to Moultonborough Bay, Lake Winnipesaukee.

Moultonborough Bay WMP Implementation Phase 1 RFQ Page 7 of 7

SCOPE OF SERVICES

The anticipated scope of work will include development of designs and final bid package for stormwater control measures on Melvin Wharf Road, Tuftonboro. Conceptual designs are reviewed with the Town of Tuftonboro and LWA before final designs and bid packages are developed. Final bid documents will include plans, specifications, and construction cost estimates needed in order for the Town to bid the projects.

Description:

Site MoB 1-06A: Melvin Wharf Road, Tuftonboro, NH

There is beach erosion from Melvin Wharf Road drainage, that flows over the beach and erodes the sand into the lake.

The intent is to install a trench drain to collect runoff from the road terminus and roadside ditch with conveyance to a new best management practice, i.e. bioretention area. The bioretention area will have a raised outlet to retain and infiltrate stormwater while providing overflow to pipe for erosion resistant conveyance of larger storms.

The project also involves replacing an existing old buried culvert for conveyance of larger storms not infiltrated in the bioretention area.

Mitigation of this site is estimated to reduce sediment and nutrient loading to Melvin Bay by 154 lbs./yr. of total suspended solids and 0.3 lbs./yr. of total phosphorus.

Tasks

Task 1: A licensed land surveyor will perform a topographic survey and furnish a base plan of existing conditions for Melvin Wharf Road, Tuftonboro.

Task 2: The engineering firm will analyze the overall drainage system along Melvin Wharf Road and provide a report to LWA.

Task 3: The engineering firm will prepare documentation required for Shoreland Permitting and Wetlands Permitting with NHDES as part of any set of bid documents.

Task 4: The engineering firm will draft conceptual designs for stormwater control measures on Melvin Wharf Road incorporating information gathered from the survey, site walk, and abutter information.

Conceptual designs are reviewed by LWA and the Town of Tuftonboro.

Task 5: The engineering firm will develop final designs based on input and feedback from the LWA and Town of Tuftonboro. Final designs will include a basic set of bid documents (plans, specifications, and construction cost estimates). Final design bid packages are submitted to NHDES for approval.

Table of Contents
I. Required Qualifications Submissions
II. Project Team and Level of Participation
III. Project Approach/Scope of Work
IV. Project Schedule
V. Selection Criteria
VI. Request for Qualifications (RFQ) Inquiries
VII. Timeline
April 4, 2025 RFQ Release
VIII. Disclaimer
Introduction and Background