RFQ905101-01 - Exhibit E - Existing Elevations.pdf

PDF 426 KB Posted

Attached to
Iowa Law Enforcement Academy Office Cement Siding Replacement
Solicitation number
RFQ905101-01
Issued by
Warren County, Iowa

About this file

This is an Existing Elevations document prepared for the Iowa Law Enforcement Academy Office Cement Siding Replacement project by InVision Architecture on behalf of the Iowa Department of Administrative Services. The document provides architectural elevation drawings for Building 4640 located at 7105 NW 70th Avenue in Johnston, Iowa. The existing structure, designated for renovation, features multiple floor levels including a ground floor at -10' to -11' 4", a first floor at 0' 0", a second floor at 10' 4", and a roof at 20' 8", with construction dates ranging from 1968 to 1971. The elevation drawings depict four primary exterior views: East Elevation, West Elevation, Partial North Elevation (two sections), and South Elevation, all drawn at a scale of 3/32" = 1'-0". The document includes detailed panel designations (E01 through E26) and references architectural sheet A2.01 through A5.04, indicating which specific siding panels are included in the replacement scope. Two addenda were issued on April 17, 2019, and April 25, 2019, to clarify project scope modifications.

The elevation drawings identify panels highlighted in red as those included in the cement siding replacement scope, with certain panels on specific elevations noted as removed from the project requirements. The document serves as a critical reference for bidders to understand the extent and location of existing siding conditions that require replacement, enabling accurate material quantification and installation planning. The drawing set was finalized on May 21, 2019, and integrated into the Phase 2 Construction Documents package. This file provides the essential visual and dimensional information necessary for contractors to prepare comprehensive quotes and execution plans for the siding replacement work under the RFQ 905101-01.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST FLOOR

0' - 0"

T.O. 1968 14' - 8"

T.O. BRICK 1968

12' - 8"

1968 GROUND FLOOR

-11' - 4"

1968 STORAGE

-14' - 0"

1968 T.O.W. STORAGE

-5' - 4"

181312119875321

ROOF 1971 DORM

20' - 8"

1971 SECOND FLOOR

10' - 4"

1971 GROUND FLOOR

-10' - 4"

14 15 16 174 19 216 10 20

A2.02

A2.02

A5.03

A5.03

E03

E03

E03

E03

E01 E02

E04

E09

E06

E11

L-1

E12

E04

E05

E04 A2.02 6 Sim

A5.01

AD1.11

AD1.11

E07

E08

E10E10

E04

E13 E14

E15 E11 E15

E13

E11

E13

A3.02

FIRST FLOOR

0' - 0"

T.O. 1968 14' - 8"

T.O. BRICK 1968

12' - 8"

1968 GROUND FLOOR

-11' - 4"

18 13 12 11 9 8 7 5 3 2 1

ROOF 1971 DORM

20' - 8"

1971 SECOND FLOOR

10' - 4"

1971 GROUND FLOOR

-10' - 4"

14151617 41921 610

E26

A2.02

E-4

E-4

E-8E-8E-8E-8E-8E-8

E-9E-9E-9E-9

A5.04

E13E02 E14

E01

E-5 E-5 E-5

E16E17

E18

E19

E02

E20 E13

E11

E11E04

FIRST FLOOR

0' - 0"

T.O. 1968 14' - 8"

T.O. BRICK 1968

12' - 8"

1968 GROUND FLOOR

-11' - 4"

1968 STORAGE

-14' - 0"

HG J

E22

E23

E25

A5.04A5.04

E04

E11E02

E24

E26

E11

FIRST FLOOR

0' - 0"

A A'BCEF

ROOF 1971 DORM

20' - 8"

1971 SECOND FLOOR

10' - 4"

1971 GROUND FLOOR

-10' - 4"

D

ELEVATION (GROUND FLOOR)

NOT IN TRUE

E16

E01E02

E16

E16

E14E16

E16

E16 E11

E14E01E02

E16

E16

E04

FIRST FLOOR

0' - 0"

C E F

1971 SECOND FLOOR

10' - 4"

1971 GROUND FLOOR

-10' - 4"

D

A3.01

E18

E19

E16 E16

E16

E04

E01E02

E21 E17

5' - 4"

8'

0"

ADD

ADD

ADD

ADD

PLANNING ARCHITECTURE INTERIORS

Copyright C 2019

OWNER SIGN-OFF:

REVISIONS:

DATE

SHEET:

NAME

SHEET NAME:

PROJECT NO:

DATE:

SHEET SET:

303 Watson Powell Jr.

Way

Suite 200

Des Moines, Iowa 50309

515.633.2941

515.633.2942 Fax

www.invisionarch.com

CONSULTANT:

S H

E E T

R E S P

O N

S

IB

IL

IT

Y

/2

/2

:5

:1

P M

W

D e s M o in e s

P ro je c ts

IL

E A

O ff ic e D o rm

B ld g

R e n o

D ra w

M o d e lin g

IL

E A

R

C o n st ru c ti o n .r v t

A2.01

IL

E A

O F F

IC

E A

N D

D O

R M

B U

IL

D

IN

G

R E N

O V

A

TI

O N

B

LD

G

B

U R

M A

R O

A D

N W

TH

A

V E

J O

H N

S

TO

N

IA

IO

W

A D

E P

A R

TM

E N

T O

F A

D M

IN

IS

TR

A

TI

V

E S

E R

V

IC

E S

05.20.2019

EXTERIOR ELEVATIONS

18114

PHASE 2 -

CONSTRUCTION

DOCUMENTS

IMEG CORP.

SAUL ENGINEERING

BISHOP ENGINEERING

DCI GROUP

MEP ENGINEER

STRUCTURAL ENGINEER

CIVIL ENGINEER

CONSTRUCTION

IN

IT

IA

L!

3/32" = 1'-0"1 EAST ELEVATION

3/32" = 1'-0"2 WEST ELEVATION

3/32" = 1'-0"4 PARTIAL NORTH ELEVATION - 1

3/32" = 1'-0"5 SOUTH ELEVATION

1/8" = 1'-0"3 PARTIAL NORTH ELEVATION - 2

Description Date No.

ADD 1 4/17/2019 1

ADD 2 4/25/2019 2

HOME PAGE

Panels Highlighted in red are included in this scope

Michael Callout Panels only on this elevation have been removed.

File details come from the government source that posted it. Updated .