RFQ905101-01 - Exhibit E - Existing Elevations.pdf
PDF 426 KB Posted
- Solicitation number
- RFQ905101-01
- Issued by
- Warren County, Iowa
About this file
This is an Existing Elevations document prepared for the Iowa Law Enforcement Academy Office Cement Siding Replacement project by InVision Architecture on behalf of the Iowa Department of Administrative Services. The document provides architectural elevation drawings for Building 4640 located at 7105 NW 70th Avenue in Johnston, Iowa. The existing structure, designated for renovation, features multiple floor levels including a ground floor at -10' to -11' 4", a first floor at 0' 0", a second floor at 10' 4", and a roof at 20' 8", with construction dates ranging from 1968 to 1971. The elevation drawings depict four primary exterior views: East Elevation, West Elevation, Partial North Elevation (two sections), and South Elevation, all drawn at a scale of 3/32" = 1'-0". The document includes detailed panel designations (E01 through E26) and references architectural sheet A2.01 through A5.04, indicating which specific siding panels are included in the replacement scope. Two addenda were issued on April 17, 2019, and April 25, 2019, to clarify project scope modifications.
The elevation drawings identify panels highlighted in red as those included in the cement siding replacement scope, with certain panels on specific elevations noted as removed from the project requirements. The document serves as a critical reference for bidders to understand the extent and location of existing siding conditions that require replacement, enabling accurate material quantification and installation planning. The drawing set was finalized on May 21, 2019, and integrated into the Phase 2 Construction Documents package. This file provides the essential visual and dimensional information necessary for contractors to prepare comprehensive quotes and execution plans for the siding replacement work under the RFQ 905101-01.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR
0' - 0"
T.O. 1968 14' - 8"
T.O. BRICK 1968
12' - 8"
1968 GROUND FLOOR
-11' - 4"
1968 STORAGE
-14' - 0"
1968 T.O.W. STORAGE
-5' - 4"
181312119875321
ROOF 1971 DORM
20' - 8"
1971 SECOND FLOOR
10' - 4"
1971 GROUND FLOOR
-10' - 4"
14 15 16 174 19 216 10 20
A2.02
A2.02
A5.03
A5.03
E03
E03
E03
E03
E01 E02
E04
E09
E06
E11
L-1
E12
E04
E05
E04 A2.02 6 Sim
A5.01
AD1.11
AD1.11
E07
E08
E10E10
E04
E13 E14
E15 E11 E15
E13
E11
E13
A3.02
FIRST FLOOR
0' - 0"
T.O. 1968 14' - 8"
T.O. BRICK 1968
12' - 8"
1968 GROUND FLOOR
-11' - 4"
18 13 12 11 9 8 7 5 3 2 1
ROOF 1971 DORM
20' - 8"
1971 SECOND FLOOR
10' - 4"
1971 GROUND FLOOR
-10' - 4"
14151617 41921 610
E26
A2.02
E-4
E-4
E-8E-8E-8E-8E-8E-8
E-9E-9E-9E-9
A5.04
E13E02 E14
E01
E-5 E-5 E-5
E16E17
E18
E19
E02
E20 E13
E11
E11E04
FIRST FLOOR
0' - 0"
T.O. 1968 14' - 8"
T.O. BRICK 1968
12' - 8"
1968 GROUND FLOOR
-11' - 4"
1968 STORAGE
-14' - 0"
HG J
E22
E23
E25
A5.04A5.04
E04
E11E02
E24
E26
E11
FIRST FLOOR
0' - 0"
A A'BCEF
ROOF 1971 DORM
20' - 8"
1971 SECOND FLOOR
10' - 4"
1971 GROUND FLOOR
-10' - 4"
D
ELEVATION (GROUND FLOOR)
NOT IN TRUE
E16
E01E02
E16
E16
E14E16
E16
E16 E11
E14E01E02
E16
E16
E04
FIRST FLOOR
0' - 0"
C E F
1971 SECOND FLOOR
10' - 4"
1971 GROUND FLOOR
-10' - 4"
D
A3.01
E18
E19
E16 E16
E16
E04
E01E02
E21 E17
5' - 4"
8'
0"
ADD
ADD
ADD
ADD
PLANNING ARCHITECTURE INTERIORS
Copyright C 2019
OWNER SIGN-OFF:
REVISIONS:
DATE
SHEET:
NAME
SHEET NAME:
PROJECT NO:
DATE:
SHEET SET:
303 Watson Powell Jr.
Way
Suite 200
Des Moines, Iowa 50309
515.633.2941
515.633.2942 Fax
www.invisionarch.com
CONSULTANT:
S H
E E T
R E S P
O N
S
IB
IL
IT
Y
/2
/2
:5
:1
P M
W
D e s M o in e s
P ro je c ts
IL
E A
O ff ic e D o rm
B ld g
R e n o
D ra w
M o d e lin g
IL
E A
R
C o n st ru c ti o n .r v t
A2.01
IL
E A
O F F
IC
E A
N D
D O
R M
B U
IL
D
IN
G
R E N
O V
A
TI
O N
B
LD
G
B
U R
M A
R O
A D
N W
TH
A
V E
J O
H N
S
TO
N
IA
IO
W
A D
E P
A R
TM
E N
T O
F A
D M
IN
IS
TR
A
TI
V
E S
E R
V
IC
E S
05.20.2019
EXTERIOR ELEVATIONS
18114
PHASE 2 -
CONSTRUCTION
DOCUMENTS
IMEG CORP.
SAUL ENGINEERING
BISHOP ENGINEERING
DCI GROUP
MEP ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
CONSTRUCTION
IN
IT
IA
L!
3/32" = 1'-0"1 EAST ELEVATION
3/32" = 1'-0"2 WEST ELEVATION
3/32" = 1'-0"4 PARTIAL NORTH ELEVATION - 1
3/32" = 1'-0"5 SOUTH ELEVATION
1/8" = 1'-0"3 PARTIAL NORTH ELEVATION - 2
Description Date No.
ADD 1 4/17/2019 1
ADD 2 4/25/2019 2
HOME PAGE
Panels Highlighted in red are included in this scope
Michael Callout Panels only on this elevation have been removed.
File details come from the government source that posted it. Updated .